3 9-10 300 304.8 1 114.872 3.00 309540.703 3.28083989501E-07 1.58
HEADER
Page 1 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
4 PUMP SUCTION
5 PUMP DISCHARGE
Page 2 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
PUMP HEADER TO
6
TOWER RISER SUPPLY
Page 3 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Page 4 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
GROUND FLOOR 63-64 PIPE 250 254.5 2 103.372 4.10 333605.865 3.92927308448E-07 2.03
1ST FLOOR 65-66 PIPE 250 254.5 2 98.012 5.00 316307.879 3.92927308448E-07 1.93
Page 5 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
2ND FLOOR 67-68 PIPE 250 254.5 2 94.402 7.00 304657.556 3.92927308448E-07 1.86
3RD FLOOR 69-70 PIPE 250 254.5 2 90.672 4.00 292619.965 3.92927308448E-07 1.78
4TH FLOOR 71-72 PIPE 250 254.5 2 87.220 3.00 281479.545 3.92927308448E-07 1.72
5TH FLOOR 73-74 PIPE 250 254.5 2 83.772 3.80 270352.035 3.92927308448E-07 1.65
6TH FLOOR 75-76 PIPE 250 254.5 2 80.322 3.50 259218.070 3.92927308448E-07 1.58
7TH FLOOR 77-78 PIPE 250 254.5 2 76.872 3.50 248084.105 3.92927308448E-07 1.51
8TH FLOOR 79-80 PIPE 250 254.5 2 73.422 3.50 236950.140 3.92927308448E-07 1.44
Page 6 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
9TH FLOOR 81-82 PIPE 250 254.5 2 70.291 3.50 226845.663 3.92927308448E-07 1.38
10TH FLOOR 83-84 PIPE 250 254.5 2 67.160 3.50 216741.186 3.92927308448E-07 1.32
11TH FLOOR 86-87 PIPE 200 202.7 2 63.980 3.50 259244.190 4.93339911199E-07 1.98
12TH FLOOR 88-89 PIPE 200 202.7 2 60.800 3.50 246358.968 4.93339911199E-07 1.89
13TH FLOOR 90-91 PIPE 200 202.7 2 57.620 3.50 233473.746 4.93339911199E-07 1.79
14TH FLOOR 92-93 PIPE 200 202.7 2 54.440 3.50 220588.523 4.93339911199E-07 1.69
15TH FLOOR 94-95 PIPE 200 202.7 2 51.260 3.50 207703.301 4.93339911199E-07 1.59
Page 7 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
16TH FLOOR 96-97 PIPE 200 202.7 2 48.080 3.50 194818.079 4.93339911199E-07 1.49
17TH FLOOR 98-99 PIPE 200 202.7 2 44.900 3.50 181932.856 4.93339911199E-07 1.39
18TH FLOOR 100-101 PIPE 200 202.7 2 41.720 3.50 169047.634 4.93339911199E-07 1.29
19TH FLOOR 102-103 PIPE 200 202.7 2 38.600 3.50 156405.529 4.93339911199E-07 1.20
20TH FLOOR 104-105 PIPE 200 202.7 2 35.480 3.50 143763.424 4.93339911199E-07 1.10
21TH FLOOR
106-107 PIPE 200 202.7 2 32.360 3.80 131121.319 4.93339911199E-07 1.00
PENTHOUSE
MEZ. FLOOR 108-109 PIPE 200 202.7 2 30.690 4.60 124354.551 4.93339911199E-07 0.95
Page 8 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
ROOF LEVEL 2 111-112 PIPE 150 154.1 2 26.770 5.13 142680.387 6.4892926671E-07 1.44
AHU TAPPING
Page 9 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
AHU RETURN
BALANCING CONTROL
134-135 100 102.3 1 16.400 2.00
VALVE
TOWER RETURN TO
10
HEAT EX. HEADER
Page 10 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Page 11 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Note :
Pr. Loss for Pipe (Pa) = λ x l/d x 1/2 ρc2 Pump Affinity Law
q1/q2 = n1/n2
c = Velocity (m/s)
Page 12 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
λ ζ 1/2 ρc2 Pa ft
0.03 1585.57 47.57 0.048 0.02 Assumed as Gate Valve. Refer Page 8 of 11
0.03 1585.57 47.57 0.048 0.02 Assumed as Gate Valve. Refer Page 8 of 11
Page 13 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
0.03 1585.57 47.57 0.048 0.02 Assumed as Gate Valve. Refer Page 8 of 11
Page 14 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
Page 15 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
Page 16 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
Page 17 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
Page 18 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
Page 19 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
Page 20 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
1.86 1031.14 1917.92 1.918 0.63 Assumed as Globe Valve. Refer Page 8 of 11
0.03 1031.14 30.930 0.031 0.01 Assumed as Gate Valve. Refer Page 8 of 11
Page 21 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
2.20 1992.58 4383.68 4.384 1.44 Assumed as Globe Valve. Refer Page 8 of 11
2.20 1992.58 4383.68 4.384 1.44 Assumed as Globe Valve. Refer Page 8 of 11
Page 22 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
Page 23 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
TOTAL (excluding HEX, AHU & AIR SEPARATOR) 225280.83 225.28 73.89
GRAND TOTAL (excluding HEX, AHU & AIR SEPARATOR) 236544.87 236.54 77.59
RAND TOTAL (including HEX, AHU & AIR SEPARATOR) 374644.87 374.64 122.88
q1 = 114.872 l/s
dp1 = 3.75bar
q2 = 118 l/s
dp2 = dp1 / (q1/q2)2
Page 24 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
d l Re k/d c
HEAT EX./PUMP
3 9-10 300 304.8 1 114.872 3.00 309540.703 3.28083989501E-07 1.58
HEADER
Page 25 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
4 PUMP SUCTION
5 PUMP DISCHARGE
Page 26 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
PUMP HEADER TO
6
TOWER RISER SUPPLY
Page 27 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Page 28 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
GROUND FLOOR 63-64 PIPE 250 254.5 2 103.372 4.10 333605.865 3.92927308448E-07 2.03
1ST FLOOR 65-66 PIPE 250 254.5 2 98.012 5.00 316307.879 3.92927308448E-07 1.93
Page 29 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
2ND FLOOR 67-68 PIPE 250 254.5 2 94.402 7.00 304657.556 3.92927308448E-07 1.86
3RD FLOOR 69-70 PIPE 250 254.5 2 90.672 4.00 292619.965 3.92927308448E-07 1.78
4TH FLOOR 71-72 PIPE 250 254.5 2 87.220 3.00 281479.545 3.92927308448E-07 1.72
5TH FLOOR 73-74 PIPE 250 254.5 2 83.772 3.80 270352.035 3.92927308448E-07 1.65
6TH FLOOR 75-76 PIPE 250 254.5 2 80.322 3.50 259218.070 3.92927308448E-07 1.58
7TH FLOOR 77-78 PIPE 250 254.5 2 76.872 3.50 248084.105 3.92927308448E-07 1.51
8TH FLOOR 79-80 PIPE 250 254.5 2 73.422 3.50 236950.140 3.92927308448E-07 1.44
Page 30 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
9TH FLOOR 81-82 PIPE 250 254.5 2 70.291 3.50 226845.663 3.92927308448E-07 1.38
10TH FLOOR 83-84 PIPE 250 254.5 2 67.160 3.50 216741.186 3.92927308448E-07 1.32
11TH FLOOR 86-87 PIPE 200 202.7 2 63.980 3.50 259244.190 4.93339911199E-07 1.98
12TH FLOOR 88-89 PIPE 200 202.7 2 60.800 3.50 246358.968 4.93339911199E-07 1.89
13TH FLOOR 90-91 PIPE 200 202.7 2 57.620 3.50 233473.746 4.93339911199E-07 1.79
14TH FLOOR 92-93 PIPE 200 202.7 2 54.440 3.50 220588.523 4.93339911199E-07 1.69
15TH FLOOR 94-95 PIPE 200 202.7 2 51.260 3.50 207703.301 4.93339911199E-07 1.59
Page 31 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
16TH FLOOR 96-97 PIPE 200 202.7 2 48.080 3.50 194818.079 4.93339911199E-07 1.49
17TH FLOOR 98-99 PIPE 200 202.7 2 44.900 3.50 181932.856 4.93339911199E-07 1.39
18TH FLOOR 100-101 PIPE 200 202.7 2 41.720 3.50 169047.634 4.93339911199E-07 1.29
19TH FLOOR 102-103 PIPE 200 202.7 2 38.600 3.50 156405.529 4.93339911199E-07 1.20
20TH FLOOR 104-105 PIPE 200 202.7 2 35.480 3.50 143763.424 4.93339911199E-07 1.10
21TH FLOOR
106-107 PIPE 200 202.7 2 32.360 3.80 131121.319 4.93339911199E-07 1.00
PENTHOUSE
MEZ. FLOOR 108-109 PIPE 200 202.7 2 30.690 4.60 124354.551 4.93339911199E-07 0.95
Page 32 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
ROOF LEVEL 2 111-112 PIPE 150 154.1 2 26.770 5.13 142680.387 6.4892926671E-07 1.44
AHU TAPPING
Page 33 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
AHU RETURN
BALANCING CONTROL
134-135 100 102.3 1 16.400 2.00
VALVE
TOWER RETURN TO
10
HEAT EX. HEADER
Page 34 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Page 35 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Note :
Pr. Loss for Pipe (Pa) = λ x l/d x 1/2 ρc2 Pump Affinity Law
q1/q2 = n1/n2
c = Velocity (m/s)
Page 36 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
λ ζ 1/2 ρc2 Pa ft
0.03 1585.57 47.57 0.048 0.02 Assumed as Gate Valve. Refer Page 8 of 11
0.03 1585.57 47.57 0.048 0.02 Assumed as Gate Valve. Refer Page 8 of 11
Page 37 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
0.03 1585.57 47.57 0.048 0.02 Assumed as Gate Valve. Refer Page 8 of 11
Page 38 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
Page 39 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
Page 40 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
Page 41 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
Page 42 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
Page 43 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
Page 44 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
1.86 1031.14 1917.92 1.918 0.63 Assumed as Globe Valve. Refer Page 8 of 11
0.03 1031.14 30.930 0.031 0.01 Assumed as Gate Valve. Refer Page 8 of 11
Page 45 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
2.20 1992.58 4383.68 4.384 1.44 Assumed as Globe Valve. Refer Page 8 of 11
2.20 1992.58 4383.68 4.384 1.44 Assumed as Globe Valve. Refer Page 8 of 11
Page 46 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
Page 47 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53
TOTAL (excluding HEX, AHU & AIR SEPARATOR) 225280.83 225.28 73.89
GRAND TOTAL (excluding HEX, AHU & AIR SEPARATOR) 247808.91 247.81 81.28
RAND TOTAL (including HEX, AHU & AIR SEPARATOR) 385908.91 385.91 126.58
q1 = 114.872 l/s
dp1 = 3.86bar
q2 = 118 l/s
dp2 = dp1 / (q1/q2)2
Page 48 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
1-2 FLEX. 200 202.7 1 57.436 0.30 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 36.110 0.036
2-3 ELBOW 200 202.7 2 57.436 1.78 0.65 1585.57 2061.23 2.061
3-4 PIPE 200 202.7 1 57.436 2.00 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 240.736 0.241
4-5 MOTORIZED VALVE 200 202.7 1 57.436 1.78 0.03 1585.57 47.57 0.048
5-6 PIPE 200 202.7 1 57.436 1.00 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 120.368 0.120
7-8 PIPE 200 202.7 1 57.436 1.00 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 120.368 0.120
8-9 TEE 200 202.7 1 57.440 1.78 0.55 1585.79 872.18 0.872
HEAT EX./PUMP
3 9-10 300 304.8 1 114.872 3.00 309540.703 3.28083989501E-07 1.58 0.01340 0.01438 1240.51 178.354 0.178
HEADER
10-11 REDUCER 300 / 250 1 114.872 2.26 0.13 2552.16 331.78 0.332
11-12 PIPE 250 254.5 1 114.872 2.00 370719.082 3.92927308448E-07 2.26 0.01281 0.01390 2552.16 283.809 0.284
12-13 ELBOW 250 254.5 1 114.872 2.26 0.55 2552.16 1403.69 1.404
13-14 PIPE 250 254.5 1 114.872 1.00 370719.082 3.92927308448E-07 2.26 0.01281 0.01390 2552.16 141.905 0.142
14-15 TEE 300 304.8 1 114.872 1.58 0.70 1240.51 868.35 0.868
15-16 PIPE 300 304.8 1 114.872 1.00 309540.703 3.28083989501E-07 1.58 0.01340 0.01438 1240.51 59.451 0.059
16-17 TEE 300 304.8 1 114.870 1.58 0.70 1240.46 868.32 0.868
17-18 PIPE 300 304.8 1 114.870 3.00 309535.314 3.28083989501E-07 1.58 0.01340 0.01438 1240.46 178.349 0.178
18-19 TEE 300 304.8 1 57.436 0.79 0.50 310.13 155.06 0.155
4 PUMP SUCTION
19-20 PIPE 200 202.7 1 57.436 3.00 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 361.104 0.361
Page 49 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
22-23 FLEX. 200 202.7 1 57.436 0.30 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 36.110 0.036
23-24 ELBOW 200 202.7 3 57.436 1.78 0.65 1585.57 3091.85 3.092
5 PUMP DISCHARGE
23-24 FLEX. 200 202.7 1 57.436 0.30 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 36.110 0.036
24-25 NRV 200 202.7 1 57.436 1.78 3.20 1585.57 5073.81 5.074
25-26 DRV 200 202.7 1 57.436 1.78 1.65 1585.57 2616.18 2.616
26-27 PIPE 200 202.7 1 57.436 3.00 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 361.104 0.361
27-28 ELBOW 200 202.7 4 57.436 1.78 0.65 1585.57 4122.47 4.122
PUMP HEADER TO
6
TOWER RISER SUPPLY
28-29 TEE 300 304.8 1 57.436 0.79 0.70 310.13 217.09 0.217
29-30 PIPE 300 304.8 1 57.436 3.00 154770.352 3.28083989501E-07 0.79 0.01593 0.01645 310.13 51.024 0.051
30-31 TEE 300 304.8 1 114.872 1.58 0.70 1240.51 868.35 0.868
31-32 PIPE 300 304.8 1 114.872 2.00 309540.703 3.28083989501E-07 1.58 0.01340 0.01438 1240.51 118.903 0.119
32-33 TEE 250 254.5 1 114.872 2.26 0.70 2552.16 1786.51 1.787
33-33a PIPE 250 254.5 1 114.872 1.00 370719.082 3.92927308448E-07 2.26 0.01281 0.01390 2552.16 141.905 0.142
33a-34 ELBOW 250 254.5 1 114.872 2.26 0.55 2552.16 1403.69 1.404
34-34a PIPE 250 254.5 1 114.872 5.00 370719.082 3.92927308448E-07 2.26 0.01281 0.01390 2552.16 709.523 0.710
34a-35 TEE 250 254.5 1 114.872 2.26 0.70 2552.16 1786.51 1.787
35-36 PIPE 250 254.5 1 113.960 18.00 367775.843 3.92927308448E-07 2.24 0.01283 0.01392 2511.80 2517.622 2.518
36-37 ELBOW 250 254.5 2 113.960 2.24 0.55 2511.80 2762.98 2.763
37-38 PIPE 250 254.5 2 113.960 4.20 367775.843 3.92927308448E-07 2.24 0.01283 0.01392 2511.80 1174.890 1.175
38-39 ELBOW 250 254.5 2 113.960 2.24 0.55 2511.80 2762.98 2.763
39-40 PIPE 250 254.5 2 113.960 35.00 367775.843 3.92927308448E-07 2.24 0.01283 0.01392 2511.80 9790.753 9.791
40-41 ELBOW 250 254.5 2 113.960 2.24 0.55 2511.80 2762.98 2.763
Page 50 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
41-42 PIPE 250 254.5 2 113.960 14.00 367775.843 3.92927308448E-07 2.24 0.01283 0.01392 2511.80 3916.301 3.916
42-43 ELBOW 250 254.5 2 113.960 2.24 0.55 2511.80 2762.98 2.763
43-44 PIPE 250 254.5 2 113.960 6.00 367775.843 3.92927308448E-07 2.24 0.01283 0.01392 2511.80 1678.415 1.678
44-45 ELBOW 250 254.5 2 113.960 2.24 0.55 2511.80 2762.98 2.763
46-47 PIPE 250 254.5 2 113.960 6.00 367775.843 3.92927308448E-07 2.24 0.01283 0.01392 2511.80 1678.415 1.678
47-48 TEE 250 254.5 2 113.960 2.24 0.55 2511.80 2762.98 2.763
48-49 PIPE 250 254.5 2 105.970 12.00 341990.225 3.92927308448E-07 2.08 0.01307 0.01411 2171.93 2942.236 2.942
49-50 ELBOW 250 254.5 2 105.970 2.08 0.55 2171.93 2389.12 2.389
50-51 PIPE 250 254.5 2 105.970 3.00 341990.225 3.92927308448E-07 2.08 0.01307 0.01411 2171.93 735.559 0.736
51-52 ELBOW 250 254.5 2 105.970 2.08 0.55 2171.93 2389.12 2.389
52-53 PIPE 250 254.5 2 105.970 8.00 341990.225 3.92927308448E-07 2.08 0.01307 0.01411 2171.93 1961.491 1.961
53-54 ELBOW 250 254.5 2 105.970 2.08 0.55 2171.93 2389.12 2.389
54-55 PIPE 250 254.5 2 105.970 3.00 341990.225 3.92927308448E-07 2.08 0.01307 0.01411 2171.93 735.559 0.736
55-56 ELBOW 250 254.5 2 105.970 2.08 0.55 2171.93 2389.12 2.389
56-57 PIPE 250 254.5 2 105.970 0.50 341990.225 3.92927308448E-07 2.08 0.01307 0.01411 2171.93 122.593 0.123
57-58 ELBOW 250 254.5 2 105.970 2.08 0.55 2171.93 2389.12 2.389
58-59 PIPE 250 254.5 2 105.970 8.00 341990.225 3.92927308448E-07 2.08 0.01307 0.01411 2171.93 1961.491 1.961
59-60 ELBOW 250 254.5 2 105.970 2.08 0.55 2171.93 2389.12 2.389
60-61 ELBOW 250 254.5 2 105.970 2.08 0.55 2171.93 2389.12 2.389
61-62 PIPE 250 254.5 2 105.970 8.00 341990.225 3.92927308448E-07 2.08 0.01307 0.01411 2171.93 1961.491 1.961
62-63 ELBOW 250 254.5 8 105.970 2.08 0.55 2171.93 9556.48 9.556
GROUND FLOOR 63-64 PIPE 250 254.5 2 103.372 4.10 333605.865 3.92927308448E-07 2.03 0.01315 0.01418 2066.74 961.004 0.961
64-65 TEE 250 254.5 2 103.372 2.03 0.70 2066.74 2893.43 2.893
1ST FLOOR 65-66 PIPE 250 254.5 2 98.012 5.00 316307.879 3.92927308448E-07 1.93 0.01333 0.01432 1857.97 1064.183 1.064
Page 51 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
66-67 TEE 250 254.5 2 98.012 1.93 0.70 1857.97 2601.15 2.601
2ND FLOOR 67-68 PIPE 250 254.5 2 94.402 7.00 304657.556 3.92927308448E-07 1.86 0.01345 0.01442 1723.62 1391.963 1.392
68-69 TEE 250 254.5 2 94.402 1.86 0.70 1723.62 2413.07 2.413
3RD FLOOR 69-70 PIPE 250 254.5 2 90.672 4.00 292619.965 3.92927308448E-07 1.78 0.01359 0.01453 1590.11 739.415 0.739
70-71 TEE 250 254.5 2 90.672 1.78 0.70 1590.11 2226.15 2.226
4TH FLOOR 71-72 PIPE 250 254.5 2 87.220 3.00 281479.545 3.92927308448E-07 1.72 0.01372 0.01464 1471.34 516.926 0.517
72-73 TEE 250 254.5 2 87.220 1.72 0.70 1471.34 2059.87 2.060
5TH FLOOR 73-74 PIPE 250 254.5 2 83.772 3.80 270352.035 3.92927308448E-07 1.65 0.01386 0.01475 1357.30 608.656 0.609
74-75 TEE 250 254.5 2 83.772 1.65 0.70 1357.30 1900.23 1.900
6TH FLOOR 75-76 PIPE 250 254.5 2 80.322 3.50 259218.070 3.92927308448E-07 1.58 0.01400 0.01487 1247.81 519.574 0.520
76-77 TEE 250 254.5 2 80.322 1.58 0.70 1247.81 1746.93 1.747
7TH FLOOR 77-78 PIPE 250 254.5 2 76.872 3.50 248084.105 3.92927308448E-07 1.51 0.01416 0.01500 1142.92 479.912 0.480
78-79 TEE 250 254.5 2 76.872 1.51 0.70 1142.92 1600.09 1.600
8TH FLOOR 79-80 PIPE 250 254.5 2 73.422 3.50 236950.140 3.92927308448E-07 1.44 0.01432 0.01513 1042.63 441.702 0.442
80-81 TEE 250 254.5 2 73.422 1.44 0.70 1042.63 1459.69 1.460
9TH FLOOR 81-82 PIPE 250 254.5 2 70.291 3.50 226845.663 3.92927308448E-07 1.38 0.01448 0.01526 955.61 408.255 0.408
82-83 TEE 250 254.5 2 70.291 1.38 0.70 955.61 1337.85 1.338
10TH FLOOR 83-84 PIPE 250 254.5 2 67.160 3.50 216741.186 3.92927308448E-07 1.32 0.01464 0.01539 872.37 376.022 0.376
84-85 TEE 250 254.5 2 67.160 1.32 0.70 872.37 1221.32 1.221
85-86 REDUCER 250 / 200 2 63.980 1.98 0.15 1967.45 590.24 0.590
11TH FLOOR 86-87 PIPE 200 202.7 2 63.980 3.50 259244.190 4.93339911199E-07 1.98 0.01401 0.01487 1967.45 1024.010 1.024
87-88 TEE 200 202.7 2 63.980 1.98 0.70 1967.45 2754.43 2.754
12TH FLOOR 88-89 PIPE 200 202.7 2 60.800 3.50 246358.968 4.93339911199E-07 1.89 0.01418 0.01502 1776.74 933.817 0.934
89-90 TEE 200 202.7 2 60.800 1.89 0.70 1776.74 2487.43 2.487
13TH FLOOR 90-91 PIPE 200 202.7 2 57.620 3.50 233473.746 4.93339911199E-07 1.79 0.01438 0.01517 1595.74 847.461 0.847
Page 52 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
91-92 TEE 200 202.7 2 57.620 1.79 0.70 1595.74 2234.04 2.234
14TH FLOOR 92-93 PIPE 200 202.7 2 54.440 3.50 220588.523 4.93339911199E-07 1.69 0.01458 0.01534 1424.47 764.858 0.765
93-94 TEE 200 202.7 2 54.440 1.69 0.70 1424.47 1994.25 1.994
15TH FLOOR 94-95 PIPE 200 202.7 2 51.260 3.50 207703.301 4.93339911199E-07 1.59 0.01480 0.01552 1262.91 686.114 0.686
95-96 TEE 200 202.7 2 51.260 1.59 0.70 1262.91 1768.08 1.768
16TH FLOOR 96-97 PIPE 200 202.7 2 48.080 3.50 194818.079 4.93339911199E-07 1.49 0.01504 0.01572 1111.08 611.227 0.611
97-98 TEE 200 202.7 2 48.080 1.49 0.70 1111.08 1555.51 1.556
17TH FLOOR 98-99 PIPE 200 202.7 2 44.900 3.50 181932.856 4.93339911199E-07 1.39 0.01530 0.01593 968.97 540.295 0.540
99-100 TEE 200 202.7 2 44.900 1.39 0.70 968.97 1356.55 1.357
18TH FLOOR 100-101 PIPE 200 202.7 2 41.720 3.50 169047.634 4.93339911199E-07 1.29 0.01558 0.01617 836.57 473.328 0.473
101-102 TEE 200 202.7 2 41.720 1.29 0.70 836.57 1171.20 1.171
19TH FLOOR 102-103 PIPE 200 202.7 2 38.600 3.50 156405.529 4.93339911199E-07 1.20 0.01589 0.01642 716.13 411.495 0.411
103-104 TEE 200 202.7 2 38.600 1.20 0.70 716.13 1002.58 1.003
20TH FLOOR 104-105 PIPE 200 202.7 2 35.480 3.50 143763.424 4.93339911199E-07 1.10 0.01623 0.01670 605.04 353.605 0.354
105-106 TEE 200 202.7 2 35.480 1.10 0.70 605.04 847.05 0.847
21TH FLOOR
106-107 PIPE 200 202.7 2 32.360 3.80 131121.319 4.93339911199E-07 1.00 0.01660 0.01701 503.31 325.386 0.325
PENTHOUSE
107-108 TEE 200 202.7 2 32.360 1.00 0.70 503.31 704.63 0.705
MEZ. FLOOR 108-109 PIPE 200 202.7 2 30.690 4.60 124354.551 4.93339911199E-07 0.95 0.01682 0.01720 452.70 358.121 0.358
109-110 TEE 200 202.7 2 30.690 0.95 0.70 452.70 633.78 0.634
110-111 REDUCER 200 / 150 2 26.770 1.44 0.18 1031.14 365.02 0.365
ROOF LEVEL 2 111-112 PIPE 150 154.1 2 26.770 5.13 142680.387 6.4892926671E-07 1.44 0.01626 0.01672 1031.14 1178.410 1.178
112-113 TEE 150 154.1 2 26.770 1.44 0.58 1031.14 1196.12 1.196
113-114 PIPE 150 154.1 2 26.770 7.00 142680.387 6.4892926671E-07 1.44 0.01626 0.01672 1031.14 1609.536 1.610
Page 53 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
115-116 DRV 150 154.1 1 26.770 1.44 1.86 1031.14 1917.92 1.918
116-117 ELBOW 150 154.1 3 26.770 1.44 0.85 1031.14 2629.40 2.629
117-118 BTU METER 150 154.1 1 26.770 1.44 0.03 1031.14 30.930 0.031
118-119 ELBOW 150 154.1 2 26.770 1.44 0.85 1031.14 1752.93 1.753
119-120 PIPE 150 154.1 2 26.770 1.00 142680.387 6.4892926671E-07 1.44 0.01626 0.01672 1031.14 229.934 0.230
120-121 TEE 150 154.1 2 26.770 1.44 0.58 1031.14 1196.12 1.196
121-122 PIPE 150 154.1 2 26.520 5.00 141347.921 6.4892926671E-07 1.42 0.01630 0.01676 1011.97 1130.374 1.130
122-123 ELBOW 150 154.1 2 26.520 1.42 0.85 1011.97 1720.35 1.720
123-124 TEE 150 154.1 2 26.520 1.42 0.58 1011.97 1169.84 1.170
AHU TAPPING
124-125 PIPE 100 102.3 1 16.400 3.00 131669.977 9.77517106549E-07 2.00 0.01659 0.01700 1992.58 1016.103 1.016
125-126 ELBOW 100 102.3 2 16.400 2.00 1.10 1992.58 4383.68 4.384
128-129 FLEX. 100 102.3 1 16.400 0.30 131669.977 9.77517106549E-07 2.00 0.01659 0.01700 1992.58 101.610 0.102
AHU RETURN
130-131 FLEX. 100 102.3 1 16.400 0.30 131669.977 9.77517106549E-07 2.00 0.01659 0.01700 1992.58 101.610 0.102
131-132 PIPE 100 102.3 1 16.400 3.00 131669.977 9.77517106549E-07 2.00 0.01659 0.01700 1992.58 1016.103 1.016
132-133 ELBOW 100 102.3 2 16.400 2.00 1.10 1992.58 4383.68 4.384
133-134 CONTROL VALVE 100 102.3 1 16.400 2.00 2.20 1992.58 4383.68 4.384
BALANCING CONTROL
134-135 100 102.3 1 16.400 2.00 2.20 1992.58 4383.68 4.384
VALVE
TOWER RETURN TO
10
HEAT EX. HEADER
135-136 PIPE 250 254.5 1 113.962 5.00 367782.297 3.92927308448E-07 2.24 0.01283 0.01392 2511.88 699.362 0.699
136-137 ELBOW 250 254.5 2 113.962 2.24 0.55 2511.88 2763.07 2.763
Page 54 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
137-138 PIPE 250 254.5 1 113.962 23.00 367782.297 3.92927308448E-07 2.24 0.01283 0.01392 2511.88 3217.063 3.217
138-139 TEE 250 254.5 2 114.872 2.26 0.70 2552.16 3573.02 3.573
139-140 AIR SEPERATOR 250 254.5 1 114.872 2.26 2552.16 15000.00 15.00
140-141 PIPE 250 254.5 1 114.872 5.00 370719.082 3.92927308448E-07 2.26 0.01281 0.01390 2552.16 709.523 0.710
141-142 REDUCER 250 / 300 1 114.872 1.58 0.13 1240.51 161.27 0.161
142-143 PIPE 300 304.8 1 114.872 1.00 309540.703 3.28083989501E-07 1.58 0.01340 0.01438 1240.51 59.451 0.059
143-144 TEE 300 304.8 1 114.872 1.58 0.55 1240.51 682.28 0.682
144-145 PIPE 300 304.8 1 57.436 3.00 154770.352 3.28083989501E-07 0.79 0.01593 0.01645 310.13 51.024 0.051
145-146 TEE 300 304.8 1 57.436 0.79 0.70 310.13 217.09 0.217
146-147 PIPE 200 202.7 1 57.436 4.00 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 481.471 0.481
147-148 ELBOW 200 202.7 1 57.436 1.78 0.65 1585.57 1030.62 1.031
150-151 FLEX. 200 202.7 1 57.436 0.30 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 36.110 0.036
GRAND TOTAL (excluding HEX, AHU & AIR SEPARATOR) 240707.83 240.71
GRAND TOTAL (including HEX, AHU & AIR SEPARATOR) 378807.83 378.81
Note :
Pr. Loss for Pipe (Pa) = λ x l/d x 1/2 ρc2 Pump Affinity Law
Page 55 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
c = Velocity (m/s)
Page 56 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
feet Remarks
ft
24 As advised by UDC
0.01 λ = 0.01518
0.08 λ = 0.01518
0.04 λ = 0.01518
0.04 λ = 0.01518
0.06 λ = 0.01438
0.11 Refer 7 of 11
0.09 λ = 0.01390
0.05 λ = 0.01390
0.02 λ = 0.01438
0.06 λ = 0.01438
0.12 λ = 0.01518
Page 57 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
feet Remarks
0.01 λ = 0.01518
0.01 λ = 0.01518
0.12 λ = 0.01518
0.02 λ = 0.01645
0.04 λ = 0.01438
0.05 λ = 0.01390
0.23 λ = 0.01390
0.83 λ = 0.01392
0.39 λ = 0.01392
3.21 λ = 0.01392
Page 58 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
feet Remarks
1.28 λ = 0.01392
0.55 λ = 0.01392
0.55 λ = 0.01392
0.97 λ = 0.01411
0.24 λ = 0.01411
0.64 λ = 0.01411
0.24 λ = 0.01411
0.04 λ = 0.01411
0.64 λ = 0.01411
0.64 λ = 0.01411
0.32 λ = 0.01418
0.35 λ = 0.01432
Page 59 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
feet Remarks
0.46 λ = 0.01442
0.24 λ = 0.01453
0.17 λ = 0.01464
0.20 λ = 0.01475
0.17 λ = 0.01487
0.16 λ = 0.01500
0.14 λ = 0.01513
0.13 λ = 0.01526
0.12 λ = 0.01539
0.34 λ = 0.01487
0.31 λ = 0.01502
0.28 λ = 0.01517
Page 60 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
feet Remarks
0.25 λ = 0.01534
0.23 λ = 0.01552
0.20 λ = 0.01572
0.18 λ = 0.01593
0.16 λ = 0.01616
0.13 λ = 0.01642
0.12 λ = 0.01670
0.11 λ = 0.01701
0.12 λ = 0.01720
0.39 λ = 0.01672
0.53 λ = 0.01672
Page 61 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
feet Remarks
0.08 λ = 0.01672
0.37 λ = 0.01676
0.33 λ = 0.01700
0.03 λ = 0.01700
0.03 λ = 0.01700
0.33 λ = 0.01700
0.23 λ = 0.01392
Page 62 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT
feet Remarks
1.06 λ = 0.01392
0.23 λ = 0.01390
0.02 λ = 0.01438
0.02 λ = 0.01645
0.16 λ = 0.01518
0.01 λ = 0.01518
75.19
3.76
78.95
124.25