PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

d l Re k/d c

1 LEVEL P2 0-1 HEAT EX. 57.436

2 HEAT EX. TO HEADER

1-2 FLEX. 200 202.7 1 57.436 0.30 232728.186 4.93339911199E-07 1.78

2-3 ELBOW 200 202.7 2 57.436 1.78

3-4 PIPE 200 202.7 1 57.436 2.00 232728.186 4.93339911199E-07 1.78

4-5 MOTORIZED VALVE 200 202.7 1 57.436 1.78

5-6 PIPE 200 202.7 1 57.436 1.00 232728.186 4.93339911199E-07 1.78

6-7 IV 200 202.7 1 57.436 1.78

7-8 PIPE 200 202.7 1 57.436 1.00 232728.186 4.93339911199E-07 1.78

8-9 TEE 200 202.7 1 57.440 1.78

HEAT EX./PUMP
3 9-10 300 304.8 1 114.872 3.00 309540.703 3.28083989501E-07 1.58
HEADER

10-11 REDUCER 300 / 250 1 114.872 2.26

11-12 PIPE 250 254.5 1 114.872 2.00 370719.082 3.92927308448E-07 2.26

12-13 ELBOW 250 254.5 1 114.872 2.26

Page 1 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

13-14 PIPE 250 254.5 1 114.872 1.00 370719.082 3.92927308448E-07 2.26

14-15 TEE 300 304.8 1 114.872 1.58

15-16 PIPE 300 304.8 1 114.872 1.00 309540.703 3.28083989501E-07 1.58

16-17 TEE 300 304.8 1 114.870 1.58

17-18 PIPE 300 304.8 1 114.870 3.00 309535.314 3.28083989501E-07 1.58

18-19 TEE 300 304.8 1 57.436 0.79

4 PUMP SUCTION

19-20 PIPE 200 202.7 1 57.436 3.00 232728.186 4.93339911199E-07 1.78

20-21 IV 200 202.7 1 57.436 1.78

21-22 STAINER 200 202.7 1 57.436 1.78

22-23 FLEX. 200 202.7 1 57.436 0.30 232728.186 4.93339911199E-07 1.78

23-24 ELBOW 200 202.7 3 57.436 1.78

5 PUMP DISCHARGE

23-24 FLEX. 200 202.7 1 57.436 0.30 232728.186 4.93339911199E-07 1.78

24-25 NRV 200 202.7 1 57.436 1.78

Page 2 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

25-26 DRV 200 202.7 1 57.436 1.78

26-27 PIPE 200 202.7 1 57.436 3.00 232728.186 4.93339911199E-07 1.78

27-28 ELBOW 200 202.7 4 57.436 1.78

PUMP HEADER TO
6
TOWER RISER SUPPLY

28-29 TEE 300 304.8 1 57.436 0.79

29-30 PIPE 300 304.8 1 57.436 3.00 154770.352 3.28083989501E-07 0.79

30-31 TEE 300 304.8 1 114.872 1.58

31-32 PIPE 300 304.8 1 114.872 2.00 309540.703 3.28083989501E-07 1.58

32-33 TEE 250 254.5 1 114.872 2.26

33-33a PIPE 250 254.5 1 114.872 1.00 370719.082 3.92927308448E-07 2.26

33a-34 ELBOW 250 254.5 1 114.872 2.26

34-34a PIPE 250 254.5 1 114.872 5.00 370719.082 3.92927308448E-07 2.26

34a-35 TEE 250 254.5 1 114.872 2.26

35-36 PIPE 250 254.5 1 113.960 18.00 367775.843 3.92927308448E-07 2.24

36-37 ELBOW 250 254.5 2 113.960 2.24

Page 3 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

FLOOR PIPING SUPPLY


7 LEVEL P1
& RETURN

37-38 PIPE 250 254.5 2 113.960 4.20 367775.843 3.92927308448E-07 2.24

38-39 ELBOW 250 254.5 2 113.960 2.24

39-40 PIPE 250 254.5 2 113.960 35.00 367775.843 3.92927308448E-07 2.24

40-41 ELBOW 250 254.5 2 113.960 2.24

41-42 PIPE 250 254.5 2 113.960 14.00 367775.843 3.92927308448E-07 2.24

42-43 ELBOW 250 254.5 2 113.960 2.24

43-44 PIPE 250 254.5 2 113.960 6.00 367775.843 3.92927308448E-07 2.24

44-45 ELBOW 250 254.5 2 113.960 2.24

46-47 PIPE 250 254.5 2 113.960 6.00 367775.843 3.92927308448E-07 2.24

47-48 TEE 250 254.5 2 113.960 2.24

48-49 PIPE 250 254.5 2 105.970 12.00 341990.225 3.92927308448E-07 2.08

49-50 ELBOW 250 254.5 2 105.970 2.08

50-51 PIPE 250 254.5 2 105.970 3.00 341990.225 3.92927308448E-07 2.08

51-52 ELBOW 250 254.5 2 105.970 2.08

Page 4 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

52-53 PIPE 250 254.5 2 105.970 8.00 341990.225 3.92927308448E-07 2.08

53-54 ELBOW 250 254.5 2 105.970 2.08

54-55 PIPE 250 254.5 2 105.970 3.00 341990.225 3.92927308448E-07 2.08

55-56 ELBOW 250 254.5 2 105.970 2.08

56-57 PIPE 250 254.5 2 105.970 0.50 341990.225 3.92927308448E-07 2.08

57-58 ELBOW 250 254.5 2 105.970 2.08

58-59 PIPE 250 254.5 2 105.970 8.00 341990.225 3.92927308448E-07 2.08

59-60 ELBOW 250 254.5 2 105.970 2.08

60-61 ELBOW 250 254.5 2 105.970 2.08

61-62 PIPE 250 254.5 2 105.970 8.00 341990.225 3.92927308448E-07 2.08

62-63 ELBOW 250 254.5 8 105.970 2.08

TOWER RISER SUPPLY


8 RISER PIPNG
& RETURN

GROUND FLOOR 63-64 PIPE 250 254.5 2 103.372 4.10 333605.865 3.92927308448E-07 2.03

64-65 TEE 250 254.5 2 103.372 2.03

1ST FLOOR 65-66 PIPE 250 254.5 2 98.012 5.00 316307.879 3.92927308448E-07 1.93

Page 5 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

66-67 TEE 250 254.5 2 98.012 1.93

2ND FLOOR 67-68 PIPE 250 254.5 2 94.402 7.00 304657.556 3.92927308448E-07 1.86

68-69 TEE 250 254.5 2 94.402 1.86

3RD FLOOR 69-70 PIPE 250 254.5 2 90.672 4.00 292619.965 3.92927308448E-07 1.78

70-71 TEE 250 254.5 2 90.672 1.78

4TH FLOOR 71-72 PIPE 250 254.5 2 87.220 3.00 281479.545 3.92927308448E-07 1.72

72-73 TEE 250 254.5 2 87.220 1.72

5TH FLOOR 73-74 PIPE 250 254.5 2 83.772 3.80 270352.035 3.92927308448E-07 1.65

74-75 TEE 250 254.5 2 83.772 1.65

6TH FLOOR 75-76 PIPE 250 254.5 2 80.322 3.50 259218.070 3.92927308448E-07 1.58

76-77 TEE 250 254.5 2 80.322 1.58

7TH FLOOR 77-78 PIPE 250 254.5 2 76.872 3.50 248084.105 3.92927308448E-07 1.51

78-79 TEE 250 254.5 2 76.872 1.51

8TH FLOOR 79-80 PIPE 250 254.5 2 73.422 3.50 236950.140 3.92927308448E-07 1.44

80-81 TEE 250 254.5 2 73.422 1.44

Page 6 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

9TH FLOOR 81-82 PIPE 250 254.5 2 70.291 3.50 226845.663 3.92927308448E-07 1.38

82-83 TEE 250 254.5 2 70.291 1.38

10TH FLOOR 83-84 PIPE 250 254.5 2 67.160 3.50 216741.186 3.92927308448E-07 1.32

84-85 TEE 250 254.5 2 67.160 1.32

85-86 REDUCER 250 / 200 2 63.980 1.98

11TH FLOOR 86-87 PIPE 200 202.7 2 63.980 3.50 259244.190 4.93339911199E-07 1.98

87-88 TEE 200 202.7 2 63.980 1.98

12TH FLOOR 88-89 PIPE 200 202.7 2 60.800 3.50 246358.968 4.93339911199E-07 1.89

89-90 TEE 200 202.7 2 60.800 1.89

13TH FLOOR 90-91 PIPE 200 202.7 2 57.620 3.50 233473.746 4.93339911199E-07 1.79

91-92 TEE 200 202.7 2 57.620 1.79

14TH FLOOR 92-93 PIPE 200 202.7 2 54.440 3.50 220588.523 4.93339911199E-07 1.69

93-94 TEE 200 202.7 2 54.440 1.69

15TH FLOOR 94-95 PIPE 200 202.7 2 51.260 3.50 207703.301 4.93339911199E-07 1.59

95-96 TEE 200 202.7 2 51.260 1.59

Page 7 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

16TH FLOOR 96-97 PIPE 200 202.7 2 48.080 3.50 194818.079 4.93339911199E-07 1.49

97-98 TEE 200 202.7 2 48.080 1.49

17TH FLOOR 98-99 PIPE 200 202.7 2 44.900 3.50 181932.856 4.93339911199E-07 1.39

99-100 TEE 200 202.7 2 44.900 1.39

18TH FLOOR 100-101 PIPE 200 202.7 2 41.720 3.50 169047.634 4.93339911199E-07 1.29

101-102 TEE 200 202.7 2 41.720 1.29

19TH FLOOR 102-103 PIPE 200 202.7 2 38.600 3.50 156405.529 4.93339911199E-07 1.20

103-104 TEE 200 202.7 2 38.600 1.20

20TH FLOOR 104-105 PIPE 200 202.7 2 35.480 3.50 143763.424 4.93339911199E-07 1.10

105-106 TEE 200 202.7 2 35.480 1.10

21TH FLOOR
106-107 PIPE 200 202.7 2 32.360 3.80 131121.319 4.93339911199E-07 1.00
PENTHOUSE

107-108 TEE 200 202.7 2 32.360 1.00

MEZ. FLOOR 108-109 PIPE 200 202.7 2 30.690 4.60 124354.551 4.93339911199E-07 0.95

109-110 TEE 200 202.7 2 30.690 0.95

110-111 REDUCER 200 / 150 2 26.770 1.44

Page 8 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

ROOF LEVEL 2 111-112 PIPE 150 154.1 2 26.770 5.13 142680.387 6.4892926671E-07 1.44

112-113 TEE 150 154.1 2 26.770 1.44

9 ROOF LEVEL 2 FLOOR PIPING SUPPLY

113-114 PIPE 150 154.1 2 26.770 7.00 142680.387 6.4892926671E-07 1.44

114-115 IV 150 154.1 1 26.770 1.44

115-116 DRV 150 154.1 1 26.770 1.44

116-117 ELBOW 150 154.1 3 26.770 1.44

117-118 BTU METER 150 154.1 1 26.770 1.44

118-119 ELBOW 150 154.1 2 26.770 1.44

119-120 PIPE 150 154.1 2 26.770 1.00 142680.387 6.4892926671E-07 1.44

120-121 TEE 150 154.1 2 26.770 1.44

121-122 PIPE 150 154.1 2 26.520 5.00 141347.921 6.4892926671E-07 1.42

122-123 ELBOW 150 154.1 2 26.520 1.42

123-124 TEE 150 154.1 2 26.520 1.42

AHU TAPPING

Page 9 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

124-125 PIPE 100 102.3 1 16.400 3.00 131669.977 9.77517106549E-07 2.00

125-126 ELBOW 100 102.3 2 16.400 2.00

126-127 IV 100 102.3 1 16.400 2.00

127-128 STRAINER 100 102.3 1 16.400 2.00

128-129 FLEX. 100 102.3 1 16.400 0.30 131669.977 9.77517106549E-07 2.00

129-130 AHU 100 102.3 1 16.400 2.00

AHU RETURN

130-131 FLEX. 100 102.3 1 16.400 0.30 131669.977 9.77517106549E-07 2.00

131-132 PIPE 100 102.3 1 16.400 3.00 131669.977 9.77517106549E-07 2.00

132-133 ELBOW 100 102.3 2 16.400 2.00

133-134 CONTROL VALVE 100 102.3 1 16.400 2.00

BALANCING CONTROL
134-135 100 102.3 1 16.400 2.00
VALVE

TOWER RETURN TO
10
HEAT EX. HEADER

135-136 PIPE 250 254.5 1 113.962 5.00 367782.297 3.92927308448E-07 2.24

136-137 ELBOW 250 254.5 2 113.962 2.24

Page 10 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

137-138 PIPE 250 254.5 1 113.962 23.00 367782.297 3.92927308448E-07 2.24

138-139 TEE 250 254.5 2 114.872 2.26

139-140 AIR SEPERATOR 250 254.5 1 114.872 2.26

140-141 PIPE 250 254.5 1 114.872 5.00 370719.082 3.92927308448E-07 2.26

141-142 REDUCER 250 / 300 1 114.872 1.58

142-143 PIPE 300 304.8 1 114.872 1.00 309540.703 3.28083989501E-07 1.58

143-144 TEE 300 304.8 1 114.872 1.58

144-145 PIPE 300 304.8 1 57.436 3.00 154770.352 3.28083989501E-07 0.79

145-146 TEE 300 304.8 1 57.436 0.79

11 HEAT EX. TAPPING

146-147 PIPE 200 202.7 1 57.436 4.00 232728.186 4.93339911199E-07 1.78

147-148 ELBOW 200 202.7 1 57.436 1.78

148-149 IV 200 202.7 1 57.436 1.78

149-150 STRAINER 200 202.7 1 57.436 1.78

150-151 FLEX. 200 202.7 1 57.436 0.30 232728.186 4.93339911199E-07 1.78

Page 11 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

TOTAL (excluding HEX, AH

GRAND TOTAL (excluding HEX, AH

GRAND TOTAL (including HEX, AHU &

Note :

Pr. Loss for Pipe (Pa) = λ x l/d x 1/2 ρc2 Pump Affinity Law

q1/q2 = n1/n2

Pr. Loss for Fittings (Pa) = ζ x 1/2 ρc2 dp1/dp2 = (n1/n2)2

where dp1/dp2 = (q1/q2)2


λ = Friction Co efficient

ζ = Pressure Loss Factor


l = Length in Meter.
d = Diameter
ρ = Density (Kg/m3)= 1000

c = Velocity (m/s)

Page 12 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

λ ζ 1/2 ρc2 Pa ft

73100.00 73.10 24 As advised by UDC

0.01439 1585.57 34.219 0.034 0.01

0.65 1585.57 2061.23 2.061 0.68 Refer Page 7 of 11

0.01439 1585.57 228.126 0.228 0.07 As per Formula

0.03 1585.57 47.57 0.048 0.02 Assumed as Gate Valve. Refer Page 8 of 11

0.01439 1585.57 114.063 0.114 0.04 As per Formula

0.03 1585.57 47.57 0.048 0.02 Assumed as Gate Valve. Refer Page 8 of 11

0.01439 1585.57 114.063 0.114 0.04 As per Formula

0.55 1585.79 872.18 0.872 0.29 Refer Page 6 of 11

0.01340 1240.51 166.189 0.166 0.05 As per Formula

0.13 2552.16 331.78 0.332 0.11 Refer 7 of 11

0.01281 2552.16 261.510 0.262 0.09 As per Formula

0.55 2552.16 1403.69 1.404 0.46 Refer Page 7 of 11

Page 13 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

0.01281 2552.16 130.755 0.131 0.04 As per Formula

0.70 1240.51 868.35 0.868 0.28 Refer Page 6 of 11

0.01340 1240.51 55.396 0.055 0.02 As per Formula

0.70 1240.46 868.32 0.868 0.28 Refer Page 6 of 11

0.01340 1240.46 166.184 0.166 0.05 As per Formula

0.50 310.13 155.06 0.155 0.05 Refer Page 6 of 11

0.01439 1585.57 342.189 0.342 0.11 As per Formula

0.03 1585.57 47.57 0.048 0.02 Assumed as Gate Valve. Refer Page 8 of 11

6300.00 6.300 2.07 From Catalouge (Kv value-817) Refer Page 9 fo 11

0.01439 1585.57 34.219 0.034 0.01 As per Formula

0.65 1585.57 3091.85 3.092 1.01 Refer Page 7 of 11

0.01439 1585.57 34.219 0.034 0.01 As per Formula

3.20 1585.57 5073.81 5.074 1.66 Refer Page 8 of 11

Page 14 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

1.65 1585.57 2616.18 2.616 0.86 Assumed as Globe Valve

0.01439 1585.57 342.189 0.342 0.11 As per Formula

0.65 1585.57 4122.47 4.122 1.35 Refer Page 7 of 11

0.70 310.13 217.09 0.217 0.07 Refer Page 6 of 11

0.01593 310.13 49.399 0.049 0.02 As per Formula

0.70 1240.51 868.35 0.868 0.28 Refer Page 6 of 11

0.01340 1240.51 110.793 0.111 0.04 As per Formula

0.70 2552.16 1786.51 1.787 0.59 Refer Page 6 of 11

0.01281 2552.16 130.755 0.131 0.04 As per Formula

0.55 2552.16 1403.69 1.404 0.46 Refer Page 6 of 11

0.01281 2552.16 653.776 0.654 0.21 As per Formula

0.70 2552.16 1786.51 1.787 0.59 Refer Page 6 of 11

0.01283 2511.80 2320.981 2.321 0.76 As per Formula

0.55 2511.80 2762.98 2.763 0.91 Refer Page 7 of 11

Page 15 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

0.01283 2511.80 1083.124 1.083 0.36 As per Formula

0.55 2511.80 2762.98 2.763 0.91 Refer Page 7 of 11

0.01283 2511.80 9026.036 9.026 2.96 As per Formula

0.55 2511.80 2762.98 2.763 0.91 Refer Page 7 of 11

0.01283 2511.80 3610.414 3.610 1.18 As per Formula

0.55 2511.80 2762.98 2.763 0.91 Refer Page 7 of 11

0.01283 2511.80 1547.320 1.547 0.51 As per Formula

0.55 2511.80 2762.98 2.763 0.91 Refer Page 7 of 11

0.01283 2511.80 1547.320 1.547 0.51 As per Formula

0.55 2511.80 2762.98 2.763 0.91 Refer Page 6 of 11

0.01307 2171.93 2724.881 2.725 0.89 As per Formula

0.55 2171.93 2389.12 2.389 0.78 Refer Page 7 of 11

0.01307 2171.93 681.220 0.681 0.22 As per Formula

0.55 2171.93 2389.12 2.389 0.78 Refer Page 7 of 11

Page 16 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

0.01307 2171.93 1816.587 1.817 0.60 As per Formula

0.55 2171.93 2389.12 2.389 0.78 Refer Page 7 of 11

0.01307 2171.93 681.220 0.681 0.22 As per Formula

0.55 2171.93 2389.12 2.389 0.78 Refer Page 7 of 11

0.01307 2171.93 113.537 0.114 0.04 As per Formula

0.55 2171.93 2389.12 2.389 0.78 Refer Page 7 of 11

0.01307 2171.93 1816.587 1.817 0.60 As per Formula

0.55 2171.93 2389.12 2.389 0.78 Refer Page 7 of 11

0.55 2171.93 2389.12 2.389 0.78 Refer Page 7 of 11

0.01307 2171.93 1816.587 1.817 0.60 As per Formula

0.55 2171.93 9556.48 9.556 3.13 Refer Page 7 of 11

0.01315 2066.74 891.415 0.891 0.29 As per Formula

0.70 2066.74 2893.43 2.893 0.95 Refer Page 6 of 11

0.01333 1857.97 990.350 0.990 0.32 As per Formula

Page 17 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

0.70 1857.97 2601.15 2.601 0.85 Refer Page 6 of 11

0.01345 1723.62 1298.338 1.298 0.43 As per Formula

0.70 1723.62 2413.07 2.413 0.79 Refer Page 6 of 11

0.01359 1590.11 691.358 0.691 0.23 As per Formula

0.70 1590.11 2226.15 2.226 0.73 Refer Page 6 of 11

0.01372 1471.34 484.460 0.484 0.16 As per Formula

0.70 1471.34 2059.87 2.060 0.68 Refer Page 6 of 11

0.01386 1357.30 571.818 0.572 0.19 As per Formula

0.70 1357.30 1900.23 1.900 0.62 Refer Page 6 of 11

0.01400 1247.81 489.297 0.489 0.16 As per Formula

0.70 1247.81 1746.93 1.747 0.57 Refer Page 6 of 11

0.01416 1142.92 453.106 0.453 0.15 As per Formula

0.70 1142.92 1600.09 1.600 0.52 Refer Page 6 of 11

0.01432 1042.63 418.114 0.418 0.14 As per Formula

0.70 1042.63 1459.69 1.460 0.48 Refer Page 6 of 11

Page 18 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

0.01448 955.61 387.406 0.387 0.13 As per Formula

0.70 955.61 1337.85 1.338 0.44 Refer Page 6 of 11

0.01464 872.37 357.709 0.358 0.12 As per Formula

0.70 872.37 1221.32 1.221 0.40 Refer Page 6 of 11

0.15 1967.45 590.24 0.590 0.19 Refer Page 7 of 11

0.01401 1967.45 964.426 0.964 0.32 As per Formula

0.70 1967.45 2754.43 2.754 0.90 Refer Page 6 of 11

0.01418 1776.74 882.089 0.882 0.29 As per Formula

0.70 1776.74 2487.43 2.487 0.82 Refer Page 6 of 11

0.01438 1595.74 802.924 0.803 0.26 As per Formula

0.70 1595.74 2234.04 2.234 0.73 Refer Page 6 of 11

0.01458 1424.47 726.972 0.727 0.24 As per Formula

0.70 1424.47 1994.25 1.994 0.65 Refer Page 6 of 11

0.01480 1262.91 654.280 0.654 0.21 As per Formula

0.70 1262.91 1768.08 1.768 0.58 Refer Page 6 of 11

Page 19 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

0.01504 1111.08 584.896 0.585 0.19 As per Formula

0.70 1111.08 1555.51 1.556 0.51 Refer Page 6 of 11

0.01530 968.97 518.874 0.519 0.17 As per Formula

0.70 968.97 1356.55 1.357 0.44 Refer Page 6 of 11

0.01558 836.57 456.271 0.456 0.15 As per Formula

0.70 836.57 1171.20 1.171 0.38 Refer Page 6 of 11

0.01589 716.13 398.234 0.398 0.13 As per Formula

0.70 716.13 1002.58 1.003 0.33 Refer Page 6 of 11

0.01623 605.04 343.615 0.344 0.11 As per Formula

0.70 605.04 847.05 0.847 0.28 Refer Page 6 of 11

0.01660 503.31 317.557 0.318 0.10 As per Formula

0.70 503.31 704.63 0.705 0.23 Refer Page 6 of 11

0.01682 452.70 350.364 0.350 0.11 As per Formula

0.70 452.70 633.78 0.634 0.21 Refer Page 6 of 11

0.18 1031.14 365.02 0.365 0.12 Refer Page 7 of 11

Page 20 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

0.01626 1031.14 1145.582 1.146 0.38 As per Formula

0.58 1031.14 1196.12 1.196 0.39 Refer Page 6 of 11

0.01626 1031.14 1564.697 1.565 0.51 As per Formula

0.03 1031.14 30.93 0.031 0.01 Gate Valve. Refer Page 8 of 11

1.86 1031.14 1917.92 1.918 0.63 Assumed as Globe Valve. Refer Page 8 of 11

0.85 1031.14 2629.40 2.629 0.86 Refer Page 7 of 11

0.03 1031.14 30.930 0.031 0.01 Assumed as Gate Valve. Refer Page 8 of 11

0.85 1031.14 1752.93 1.753 0.57 Refer Page 7 of 11

0.01626 1031.14 223.528 0.224 0.07 As per Formula

0.58 1031.14 1196.12 1.196 0.39 Refer Page 6 of 11

0.01630 1011.97 1099.436 1.099 0.36 As per Formula

0.85 1011.97 1720.35 1.720 0.56 Refer Page 7 of 11

0.58 1011.97 1169.84 1.170 0.38 Refer Page 6 of 11

Page 21 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

0.01659 1992.58 991.724 0.992 0.33 As per Formula

1.10 1992.58 4383.68 4.384 1.44 Refer Page 7 of 11

0.03 1992.58 59.78 0.060 0.02 Gate Valve. Refer Page 8 of 11

6652.00 6.652 2.18 From Catalouge (Kv value-229)

0.01659 1992.58 99.172 0.099 0.03 As per Formula

1992.58 50000.00 50.000 16.40 As advised by UDC

0.01659 1992.58 99.172 0.099 0.03 As per Formula

0.01659 1992.58 991.724 0.992 0.33 As per Formula

1.10 1992.58 4383.68 4.384 1.44 Refer Page 7 of 11

2.20 1992.58 4383.68 4.384 1.44 Assumed as Globe Valve. Refer Page 8 of 11

2.20 1992.58 4383.68 4.384 1.44 Assumed as Globe Valve. Refer Page 8 of 11

0.01283 2511.88 644.737 0.645 0.21 As per Formula

0.55 2511.88 2763.07 2.763 0.91 Refer Page 7 of 11

Page 22 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

0.01283 2511.88 2965.789 2.966 0.97 As per Formula

0.70 2552.16 3573.02 3.573 1.17 Refer Page 6 of 11

2552.16 15000.00 15.00 4.92 As advised by UDC

0.01281 2552.16 653.776 0.654 0.21 As per Formula

0.13 1240.51 161.27 0.161 0.05 Refer Page 7 of 11

0.01340 1240.51 55.396 0.055 0.02 As per Formula

0.55 1240.51 682.28 0.682 0.22 Refer Page 6 of 11

0.01593 310.13 49.399 0.049 0.02 As per Formula

0.70 310.13 217.09 0.217 0.07 Refer Page 6 of 11

0.01439 1585.57 456.252 0.456 0.15 As per Formula

0.65 1585.57 1030.62 1.031 0.34 Refer Page 7 of 11

0.03 1585.57 47.57 0.048 0.02 Gate Valve. Refer Page 8 of 11

6300.00 6.300 2.07 From Catalouge (Kv value-817) Refer Page 9 of 11

0.01439 1585.57 34.219 0.034 0.01

Page 23 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

TOTAL (excluding HEX, AHU & AIR SEPARATOR) 225280.83 225.28 73.89

SAFETY FACTOR 5% 11264.04 11.26 3.69

GRAND TOTAL (excluding HEX, AHU & AIR SEPARATOR) 236544.87 236.54 77.59

RAND TOTAL (including HEX, AHU & AIR SEPARATOR) 374644.87 374.64 122.88

q1 = 114.872 l/s

dp1 = 3.75bar

q2 = 118 l/s
dp2 = dp1 / (q1/q2)2

dp2 = 3.96 bar

Page 24 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

d l Re k/d c

1 LEVEL P2 0-1 HEAT EX. 57.436

2 HEAT EX. TO HEADER

1-2 FLEX. 200 202.7 1 57.436 0.30 232728.186 4.93339911199E-07 1.78

2-3 ELBOW 200 202.7 2 57.436 1.78

3-4 PIPE 200 202.7 1 57.436 2.00 232728.186 4.93339911199E-07 1.78

4-5 MOTORIZED VALVE 200 202.7 1 57.436 1.78

5-6 PIPE 200 202.7 1 57.436 1.00 232728.186 4.93339911199E-07 1.78

6-7 IV 200 202.7 1 57.436 1.78

7-8 PIPE 200 202.7 1 57.436 1.00 232728.186 4.93339911199E-07 1.78

8-9 TEE 200 202.7 1 57.440 1.78

HEAT EX./PUMP
3 9-10 300 304.8 1 114.872 3.00 309540.703 3.28083989501E-07 1.58
HEADER

10-11 REDUCER 300 / 250 1 114.872 2.26

11-12 PIPE 250 254.5 1 114.872 2.00 370719.082 3.92927308448E-07 2.26

12-13 ELBOW 250 254.5 1 114.872 2.26

Page 25 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

13-14 PIPE 250 254.5 1 114.872 1.00 370719.082 3.92927308448E-07 2.26

14-15 TEE 300 304.8 1 114.872 1.58

15-16 PIPE 300 304.8 1 114.872 1.00 309540.703 3.28083989501E-07 1.58

16-17 TEE 300 304.8 1 114.870 1.58

17-18 PIPE 300 304.8 1 114.870 3.00 309535.314 3.28083989501E-07 1.58

18-19 TEE 300 304.8 1 57.436 0.79

4 PUMP SUCTION

19-20 PIPE 200 202.7 1 57.436 3.00 232728.186 4.93339911199E-07 1.78

20-21 IV 200 202.7 1 57.436 1.78

21-22 STAINER 200 202.7 1 57.436 1.78

22-23 FLEX. 200 202.7 1 57.436 0.30 232728.186 4.93339911199E-07 1.78

23-24 ELBOW 200 202.7 3 57.436 1.78

5 PUMP DISCHARGE

23-24 FLEX. 200 202.7 1 57.436 0.30 232728.186 4.93339911199E-07 1.78

24-25 NRV 200 202.7 1 57.436 1.78

Page 26 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

25-26 DRV 200 202.7 1 57.436 1.78

26-27 PIPE 200 202.7 1 57.436 3.00 232728.186 4.93339911199E-07 1.78

27-28 ELBOW 200 202.7 4 57.436 1.78

PUMP HEADER TO
6
TOWER RISER SUPPLY

28-29 TEE 300 304.8 1 57.436 0.79

29-30 PIPE 300 304.8 1 57.436 3.00 154770.352 3.28083989501E-07 0.79

30-31 TEE 300 304.8 1 114.872 1.58

31-32 PIPE 300 304.8 1 114.872 2.00 309540.703 3.28083989501E-07 1.58

32-33 TEE 250 254.5 1 114.872 2.26

33-33a PIPE 250 254.5 1 114.872 1.00 370719.082 3.92927308448E-07 2.26

33a-34 ELBOW 250 254.5 1 114.872 2.26

34-34a PIPE 250 254.5 1 114.872 5.00 370719.082 3.92927308448E-07 2.26

34a-35 TEE 250 254.5 1 114.872 2.26

35-36 PIPE 250 254.5 1 113.960 18.00 367775.843 3.92927308448E-07 2.24

36-37 ELBOW 250 254.5 2 113.960 2.24

Page 27 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

FLOOR PIPING SUPPLY


7 LEVEL P1
& RETURN

37-38 PIPE 250 254.5 2 113.960 4.20 367775.843 3.92927308448E-07 2.24

38-39 ELBOW 250 254.5 2 113.960 2.24

39-40 PIPE 250 254.5 2 113.960 35.00 367775.843 3.92927308448E-07 2.24

40-41 ELBOW 250 254.5 2 113.960 2.24

41-42 PIPE 250 254.5 2 113.960 14.00 367775.843 3.92927308448E-07 2.24

42-43 ELBOW 250 254.5 2 113.960 2.24

43-44 PIPE 250 254.5 2 113.960 6.00 367775.843 3.92927308448E-07 2.24

44-45 ELBOW 250 254.5 2 113.960 2.24

46-47 PIPE 250 254.5 2 113.960 6.00 367775.843 3.92927308448E-07 2.24

47-48 TEE 250 254.5 2 113.960 2.24

48-49 PIPE 250 254.5 2 105.970 12.00 341990.225 3.92927308448E-07 2.08

49-50 ELBOW 250 254.5 2 105.970 2.08

50-51 PIPE 250 254.5 2 105.970 3.00 341990.225 3.92927308448E-07 2.08

51-52 ELBOW 250 254.5 2 105.970 2.08

Page 28 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

52-53 PIPE 250 254.5 2 105.970 8.00 341990.225 3.92927308448E-07 2.08

53-54 ELBOW 250 254.5 2 105.970 2.08

54-55 PIPE 250 254.5 2 105.970 3.00 341990.225 3.92927308448E-07 2.08

55-56 ELBOW 250 254.5 2 105.970 2.08

56-57 PIPE 250 254.5 2 105.970 0.50 341990.225 3.92927308448E-07 2.08

57-58 ELBOW 250 254.5 2 105.970 2.08

58-59 PIPE 250 254.5 2 105.970 8.00 341990.225 3.92927308448E-07 2.08

59-60 ELBOW 250 254.5 2 105.970 2.08

60-61 ELBOW 250 254.5 2 105.970 2.08

61-62 PIPE 250 254.5 2 105.970 8.00 341990.225 3.92927308448E-07 2.08

62-63 ELBOW 250 254.5 8 105.970 2.08

TOWER RISER SUPPLY


8 RISER PIPNG
& RETURN

GROUND FLOOR 63-64 PIPE 250 254.5 2 103.372 4.10 333605.865 3.92927308448E-07 2.03

64-65 TEE 250 254.5 2 103.372 2.03

1ST FLOOR 65-66 PIPE 250 254.5 2 98.012 5.00 316307.879 3.92927308448E-07 1.93

Page 29 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

66-67 TEE 250 254.5 2 98.012 1.93

2ND FLOOR 67-68 PIPE 250 254.5 2 94.402 7.00 304657.556 3.92927308448E-07 1.86

68-69 TEE 250 254.5 2 94.402 1.86

3RD FLOOR 69-70 PIPE 250 254.5 2 90.672 4.00 292619.965 3.92927308448E-07 1.78

70-71 TEE 250 254.5 2 90.672 1.78

4TH FLOOR 71-72 PIPE 250 254.5 2 87.220 3.00 281479.545 3.92927308448E-07 1.72

72-73 TEE 250 254.5 2 87.220 1.72

5TH FLOOR 73-74 PIPE 250 254.5 2 83.772 3.80 270352.035 3.92927308448E-07 1.65

74-75 TEE 250 254.5 2 83.772 1.65

6TH FLOOR 75-76 PIPE 250 254.5 2 80.322 3.50 259218.070 3.92927308448E-07 1.58

76-77 TEE 250 254.5 2 80.322 1.58

7TH FLOOR 77-78 PIPE 250 254.5 2 76.872 3.50 248084.105 3.92927308448E-07 1.51

78-79 TEE 250 254.5 2 76.872 1.51

8TH FLOOR 79-80 PIPE 250 254.5 2 73.422 3.50 236950.140 3.92927308448E-07 1.44

80-81 TEE 250 254.5 2 73.422 1.44

Page 30 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

9TH FLOOR 81-82 PIPE 250 254.5 2 70.291 3.50 226845.663 3.92927308448E-07 1.38

82-83 TEE 250 254.5 2 70.291 1.38

10TH FLOOR 83-84 PIPE 250 254.5 2 67.160 3.50 216741.186 3.92927308448E-07 1.32

84-85 TEE 250 254.5 2 67.160 1.32

85-86 REDUCER 250 / 200 2 63.980 1.98

11TH FLOOR 86-87 PIPE 200 202.7 2 63.980 3.50 259244.190 4.93339911199E-07 1.98

87-88 TEE 200 202.7 2 63.980 1.98

12TH FLOOR 88-89 PIPE 200 202.7 2 60.800 3.50 246358.968 4.93339911199E-07 1.89

89-90 TEE 200 202.7 2 60.800 1.89

13TH FLOOR 90-91 PIPE 200 202.7 2 57.620 3.50 233473.746 4.93339911199E-07 1.79

91-92 TEE 200 202.7 2 57.620 1.79

14TH FLOOR 92-93 PIPE 200 202.7 2 54.440 3.50 220588.523 4.93339911199E-07 1.69

93-94 TEE 200 202.7 2 54.440 1.69

15TH FLOOR 94-95 PIPE 200 202.7 2 51.260 3.50 207703.301 4.93339911199E-07 1.59

95-96 TEE 200 202.7 2 51.260 1.59

Page 31 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

16TH FLOOR 96-97 PIPE 200 202.7 2 48.080 3.50 194818.079 4.93339911199E-07 1.49

97-98 TEE 200 202.7 2 48.080 1.49

17TH FLOOR 98-99 PIPE 200 202.7 2 44.900 3.50 181932.856 4.93339911199E-07 1.39

99-100 TEE 200 202.7 2 44.900 1.39

18TH FLOOR 100-101 PIPE 200 202.7 2 41.720 3.50 169047.634 4.93339911199E-07 1.29

101-102 TEE 200 202.7 2 41.720 1.29

19TH FLOOR 102-103 PIPE 200 202.7 2 38.600 3.50 156405.529 4.93339911199E-07 1.20

103-104 TEE 200 202.7 2 38.600 1.20

20TH FLOOR 104-105 PIPE 200 202.7 2 35.480 3.50 143763.424 4.93339911199E-07 1.10

105-106 TEE 200 202.7 2 35.480 1.10

21TH FLOOR
106-107 PIPE 200 202.7 2 32.360 3.80 131121.319 4.93339911199E-07 1.00
PENTHOUSE

107-108 TEE 200 202.7 2 32.360 1.00

MEZ. FLOOR 108-109 PIPE 200 202.7 2 30.690 4.60 124354.551 4.93339911199E-07 0.95

109-110 TEE 200 202.7 2 30.690 0.95

110-111 REDUCER 200 / 150 2 26.770 1.44

Page 32 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

ROOF LEVEL 2 111-112 PIPE 150 154.1 2 26.770 5.13 142680.387 6.4892926671E-07 1.44

112-113 TEE 150 154.1 2 26.770 1.44

9 ROOF LEVEL 2 FLOOR PIPING SUPPLY

113-114 PIPE 150 154.1 2 26.770 7.00 142680.387 6.4892926671E-07 1.44

114-115 IV 150 154.1 1 26.770 1.44

115-116 DRV 150 154.1 1 26.770 1.44

116-117 ELBOW 150 154.1 3 26.770 1.44

117-118 BTU METER 150 154.1 1 26.770 1.44

118-119 ELBOW 150 154.1 2 26.770 1.44

119-120 PIPE 150 154.1 2 26.770 1.00 142680.387 6.4892926671E-07 1.44

120-121 TEE 150 154.1 2 26.770 1.44

121-122 PIPE 150 154.1 2 26.520 5.00 141347.921 6.4892926671E-07 1.42

122-123 ELBOW 150 154.1 2 26.520 1.42

123-124 TEE 150 154.1 2 26.520 1.42

AHU TAPPING

Page 33 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

124-125 PIPE 100 102.3 1 16.400 3.00 131669.977 9.77517106549E-07 2.00

125-126 ELBOW 100 102.3 2 16.400 2.00

126-127 IV 100 102.3 1 16.400 2.00

127-128 STRAINER 100 102.3 1 16.400 2.00

128-129 FLEX. 100 102.3 1 16.400 0.30 131669.977 9.77517106549E-07 2.00

129-130 AHU 100 102.3 1 16.400 2.00

AHU RETURN

130-131 FLEX. 100 102.3 1 16.400 0.30 131669.977 9.77517106549E-07 2.00

131-132 PIPE 100 102.3 1 16.400 3.00 131669.977 9.77517106549E-07 2.00

132-133 ELBOW 100 102.3 2 16.400 2.00

133-134 CONTROL VALVE 100 102.3 1 16.400 2.00

BALANCING CONTROL
134-135 100 102.3 1 16.400 2.00
VALVE

TOWER RETURN TO
10
HEAT EX. HEADER

135-136 PIPE 250 254.5 1 113.962 5.00 367782.297 3.92927308448E-07 2.24

136-137 ELBOW 250 254.5 2 113.962 2.24

Page 34 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

137-138 PIPE 250 254.5 1 113.962 23.00 367782.297 3.92927308448E-07 2.24

138-139 TEE 250 254.5 2 114.872 2.26

139-140 AIR SEPERATOR 250 254.5 1 114.872 2.26

140-141 PIPE 250 254.5 1 114.872 5.00 370719.082 3.92927308448E-07 2.26

141-142 REDUCER 250 / 300 1 114.872 1.58

142-143 PIPE 300 304.8 1 114.872 1.00 309540.703 3.28083989501E-07 1.58

143-144 TEE 300 304.8 1 114.872 1.58

144-145 PIPE 300 304.8 1 57.436 3.00 154770.352 3.28083989501E-07 0.79

145-146 TEE 300 304.8 1 57.436 0.79

11 HEAT EX. TAPPING

146-147 PIPE 200 202.7 1 57.436 4.00 232728.186 4.93339911199E-07 1.78

147-148 ELBOW 200 202.7 1 57.436 1.78

148-149 IV 200 202.7 1 57.436 1.78

149-150 STRAINER 200 202.7 1 57.436 1.78

150-151 FLEX. 200 202.7 1 57.436 0.30 232728.186 4.93339911199E-07 1.78

Page 35 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number
Internal Roughness (M/S)
pipe Dia LENGTH /
PIPE DIA WATER
NODE from EQ. LENGTH Re=(Density x
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow
POINTS Catalouge (MTR) Velocity x Pipe Dia) /
(mm) Table 4.1) (m3/s) / Area m2
Dynamic Viscosity

TOTAL (excluding HEX, AH

GRAND TOTAL (excluding HEX, AH

GRAND TOTAL (including HEX, AHU &

Note :

Pr. Loss for Pipe (Pa) = λ x l/d x 1/2 ρc2 Pump Affinity Law

q1/q2 = n1/n2

Pr. Loss for Fittings (Pa) = ζ x 1/2 ρc2 dp1/dp2 = (n1/n2)2

where dp1/dp2 = (q1/q2)2


λ = Friction Co efficient

ζ = Pressure Loss Factor


l = Length in Meter.
d = Diameter
ρ = Density (Kg/m3)= 1000

c = Velocity (m/s)

Page 36 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

λ ζ 1/2 ρc2 Pa ft

73100.00 73.10 24 As advised by UDC

0.01439 1585.57 34.219 0.034 0.01

0.65 1585.57 2061.23 2.061 0.68 Refer Page 7 of 11

0.01439 1585.57 228.126 0.228 0.07 As per Formula

0.03 1585.57 47.57 0.048 0.02 Assumed as Gate Valve. Refer Page 8 of 11

0.01439 1585.57 114.063 0.114 0.04 As per Formula

0.03 1585.57 47.57 0.048 0.02 Assumed as Gate Valve. Refer Page 8 of 11

0.01439 1585.57 114.063 0.114 0.04 As per Formula

0.55 1585.79 872.18 0.872 0.29 Refer Page 6 of 11

0.01340 1240.51 166.189 0.166 0.05 As per Formula

0.13 2552.16 331.78 0.332 0.11 Refer 7 of 11

0.01281 2552.16 261.510 0.262 0.09 As per Formula

0.55 2552.16 1403.69 1.404 0.46 Refer Page 7 of 11

Page 37 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

0.01281 2552.16 130.755 0.131 0.04 As per Formula

0.70 1240.51 868.35 0.868 0.28 Refer Page 6 of 11

0.01340 1240.51 55.396 0.055 0.02 As per Formula

0.70 1240.46 868.32 0.868 0.28 Refer Page 6 of 11

0.01340 1240.46 166.184 0.166 0.05 As per Formula

0.50 310.13 155.06 0.155 0.05 Refer Page 6 of 11

0.01439 1585.57 342.189 0.342 0.11 As per Formula

0.03 1585.57 47.57 0.048 0.02 Assumed as Gate Valve. Refer Page 8 of 11

6300.00 6.300 2.07 From Catalouge (Kv value-817) Refer Page 9 fo 11

0.01439 1585.57 34.219 0.034 0.01 As per Formula

0.65 1585.57 3091.85 3.092 1.01 Refer Page 7 of 11

0.01439 1585.57 34.219 0.034 0.01 As per Formula

3.20 1585.57 5073.81 5.074 1.66 Refer Page 8 of 11

Page 38 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

1.65 1585.57 2616.18 2.616 0.86 Assumed as Globe Valve

0.01439 1585.57 342.189 0.342 0.11 As per Formula

0.65 1585.57 4122.47 4.122 1.35 Refer Page 7 of 11

0.70 310.13 217.09 0.217 0.07 Refer Page 6 of 11

0.01593 310.13 49.399 0.049 0.02 As per Formula

0.70 1240.51 868.35 0.868 0.28 Refer Page 6 of 11

0.01340 1240.51 110.793 0.111 0.04 As per Formula

0.70 2552.16 1786.51 1.787 0.59 Refer Page 6 of 11

0.01281 2552.16 130.755 0.131 0.04 As per Formula

0.55 2552.16 1403.69 1.404 0.46 Refer Page 6 of 11

0.01281 2552.16 653.776 0.654 0.21 As per Formula

0.70 2552.16 1786.51 1.787 0.59 Refer Page 6 of 11

0.01283 2511.80 2320.981 2.321 0.76 As per Formula

0.55 2511.80 2762.98 2.763 0.91 Refer Page 7 of 11

Page 39 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

0.01283 2511.80 1083.124 1.083 0.36 As per Formula

0.55 2511.80 2762.98 2.763 0.91 Refer Page 7 of 11

0.01283 2511.80 9026.036 9.026 2.96 As per Formula

0.55 2511.80 2762.98 2.763 0.91 Refer Page 7 of 11

0.01283 2511.80 3610.414 3.610 1.18 As per Formula

0.55 2511.80 2762.98 2.763 0.91 Refer Page 7 of 11

0.01283 2511.80 1547.320 1.547 0.51 As per Formula

0.55 2511.80 2762.98 2.763 0.91 Refer Page 7 of 11

0.01283 2511.80 1547.320 1.547 0.51 As per Formula

0.55 2511.80 2762.98 2.763 0.91 Refer Page 6 of 11

0.01307 2171.93 2724.881 2.725 0.89 As per Formula

0.55 2171.93 2389.12 2.389 0.78 Refer Page 7 of 11

0.01307 2171.93 681.220 0.681 0.22 As per Formula

0.55 2171.93 2389.12 2.389 0.78 Refer Page 7 of 11

Page 40 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

0.01307 2171.93 1816.587 1.817 0.60 As per Formula

0.55 2171.93 2389.12 2.389 0.78 Refer Page 7 of 11

0.01307 2171.93 681.220 0.681 0.22 As per Formula

0.55 2171.93 2389.12 2.389 0.78 Refer Page 7 of 11

0.01307 2171.93 113.537 0.114 0.04 As per Formula

0.55 2171.93 2389.12 2.389 0.78 Refer Page 7 of 11

0.01307 2171.93 1816.587 1.817 0.60 As per Formula

0.55 2171.93 2389.12 2.389 0.78 Refer Page 7 of 11

0.55 2171.93 2389.12 2.389 0.78 Refer Page 7 of 11

0.01307 2171.93 1816.587 1.817 0.60 As per Formula

0.55 2171.93 9556.48 9.556 3.13 Refer Page 7 of 11

0.01315 2066.74 891.415 0.891 0.29 As per Formula

0.70 2066.74 2893.43 2.893 0.95 Refer Page 6 of 11

0.01333 1857.97 990.350 0.990 0.32 As per Formula

Page 41 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

0.70 1857.97 2601.15 2.601 0.85 Refer Page 6 of 11

0.01345 1723.62 1298.338 1.298 0.43 As per Formula

0.70 1723.62 2413.07 2.413 0.79 Refer Page 6 of 11

0.01359 1590.11 691.358 0.691 0.23 As per Formula

0.70 1590.11 2226.15 2.226 0.73 Refer Page 6 of 11

0.01372 1471.34 484.460 0.484 0.16 As per Formula

0.70 1471.34 2059.87 2.060 0.68 Refer Page 6 of 11

0.01386 1357.30 571.818 0.572 0.19 As per Formula

0.70 1357.30 1900.23 1.900 0.62 Refer Page 6 of 11

0.01400 1247.81 489.297 0.489 0.16 As per Formula

0.70 1247.81 1746.93 1.747 0.57 Refer Page 6 of 11

0.01416 1142.92 453.106 0.453 0.15 As per Formula

0.70 1142.92 1600.09 1.600 0.52 Refer Page 6 of 11

0.01432 1042.63 418.114 0.418 0.14 As per Formula

0.70 1042.63 1459.69 1.460 0.48 Refer Page 6 of 11

Page 42 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

0.01448 955.61 387.406 0.387 0.13 As per Formula

0.70 955.61 1337.85 1.338 0.44 Refer Page 6 of 11

0.01464 872.37 357.709 0.358 0.12 As per Formula

0.70 872.37 1221.32 1.221 0.40 Refer Page 6 of 11

0.15 1967.45 590.24 0.590 0.19 Refer Page 7 of 11

0.01401 1967.45 964.426 0.964 0.32 As per Formula

0.70 1967.45 2754.43 2.754 0.90 Refer Page 6 of 11

0.01418 1776.74 882.089 0.882 0.29 As per Formula

0.70 1776.74 2487.43 2.487 0.82 Refer Page 6 of 11

0.01438 1595.74 802.924 0.803 0.26 As per Formula

0.70 1595.74 2234.04 2.234 0.73 Refer Page 6 of 11

0.01458 1424.47 726.972 0.727 0.24 As per Formula

0.70 1424.47 1994.25 1.994 0.65 Refer Page 6 of 11

0.01480 1262.91 654.280 0.654 0.21 As per Formula

0.70 1262.91 1768.08 1.768 0.58 Refer Page 6 of 11

Page 43 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

0.01504 1111.08 584.896 0.585 0.19 As per Formula

0.70 1111.08 1555.51 1.556 0.51 Refer Page 6 of 11

0.01530 968.97 518.874 0.519 0.17 As per Formula

0.70 968.97 1356.55 1.357 0.44 Refer Page 6 of 11

0.01558 836.57 456.271 0.456 0.15 As per Formula

0.70 836.57 1171.20 1.171 0.38 Refer Page 6 of 11

0.01589 716.13 398.234 0.398 0.13 As per Formula

0.70 716.13 1002.58 1.003 0.33 Refer Page 6 of 11

0.01623 605.04 343.615 0.344 0.11 As per Formula

0.70 605.04 847.05 0.847 0.28 Refer Page 6 of 11

0.01660 503.31 317.557 0.318 0.10 As per Formula

0.70 503.31 704.63 0.705 0.23 Refer Page 6 of 11

0.01682 452.70 350.364 0.350 0.11 As per Formula

0.70 452.70 633.78 0.634 0.21 Refer Page 6 of 11

0.18 1031.14 365.02 0.365 0.12 Refer Page 7 of 11

Page 44 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

0.01626 1031.14 1145.582 1.146 0.38 As per Formula

0.58 1031.14 1196.12 1.196 0.39 Refer Page 6 of 11

0.01626 1031.14 1564.697 1.565 0.51 As per Formula

0.03 1031.14 30.93 0.031 0.01 Gate Valve. Refer Page 8 of 11

1.86 1031.14 1917.92 1.918 0.63 Assumed as Globe Valve. Refer Page 8 of 11

0.85 1031.14 2629.40 2.629 0.86 Refer Page 7 of 11

0.03 1031.14 30.930 0.031 0.01 Assumed as Gate Valve. Refer Page 8 of 11

0.85 1031.14 1752.93 1.753 0.57 Refer Page 7 of 11

0.01626 1031.14 223.528 0.224 0.07 As per Formula

0.58 1031.14 1196.12 1.196 0.39 Refer Page 6 of 11

0.01630 1011.97 1099.436 1.099 0.36 As per Formula

0.85 1011.97 1720.35 1.720 0.56 Refer Page 7 of 11

0.58 1011.97 1169.84 1.170 0.38 Refer Page 6 of 11

Page 45 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

0.01659 1992.58 991.724 0.992 0.33 As per Formula

1.10 1992.58 4383.68 4.384 1.44 Refer Page 7 of 11

0.03 1992.58 59.78 0.060 0.02 Gate Valve. Refer Page 8 of 11

6652.00 6.652 2.18 From Catalouge (Kv value-229)

0.01659 1992.58 99.172 0.099 0.03 As per Formula

1992.58 50000.00 50.000 16.40 As advised by UDC

0.01659 1992.58 99.172 0.099 0.03 As per Formula

0.01659 1992.58 991.724 0.992 0.33 As per Formula

1.10 1992.58 4383.68 4.384 1.44 Refer Page 7 of 11

2.20 1992.58 4383.68 4.384 1.44 Assumed as Globe Valve. Refer Page 8 of 11

2.20 1992.58 4383.68 4.384 1.44 Assumed as Globe Valve. Refer Page 8 of 11

0.01283 2511.88 644.737 0.645 0.21 As per Formula

0.55 2511.88 2763.07 2.763 0.91 Refer Page 7 of 11

Page 46 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

0.01283 2511.88 2965.789 2.966 0.97 As per Formula

0.70 2552.16 3573.02 3.573 1.17 Refer Page 6 of 11

2552.16 15000.00 15.00 4.92 As advised by UDC

0.01281 2552.16 653.776 0.654 0.21 As per Formula

0.13 1240.51 161.27 0.161 0.05 Refer Page 7 of 11

0.01340 1240.51 55.396 0.055 0.02 As per Formula

0.55 1240.51 682.28 0.682 0.22 Refer Page 6 of 11

0.01593 310.13 49.399 0.049 0.02 As per Formula

0.70 310.13 217.09 0.217 0.07 Refer Page 6 of 11

0.01439 1585.57 456.252 0.456 0.15 As per Formula

0.65 1585.57 1030.62 1.031 0.34 Refer Page 7 of 11

0.03 1585.57 47.57 0.048 0.02 Gate Valve. Refer Page 8 of 11

6300.00 6.300 2.07 From Catalouge (Kv value-817) Refer Page 9 of 11

0.01439 1585.57 34.219 0.034 0.01

Page 47 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Friction Factor Pressure Loss

Velocity
From CIBSE Pressure
λ = 0.11((k/d) + Remarks
Table 4.47 to Pa Kpa feet
(68/Re))0.25
4.53

TOTAL (excluding HEX, AHU & AIR SEPARATOR) 225280.83 225.28 73.89

SAFETY FACTOR 10% 22528.08 22.53 7.39

GRAND TOTAL (excluding HEX, AHU & AIR SEPARATOR) 247808.91 247.81 81.28

RAND TOTAL (including HEX, AHU & AIR SEPARATOR) 385908.91 385.91 126.58

q1 = 114.872 l/s

dp1 = 3.86bar

q2 = 118 l/s
dp2 = dp1 / (q1/q2)2

dp2 = 4.07 bar

Page 48 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number Friction Factor Pressure Loss
Internal Roughness (M/S) Friction
pipe Dia LENGTH / Factor λ
PIPE DIA WATER Velocity
NODE from EQ. LENGTH Re=(Density x From CIBSE (through
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow λ = 0.11((k/d) + Pressure
POINTS Catalouge (MTR) Velocity x Pipe Dia) / Table 4.47 to Iteration Pa Kpa
(mm) Table 4.1) (m3/s) / Area m2 (68/Re))0.25 formula)
Dynamic Viscosity 4.53

d l Re k/d c λ ζ 1/2 ρc2 Pa

1 LEVEL P2 0-1 HEAT EX. 57.436 73100.00 73.10

2 HEAT EX. TO HEADER

1-2 FLEX. 200 202.7 1 57.436 0.30 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 36.110 0.036

2-3 ELBOW 200 202.7 2 57.436 1.78 0.65 1585.57 2061.23 2.061

3-4 PIPE 200 202.7 1 57.436 2.00 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 240.736 0.241

4-5 MOTORIZED VALVE 200 202.7 1 57.436 1.78 0.03 1585.57 47.57 0.048

5-6 PIPE 200 202.7 1 57.436 1.00 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 120.368 0.120

6-7 IV 200 202.7 1 57.436 1.78 0.03 1585.57 47.57 0.048

7-8 PIPE 200 202.7 1 57.436 1.00 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 120.368 0.120

8-9 TEE 200 202.7 1 57.440 1.78 0.55 1585.79 872.18 0.872

HEAT EX./PUMP
3 9-10 300 304.8 1 114.872 3.00 309540.703 3.28083989501E-07 1.58 0.01340 0.01438 1240.51 178.354 0.178
HEADER

10-11 REDUCER 300 / 250 1 114.872 2.26 0.13 2552.16 331.78 0.332

11-12 PIPE 250 254.5 1 114.872 2.00 370719.082 3.92927308448E-07 2.26 0.01281 0.01390 2552.16 283.809 0.284

12-13 ELBOW 250 254.5 1 114.872 2.26 0.55 2552.16 1403.69 1.404

13-14 PIPE 250 254.5 1 114.872 1.00 370719.082 3.92927308448E-07 2.26 0.01281 0.01390 2552.16 141.905 0.142

14-15 TEE 300 304.8 1 114.872 1.58 0.70 1240.51 868.35 0.868

15-16 PIPE 300 304.8 1 114.872 1.00 309540.703 3.28083989501E-07 1.58 0.01340 0.01438 1240.51 59.451 0.059

16-17 TEE 300 304.8 1 114.870 1.58 0.70 1240.46 868.32 0.868

17-18 PIPE 300 304.8 1 114.870 3.00 309535.314 3.28083989501E-07 1.58 0.01340 0.01438 1240.46 178.349 0.178

18-19 TEE 300 304.8 1 57.436 0.79 0.50 310.13 155.06 0.155

4 PUMP SUCTION

19-20 PIPE 200 202.7 1 57.436 3.00 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 361.104 0.361

20-21 IV 200 202.7 1 57.436 1.78 0.03 1585.57 47.57 0.048

21-22 STAINER 200 202.7 1 57.436 1.78 6300.00 6.300

Page 49 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number Friction Factor Pressure Loss
Internal Roughness (M/S) Friction
pipe Dia LENGTH / Factor λ
PIPE DIA WATER Velocity
NODE from EQ. LENGTH Re=(Density x From CIBSE (through
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow λ = 0.11((k/d) + Pressure
POINTS Catalouge (MTR) Velocity x Pipe Dia) / Table 4.47 to Iteration Pa Kpa
(mm) Table 4.1) (m3/s) / Area m2 (68/Re))0.25 formula)
Dynamic Viscosity 4.53

22-23 FLEX. 200 202.7 1 57.436 0.30 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 36.110 0.036

23-24 ELBOW 200 202.7 3 57.436 1.78 0.65 1585.57 3091.85 3.092

5 PUMP DISCHARGE

23-24 FLEX. 200 202.7 1 57.436 0.30 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 36.110 0.036

24-25 NRV 200 202.7 1 57.436 1.78 3.20 1585.57 5073.81 5.074

25-26 DRV 200 202.7 1 57.436 1.78 1.65 1585.57 2616.18 2.616

26-27 PIPE 200 202.7 1 57.436 3.00 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 361.104 0.361

27-28 ELBOW 200 202.7 4 57.436 1.78 0.65 1585.57 4122.47 4.122

PUMP HEADER TO
6
TOWER RISER SUPPLY

28-29 TEE 300 304.8 1 57.436 0.79 0.70 310.13 217.09 0.217

29-30 PIPE 300 304.8 1 57.436 3.00 154770.352 3.28083989501E-07 0.79 0.01593 0.01645 310.13 51.024 0.051

30-31 TEE 300 304.8 1 114.872 1.58 0.70 1240.51 868.35 0.868

31-32 PIPE 300 304.8 1 114.872 2.00 309540.703 3.28083989501E-07 1.58 0.01340 0.01438 1240.51 118.903 0.119

32-33 TEE 250 254.5 1 114.872 2.26 0.70 2552.16 1786.51 1.787

33-33a PIPE 250 254.5 1 114.872 1.00 370719.082 3.92927308448E-07 2.26 0.01281 0.01390 2552.16 141.905 0.142

33a-34 ELBOW 250 254.5 1 114.872 2.26 0.55 2552.16 1403.69 1.404

34-34a PIPE 250 254.5 1 114.872 5.00 370719.082 3.92927308448E-07 2.26 0.01281 0.01390 2552.16 709.523 0.710

34a-35 TEE 250 254.5 1 114.872 2.26 0.70 2552.16 1786.51 1.787

35-36 PIPE 250 254.5 1 113.960 18.00 367775.843 3.92927308448E-07 2.24 0.01283 0.01392 2511.80 2517.622 2.518

36-37 ELBOW 250 254.5 2 113.960 2.24 0.55 2511.80 2762.98 2.763

FLOOR PIPING SUPPLY


7 LEVEL P1
& RETURN

37-38 PIPE 250 254.5 2 113.960 4.20 367775.843 3.92927308448E-07 2.24 0.01283 0.01392 2511.80 1174.890 1.175

38-39 ELBOW 250 254.5 2 113.960 2.24 0.55 2511.80 2762.98 2.763

39-40 PIPE 250 254.5 2 113.960 35.00 367775.843 3.92927308448E-07 2.24 0.01283 0.01392 2511.80 9790.753 9.791

40-41 ELBOW 250 254.5 2 113.960 2.24 0.55 2511.80 2762.98 2.763

Page 50 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number Friction Factor Pressure Loss
Internal Roughness (M/S) Friction
pipe Dia LENGTH / Factor λ
PIPE DIA WATER Velocity
NODE from EQ. LENGTH Re=(Density x From CIBSE (through
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow λ = 0.11((k/d) + Pressure
POINTS Catalouge (MTR) Velocity x Pipe Dia) / Table 4.47 to Iteration Pa Kpa
(mm) Table 4.1) (m3/s) / Area m2 (68/Re))0.25 formula)
Dynamic Viscosity 4.53

41-42 PIPE 250 254.5 2 113.960 14.00 367775.843 3.92927308448E-07 2.24 0.01283 0.01392 2511.80 3916.301 3.916

42-43 ELBOW 250 254.5 2 113.960 2.24 0.55 2511.80 2762.98 2.763

43-44 PIPE 250 254.5 2 113.960 6.00 367775.843 3.92927308448E-07 2.24 0.01283 0.01392 2511.80 1678.415 1.678

44-45 ELBOW 250 254.5 2 113.960 2.24 0.55 2511.80 2762.98 2.763

46-47 PIPE 250 254.5 2 113.960 6.00 367775.843 3.92927308448E-07 2.24 0.01283 0.01392 2511.80 1678.415 1.678

47-48 TEE 250 254.5 2 113.960 2.24 0.55 2511.80 2762.98 2.763

48-49 PIPE 250 254.5 2 105.970 12.00 341990.225 3.92927308448E-07 2.08 0.01307 0.01411 2171.93 2942.236 2.942

49-50 ELBOW 250 254.5 2 105.970 2.08 0.55 2171.93 2389.12 2.389

50-51 PIPE 250 254.5 2 105.970 3.00 341990.225 3.92927308448E-07 2.08 0.01307 0.01411 2171.93 735.559 0.736

51-52 ELBOW 250 254.5 2 105.970 2.08 0.55 2171.93 2389.12 2.389

52-53 PIPE 250 254.5 2 105.970 8.00 341990.225 3.92927308448E-07 2.08 0.01307 0.01411 2171.93 1961.491 1.961

53-54 ELBOW 250 254.5 2 105.970 2.08 0.55 2171.93 2389.12 2.389

54-55 PIPE 250 254.5 2 105.970 3.00 341990.225 3.92927308448E-07 2.08 0.01307 0.01411 2171.93 735.559 0.736

55-56 ELBOW 250 254.5 2 105.970 2.08 0.55 2171.93 2389.12 2.389

56-57 PIPE 250 254.5 2 105.970 0.50 341990.225 3.92927308448E-07 2.08 0.01307 0.01411 2171.93 122.593 0.123

57-58 ELBOW 250 254.5 2 105.970 2.08 0.55 2171.93 2389.12 2.389

58-59 PIPE 250 254.5 2 105.970 8.00 341990.225 3.92927308448E-07 2.08 0.01307 0.01411 2171.93 1961.491 1.961

59-60 ELBOW 250 254.5 2 105.970 2.08 0.55 2171.93 2389.12 2.389

60-61 ELBOW 250 254.5 2 105.970 2.08 0.55 2171.93 2389.12 2.389

61-62 PIPE 250 254.5 2 105.970 8.00 341990.225 3.92927308448E-07 2.08 0.01307 0.01411 2171.93 1961.491 1.961

62-63 ELBOW 250 254.5 8 105.970 2.08 0.55 2171.93 9556.48 9.556

TOWER RISER SUPPLY


8 RISER PIPNG
& RETURN

GROUND FLOOR 63-64 PIPE 250 254.5 2 103.372 4.10 333605.865 3.92927308448E-07 2.03 0.01315 0.01418 2066.74 961.004 0.961

64-65 TEE 250 254.5 2 103.372 2.03 0.70 2066.74 2893.43 2.893

1ST FLOOR 65-66 PIPE 250 254.5 2 98.012 5.00 316307.879 3.92927308448E-07 1.93 0.01333 0.01432 1857.97 1064.183 1.064

Page 51 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number Friction Factor Pressure Loss
Internal Roughness (M/S) Friction
pipe Dia LENGTH / Factor λ
PIPE DIA WATER Velocity
NODE from EQ. LENGTH Re=(Density x From CIBSE (through
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow λ = 0.11((k/d) + Pressure
POINTS Catalouge (MTR) Velocity x Pipe Dia) / Table 4.47 to Iteration Pa Kpa
(mm) Table 4.1) (m3/s) / Area m2 (68/Re))0.25 formula)
Dynamic Viscosity 4.53

66-67 TEE 250 254.5 2 98.012 1.93 0.70 1857.97 2601.15 2.601

2ND FLOOR 67-68 PIPE 250 254.5 2 94.402 7.00 304657.556 3.92927308448E-07 1.86 0.01345 0.01442 1723.62 1391.963 1.392

68-69 TEE 250 254.5 2 94.402 1.86 0.70 1723.62 2413.07 2.413

3RD FLOOR 69-70 PIPE 250 254.5 2 90.672 4.00 292619.965 3.92927308448E-07 1.78 0.01359 0.01453 1590.11 739.415 0.739

70-71 TEE 250 254.5 2 90.672 1.78 0.70 1590.11 2226.15 2.226

4TH FLOOR 71-72 PIPE 250 254.5 2 87.220 3.00 281479.545 3.92927308448E-07 1.72 0.01372 0.01464 1471.34 516.926 0.517

72-73 TEE 250 254.5 2 87.220 1.72 0.70 1471.34 2059.87 2.060

5TH FLOOR 73-74 PIPE 250 254.5 2 83.772 3.80 270352.035 3.92927308448E-07 1.65 0.01386 0.01475 1357.30 608.656 0.609

74-75 TEE 250 254.5 2 83.772 1.65 0.70 1357.30 1900.23 1.900

6TH FLOOR 75-76 PIPE 250 254.5 2 80.322 3.50 259218.070 3.92927308448E-07 1.58 0.01400 0.01487 1247.81 519.574 0.520

76-77 TEE 250 254.5 2 80.322 1.58 0.70 1247.81 1746.93 1.747

7TH FLOOR 77-78 PIPE 250 254.5 2 76.872 3.50 248084.105 3.92927308448E-07 1.51 0.01416 0.01500 1142.92 479.912 0.480

78-79 TEE 250 254.5 2 76.872 1.51 0.70 1142.92 1600.09 1.600

8TH FLOOR 79-80 PIPE 250 254.5 2 73.422 3.50 236950.140 3.92927308448E-07 1.44 0.01432 0.01513 1042.63 441.702 0.442

80-81 TEE 250 254.5 2 73.422 1.44 0.70 1042.63 1459.69 1.460

9TH FLOOR 81-82 PIPE 250 254.5 2 70.291 3.50 226845.663 3.92927308448E-07 1.38 0.01448 0.01526 955.61 408.255 0.408

82-83 TEE 250 254.5 2 70.291 1.38 0.70 955.61 1337.85 1.338

10TH FLOOR 83-84 PIPE 250 254.5 2 67.160 3.50 216741.186 3.92927308448E-07 1.32 0.01464 0.01539 872.37 376.022 0.376

84-85 TEE 250 254.5 2 67.160 1.32 0.70 872.37 1221.32 1.221

85-86 REDUCER 250 / 200 2 63.980 1.98 0.15 1967.45 590.24 0.590

11TH FLOOR 86-87 PIPE 200 202.7 2 63.980 3.50 259244.190 4.93339911199E-07 1.98 0.01401 0.01487 1967.45 1024.010 1.024

87-88 TEE 200 202.7 2 63.980 1.98 0.70 1967.45 2754.43 2.754

12TH FLOOR 88-89 PIPE 200 202.7 2 60.800 3.50 246358.968 4.93339911199E-07 1.89 0.01418 0.01502 1776.74 933.817 0.934

89-90 TEE 200 202.7 2 60.800 1.89 0.70 1776.74 2487.43 2.487

13TH FLOOR 90-91 PIPE 200 202.7 2 57.620 3.50 233473.746 4.93339911199E-07 1.79 0.01438 0.01517 1595.74 847.461 0.847

Page 52 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number Friction Factor Pressure Loss
Internal Roughness (M/S) Friction
pipe Dia LENGTH / Factor λ
PIPE DIA WATER Velocity
NODE from EQ. LENGTH Re=(Density x From CIBSE (through
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow λ = 0.11((k/d) + Pressure
POINTS Catalouge (MTR) Velocity x Pipe Dia) / Table 4.47 to Iteration Pa Kpa
(mm) Table 4.1) (m3/s) / Area m2 (68/Re))0.25 formula)
Dynamic Viscosity 4.53

91-92 TEE 200 202.7 2 57.620 1.79 0.70 1595.74 2234.04 2.234

14TH FLOOR 92-93 PIPE 200 202.7 2 54.440 3.50 220588.523 4.93339911199E-07 1.69 0.01458 0.01534 1424.47 764.858 0.765

93-94 TEE 200 202.7 2 54.440 1.69 0.70 1424.47 1994.25 1.994

15TH FLOOR 94-95 PIPE 200 202.7 2 51.260 3.50 207703.301 4.93339911199E-07 1.59 0.01480 0.01552 1262.91 686.114 0.686

95-96 TEE 200 202.7 2 51.260 1.59 0.70 1262.91 1768.08 1.768

16TH FLOOR 96-97 PIPE 200 202.7 2 48.080 3.50 194818.079 4.93339911199E-07 1.49 0.01504 0.01572 1111.08 611.227 0.611

97-98 TEE 200 202.7 2 48.080 1.49 0.70 1111.08 1555.51 1.556

17TH FLOOR 98-99 PIPE 200 202.7 2 44.900 3.50 181932.856 4.93339911199E-07 1.39 0.01530 0.01593 968.97 540.295 0.540

99-100 TEE 200 202.7 2 44.900 1.39 0.70 968.97 1356.55 1.357

18TH FLOOR 100-101 PIPE 200 202.7 2 41.720 3.50 169047.634 4.93339911199E-07 1.29 0.01558 0.01617 836.57 473.328 0.473

101-102 TEE 200 202.7 2 41.720 1.29 0.70 836.57 1171.20 1.171

19TH FLOOR 102-103 PIPE 200 202.7 2 38.600 3.50 156405.529 4.93339911199E-07 1.20 0.01589 0.01642 716.13 411.495 0.411

103-104 TEE 200 202.7 2 38.600 1.20 0.70 716.13 1002.58 1.003

20TH FLOOR 104-105 PIPE 200 202.7 2 35.480 3.50 143763.424 4.93339911199E-07 1.10 0.01623 0.01670 605.04 353.605 0.354

105-106 TEE 200 202.7 2 35.480 1.10 0.70 605.04 847.05 0.847

21TH FLOOR
106-107 PIPE 200 202.7 2 32.360 3.80 131121.319 4.93339911199E-07 1.00 0.01660 0.01701 503.31 325.386 0.325
PENTHOUSE

107-108 TEE 200 202.7 2 32.360 1.00 0.70 503.31 704.63 0.705

MEZ. FLOOR 108-109 PIPE 200 202.7 2 30.690 4.60 124354.551 4.93339911199E-07 0.95 0.01682 0.01720 452.70 358.121 0.358

109-110 TEE 200 202.7 2 30.690 0.95 0.70 452.70 633.78 0.634

110-111 REDUCER 200 / 150 2 26.770 1.44 0.18 1031.14 365.02 0.365

ROOF LEVEL 2 111-112 PIPE 150 154.1 2 26.770 5.13 142680.387 6.4892926671E-07 1.44 0.01626 0.01672 1031.14 1178.410 1.178

112-113 TEE 150 154.1 2 26.770 1.44 0.58 1031.14 1196.12 1.196

9 ROOF LEVEL 2 FLOOR PIPING SUPPLY

113-114 PIPE 150 154.1 2 26.770 7.00 142680.387 6.4892926671E-07 1.44 0.01626 0.01672 1031.14 1609.536 1.610

114-115 IV 150 154.1 1 26.770 1.44 0.03 1031.14 30.93 0.031

Page 53 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number Friction Factor Pressure Loss
Internal Roughness (M/S) Friction
pipe Dia LENGTH / Factor λ
PIPE DIA WATER Velocity
NODE from EQ. LENGTH Re=(Density x From CIBSE (through
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow λ = 0.11((k/d) + Pressure
POINTS Catalouge (MTR) Velocity x Pipe Dia) / Table 4.47 to Iteration Pa Kpa
(mm) Table 4.1) (m3/s) / Area m2 (68/Re))0.25 formula)
Dynamic Viscosity 4.53

115-116 DRV 150 154.1 1 26.770 1.44 1.86 1031.14 1917.92 1.918

116-117 ELBOW 150 154.1 3 26.770 1.44 0.85 1031.14 2629.40 2.629

117-118 BTU METER 150 154.1 1 26.770 1.44 0.03 1031.14 30.930 0.031

118-119 ELBOW 150 154.1 2 26.770 1.44 0.85 1031.14 1752.93 1.753

119-120 PIPE 150 154.1 2 26.770 1.00 142680.387 6.4892926671E-07 1.44 0.01626 0.01672 1031.14 229.934 0.230

120-121 TEE 150 154.1 2 26.770 1.44 0.58 1031.14 1196.12 1.196

121-122 PIPE 150 154.1 2 26.520 5.00 141347.921 6.4892926671E-07 1.42 0.01630 0.01676 1011.97 1130.374 1.130

122-123 ELBOW 150 154.1 2 26.520 1.42 0.85 1011.97 1720.35 1.720

123-124 TEE 150 154.1 2 26.520 1.42 0.58 1011.97 1169.84 1.170

AHU TAPPING

124-125 PIPE 100 102.3 1 16.400 3.00 131669.977 9.77517106549E-07 2.00 0.01659 0.01700 1992.58 1016.103 1.016

125-126 ELBOW 100 102.3 2 16.400 2.00 1.10 1992.58 4383.68 4.384

126-127 IV 100 102.3 1 16.400 2.00 0.03 1992.58 59.78 0.060

127-128 STRAINER 100 102.3 1 16.400 2.00 6652.00 6.652

128-129 FLEX. 100 102.3 1 16.400 0.30 131669.977 9.77517106549E-07 2.00 0.01659 0.01700 1992.58 101.610 0.102

129-130 AHU 100 102.3 1 16.400 2.00 1992.58 50000.00 50.000

AHU RETURN

130-131 FLEX. 100 102.3 1 16.400 0.30 131669.977 9.77517106549E-07 2.00 0.01659 0.01700 1992.58 101.610 0.102

131-132 PIPE 100 102.3 1 16.400 3.00 131669.977 9.77517106549E-07 2.00 0.01659 0.01700 1992.58 1016.103 1.016

132-133 ELBOW 100 102.3 2 16.400 2.00 1.10 1992.58 4383.68 4.384

133-134 CONTROL VALVE 100 102.3 1 16.400 2.00 2.20 1992.58 4383.68 4.384

BALANCING CONTROL
134-135 100 102.3 1 16.400 2.00 2.20 1992.58 4383.68 4.384
VALVE

TOWER RETURN TO
10
HEAT EX. HEADER

135-136 PIPE 250 254.5 1 113.962 5.00 367782.297 3.92927308448E-07 2.24 0.01283 0.01392 2511.88 699.362 0.699

136-137 ELBOW 250 254.5 2 113.962 2.24 0.55 2511.88 2763.07 2.763

Page 54 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number Friction Factor Pressure Loss
Internal Roughness (M/S) Friction
pipe Dia LENGTH / Factor λ
PIPE DIA WATER Velocity
NODE from EQ. LENGTH Re=(Density x From CIBSE (through
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow λ = 0.11((k/d) + Pressure
POINTS Catalouge (MTR) Velocity x Pipe Dia) / Table 4.47 to Iteration Pa Kpa
(mm) Table 4.1) (m3/s) / Area m2 (68/Re))0.25 formula)
Dynamic Viscosity 4.53

137-138 PIPE 250 254.5 1 113.962 23.00 367782.297 3.92927308448E-07 2.24 0.01283 0.01392 2511.88 3217.063 3.217

138-139 TEE 250 254.5 2 114.872 2.26 0.70 2552.16 3573.02 3.573

139-140 AIR SEPERATOR 250 254.5 1 114.872 2.26 2552.16 15000.00 15.00

140-141 PIPE 250 254.5 1 114.872 5.00 370719.082 3.92927308448E-07 2.26 0.01281 0.01390 2552.16 709.523 0.710

141-142 REDUCER 250 / 300 1 114.872 1.58 0.13 1240.51 161.27 0.161

142-143 PIPE 300 304.8 1 114.872 1.00 309540.703 3.28083989501E-07 1.58 0.01340 0.01438 1240.51 59.451 0.059

143-144 TEE 300 304.8 1 114.872 1.58 0.55 1240.51 682.28 0.682

144-145 PIPE 300 304.8 1 57.436 3.00 154770.352 3.28083989501E-07 0.79 0.01593 0.01645 310.13 51.024 0.051

145-146 TEE 300 304.8 1 57.436 0.79 0.70 310.13 217.09 0.217

11 HEAT EX. TAPPING

146-147 PIPE 200 202.7 1 57.436 4.00 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 481.471 0.481

147-148 ELBOW 200 202.7 1 57.436 1.78 0.65 1585.57 1030.62 1.031

148-149 IV 200 202.7 1 57.436 1.78 0.03 1585.57 47.57 0.048

149-150 STRAINER 200 202.7 1 57.436 1.78 6300.00 6.300

150-151 FLEX. 200 202.7 1 57.436 0.30 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 36.110 0.036

TOTAL (excluding HEX, AHU & AIR SEPARATOR) 229245.55 229.25

SAFETY FACTOR 5% 11462.28 11.46

GRAND TOTAL (excluding HEX, AHU & AIR SEPARATOR) 240707.83 240.71

GRAND TOTAL (including HEX, AHU & AIR SEPARATOR) 378807.83 378.81

Note :

Pr. Loss for Pipe (Pa) = λ x l/d x 1/2 ρc2 Pump Affinity Law

q1/q2 = n1/n2 q1 = 114.872 l/s

Pr. Loss for Fittings (Pa) = ζ x 1/2 ρc 2 dp1/dp2 = (n1/n2) 2


dp1 = 3.75bar

Page 55 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number Friction Factor Pressure Loss
Internal Roughness (M/S) Friction
pipe Dia LENGTH / Factor λ
PIPE DIA WATER Velocity
NODE from EQ. LENGTH Re=(Density x From CIBSE (through
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow λ = 0.11((k/d) + Pressure
POINTS Catalouge (MTR) Velocity x Pipe Dia) / Table 4.47 to Iteration Pa Kpa
(mm) Table 4.1) (m3/s) / Area m2 (68/Re))0.25 formula)
Dynamic Viscosity 4.53

where dp1/dp2 = (q1/q2)2 q2 = 118 l/s


λ = Friction Co efficient dp2 = dp1 / (q1/q2)2

ζ = Pressure Loss Factor


l = Length in Meter. dp2 = 3.96 bar
d = Diameter
ρ = Density (Kg/m3)= 1000

c = Velocity (m/s)

Page 56 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

feet Remarks

ft

24 As advised by UDC

0.01 λ = 0.01518

0.68 Refer Page 7 of 11

0.08 λ = 0.01518

0.02 Assumed as Gate Valve. Refer Page 8 of 11

0.04 λ = 0.01518

0.02 Assumed as Gate Valve. Refer Page 8 of 11

0.04 λ = 0.01518

0.29 Refer Page 6 of 11

0.06 λ = 0.01438

0.11 Refer 7 of 11

0.09 λ = 0.01390

0.46 Refer Page 7 of 11

0.05 λ = 0.01390

0.28 Refer Page 6 of 11

0.02 λ = 0.01438

0.28 Refer Page 6 of 11

0.06 λ = 0.01438

0.05 Refer Page 6 of 11

0.12 λ = 0.01518

0.02 Assumed as Gate Valve. Refer Page 8 of 11

2.07 From Catalouge (Kv value-817) Refer Page 9 fo 11

Page 57 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

feet Remarks

0.01 λ = 0.01518

1.01 Refer Page 7 of 11

0.01 λ = 0.01518

1.66 Refer Page 8 of 11

0.86 Assumed as Globe Valve

0.12 λ = 0.01518

1.35 Refer Page 7 of 11

0.07 Refer Page 6 of 11

0.02 λ = 0.01645

0.28 Refer Page 6 of 11

0.04 λ = 0.01438

0.59 Refer Page 6 of 11

0.05 λ = 0.01390

0.46 Refer Page 6 of 11

0.23 λ = 0.01390

0.59 Refer Page 6 of 11

0.83 λ = 0.01392

0.91 Refer Page 7 of 11

0.39 λ = 0.01392

0.91 Refer Page 7 of 11

3.21 λ = 0.01392

0.91 Refer Page 7 of 11

Page 58 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

feet Remarks

1.28 λ = 0.01392

0.91 Refer Page 7 of 11

0.55 λ = 0.01392

0.91 Refer Page 7 of 11

0.55 λ = 0.01392

0.91 Refer Page 6 of 11

0.97 λ = 0.01411

0.78 Refer Page 7 of 11

0.24 λ = 0.01411

0.78 Refer Page 7 of 11

0.64 λ = 0.01411

0.78 Refer Page 7 of 11

0.24 λ = 0.01411

0.78 Refer Page 7 of 11

0.04 λ = 0.01411

0.78 Refer Page 7 of 11

0.64 λ = 0.01411

0.78 Refer Page 7 of 11

0.78 Refer Page 7 of 11

0.64 λ = 0.01411

3.13 Refer Page 7 of 11

0.32 λ = 0.01418

0.95 Refer Page 6 of 11

0.35 λ = 0.01432

Page 59 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

feet Remarks

0.85 Refer Page 6 of 11

0.46 λ = 0.01442

0.79 Refer Page 6 of 11

0.24 λ = 0.01453

0.73 Refer Page 6 of 11

0.17 λ = 0.01464

0.68 Refer Page 6 of 11

0.20 λ = 0.01475

0.62 Refer Page 6 of 11

0.17 λ = 0.01487

0.57 Refer Page 6 of 11

0.16 λ = 0.01500

0.52 Refer Page 6 of 11

0.14 λ = 0.01513

0.48 Refer Page 6 of 11

0.13 λ = 0.01526

0.44 Refer Page 6 of 11

0.12 λ = 0.01539

0.40 Refer Page 6 of 11

0.19 Refer Page 7 of 11

0.34 λ = 0.01487

0.90 Refer Page 6 of 11

0.31 λ = 0.01502

0.82 Refer Page 6 of 11

0.28 λ = 0.01517

Page 60 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

feet Remarks

0.73 Refer Page 6 of 11

0.25 λ = 0.01534

0.65 Refer Page 6 of 11

0.23 λ = 0.01552

0.58 Refer Page 6 of 11

0.20 λ = 0.01572

0.51 Refer Page 6 of 11

0.18 λ = 0.01593

0.44 Refer Page 6 of 11

0.16 λ = 0.01616

0.38 Refer Page 6 of 11

0.13 λ = 0.01642

0.33 Refer Page 6 of 11

0.12 λ = 0.01670

0.28 Refer Page 6 of 11

0.11 λ = 0.01701

0.23 Refer Page 6 of 11

0.12 λ = 0.01720

0.21 Refer Page 6 of 11

0.12 Refer Page 7 of 11

0.39 λ = 0.01672

0.39 Refer Page 6 of 11

0.53 λ = 0.01672

0.01 Gate Valve. Refer Page 8 of 11

Page 61 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

feet Remarks

0.63 Assumed as Globe Valve. Refer Page 8 of 11

0.86 Refer Page 7 of 11

0.01 Assumed as Gate Valve. Refer Page 8 of 11

0.57 Refer Page 7 of 11

0.08 λ = 0.01672

0.39 Refer Page 6 of 11

0.37 λ = 0.01676

0.56 Refer Page 7 of 11

0.38 Refer Page 6 of 11

0.33 λ = 0.01700

1.44 Refer Page 7 of 11

0.02 Gate Valve. Refer Page 8 of 11

2.18 From Catalouge (Kv value-229)

0.03 λ = 0.01700

16.40 As advised by UDC

0.03 λ = 0.01700

0.33 λ = 0.01700

1.44 Refer Page 7 of 11

1.44 Assumed as Globe Valve. Refer Page 8 of 11

1.44 Assumed as Globe Valve. Refer Page 8 of 11

0.23 λ = 0.01392

0.91 Refer Page 7 of 11

Page 62 of 63
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

feet Remarks

1.06 λ = 0.01392

1.17 Refer Page 6 of 11

4.92 As advised by UDC

0.23 λ = 0.01390

0.05 Refer Page 7 of 11

0.02 λ = 0.01438

0.22 Refer Page 6 of 11

0.02 λ = 0.01645

0.07 Refer Page 6 of 11

0.16 λ = 0.01518

0.34 Refer Page 7 of 11

0.02 Gate Valve. Refer Page 8 of 11

2.07 From Catalouge (Kv value-817) Refer Page 9 of 11

0.01 λ = 0.01518

75.19

3.76

78.95

124.25

Page 63 of 63