Anda di halaman 1dari 1

1 2 3 4 5 6 7 8 9 10 11 12 13

55000
5000 9000 9000 9000 9000 9000 5000
4500 4500 4500 4500 4500 4500 4500 4500 4500 4500

0.40 mm THK. (BASE METAL THICKNESS) WITH TOTAL THICKNESS


OF 0.43 - 0.45 mm THK. (WITH PAINT) CORRUGATED G.I. SHEET
ROOFING 9300 0.60 mm THK. (BASE METAL THICKNESS)
TOP LINE OF PARAPET 150 2000 5000 2000 150 PREFORMED AND PRE-PAINTED RIDGE ROLL
600

APEX LINE OF TRUSS


150 mm THK. CHB END WALL WITH PLAIN CEMENT
PLASTER PAINTED FINISH (TYPICAL TO OTHER SIDE)
3150

200
200
0.40mm THK. PRE-PAINTED AND PREFORMED G.I. END
TOP LINE OF ROOF BEAM/ FLASHING G.I. SHEET WITH TOTAL COATED THICKNESS

600 800
DECK ROOF FLOOR LEVEL OF 0.43 - 0.45 mm THK.

1400
R

CEILING LINE/CORRIDOR F F F F F F F F F F F F F F F F F F F F

D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 EWF-1
3150

EWF-2 D-4 D-3a D-3a D-4


9750

19 mm SQUARE BARS (PAINTED FINISH) FULLY WELDED


(GRILLE SUPPORT FRAME)

1500
SECOND/CORRIDOR FLOOR LINE 20 X 20 mm GROOVE LINES

600
R

F F F F F F F F F F F F F F F F F F F F
(1 @ 900 mm, 1@ 700 mm
EWF-1a HIGH FROM RAMP/ LANDING FLOOR LEVEL) FULLY WELDED ON
3150

R
D-3a D-3 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-3 D-3a
SIDE ( SEE DETAIL)
R

750
GROUND/CORRIDOR FLOOR LINE

200
300

FINISH GRADE LINE


EWF-1 EWF-1
1200 1500 3600 300 REINFORCED CONCRETE BENCH WITH PLAIN REINFORCED CONCRETE CANOPY WITH PLAIN CEMENT PLASTER 300 3600 1500 1200
CEMENT PLASTER PAINTED FINISH PAINTED FINISH
18000 9000 18000

(1 @ 900 mm, 1@ 700 mm 150 mm THK. CHB EXTERIOR WALL RAILING (BELOW R.C. BENCH)
HIGH FROM RAMP/ LANDING FLOOR LEVEL) FULLY WELDED ON
EMBEDDED ON CHB RAILING SPACED @ 1050 mm O.C
AT 600 mm HIGH WITH PLAIN CEMENT PLASTER PAINTED
FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
LEGEND:
SIDE ( SEE DETAIL) - TYPICAL TO OTHER SIDE
R REVISION OF DRAWING DETAILS (1/23/2018) SCHEDULE OF WALL FINISHES :
1 FRONT ELEVATION NOTE: - REVISION OF CORRIDOR RAILING AT GROUND FLOOR
(FROM 150 mm THK. CHB RAILING TO REINFORCED MARK WALL DESCRIPTION
SCALE 1: 100 M. CONCRETE BENCH) ADAPTING THE PROPOSED DEPED
A-5 - FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL DESIGN. 150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER
AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT - REVISION OF CORRIDOR RAILING AT SECOND AND EWF - 1 PAINTED FINISH
ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE THIRD FLOOR ADAPTING THE PROPOSED DEPED DESIGN. (SUBMIT COLOR SCHEMES FOR APPROVAL)
USED AS ALTERNATE ROOFING MATERIALS). - REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3) 150 mm THK. CHB EXTERIOR WALL RAILING WITH PLAIN CEMENT
PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS. EWF - 1a PLASTER PAINTED FINISH
- FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS. (SUBMIT COLOR SCHEMES FOR APPROVAL)
- REVISION OF PARAPET WALL (R.C. GUTTER) FROM 100 mm THK.
CHB TO 100 mm THK. REINFORCED CONCRETE
100 mm THK. RC PARAPET WITH PLAIN CEMENT PLASTER PAINTED
- ADDITIONAL CANOPY (REINFORCED CONCRETE) ALONG MAIN EWF - 2 FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
ENTRANCE, AS RECOMMENDED ON THE PROPOSED DEPED
DESIGN
100 mm THK./ 150 mm THK. CHB INTERIOR WALL WITH PLAIN CEMENT
- ADDITIONAL MEDIA AGUA (REINFORCED CONCRETE SUN IWF - 1 PLASTER PAINTED FINISH
BREAKER) ABOVE WINDOW (W-1) AT REAR.
(SUBMIT COLOR SCHEMES FOR APPROVAL)
- REVISION OF TOILET'S WALL & FLOOR FINISHES
- (IWF-2) FROM 200 X 200mm VIT. GLAZED WALL TILES FINISH 200 X 200 mm VITRIFIED GLAZED TILE WALL FINISH
TO 300 X 300mm VIT. GLAZED WALL TILES FINISH IWF - 2
- (FL-3) FROM 200 X 200 mm VIT. UNGLAZED TILES FLOOR FINISH (SIZE & OR COLOR FOR APPROVAL BY THE END-USER) R
TO 300 X 300mm VIT. UNGLAZED TILES FLOOR FINISH - TYPICAL ON ALL TOILET WALLS

13 12 11 10 9 8 7 6 5 4 3 2 1
55000
5000 9000 9000 9000 9000 9000 5000
0.40 mm THK. (BASE METAL THICKNESS) WITH TOTAL THICKNESS
OF 0.43 - 0.45 mm THK. (WITH PAINT) CORRUGATED G.I. SHEET 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500
ROOFING 0.40mm THK. PRE-PAINTED AND PREFORMED G.I. END
TOP LINE OF PARAPET FLASHING G.I. SHEET WITH TOTAL COATED THICKNESS
OF 0.43 - 0.45 mm THK.
600

APEX LINE OF TRUSS


150 mm THK. CHB END WALL WITH PLAIN CEMENT
PLASTER PAINTED FINISH (TYPICAL TO OTHER SIDE)
3150

R
D-5 D-5
TOP LINE OF ROOF BEAM/
DECK ROOF FLOOR LEVEL

CEILING LINE/CORRIDOR F F F F F F F F 100 mm X 50 mm THK. PRE-CAST MOULDINGS WITH


PAINTED FINISH (ALL-AROUND)
3150
9750

EWF-1
W-3 W-4 W-4 W-3

1475
925
SECOND/CORRIDOR FLOOR LINE R
EWF-1

F F F F F F F F
3150

W-3 W-4 W-4 W-3

1475
925
GROUND/CORRIDOR FLOOR LINE
300

FINISH GRADE LINE


EWF-1 EWF-1 EWF-1 EWF-1

2 REAR ELEVATION
SCALE 1: 100 M.
A-5

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FRONT ELEVATION
MODIFIED STANDARD DPWH - DEPED REAR ELEVATION CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM SCHEDULE OF WALL FINISHES LARK MAVERICK E. DE VERA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A-5
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING CHECKED: SIGNED B 19 67
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH