Anda di halaman 1dari 40

POWER MAPS

&
OTHER IMPORTANT INFORMATION
RELATED TO NORTHERN GRID
Sixth Edition

NORTHERN REGIONAL LOAD DESPATCH CENTRE


POWER SYSTEM OPERATION CORPORATION LIMITED
(A wholly owned subsidiary of the POWERGRID)

June 2014
Index
Sl No Items Page
Section-I: POWER MAPS
1 Northern Region High Voltage Grid 1
2 Punjab 2
3 Haryana 3
4 Rajasthan 4
5 Delhi 5
6 Uttar Pradesh 6
7 Uttrakhand 7
8 Himachal Pradesh 8
9 Jammu & Kashmir 9
10 UT Chandigarh 10
Section-II: POWER MAP OF OTHER REGION
11 Western Region 11
12 Eastern Region 12
13 North Eastern Region 13
14 Southern Region 14
Section-III: Connectivity Diagrams
15 400kV and above Transmission Line in Northern Region 15
16 400kV and above Transmission Line in Northern Region (with future lines) 16
17 Control Centers (SLDCs & Sub-LDCs) 17
18 Wide Band Communication Network (SCADA system) 18
19 Wide Band Communication Network 19
20 Location of PMUs in Northern Region 20
Section-IV: Generation Details & Statistics
21 Breakup of Installed Generation Capacity in Northern Region 21-25
22 Summary of Effective Generation Capacity in Northern Region 26
23 Breakup of Effective Generation Capacity in Northern Region 27
24 Fuel wise Effective Generation Capacity in Northern Region 28
25 Ownership wise Effective Generation Capacity in Northern Region 29
26 Number of HVDC/765kV/ 400kV transmission lines in Northern Region 30
Section-V: Details of Railway & DMRC
27 Power supply to traction network over Northern Railway Map By Railways 31
28 Power supply to Northern Railway traction Map by NRLDC 32-33
29 Power Supply to DMRC Map By SLDC-Delhi 34-35

POWER MAPS & OTHER IMP. INFORMATION RELATED TO NORTHERN GRID, 6E, JUNE 2014
POWER MAPS & OTHER IMP. INFORMATION RELATED TO NORTHERN GRID, 6E, JUNE 2014
Preface to the Sixth Edition

The sixth edition of the document Power Maps & Other Important information Related

to Northern Grid is before you. Information contained in this booklet has been found to

be very useful in various stages of system operation. This document was also found to be

very useful for updating network model in SCADA & offline system studies packages.

We are sure that this updated document Power Maps & Other Important

information Related to Northern Grid would be helpful for the operating personnel at

different load dispatch centers in system monitoring and control.

All efforts have been made to make this book error free and up to date. However, in view

of the fast changing network conditions, it is possible that some of the changes could have

not been incorporated as per actual. Any feedback from the users of the book is most

welcome as it will help us to improve the overall quality, style and presentation of the

document in future.

Awadesh Mani
General Manager
June 2014
POWER MAP OF PUNJAB

JAMMU AND KASHMIR


Jassor Chamera Pooling

Udampur

Hiranagar
Kishenpur
RSD Chamera1

Sarna Jassore

Parbati-PO(Banala)

Hamirpur(PG)

PAKISTAN Tibber
PONG

Kotli Surat Mali

Wadalagranthian Dasuya
F.G.Churian
Majitha HIMACHAL PRADESH
Amritsar(PG)
Amritsar
C.L.Amritsar Udoke
Khassa
Charged at 400kV

Butari Hamirpur(HP)
Verpal
Hamirpur(PG)

Rashiana
Kartarpur
Bhakra_R
Rehana Jattan Bhakra_L
Jalandhar
Jalandhar(PG)
Mahilpur
Jalandhar BB
Algaon Kapurthala
Patti
Ganguwal

Sultanpur Jamsher
Jamalpur
Chola Sahib Nakodar Panipat

Makhu Goraya
Nurmehal
Bhiwani
Mastewala

Botianawala Ferozpur Rd
Gaunsgarh Ropar
Humbaran Ludhiana
Ludhiana(PG) Dhulkot
Ferozpur Dandharikalan
Moga(PSEB)
Kohara

Sahnewal
Lalton- Bassi
Ajitwal Kalan Doraha Pathana
Moga(PG) Railway
Jagraon Kharar
Sadiq
Pakhowal
Baghapurana Mohali-1
Gobindgarh 2 Nallagar
Nallagarh(PG)
Mohali-2
Ikolaha
Gobindgarh 1 Derabassi
Ghubaya Amloh
Road Lalru
Malerkotla
Malerkotla(PG)
RLY RLY
Himmatpura
Amloh
Malerkotla(PSEB)
Muktsar
Bajakhana Rajpura
Mehal Kalan

Barnala(PSEB) Dhuri Rajpura TPS

Barnala(BBMB) Fp Nabha Bahadurgarh

Dhanaula
Patiala(PG)
Lehramohabbat Patiala(PSEB)
Sangrur
Bathinda
Malout
Passiana
Rajla
Sunam Jagadhari

Talwandi Kakrala
Sabo
Bangan
Talwandi Sabo Mansa
Kaithal(PG)
Patran

Jhunir

Fatehabad(PG) 273
RAJASTHAN Dadri

Hisar(PG)
Hisar(BBMB)
Bhiwani(PG)

Bhiwadi(PG)

HARYANA LEGEND
132kV Transmission Substation 132kV Lline

220kV Transmission Substation 220kV Line

400kV Transmission Substation 400kV Line

765kV Transmission Substation 765kV Line

Hydro Generating Station International Boundary

Thermal Generating Station State Boundary


POWER MAP OF HARYANA
HIMACHAL PRADESH
Kunihar

Baddi

Nathpa Jhakri

CHANDIGARH Panchkula(PG)
Dehar

PUNJAB Rewali Karcham


Wangtu

Ganguwal

Dhulkote

Tepla

Jagadhari

Shahbad Jaga-Rai Abdullapur


Abdullapur(PG)
Jorian
New Rampur
Yamunagar

Cheeka
Dhurala

Kurukshetra
Pehowa
Salempur
Patiala(PG)

Moga(PG) Unispur
Sangrur
Kaul
Chormar
Kaithal(PG)

Meerut(PG)
Kaithal
Batta
Nuhiyawali Nissing
Bastra Karnal

Narwana

Sirsa Fatehabad
Rania
Bhuna

Fatehabad

Chhajpur
Khedar Panipat(BBMB)
Safidon Panipat Old
Kirori Panipat-N

Jind
UTTAR PRADESH
Masudpur Samalkha Dadri
Hisar
Hisar(PG)
IA-Hisar Jindal Steel

Hisar-BBMB Hansi

Mohana Sonepat

Sonepat-Pg
Deepalpur
Chirawa Sangwan

Meerut(PG)

Rohtak
Bhiwani(PG)
Narela
Sampla Bawana
Isharwal Kabulpur
Bhiwani(BBMB)

Nuna Majra Bahadurgarh


DELHI
Charkhi Dadri Jhajjar
MGTPS Jhajjar Jhatikra(PG)
Mundka Bamnoli Nawada
Maharani
Bagh
Greater Noida

Daulatabad Badarpur

Faridabad
Gurgaon
Dadhiban Sec 52 Palla
Gurgaon Pali
Sec 56
Gurgaon
Gurgaon(PG)

Badshahpur Samaypur(BBMB)
Mahendergarh
RAJASTHAN Manesar(PG)
Ballabhgarh(PG)
Kanpur
Dhanauda Mau HR
Mahendergarh HVDC
Khetri Lula Ahir

Rewari
Bhiwadi
Rewari

Mainpuri
Palwal

Narnaul

Neemrana

CGPL-Mundra

Agra

LEGEND
66kV Transmission Substation 132kV Lline

132kV Transmission Substation 220kV Line

220kV Transmission Substation 400kV Line

400kV Transmission Substation HVDC Line

HVDC Future Transmission Substation


765kV Line
International Boundary
765kV Transmission Substation
State Boundary
Thermal Generating Station
POWER MAP OF RAJASTHAN PUNJAB

Udyogvihar
Chomu
Padampur

Hanuman Garh
Kukas
Vkia

Suratgarh Suratgarh

Bassi
Phulera Sms Stdm
Dausa
Bhadra Mansarovar
Kunda
Jaipur_pg
HARYANA Bagru Sanganer
Ki Dhani
Jagatpura/Indira
PAKISTAN Sez1
Gandhi

Heerapura
Renwal1

Sez1
Nph1
DELHI 21

Hissar
Rewari
Mau
Gurgaon
Sitapura-21
Hissar
Hissar Phagi

Chidawa Moga
Sri Dungargarh
Bhiwadi
Ratangarh Charkhi Dadri Manesar(PG)
Badla Bikaner Jhunjhunu
Bhiwadi
Bikaner1
Ratangarh
Neemrana(PG)
Kushkher
UTTAR PRADESH
Khetri
Nagar
Gajner Badno
PS2-21
Neemrana Badarpur
Nawalgarh-21
Barsingsar Laxmangarh Kishangarh Bas
Kotputli Agra
Sujangarh Kotputli

Sikar
Nokha Alwar
Sikar
Ramgarh Mia-Alwar
Dhod
Bap
Deedwana
Reengus

Manoharpur
Nagaur1 Agra
Phalodi Bharatpur-21

Bhu-Ener Kuchaman Chomu


Mandawar
Amarsagar Kukas
Kuchera Makrana1 Vkia
Khimsar

Akal Bassi
Phulera Sms Stdm Dausa Sikrai
Mansarovar Kunda
Dechu
Jaipur(PG) Ki Dhani
Merta Bagru Sanganer Jagatpura/Indira
Gandhi Hindaun
Heerapura Sez1 Dholpur
Kishangarh Hindaun
Tinwari Bhopalgarh Renwal1
Sez1 Dholpur
Nph1
21
Ketukalan Karwar

Ajmer Sitapura-21
RAS_2 Phagi Gangac21
Barli
Rajwest Bhadwasi
Enggcoll
Jodhpur
Jodhpur
Jodhpur(PG)
Borunda Bilara1
Jalamand Shree Cement
Baytoo Beawar
Giral TPS
Sawai
Madhopur
Balotra1 Gulabpur
Barmer
Duni
Pali

Jalore Bundi

Bhilwara Bhilwara KTPS


Dhauriman

Bali
Anta
Kota(PG) Dahra
Sakatpura
Kankroli(PG) Baran
Bhinmal Kankroli Anta

RAPP_A
Bhinmal
Chittorgarh Rp Sagar_c2
Sirohi RAPP_B
Pindwara

Sanchore21 Rp Sagar Kawai


Sawa Modak1
J K Lakshmi Kawai
Cement Factory
Debaria
Nimbhera Chabra-4
Jhalawar
BADOD

Zerda

132kV Transmission Substation LEGEND Madri Kalisindh-4

132kV Lline
220kV Transmission Substation
220kV Line
400kV Transmission Substation 1. Sarna Doongar Aspur

400kV Line 2. Vaishali


HVDC Transmission Substation MADHYA PRADESH
3. Pwd Bungalow
765kV Line(Charged at 400kV) 4. Chambal
Thermal/Coal Generating Station 5. Mansarovar
HVDC Line 6. Mnit-jaipur Banswara1
Hydro Generating Station
7. Balawala
Nuclear Generating Station International Boundary

Wind Generating Station State Boundary


POWER MAP OF DELHI
Panipat
Assandh

Abdullapur Kundli
Deepalpur

Narela
Mandaula

DSIDC Bawana

Bhiwani(PG)
Bawana

Rohini II

Gopalpur

Kanjhawala
Rohini
HARYANA Shalimar Wazirabad
Bagh

Mundka
UTTAR PRADESH
Bahadurgarh
Rohtak Road Sabjimandi
Kashmiri
Gate
Jhajjar Geeta Colony Sahibabad
DMRC

Rajghat Patparganj
Parkstreet Gazipur
Ridge Indraprastha
Valley Electric Lane Noida-Sec 62
Najafgarh Pappankalan-II Pragati
Praga
Naraina

Pappankalan-I

Lodhi Road
Bhiwani(PG) Noida-Sec 20
Maharani
AIIMS Bagh Okhla Dadri
85 Delhi International
Airport Limited
Vasant Kunj Noida-Sec 20
Bamnoli
Masjid Moth Sarita
Jhatikara
Vihar Greater Noida
Mehrauli
Nawada
245
Badarpur

Agra(PG)

66kV Transmissioin Substation


LEGEND
132kV Lline
66kV Under Ground Transmissioin Substation
220kV Under Ground Transmissioin Substation 220kV underground cable
Mia-Alwa
132kV Transmission Substation 220kV Line
220kV Transmission Substation
400kV Line
400kV Transmission Substation 765kV Line
765kV Transmission Substation State Boundary Ballabgarh

Thermal/Coal/Gas Generating Station


PUNJAB
POWER MAP OF UTTAR PRADESH
Khodrie

Saharanpur

Malerkotla
Behat
Khara INSET MAP
Roorkee Kotdwar
UTTARAKHAND
Koteshwar-Pol

Nanauta

Charged at 400kV

Muzaffar Nagar

Nara
Shamli
Kashipur

Kaithal
Nehtor
OBRA 4
Sitarganj
Baraut Modi

HARYANA Bhiwani
Meerut Pg
Meerut-Pg
Puram

Pitthorgarh
Tanakpur ANPARA-C
Pant Nagar
Mandaula FaridNagar Dhauliganga
Narela
Shatabdinagar Gajraula Moradabad
RIHAND G
Burari Muradnagar Muradnagar
Wazirabad
Simbhawali
Loni
Bawana4
Patparganj RIHAND-HVDC
DELHI Maharani Bagh
Gazipur
BTPS
Sambhal
SINGRAULI4
Dadri
Dadri NCR
Sikandrabad C.B. Ganj
Greater Noida Dohana
Jahangirabad
Nawada
Gharbara JPSI
Bareilly(UP)
RCGreen

Panipat
Bareilly(PG)
Khurja
Narora Anpara A & B

Atrauli Badaun
BALLABGARH

Jhatikra
Harduaganj Shahjhanpur

Rosa
Bhiwadi Shahjhanpur(PG)

Hathras Etah

Gokul Hardoi
Bharatpur

Agra(UP)
Jaipur Sitapur
Shamsabad
Mainpuri(PG)
Sikar Firozabad Chhibramau
Agra Sikandra
Hardoi Road
Manpuri

Kursi Road
Bassi AGRA-PG
Lucknow(UP)
Saifai Chinhat
Gorakhpur2

Gomti Nagar
Basti
Lucknow-4(PG)
Bharthana Gorakhpur(UP)
Gorakhpur PG
Gorakhpur(PG)
Sohawal
RAJASTHAN Unnao
Bithoor
Lucknow-7(PG)
Raebareli Tanda
RPH kanpur
Panki4
Panki Deoria
Auraiya Kanpur_SO
Kanpur
GAIL Muzaffarpur
Ballabgarh
Phaphund
Gwalior Naubasta

Sultanpur

Phulpur Azamgarh

Orai Mau
Fatehpur-Pg
Unchahar

Fatehpur
Balia(PG) Sasaram

Jaunpur
Patna

Gajokhar Ghazipur BIHAR


Paricha Biharshariff
Jhunsi
Jhansi Banda Sasaram
Dorana Allahabad Sarnath

Allahabad(Rewa Road)

Cant_Allahabad Sahupuri

Sasaram

Sasaram

Malanpur2
Malanpur
Mehgaon

LEGEND
132kV Transmission Substation 132kV Lline
OBRA
220kV Transmission Substation 220kV Line
ANPARA-C

400kV Transmission Substation 400kV Line RIHAND

RIHAND
HVDC Transmission Substation HVDC Line SINGRAULI
MADHYA PRADESH
765kV Transmission Substation 765kV Line Vindhyachal
Vindhyachal-4 Anpara A & B
International Boundary
Nuclear Generating Station
State Boundary
Thermal/Coal Generating Station
POWER MAP OF UTTARAKHAND

HIMACHAL
PRADESH

CHINA

Giri

Kulhal

Chibbro-H

Maneri Bhilanga
Vishnu
Majri Prayag
Bhali_2
(Dharasu)
Khodri Maneri
Dhalipur Khodri Bhali_1
Dhakrani Tehri Charged at 400kV
Purkulgaon

Bindal
Chamba 25
Majra 3
Saharanpur Koteshwar
Koteshwar-Pol
Srinagar
44

Bagwanpur
T-Point
161
Rishikesh Charged at 400kV

50 Airliqu
Saharanpur Hero Honda Chilla-H
Haridwar Bhupatwala
BHEL ASIGLS
Satpuli
Roorkee
Roorkee(PG) Jwalapur
Dhauli Ganga2
Roorkee

RBNS
280
Manglore
Kotdwar
Laksar

Chandak 172
Ranikhet
Kiratpur Nara
Nazibabad Almora
Pithorgarh
71 Meerut
Kalagarh

Charged at 220 kV
Muzzafarnagar
Ramnagar
Bhowali
Nehtor
Dhampur
Danda
Charged at 220 kV

Jaspur
INDIA GLYCOLS LTD
Kathgodam NEPAL
KVS
Kashi-Old
Haldwani
Thakurdwara Kashipur
Mahuakhera Bazpur
Shravanti Plyflex

CPP Tanakpur Mahendragarh


108
Pantnagar
Tata
Rudrapur
Sitarganj
Moradabad Sitarganj Khatima

Kicchha

Bakntpr2
Bareilly (UP)
Dohana
Richha

Pilibhit

LEGEND CB Ganj

132kV Transmission Substation 132kV Lline

220kV Transmission Substation 220kV Line UTTAR


400kV Transmission Substation 400kV Line
PRADESH
Hydro Generating Station 765kV Line(Charged at 400kV)
Thermal/Coal Generating Station International Boundary

State Boundary
POWER MAP OF HIMACHAL PARDESH

JAMMU AND KASHMIR

Kishenpur(PG)

Chamera-3
Chamera-2

Chamera-1 Chamba(Chamera-Pol)
Bathri

Budhil
Bairasul

Jalandhar(PG)

RSD
Mamun
Jassor
Pathankot
Shanan
Kandrori
Parbati-II
Kangra(PSEB) Adhydro
Kangra(HPSEB)
Palampur
Malana-I
Joginder Nagar Malana-II
Parbati-3
Pong
Bassi Parbati-PO(Banala)

Dasuya Bajaura
Koldam
CHINA
Hamirpur Larji
Kangoo2 Mandi Chhaur
Amb Hamirpur(PG)
Hamirpur

Amritsar(PG) Mandi
(Bijni)
Chohal Dehra
Bagha
Karcham Wangtoo Nathpa Jhakri
Jalandhar(BBMB) Jalandhar(PG)
Una Bhaba2
Bhakra_R Kashang
Dehar
Bhakra L Baspa
ACC1
Rampur
Mahilpur
ACC2

Darlaghat
Jamalpur Ganguwal

Rauri
Upar nangal
Jutog
Kunihar

Kotla2
Nalagarh
Nalagarh(PG)

Barotiwa
Solan
Patiala(PG)
Baddi2
Madanpuri
PUNJAB Panchkula
Mohali
Panchkula

Chandigarh Panipat(BBMB)

Bhiwani(BBMB) Kulhal

Panchkula

Giri/Majri
Kalaamb
CHANDIGARH Khodrihe
Paonta Sahib UTTARAKHAND
Abdullapur

Abdullapur(PG)

HARYANA

LEGEND
66kV Transmission Substation 132kV Line

132kV Transmission Substation 220kV Line


400kV Line
220kV Transmission Substation UTTAR
International Boundary
400kV Transmission Substation PRADESH
Hydro Generating Station State Boundary

Thermal/Coal Generating Station


POWER MAP OF JAMMU AND KASHMIR

CHINA

PAKISTAN
Lowr
Jhelum Upersind-1
Kupwara
Upersind-2
Villgam

Pattan
Kangan
Amargarh Wanganpura
Pampore1
Delina Bemina Badampur
Chashma-Shahi
Sheeri Rawalpora1 Pampore2
Zainkot
Magam Habbak Budgam
Khanmoh
URI-1 Wagoora

URI-2
New
Chandak Wanpoh Mattan
Wanpoh
Shopian
New Wanpoh
Draba Kulgam
Lassipore
Tethar
Baglihar Dulhasti
Rajouri
Awantipura Lisser 1 Kishtwar
2
Mirbazar Ramban
Kalakot
Salal Batot
Siot Khellani

Jhajjar Chenani
Kotli
Akhnoor Katra
Barn Udhampur2
Jourian Sidhra
Janipur
Kishenpur
Newcanal Jammu Chamera-2
Samba
Meeransahib
1 2

Bishnah
Bari
Brahmana
Samba
Mahanpur LEGEND
Sewa-II 132kV Line
Hiranagar
Kathua 132kV Transmission Substation
220kV Line

Sarna
220kV Transmission Substation
Sarna 400kV Line
Moga HIMACHAL PRADESH 400kV Transmission Substation 765kV charged at 400kV Line
Hydro Generating Station International Boundary

Thermal/Coal Generating Station State Boundary


PUNJAB
POWER MAP OF CHANDIGARH
Nalagarh

Sector 12

Pinjore

Sector 1(Cvl Secretrait)

Mansa Devi
Dhulkote

x
x
x x

x
Sector 56 x x

x
Sector 39 Sector 18

x
Kish.Chandigarh

x
Nalagarh

x
x
IT Park
Ganguwal

Sector 28 Mani Majra


Ropar (BBMB)
PUNJAB
Sector 52 Sector 32

Kharar
Mohali-1

Lalru
HARYANA
Industrial Area PH-I

Derabassi
Mohali-2
Sector 47
Industrial Area PH-II

LEGEND 66kv Line

66kv Transmission Substation 220kv Line

220kv Transmission Substation x x 66kv U/G Line


State Boundary
11
SIKKIM
1.MELLIBAZAR
2. TADONG
3. SICHEY
4. PHODONG
5. NAMCHI
6. ROTHAK
ERLDC 7. GAYZING
SIKKIM 8. SORENG
8a.SAGBARI
NOT TO SCALE Teesta

Gandak Gangtok 4
7 Rangit
3
8a 2 TALA

BHPC Valmiki'ngr
8 6
5 1
LLHP
Jaldhaka
BHUTAN
SIN'GAON
Rammam K'pong CHUKHA
10 MALBASE

GOROKHPUR
Ramnagar NEPAL Lebong NBU 9
Siliguri
11
12BIR(W)

DUHABI(NEPAL) TCF BINAGURI Hamiltongunj


Betiah Dhaka NJP Birpara(P) Salakati
Sitamari 2nd Mile Moinaguri
Gopalganj Motihari Jaynagar Alipurduar
MZ'PG Madhubani Phulparas Kosi Bon'gaon
Muz'pr Supuol
Phorbis'ganj
Pandual Kishanganj
Siwan
UTTAR Vaishal MTPS
Darbhanga
Ud'gan
Purnia(PG)
Coochbihar
ASSAM
Samastipur Saharsa
PRADESH Chapra
Shetalpur
Purnea(BSEB) Dal(P) Dalkhola
Azamgarh Hazipur Khagaria
BALIA Barauni TPS Katihar
Sarnath
Patna(PG) BARH N'gachia
Allahabad Gazipur Begusarai
9. ODLABARI
Khagaul Kahalgaon
Fatuha Hatidah
Sipara JamalpurSabour 10. CHALSA
Zamania 29 Raiganj 11. NAGRAKATA
Buxar 30 32 Barh 33 12. BANARHAT
PG Binta 31 Lakhisarai Khl(BSEB) Samsi Gangarampur
Sahupuri Dumraon Arrah(B) (PG) 13. KHEJURIA
Malda(PG) 14.KUMARDHUBI
Jagdispur B'shariff(B) Jamui Balurghat 15. RAMKANALI
Sasaram Shekhpura Malda(W)
Jhan'bad Ekn'sarai 16. KALIPAHARI
Fathepur Karmanasa Banka 17. UKHRA
Bikramganj Lalmatia 17a.BURNPUR

Kudra
S'ram(B)
GayaPG Belaganj Rajgir
Mulasganj
BIHAR Banka(PG) 13 17b.BARJORA
18. MUCHIPARA
Nawadah FSTPP Farakka 18a. DHANBAD
Dehri Gaya 19.BOLPUR
Sonenagar Rafigunj 20.SATGACHIA
21.BURDWAN
Nabinagar Bodhgaya
Kodarma(DVC) Dhulian 22.ADISAPTAGRAM
23. DHARAMPUR
Deogarh Raghunathganj 24. CHANDITALA
Barhi(DVC) Jamtara Lalgola 24a.BAGHATI
Nimiaghat Balihari Ram'hat Sagardighi 25.MANIQUE(DVC)
Japla HAZARIBAGH Konar Maithon R/B Bheramara 26. GOLMURI
K'swari
Singrauli Garwa Bokaro Putki 14 Gokorna Behrampur 27. JADUGUDA
Rihand Panchet Sainthia 28. ADITYAPUR
Sindri Mtn Amtala 29.PATNA
Tenughat 16 BKSR Beldanga 30.MITHAPUR
CTPS
Tolra Patratu Ramgarh(D) 15
DSTPS 17a17b 18 Katwa 31.GAIGHAT
Debogram 32.BARIPAHARI
RAY PAR(D)
Mejia 17 PAR(PG) 19 33.SULTANGANJ
Jabalpur Vindyachal PAT(D) Krish'ngr
N.KARANPURA Asansol
Gola(D) Bidhan'ngr
Santaldih
JHARKHAND Purulia
Waria(D)
Rgh'pr
Mankar
Santipur
(DVC) Barjora DPL Ranaghat
Raghu'pur Bankura 20
SHPS Bagmundi
W. BENGAL BTPS Kalyani
Namkum P.P.S.P. Bisnupur
21
Khanayn Bongaon BANGLADESH
Hatia Ranchi Raina Belmuri 22 2424 Jeerat
23
CHHATTISGARH Gumla Chandil Adhunik Arambag
Tar'swar Rishra cesc TT
Basirhat
Barasat
Kamdara 25 Jamshedpur HM PS Ashoknagar
26 TISCO Jangipara
AMARKANTAK Rajkharswan Chan'kna Birsingha Domjur
TTPS
Dankuni S.L. Raj'hat
28 Ramch'pur Jhar'gm
27
Goelkera Uluberia Liluah CLC
Kendoposi JAM(D) Dharma Pingla
DVC Kasba
KSTPP Dalbhumgarh BalichakKol(D) Howrah(W)
Hizli(D) Kol(W)
Noamundi Joka Sonarpur
Korba(E) Mosabani KTPS
Hizli Southern Subhasgram
Raigarh
Rourkela Kgp Tamluk M'jhut (WB)
38 Rashmi
Sterlite Tarkera Chhend ICCL CH'MIR
Lakh'pur
Korba(W) Tat N. Haldia B'BUDGE
Sun'garh Egra Haldia
Bhatapara Raigarh 36 Jindal
Rajgangpur 37 35 34 HPCL
Bhilai Budhipadar Nalda Contai FALTA
Baripada Tata
Sipat VAL Jharsuguda Bolani Joda B'pada(PG)
Raipur Brajraj'ngr
Chaniposh Polasponga
Jaleswar
L&T
` Barkote Tensa
Bhusan CPP Sambalpur Keonjhar Birla Tyres
IB (T) Balasore
Chandrapur Hirakud 40Ren(O) Balgopalpur
Burla(H) Indal 39 41 Ispat Alloys
Katapali
Facor
Chiplima Redhakhol GMR
Kalrangi Brahmanipal Soro
Barsur Bargarh
TSTPP TTPS Mesco New 51a Bhadrak
K.ngr Dhuburi
Boidna Jajpur Town
Ramagundam NALCO Chainpal Duburi Jajpur Rd
52 Chandikhol
Bolgangir Sonepur Meramundali FCI Dhenkanal
BSSL Arati Steel Pattamundai
Patnagarh Anugul 52a
Nuapatna Choudwar Kendrapara
Bol'gir(PG)
Saintala ORISSA 42
Bidanasi
ICCL
Oswal
Lower Sileru Khariar Turla Phulbani Cuttack
Mendashal Chandaka 48
Nayagarh Bhubaneswar Paradeep
PPL
Khurda Ranasingpur
Kesinga 49
Junagarh Bhanjanagar Nimapara
Balugaon
Aska Solari Puri

J.K.Paper Mohana
Rambha
Indravati(PG) 53 Ganjam
IMFA 34. BARAJAMDA
Berhampur 35. BHALULATA
Therubali Chatrapur 36. ROURKELA
T.khunti
50 A. SINGH
Narendrapur 37.RSP
IRE 38.RAIRANGPUR
Kolar 44 Rayagada Jagn'pur 39. RENGALI (PG)
43 40. RENGALI (O)
41. RENGALI (PS)
Jaypore(PG) 45 42. NANDIRA
Damonjodi 43. JAYPORE TR. 66 KV
46
Jaynagar 44. CH. KUSUMI
Sunabeda Bobbili
45. MALIGUDA
46. MANBAR
132 KV
U.Kolab Tekkali
Machkund(Rd) Facor 47.MACHKUND
48.JAGATS'PUR
220 KV
Padwa
47
T. Vada
Srikakulam 49.KHANDAGIRI
50. P.KHEMUNDI
400 KV
Araku Garividi
51. NEW DHUBURI
51a. JINDAL
765   KV
Balimela(H) T.B. Vijaynagaram 52.JAKHAPURA Tr.
52a. MAHESWARI
THERMAL
Goldstar 53. D. Pahandi HYDRO
Upper Sileru Ridhisidhi
Pendurthi GT
Gazuwaka

POSOCO, ERLDC
ANDHRA PRADESH website:www:erldc.org SEPTEMBER-2013

12
POWER MAP OF NORTH EAST REGIONAL GRID

China
Along

Daporizo v

Doomdooma
Ziro
Tinsukia
Bhutan Ranganadi Dhemaji
Dibrugarh
Margherita
13
Maran AGBPP
Naharlugan 22
Bhalukpong Sibsagar
Khupi 23 17
Nirjuli Majuli
Gelyphu(Bhutan) Motonga(Bhutan)
15 Mariani(PG) Deomali
Bhutan Balipara Gohpur 16

9 12 14 Nazira
21 Mokokchung
Salakati 18
Rangia
Birpara(ER)
5 7 Khalaigaon 11
4 Golaghat
Binaguri(ER) Bongaigaon Doyang
3 Kahilipara 6
West Bengal

8 Samaguri Wokha
Gossaigaon BTPS 2 Kiphire
10 Bokajan
1 Misa
Gauripur Kukurmara 9
BTPS (NTPC) Sarusajai
Agia Dimapur
Boko 8 Diphu
Langpi Meluri
5 6 7
4 Kopili Sankardevnagar Kohima NEEPCO (in MW)
Rongkhon Dimapur (S)
3 NEIGRIHMS
Nangalbibra Mawngap Khleihriat(S) Khandong Ranganadi - 3x135
2 1
Doyang - 3x25
Nongstoin Haflong Karong
Cherapunjee
Mawlai NEHU
Leshka Khleihriat AGBPP - 4x33.6+2x35+3x30
Haflong AGTPP - 4x21
Lumshnong 19 20 Khandong - 2x25
Bangladesh Srikona
Pailapool Imphal
Imphal(S)
Kopili - 4x50
Badarpur Yaingangpokpi
Jiribam
Rengpang
Kopili St II - 1x25
Dullavcherra Silchar NHPC (in MW)
Tripura Meghalaya Kongba Loktak - 3x35
1. Dharmanagar 1. Umiam Bangladesh 1
Bairabi
Loktak Ningthonkhong
Important Lines (per circuit in Km)
1. 400 kV Misa-Balipara D/C - 96
2. Kailashahar 2. Umiam St I 3 Churachandpur 2. 400 kV Balipara-Bongaigaon D/C - 290
3. Kamalpur 3. Umiam St II 4 2 Kakching LEGEND
3. 400 kV Balipara - Ranganadi D/C - 166
4. Dhalabil AGTPP
4. Umiam St III Kolasib
4. 400 kV Bongaigaon - Binaguri D/C - 218 400 kV -
5. Agartala 5. Umiam St IV 8 9 5. 400 kV Silchar - Byrnihat(Killing) S/C - 217
6. Bodhjangnagar 5 7 Kumarghat 6. 400 kV Silchar - Palatana D/C - 247
220 kV -
6. Umtru 6 10
7. Jirania 7. EPIP II (Norbong) 11 9
Luangmual 7. 400 kV Silchar - Kukurmara S/C - 265 132 kV -
8. Baramura Udaipur Aizawl
8. EPIP I (Raja) P.K. Bari Hydro -
9. Teliamura 1. 220 kV Misa - Dimapur D/C - 124
9. Killing (Byrnihat) Rokhia Palatana Zuangtui 2. 220 kV Misa - Mariani S/C - 220
Thermal -
10. Ambasa
11 Surjamaninagar 3. 220 kV Misa - Mariani (PG) S/C - 23 POWERGRID
Saitual 4. 220 kV Mariani (PG) - AGBPP S/C - 161
15. Jorhat NEEPCO
Serchhip 5. 220 kV Misa - Samaguri D/C - 34
Assam 16. LTPS 6. 220 kV MIsa - Kopili I & II - 73
NHPC
(Bukpui)
1. Jogigopa 8. Narengi 17. NTPS 7. 220 kV Mias - Kopilli III- 76 Assam
2. Dhaligaon 9. Rowta 18. Mariani 8. 220 kV Samaguri - Mariani S/C - 168 Meghalaya
3. Nalbari 10. Baghjap 19. Panchgram 9. 220 kV Mariani - AGBPP S/C - 163
Tripura
4. Bornagar 11. Depota
12. Pavoi
20.
Panchgram(New)
Bangladesh Khawiva
10. 220 kV Balipara - Samaguri S/C - 65
11 - 220 kV Sarusajai - Samaguri S/C - 130 Others
5. Sipajhar (Lunglei)
13. 21. Ghoramari 12. 220 kV Birpara - Salakati D/C - 160
6. Sisugram
NLakhimpur 22. Behaiting 13. 220 kV Salakati - BTPS D/C - 2.7
7. CTPS
14.- Bokaghat 23. Sonari

13 Revised on 27-Jun-14
TO CHA NDRAPUR

TO TA LCHER

SUB STATIONS
TO JE YPORE
NIRMAL
BELLAMPALLY TO BA LIMELA
V EMNUR 1. YEDDUMAILARAM
J AGTIYAL MACHK UND
RA MA GUNDAM 2. GAC HIBOWLI
TEKKALI
BHIMGAL
G ANGA RAM
3. SHAHPUR NAGAR
TO BA RASUR
DICHIPA LLY ME DA RAM MALAYALAPALLY BHIMG HANPUR 4. MOULALI
DURSHED S ALIVAGU ARA KU
K AMAREDDY K AKATIYA GARIVIDI 5. M ALKARAM
49 B HOOPALAPPALLY 6. GHANAPUR
G AJWEL UPPER SILERU
SIDDIPET DFARM SARDA
MINPUR P ALAKURTHY MA NUG URU 7. CHANDRAYANGUTTA
PE NDURTHI
HALABARGA
DONKA RAI G AZUWAKA 8. SHAMSHABAD
WARANGAL HWP LOWER SILERU KALPAKA GVP
KTPS 9. SIVARAM PALLY
G UNROCK W K PALLI KTPS VI VSP
MEDCHAL 23 MRS 10. KONDAPALLI
KTPS - V R C V ARAM 50 56
SHANK ARAP ALLY 3 5 B RAN DIX
HUMNA BAD 2 A BH IJ EE T ALLOY 11. VIJJESWARAM - I
S ADASHIVPET 4
BHO NG IRI S ITARAMPA TANAM P ARWA DA
1 6 G HANAPUR GMR (BA RG E) 12. VIJJESWARAM - II
9 21
SHA DNAG AR 8 72
7
84 11 19 15
22 13. JEGRUPADU
G ULB ARGA GAP
MAMIDIPALLI K HAMMAM K ONASEEMA 14. JEGRUPADU EXTN . (GVK)
S EDAM TA NDUR NBEIL 12 16
NARKETPALLI 81
82
13 15. SPECTRUM
SHA HABAD 80 K V KOTA 20
TO YA NAM
TO SHOL APUR INDI P UTTANGADI MIRYALG UDA 14
16. KAKINADA
83 LANCO 17
S HA HAPUR L JURALA 78 10 B HIMA DOLE 18
17. VEMAGIRI
MAHABOO B NAGAR CHE LL AKURTHI CHIL79LAK ALLU G AUTA MI
TO KO LHAPUR B IJAPUR U J URALA HY K M PALLY VTS 47
B HIMA VARAM
18. VEMAGIRI PGL (GMR)
MAHA BOO B NAGAR
B ALUTILIS KAL WAKURTHY N SA GAR NUNNA 19. BOMMUR
B BAGEWADI J URALA NARASARAOPET GUNADALA G UDIVADA
KUDA CHI
NTPD 76 20. NIDADAVOLU
CHIKK ODI DINDI 77
REG UMANAGADDA RENTA 75 CHINTALA S'PALLY 21. PEDAPURAM
V AJ RAMA TTI RAICHUR NEW TADIK ONDA
ATHANI A LMATTI
MAHALINGPUR WANARPARTHY 73 22. BSES
B AGALKOTE RAICHUR(RTPS) SLBPH
74 S RIS AILAM RBPH 23. SIMHADRI STG 1
BRAHMANAKOTKUR
INDAL LINGASUGUR RA ICHUR 24. YERANDAHALLI
MALYALA
BELG AUM S INDHAPUR K URNO OL NEW
PA RCHUR 25. ITPL
KANA BHA RGI LYT AP CARBIDES MA RK APUR
K USHTAGI NANSURA LLA K URNO OL 26. HSR LAYOUT
G HATA PRABHA M K HUBLI JSW
55 B'G UDUR P ODILI O NGOLE 27. NRS
NARENDRA-PG S OUNDATTI KALYANI STEEL L AKKAS AGARAM SOMAYAJULAPALLY
54 28. SUBRAM AN AYAPURA
HAMPI
P ONDA AMB EWADI G ADAG 65 66 35 KAMB ALAPADU NANDY AL
NA RE NDRA-KP T B DAM 29. PEENYA
E NERCON DHO NE
HUB LI B TPS ALIPUR 30. HEBBAL
SUPA BIDNAL LINGAPUR REG ULAP ADUG OOTY
67
68
KUDITINI L &T
31. WHITEFIELD
NAG JHARI M'RABAD
HAV ERI SUZL ON(W) G OOTY RTSS P ULIVENDULA 32. TATAGUNI
J INDAL B R'PALLI PENNA TP CL
B MM TADIPATRI 33. AN THARASANAHALLY
ITTAGI KDVL MY DUKUR MEE NAKSHI
KODASALLI MUDDA NUR 34. HONALI
KADRA NELLO RE PS
A NA NTPUR THIMMAPURAM SIMHAPURI 35. MUNIRABAD
NIL AGUNDA YEE LANUR KADAPA NELL ORE
RA NIBE NNUR KAL YANDURG MUTHYALA Y ERRA GUNTLA KRISHNA PATNAM 36. NELAMANGALA
KA RWAR KAIGA KO NDA PURAM NELLORE
SIRSI G UTTUR CHINAKAMPA LLY (MANUB OLU) 37. KUNDARA
69 RAMAG IRI
S.KOPPA CHITRADURGA RLY
S HARA VATI 38. VIRANAM
TALAG UPPA DAVA NAGERE TALLAK S HA PURAM
34
RAJ AMPET K O DUR 39. KODIKURCHI
S HIMOGA HIRIYUR
RA CHAG UNNERI
JOG HIRIYUR (PG) 40. KODAYAR
E NE RCON HINDUPUR
L DPH S .TA IL RACE CHIKKAMAG ALUR K ALIKIRI
S UL URPET 41. TRIVANDRUM
RENIG UNTA
MADHUGIRI G OWRIB IDANUR 63 NCTPS S TG2 42. UDAYATHUR
V ARAHI HAS SAN PALAMANERU
HOSK OTE 43. SRIPERUM BUDUR
A RS62 6158 NCTPS
KIBBANAHALLI NAG ARI
HASSAN 33 K IADB KOLAR A LMATHY 64
44 44. KILPURK
R OPG ENNORE
CR PATNA KA DUR 36 DB PURA TO O B B GAS/G M R VASAVI 45. DOBSPET
BIAL K OLAR C H IT MOSUR
MANALI TONDIARPET
45 71 THIRUVALA M-PG ELEPHANTGATE 46. VRUSHABHAVATHI
GOPAL PURA 30 31 VAL LUR B ASIN BRIDGE GAS
KUDREMUKH 29 CHINTAMANI
K EMAR NITTUR 27 K ALAV IN DA PATTU 53 MYLAPORE 47. VTS STAGE IV
K UNIGAL 46 70 HOODY MA LUR B 'PET THIRUVALAM 59 CMRL
NP CL 51
S ARJAPURA 60 43 KOY AMBEDU 48. NAGANATHPURA
UPCL HN'P URA K .R.PET 28 32 26 25 52
Y ELEHANKA H YUN DAI KADP ERI
KAVOOR 48 57
HO SUR THA RA MANI 49. NAGARAM
PUTTUR 24 ORA GA DAM
KONAJE S IR USERI
50. SIMHADRI STG 2
MA NJ ESHWAR B IDADI SOMA NAHALLI V INNA MA NG ALAM ARNI S .V .C HATRAM SP K OIL KITS PA RK
V IDYANA GAR B HAV ANI
K UB A NUR HAROHALLI 51. HAL
K ASARKODE KARIMANGALAM K ALPAKKAM
K 'NAGARA TUB INAK ERE 52. EDC
MYS ORE S AMALPA TTY ACHARAP AKKAM
B ASTHIP URA
KANA KAPURA T V MALAI 53. KORATHUR
VAGAMANGALA B AHOOR
S ING ARA PETTAI 54. KRISHNAGIRI
TALIPARAMBA HOOTAGALLI T K HALLI V ILLUPURAM THO NDAMA NATHAM
METTUR AUTO V ILLIANUR 55. SETTIPALLY
KANHIRO DE KADAKOLA MADUV ANAHALLI NEYVELI TS 1 CUDDA LORE
(KAN NUR) S ALEM 56. GAZUWAKA HVDC B2B
KUTTIADI EXT. NEYVEL I TS 2
K ANIA MPET CR NAGAR ME TTUR TUNNEL SAIL DEV IA KURCHI 57. NIM HANS
MALCO NEYVELI TS 2 (Exp)
V ATAKARA K UTTIADI K UTHUMUNDA SALEM 58. ATHIPATTU
MTPS
PALLAKPALYAMEA CHENGADU S T-CMS NEYVE LI TPS 1 (Exp)
UPA ATTI P YKARA
GOBI ANTHIYURUNJ ANAI
59. NOKIA
K OZHIKODE K UNDAH 1
A REAKODE P ERAMBALUR
KUNDAH 2 KUNDAH 4 ING UR PUDA NCHANDAI
NALL ALAM K ADAL ANGUDI 61. GUMMIDIPOONDI
K ARAIMA DAI
K UNDAH 3 THUDIY ALUR PUG ALUR 62. CAUVERY PGCPL
S UZLON SAMAYPURAM P P NALLUR
COIMB ATORE 63. KAMAKSHI
WALA YAR ARASUR PALLADAM ABAN
MALA PPA RAMBA O K MANDAPAM TRICHY K UTTALAM 64. SURYA DEV
SHO RA NUR MADUKKA RAI SADAY AMPALAYAM THANJ AVUR
PALAKKAD
A NAIKADAVU THIRUVA RUR 65. RSS STEELS
UDULMALPET P ONNA PURAM TRICHY KARAMBAYAM
66. HRG STEELS
UDUMA LPET R N PURAM KOVIL KALAPAL
TRICHUR ALIYAR P UDUKOTTAI 67. D'DESH
K ADAMPA RAI 68. X INDIA
BSES S HOLAYAR SEMBATTI

IDA MALYAR A LAGARKOIL K ARAIKUDI NEW 69. KUDREKONDA


KALAMASSERY
KOCHI
L OWER PASUMALAI 70. A STATION
MADURAI P CL KARAIKUDI
B RA MHA PURAM P ERIYAR 71. CPRI
THENI
AMBA LAMUGAL P ERIYAR MA DURAI 72. HIAL
(CHE CK ANURANI)
IDUKKI
N ALLA MA NAIC KENPATTY
PARAMAK UDI
73. GADWAL
A MUTHAP URAM V AL ATHUR
PALOM (KAVA NO OR) 74. ALAM PUR
NEW PALOM S ATHUR A RKAY 75. KCP CEMENT
SABRIGIRI COAS TAL
KAKKAD S TE RLITE 76. PIDUGURALLA
INDEX
EDAP PON K AYATHAR SIP COT 77. THANGEDA
K AYAMKULAM INDB HARATH 78. RAMAPURAM
38 TUTICORIN JV
37 EDAMON 39 79. SITAPURAM
TUTICORIN LEGEND DISC RIPTION
PO THENCODE A UTO 80. KODAD
THIRUNELV ELI 400 KV LINE
40 81. KUSUMANCHI
41 42 SANKANERI
PARUTHIPA RA 400 KV LINE CHARGED AT 220 KV 82. BONAKALLU
PARASSALA S R P UDUR KOODA NKULAM 83. MADHIRA
220 KV LINE
K UZHITHURAI 84. AS WARAOPETA
HVDC LINE
110/132 KV LINE
66 KV LINE
HYDEL POWER STATION
THERMAL POWER STATION
NUCLEAR POWER STATION

14
Northern Regional Control Centres RLDC, SLDCs & Sub LDCs

RLDC-1
SLDC-9
Sub LDC-17
RTUs-478

NRLDC, Katwaria
Sarai New Delhi RTUs-101

Jammu & Kashmir Himachal Punjab Haryana BBMB Uttar Pradesh Rajasthan Delhi Uttrakhand
SLDC (Gladini) Pradesh SLDC SLDC SLDC SLDC SLDC SLDC SLDC SLDc
(Jutogh) (Ablowal) (Panipat) (Chandigarh) (Lucknow) (Heerapura) (Minto Road) (Rishikesh)

Sub LDC Sub LDC


Sub LDC Sub LDC Sub LDC ▪ Moradabad ▪ Kota RTUs-37 RTUs-10
Sub LDC
▪ Laltokalan ▪ Narwana ▪ Dadri ▪ Panki ▪ Ratangarh
▪ Bemina
▪ Patiala ▪ Dadri ▪ Panipat ▪ Sultanpur ▪ Bhilwara
▪ Ganguwal ▪ Modipuram
▪ Jamalpur ▪ Varanasi

RTUs-11 RTUs-25 RTUs-74 RTUs-52 RTUs-21 RTUs-115 RTUs-116

SECTION-III:POWER MAPS OTHER IMP. INFORMATION RELATED TO NORTHERN GRID, 6E, JUNE 2014 17
WIDEBAND COMMUNICATION NETWORK FOR
NORTHERN REGION SCADA SYSTEM
PUNJAB
JAMMU & KASHMIR RISHIKESH
HAMIRPUR

GLADNI HARDWAR
DULHASTI GAGAL

SALAL
AD HYDRO HIMACHAL ROORKEE
CHAMERA-1
BAIRASUIL
GANGUWAL PRADESH UTTAR PRADESH ROORKEE

JANIPURA KUNIHAR
CHAMERA-2 ROPAR
JUTOGH-SLDC MUHAMDPUR
KISHENPUR JALLANDHAR-II

URI
UDHAMPUR
WAGOORA MEERUT MUZAFERNAGAR
CHAMBA TEHRI

KOTESHWAR (PG)
KOTESHWAR (Th) MEERUT (PG) 800
KISHANPUR PANCHKULA NARWANA

MEERUT-220
GORAYA JAMALPUR BARNALA
KURALI HARYANA (MODIPURAM)

MURAD NAGAR-II

TIBER
CHANDIGARH GULAUTI
ASSANDH PANIPAT-TPS
AMRITSAR (BBMB)
MALLERKOTLA
JALLENDHAR
LUDHIANA
MOGA
FATEHABAD
PANIPAT-SLDC KHURJA

MURADNAGAR
JAGRAON LALTON KALAN MALERKOTLA GOBINDGARH NAUSERA DHULKOTE HARDUAGANJ
MOGA PATIALA- SLDC
NARORA

KARCHAM
NALAGARH JHAJJAR
KAITHAL SIKANDRA RAO
SONIPATH
PATIALA
HISSAR JHAJJAR ABDULLAPUR
SONIPAT
NATHPA JHAKRI
RATANGARH
BAHADURGARH
ETAH 123
HISSAR
BHIWANI DADRI SLDC
CPCC- 2

NARELA GOPALPUR MORADABAD


WAZIRABAD
MAINPURI
PATPARGAN
LACHMANGARH
BAWANA NARORA

BHINMAL
MAHINDERGARH NARORA GAZIPUR
NIBKARORI
RAJASTHAN MALANA-2 DULIGANGA
BALIA DAULIGANGA VINDHYACHAL LUCKNOW
GURSAHAIGANJ
GORAKHPUR GORAKHPUR
SIKAR IP.POWER TANAKPUR
MINTO ROAD
BAHADURGARH
KHANJAWALA
RAIBAREILLY
DELHI CB GANJ
SITARGANJ
PITHORAGHAR VINDHYCHAL UNNAO
BILHAUR
LOCAL_PG
Mundra LODHI ROAD
PALSANA SRICEMENT UNCHHAR
RSCC ALLAHABAD ALLAHABAD
NRLDC IP.EXT.
SINGRAULI PANKI AURIYA
DADRI HVDC KANPUR
NAJABGARH RIHAND FATHEPUR
CPCC- 1 DADRI GAS
HVDC KANPUR
DADRI THM SINGRAULI
RIHAND THM AJGAIN
REENGUS SARITA VIHAR
LUKHNOW
DADRI (SAROJNI Nagar)
GURGAON BADARPUR
AGRA
BADARPUR RIHAND HVDC
ANTA
BHIWADI SHAKTI
BHAWAN
HINGONIA BASSI
BHIWADI (HVDC) LUCKNOW
MEHRAULI OKHLA AGRA MAHARANIBAG SAMESHI
BAMNAULI RAIBAREILLY
BHIWADI
FARIDABAD MBAGH RIHAND PIPRI
(400KV) MANDOLA
BALLABGARH BAREILLY
RAE BARELI
MAINPURI MBAGH
(220KV)
SIRSHI
ALWAR GURGAON
BASSI DALLA GAURIGANJ
BALLABGARH MANDOLA
HEERAPURA
OBRA B
LEGEND SULTANPUR
RAMGANJ
STATION

REPEATER ROBERTGANJ
PHAGI DEBARI

SUB SLDC
RAPP - B KOTA ( PG )
MAU AIMMA
RAPP - A
CHITTORGARH SLDC
RAPP - B MARIHANE
MALPURA ANTA
CPCC
KAKRAULI ALLAHABAD
BHINMAL NO PATH
RAPP - C FIBER
MICROWAVE LINK
KEKRI HANDIA
TELECOM LINK
SAHAPURA BHILWARA MANPURA BIJOLIA DABI TALERA DIFFERENT PATH AZAMGARH VARANSI SAHUPURI CHUNAR MIRZAPUR
KOTA
VSAT / MEKSET LINK/GPRS

POWER SYSTEM OPERATION CORPORATION LIMITED WIDEBAND COMMUNICATION NETWORK FOR Prepared by : SCADA Deptt.
NORTHERN REGION SCADA SYSTEM
NORTHERN REGIONAL LOAD DESPATCH CENTRE Updated on : july, 2012

Note: May loose information if not printed in colour

18
Page 1 / 1
19
Breakup of Installed Generation Capacity in NR as on 30th April 2014

INSTALLED CAPACITY EFFECTIVE CAPACITY


Owner STATION Units Total (MW) Units Total (MW)
1 Regional Entities
1.A Central Govt Owned Companies
Coal
(a) NTPC Singrauli STPS 5x200+2x500 2000.00 5x200+2x500 2000.00
(b) NTPC Rihand STPS Stage-I 2x500 1000.00 2x500 1000.00
(c) NTPC Rihand STPS Stage-II 2x500 1000.00 2x500 1000.00
(e) NTPC Rihand STPS Stage-III 2x500 1000.00 2x500 1000.00
(f) NTPC Dadri NCTPS Stage-I 4x210 840.00 4x210 840.00
(g) NTPC Dadri NCTPS Stage-II 2x490 980.00 2x490 980.00
(h) NTPC Unchahar TPS Stage-I 2x210 420.00 2x210 420.00
(i) NTPC Unchahar TPS Stage-II 2x210 420.00 2x210 420.00
(j) NTPC Unchahar TPS Stage-III 1x210 210.00 1x210 210.00
Sub-Total (Coal) 7870.00 7870.00
Gas
(a) NTPC Anta GPS 3x88.71+1x153.20 419.33 3x88.71+1x153.20 419.33
(b) NTPC Auraiya GPS 4x111.19+2x109.30 663.36 4x111.19+2x109.30 663.36
(c) NTPC Dadri GPS 4x130.19+2x154.51 829.78 4x130.19+2x154.51 829.78
Sub-Total (Gas) 1912.47 1912.47
Nuclear
(a) NPC RAPS -B 2x220 440.00 2x220 440.00
(b) NPC RAPS -C 2X220 440.00 2X220 440.00
(c) NPC NAPS 2x235 470.00 2x220 440.00
Sub-Total(Nuclear) 1350.00 1320.00
Hydro
(a) NHPC Bairasiul 3x60 180.00 3x60 180.00
(b) NHPC Salal Stage - I 3x115 345.00 3x115 345.00
(c) NHPC Salal Stage - II 3x115 345.00 3x115 345.00
(d) NHPC Tanakpur HPS 3x40 120.00 3x31.4 94.20
(e) NHPC Chamera HPS-I 3x180 540.00 3x180 540.00
(f) NHPC Chamera HPS-II 3x100 300.00 3x100 300.00
(g) NHPC Chamera HPS-III 3x77 231.00 3x77 231.00
(h) NHPC URI-I 4x120 480.00 4x120 480.00
(i) NHPC URI-II 4x60 240.00 4x60 240.00
(j) NHPC Dhauli Ganga 4x70 280.00 4x70 280.00
(k) NHPC Dulhasti 3x130 390.00 3x130 390.00
(l) NHPC Sewa-II 3x40 120.00 3X40 120.00
(m) NHPC Parbati-III 4x130 520.00 4x130 520.00
(n) SJVNL Nathpa-Jhakri 6x250 1500.00 6x250 1500.00
(o) SJVNL Rampur 6x68.67 412.02 4x68.67 274.68
(p) THDC Tehri HEP 4x250 1000.00 4x250 1000.00
(q) THDC Koteswar HEP 4x100 400.00 4x100 400.00
Sub-Total(Hydro) 7403.02 7239.88
Renewable
(a) NTPC Dadri Solar 5 5.00 5 5.00
(b) NTPC Unchahar Solar 10 10.00 10 10.00
Sub-Total(Renewable) 15.00 15.00
Total Central Govt Owned 18550.49 18357.35
1. B Independent Power Producers (IPP)
Coal
(a) Shree Cement Shree Cement 2x150 300.00 2x150 300.00
Sub-Total(Thermal) 300.00 300.00
Hydro
(a) ADHP ADHP 2x96 192.00 2x96 192.00
(b) Everest Power Malana-II 2x50 100.00 2x50 100.00
(c) JPVL Karcham Wangtoo 4x250 1000.00 4x250 1000.00
(d) Lanco Budhil 2x35 70.00 2x35 70.00
Sub-Total(Hydro) 1362.00 1362.00
Total(IPP)) 1662.00 1662.00
Total Regional Entities( A+B) 20212.49 20019.35
2 Joint Entities
Coal
(a) APCPL Jhajjar 3x500 1500.00 3x500 1500.00
Sub-Total(Thermal) 1500.00 1500.00
Hydro
(a) Bhakra Complex

SECTION-IV: POWER MAP AND OTHER IMPORTANT INFORMATION RELATED TO NORTHERN GRID, 6E, JUNE 2014
21
Breakup of Installed Generation Capacity in NR as on 30th April 2014

INSTALLED CAPACITY EFFECTIVE CAPACITY


Owner STATION Units Total (MW) Units Total (MW)
BBMB (i) Bhakra (L) 3x108 + 2x126 576.00 3x108 + 2x126 576.00
BBMB (ii) Bhakra (R) 5x157 785.00 5x157 785.00
BBMB (iii) Ganguwal 1x27.99+2x24.20 76.39 1x27.99+2x24.20 76.39
BBMB (iv) Kotla 1x28.94+2x24.20 77.34 1x28.94+2x24.20 77.34
1514.73 1514.73
(b) BBMB Dehar 6x165 990.00 6x165 990.00
(c) BBMB Pong 6x66 396.00 6x66 396.00
Sub-Total(Hydro) 2900.73 2900.73
Total Joint Entities 4400.73 4400.73

3 State Entities
3.1 CHANDIGARH
State Govt Owned Companies
Diesel
(a) CHANDIGARH 2.00 1.40
Total Chandigarh Total Diesel 2.00 1.40

3.2 DELHI
State Govt Owned Companies
Coal
(a) IPGCL Indra Prastha 3x62.5+1x60 247.50 0 0.00
(b) IPGCL Rajghat 1x15+2x67.5 150.00 2x67.5 135.00
Sub-Total (Coal) 397.50 135.00
Gas
(a) IPGCL Gas Turbines 6x30+3x34 282.00 6x30+3x30 270.00
(b) PPCL Pragati Gas Turbines 2x104.6+1x121.2 330.00 2x104.6+1x121.2 330.00
(c) NDPL Rithala 3x36 108.00 3x36 108.00
(d) PPCL Bawana 6x250 1500.00 3x250 750.00
Sub-Total (Gas) 2220.00 1458.00
Renewable
Timarpur Okhla Waste
(a) JUIL Management Company Ltd. 21.00 16.00
Sub-Total (Renewable) 21.00 16.00
Total State Govt Owned 2638.50 1593.00
Central Govt Owned Companies
Coal
(a) NTPC Badarpur TPS 3x100+2x210 720.00 3x95+2x210 705.00
Total Delhi 3358.50 2314.00

3.3 HARYANA
State Govt Owned Companies
Coal
(a) HPGCL Faridabad (New) 3x55 165.00 0 0.00
(b) HPGCL Panipat 1x117.8+3x110+2x210+2x250 1367.80 1x117.8+3x110+2x210+2x250 1367.80
(c) HPGCL DCRTPP (Yamuna Nagar) 2x300 600.00 2X300 600.00
(d) HPGCL RGTPP Khedar 2x600 1200.00 2x600 1200.00
(e) HPGCL Jhajjar (CLP) 2x660 1320.00 2x660 1320.00
Sub-Total (Coal) 4652.80 4487.80
Hydro

(a) HPGCL Western Yamuna canal (WYC) -I & II 6x8+2x7.2 62.40 6x8+2x7.2 62.40
Sub-Total(Hydro) 62.40 62.40
Total State Govt Owned 4715.20 4550.20
Central Govt Owned Companies
Gas
(a) NTPC Faridabad GPS 2x137.75 +1x156.07 431.57 2x137.75 +1x156.07 431.57
Total Govt Owned in Haryana 5146.77 4981.77
Independent Power Producers (IPP)
Diesel
(a) IPP_MD Magnum Diesel (IPP) 4x6.3 25.20 4x6.3 25.20
Total IPP Sub-Total (Diesel) 25.20 25.20
Total Haryana 5171.97 5006.97

3.4 HIMACHAL PRADESH


State Govt Owned Companies
Hydro

SECTION-IV: POWER MAP AND OTHER IMPORTANT INFORMATION RELATED TO NORTHERN GRID, 6E, JUNE 2014
22
Breakup of Installed Generation Capacity in NR as on 30th April 2014

INSTALLED CAPACITY EFFECTIVE CAPACITY


Owner STATION Units Total (MW) Units Total (MW)
(a) HPSEB LTD Larji 3x42 126.00 3x 42 126.00
(b) HPSEB LTD Bhabha (H) 3x40.00 120.00 3x40.00 120.00
(c) HPSEB LTD Bassi 4x15.00 60.00 4x15.00 60.00
(d) HPSEB LTD Giri 2x30.00 60.00 2x30.00 60.00
(e) HPSEB LTD Ghanvi 2x11.25 22.50 2x11.25 22.50
(f) HPSEB LTD Andhra 3x 5.65 16.95 3x 5.65 16.95
(g) HPSEB LTD Baner (H) 3x 4.00 12.00 3x 4.00 12.00
(h) HPSEB LTD Khauli 2x6 12.00 2x 6.0 12.00
(i) HPSEB LTD Gaj (H) 3x 3.50 10.50 3x 3.50 10.50
(j) HPSEB LTD Binwa 2x 3.00 6.00 2x 3.00 6.00
(k) HPSEB LTD Thirot 3x1.5 4.5 3x 1.5 4.5
(l) HPSEB LTD Gumma 2x1.5 3.00 2x 1.5 3.00
(m) HPSEB LTD Holi 2x1.5 3.00 2x 1.5 3.00
(n) HPSEB LTD Nogli 2x 0.25+4x0.50 2.50 2x 0.25+4x0.50 2.50
(o) HPSEB LTD Rongtong 4x 0.50 2.00 4x 0.50 2.00
(p) HPSEB LTD Sal -2 1x 2 2.00 1x 2 2.00
MMH (HP Below 2 MW)
(Chaba=1.75 MW+ Rukti =1.5
(q) HPSEB LTD MW+Bhuri Singh PH=0.45 4.80 1.75+1.5+0.45+0.3+0.2+0.1+0.1+0.4 4.80
MW+Killar=0.30
MW+Kothi=0.2MW+juthed=0.1MW+
Gharola=0.1MW+Lingti=0.4MW)
Total State Govt Owned Sub-Total(Hydro) 467.75 467.75
Independent Power Producers (IPP)
Hydro
(r) IPP_HP Malana (IPP) 2x43 86.00 2x43 86.00
(s) IPP_HP Baspa (IPP) 3x100 300.00 3x100 300.00
(t) IPP_HP Patikari(IPP) 2x8 16.00 2x8 16.00
(u) IPP_HP Toss (IPP) 2x5 10.00 2x5 10.00
(v) IPP_HP MMH(IPP) 51.00 51.00
Total IPP Sub-Total(Hydro) 463.00 463.00
Total HP 930.75 930.75

3.5 J&K
State Govt Owned Companies
Gas
(a) PDD Pampore GT St - I 3x25.0 75.00 0 0.00
(b) PDD Pampore GT St - II 4x25.0 100.00 0 0.00
Sub-Total (Gas) 175.00 0.00
Diesel
(a) PDD Diesel Gen. Sets 8.94 7.18
Sub-Total (Diesel) 8.94 7.18
Hydro
(a) JKSPDCL Baglihar 3x150 450 3x150 450.00
(b) PDD Lower Jhelum 3x35.0 105.00 3x35.0 105.00
(c) PDD Upper Sindh 2x11.30+3x35.0 127.60 2x11.30+3x35.0 127.60
(d) PDD Ganderbal 2x3+2x4.5 15.00 2x3+2x4.5 15.00
(e) PDD Chenani 5x4.66 +2X1.0 +3x2.5 32.80 5x4.66 +2X1.0 + 3x2.5 32.80
(f) PDD Stakna 2x2.0 4.00 2x2.0 4.00
(g) PDD Small Hydel 15.30 15.30
(h) PDD Sewa 3x3.0 9.00 3x3.0 9.00
(i) PDD Barnwar 2x2.5 5.00 2x2.5 5.00
Sub-Total(Hydro) 763.70 763.7
Total State Govt Owned 947.64 770.88
Independent Power Producers (IPP)
(a) IPP_JK Atwatoo (IPP) 2x5 10.00 2x5 10.00
Total IPP 10.00 10.00
Total J & K 957.64 780.88

3.6 PUNJAB
State Govt Owned Companies
Coal
(a) PSPCL Guru Nanak Dev TPS (Bhatinda) 4x110 440.00 4x110 440.00
(b) PSPCL Guru Gobind Singh (Ropar) 6x210 1260.00 6x210 1260.00
(c) PSPCL Lehra Mohabbat TPS 2x210+2x250 920.00 2x210+2x 250 920.00
(d) PSPCL Jhalkeri Rice Straw Fired 1x10 10.00 1x10 10.00
Sub-Total (Coal) 2630.00 2630.00

SECTION-IV: POWER MAP AND OTHER IMPORTANT INFORMATION RELATED TO NORTHERN GRID, 6E, JUNE 2014
23
Breakup of Installed Generation Capacity in NR as on 30th April 2014

INSTALLED CAPACITY EFFECTIVE CAPACITY


Owner STATION Units Total (MW) Units Total (MW)
Hydro
(e) PSPCL Jogindernagar/Shanan 4x15+1x50 110.00 4x15+1x50 110.00
(f) PSPCL Upper Behari Doab Canal (UBDC) 3x15+3x15.45 91.35 3x15+3x15.45 91.35
(g) PSPCL Mukerian 6x15+6x19.5 207.00 6x15+6x19.5 207.00
(h) PSPCL Anandpur Sahib (APS) 4x33.5 134.00 4x33.5 134.00
(i) PSPCL Ranjit Sagar HPS 4x150 600.00 4x150 600.00
(j) PSPCL Small Hydel 5.60 5.60
Sub-Total(Hydro) 1147.95 1147.95
Total State Govt Owned 3777.95 3777.95
Independent Power Producers (IPP)
(a) IPP_Punjab IPP(MMH+PEDA+others) 69.85 69.85
Coal

IPP_Punjab (L&T
Power
Development Ltd.)
(b) Rajpura TPS 1x700 700.00 1x700 700.00
IPP_Punjab
(c) (Sterlite Energy) Talwandi Saboo 1x660 660.00 1x660 660.00
Total IPP 1429.85 1429.85
Total Punjab 5207.80 5207.80

3.7 RAJASTHAN
State Govt Owned Companies
Coal
(a) RVUNL Kota TPS 2x110+3x210 +2x195 1240.00 2x110+3x210 +2x195 1240.00
(b) RVUNL Suratgarh TPS 6x250 1500.00 6x250 1500.00
(c) RVUNL Kalisindh TPS 1x600 600.00 1x600 600.00
(d) RVUNL Chhabra TPS 2x250 500.00 2x250 500.00
Sub-Total (Coal) 3840.00 3840.00
Gas
(a) RVUNL Ramgarh GT EXT. 1x3+1x35.5+2x37.5+1x110 223.50 1x3+1x35.5+2x37.5+1x110 223.50
(b) RVUNL Dholpur CCPP 3x110 330.00 3x110 330.00
Sub-Total (Gasl) 553.50 553.50
Lignite
(a) RVUNL Giral TPS 2x125 250.00 2x125 250.00

Sub-Total (Lignitel) 250.00 250.00


Hydro
(a) RVUNL Mahi Power House-I & II 2x25+2x45 140.00 2x25+2x45 140.00
(b) RVUNL Rana Pratap Sagar (RPS) 4x43 172.00 4x43 172.00
(c) RVUNL Jawahar Sagar (JS) 3x33 99.00 3x33 99.00
(d) RVUNL Anoopgarh I & II (3x1.5 ) x2 9.00 (3x1.5 ) x2 9.00
(e) RVUNL Small Hydro 14.85 14.85
(f) RVUNL Gandhi sagar 5x23 115.00 5x23 115.00
Sub-Total(Hydro) 549.85 549.85
Renewables
(a) IPP_Rajasthan Wind farm 2797.84 2797.84 2797.84
(b) IPP_Rajasthan Bio-mass 99.3 99.30 99.30
(c) IPP_Rajasthan Solar 730 730.00 730.00
Sub-Total(Renewables) 3627.14 3627.14
Total State Govt Owned 8820.49 8820.49
Central Govt Owned Companies
Nuclear
(a) NPC RAPS -A 2x220 440.00 1x100+1x200 300.00
Lignite
(a) NLC Barsingsar 2x125 250.00 2x125 250.00
Total Govt Owned in Rajasthan 9510.49 9370.49
Independent Power Producers (IPP)
Lignite
IPP_Rajasthan
(Rajwest Power
(a) Ltd.) Rajwest 8x135 1080.00 8x135 1080.00
IPP_Rajasthan
(b) (KSK Energy) VSLPP 1x135 135.00 1x135 135.00
Coal
IPP_Rajasthan
(c) (Adani Power) Kawai 2x660 1320.00 2x660 1320.00
Total IPP 2535.00 2535.00
Total Rajasthan 12045.49 11905.49
SECTION-IV: POWER MAP AND OTHER IMPORTANT INFORMATION RELATED TO NORTHERN GRID, 6E, JUNE 2014
24
Breakup of Installed Generation Capacity in NR as on 30th April 2014

INSTALLED CAPACITY EFFECTIVE CAPACITY


Owner STATION Units Total (MW) Units Total (MW)

3.8 UP
State Govt Owned Companies
Coal
(a) UPRVUNL Obra 2x50 100.00 2x50 100.00
(b) UPRVUNL Obra Extn. - I 1x100 100.00 1x94 94.00
(c) UPRVUNL Obra Extn. - II 5x200 1000.00 5x200 1000.00
(d) UPRVUNL Panki Extn. 2x110 220.00 2x105 210.00
(e) UPRVUNL Harduaganj - C 1x60+1x110+2x250 670.00 1x60+1x105+2x250 665.00
(f) UPRVUNL Paricha 2x110+2x210+2x250 1140.00 2x110+2x210+2x250 1140.00
(g) UPRVUNL Anpara - A 3x210 630.00 3x210 630.00
(h) UPRVUNL Anpara - B 2x500 1000.00 2x500 1000.00
Sub-Total (Coal) 4860.00 4839.00
Hydro
(a) UPJVNL Rihand 6x50.0 300.00 6x50.0 300.00
(b) UPJVNL Obra 3x33.0 99.00 3x33.0 99.00
(c) UPJVNL Matatilla 3x10.2 30.60 3x10.2 30.60
(d) UPJVNL Khara 3x24.0 72.00 3x24.0 72.00
(e) UPJVNL MMH 25.30 25.30

Sub-Total(Hydro) 526.90 526.90


Total State Govt Owned 5386.90 5365.90
Central Govt Owned Companies
Coal
(a) NTPC Tanda TPS 4x110 440.00 4x110 440.00
Sub Total Govt Owned in UP 5826.90 5805.90
Independent Power Producers (IPP)
Hydro
(a) IPP_UP (JPVNL) Vishnuprayag IPP 4x100 400.00 4x100 400.00
Coal
(b) IPP_UP (Lanco) Anpara C 2x600 1200.00 2x600 1200.00
(c) IPP_UP (Reliance) Roza 4x300 1200.00 4x300 1200.00
(d) IPP_UP(Bajaj) Barkhera TPS 2x45 90.00 2x45 90.00
(e) IPP_UP(Bajaj) Khambarkhera TPS 2x45 90.00 2x45 90.00
(f) IPP_UP(Bajaj) Kundarki TPS 2x45 90.00 2x45 90.00
(g) IPP_UP(Bajaj) Maqsoodpur TPS 2x45 90.00 2x45 90.00
(h) UPRVUNL Co-Generation 951.00 951.00
Total IPP 4111.00 4111.00
Total UP 9937.90 9916.90

3.9 UTTRAKHAND
State Govt Owned Companies
Hydro
(a) UJVNL Khatima 3x13.8 41.40 3x13.8 41.40
(b) UJVNL Ramganga 3x66.0 198.00 3x66.0 198.00
(c) UJVNL Upper Ganga Canal
UJVNL Mohamedpur 3x3.1+ 3x3.1+
UJVNL Pathari 3x6.8 29.70 3x6.8 29.70
(d) UJVNL Yamuna ( I & IV )
UJVNL - Dhalipur 3x17.00+ 3x17.00+
UJVNL - Dhakrani 3x11.25+ 3x11.25+
UJVNL - Kulhal 3x10.00 114.75 3x10.00 114.75
(e) UJVNL Chibro 4x60.0 240.00 4x60.0 240.00
(f) UJVNL Khodri 4x30.0 120.00 4x30.0 120.00
(g) UJVNL Chilla 4x36.0 144.00 4x36.0 144.00
(h) UJVNL Maneri Bhali(St I & II) 3x30.0 + 4x76 394.00 3x30.0 +4x76 394.00
(i) UJVNL Small Hydro 24.05 24.05 24.05 24.05
Total Hydro 1305.90 1305.90
Independent Power Producers (IPP)
(a) IPP_UK Small Hydro 58.85 58.85 58.85 58.85
Total IPP 58.85 58.85
Total Uttarakhand 1364.75 1364.75

Total Region (1 to 3) 63590.02 61849.02

SECTION-IV: POWER MAP AND OTHER IMPORTANT INFORMATION RELATED TO NORTHERN GRID, 6E, JUNE 2014
25
Summary of Effective Generation Capacity in Northern Region As on 30th April 2014

Table 1: Company wise Breakup


Effective % age of Total NR
Sl No. Company Capacity Effective Capacity
1 NTPC Ltd. 11374 18.39
2 UP Rajya Vidyut Utpadan Nigam Ltd. (UPRVUNL) 5790 9.36
Rajasthan Rajya Vidyut Utpadan Nigam Limited
3 (RVUN) 5193 8.40
4 Punjab State Power Corporation Limited (PSPCL) 3778 6.11

5 Haryana Power Generation Corporation Ltd. (HPGCL) 4550 7.36


6 NHPC Ltd. 4065 6.57
7 Bhakra Beas Management Board (BBMB) 2901 4.69
8 Nuclear Power Corporation of India Ltd. (NPCIL) 1620 2.62
9 IPP_Rajasthan 6162 9.96
10 Satluj Jal Vidyut Nigam Limited (SJVNL) 1775 2.87
11 Uttarakhand Jal Vidyut Nigam Ltd (UJVNL) 1306 2.11
12 Tehri Hydro Development Corporation (THDC) 1400 2.26
13 IPP_UP 3160 5.11
14 UP Jal Vidyut Nigam Ltd. (UPJVNL) 527 0.85
15 IPP_HP 463 0.75
16 Power Development Department (PDD) 321 0.52
Himachal Pradesh State Electricity Board Ltd.
17 (HPSEB LTD) 468 0.76
Jammu and Kashmir State Power Development
18 Corporation Limited (JKSPDCL) 450 0.73
19 Indraprastha Power Generation Co. Ltd (IPGCL) 405 0.65
20 New Delhi Power Ltd. (NDPL) 108 0.17
21 Pragati Power Corporation Ltd. (PPCL) 1080 1.75
22 Timarpur Okhla Waste Management Company Ltd. 16 0.03
23 Neyveli Lignite Corporation Ltd. (NLC) 250 0.40
24 Allain Duhangan Hydroelectric Projec (ADHP) 192 0.31
25 Aravali Power Company Private Ltd. (APCPL) 1500 2.43
26 Jaypee Power Ventures Ltd. (JPVL) 1000 1.62
27 Shree Cement 300 0.49
28 Everest Power 100 0.16
29 Lanco Budhil Hydro Power Private Limited 70 0.11
30 IPP_Uttarakhand 59 0.10
31 IPP_Punjab 1430 2.31
32 IPP_Haryana 25 0.04
33 IPP_JK 10 0.02
34 CHANDIGARH 1 0.00
Total NR Installed Generation Capacity 61849 100.00

Table 2:Fuel wise Breakup


Effective % age of Total NR
Sl No. Fuel Type Capacity Effective Capacity
1 Coal 32187 52.04
2 Hydro 17259 27.90
3 Gas-Diesel 4389 7.10
4 Other(Wind, Biomass, Co-generation,Solar) 4679 7.57
5 Nuclear 1620 2.62
6 Lignite 1715 2.77
Total NR Installed Generation Capacity 61849 100.00

SECTIOB-IV: POWER MAP AND OTHER IMP. INFORMATION RELATED TO NORTHERN GRID, 6E, JUNE 2014 26
Breakup of Effective Generation Capacity (in MW) in
Northern Region

1609
1 (0%) (3%) 4575 (8%) 931 (2%)
781 (1%)
5208 (9%)
26462 (43%)

10455 (17%)

9477 (16%)

1365 (2%)

Total NR Generation Capacity: 61849 MW

Chandigarh Delhi Haryana

Himachal Pradesh Jammu & Kashmir Punjab

Rajasthan Uttar Pradesh Uttarakhand

Central Sector

NOTE: IPP Generation included in respective control area where they are located.
As on 31st May 2014
SECTION-IV:POWER MAPS AND OTHER IMP. INFORMATION RELATED TO NORTHERN GRID, 6E, JUNE 2014 27
Fuelwise breakup of Effective Generation
Capacity(MW) in Northern Region

1620 (3%) 1715 (3%)


4378 (7%)
31587 (52%)

4389 (7%)

17174 (28%)

Total NR Generation Capacity: 61849 MW

Coal
Hydro
Gas-Diesel
Other(Wind, Biomass, Co-generation,Solar)
Nuclear
Lignite
As on 31st May 2014

SECTION-IV:POWER MAPS AND OTHER IMP. INFORMATION RELATED TO NORTHERN GRID, 6E, JUNE 2014 28
Ownershipwise Effective Generation (MW)
Capacity in Northern Region

12987, 21% 11374, 18%


1, 0%
1593, 3%
4065, 7%
771, 1%
1620, 3%
468, 1% 4550, 7%

1306, 2% 2901, 5%
5193, 8% 6317, 10% 1400, 2%
1775, 3%
3778, 6%
1500, 2%
250, 0%

Total NR Generation Capacity: 61849 MW

National Thermal Power Corporation Ltd.(NTPC) National Hydro Power Corporation Ltd. (NHPC)

Nuclear Power Corporation of India Ltd. (NPCIL) Bhakra Beas Management Board (BBMB)

Tehri Hydro Development Corporation (THDC) Satluj Jal Vidyut Nigam Limited (SJVNL)

Aravali Power Company Private Ltd. (APCPL) Neyveli Lignite Corporation Ltd. (NLC)

Uttar Pradesh Rajasthan

Punjab Haryana

Uttrakhand Himachal pradesh

Jammu & Kashmir Delhi

Chandigarh IPPs

As on 31th May 2014

SECTION-I:POWER MAPS AND OTHER IMP. INFORMATION RELATED TO NORTHERN GRID, 6E, JUNE 2014
29
Number of HVDC/765kV/400kV lines in
Northern Region
23

27
3

2 11
6

17

10
2 198
2
8
6

Total: 315

PowerGrid Adani Power Ltd.

Powerlink Aravali Power Company Ltd.

BBMB DTL

HVPNL JPVL/Jaypee POWERGRID Ltd (JPL)

PDD (Jammu&Kashmir) PSTCL

PTCUL UPPTCL

RRVPNL

As on 31th May 2014

SECTION-I:POWER MAPS AND OTHER IMP. INFORMATION RELATED TO NORTHERN GRID, 6E, JUNE 2014
30
31
34
35
NORTHERN REGIONAL LOAD DESPATCH CENTRE
POWER SYSTEM OPERATION CORPORATION LIMITED
(A wholly owned subsidiary of the POWERGRID)

18-A, Shaheed Jeet Singh Sansanwal Marg, Katwaria Sarai,


New Delhi - 110 016
Phone: 91-11-2653 6832, 2686 4861, 2685 4015
Fax: 91-11-2685 2747 E-mail: nrldcso@gmail.com, nrldcso2@gmail.com,
nrldcos@yahoo.co.in
Website: http://www.nrldc.in or http://www.nrldc.org

Anda mungkin juga menyukai