01.01 EXCAVACIONES m3
01.02 RELLENOS m3
01.03.02 ELIMIN. MAT. CARGAD. 125 HP/VOLQ.6M3, D= 10KM 363.50 20.13 7,317.26
02.03.01 FALSO PISO DE 4" CON MEZC. 1:8 C:H 7.98 25.47 203.25
03.02.01 CONCRETO F'C=210 KG/CM2 MUROS, TABIQUES Y PLACAS m3 48.44 432.80 20,964.83
03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL MUROS, TABIQUES Y PLACAS m2 331.65 40.57 13,455.04
03.04.03 LADRILLO ARCILLA PARA TECHO 15X30X30 CM und 104.00 2.28 237.12
03.07.02 ANCLAJE EN VARILLA DE 3/4" CON ADITIVO EPÓXICO DE INYECCION und 90.00 21.39 1,925.10
SUBTOTAL 157,283.42
IGV 18% 28,311.02
--------------------
TOTAL PRESUPUESTO 185,594.43
--------------------
ESTRUCTURAS
OBRA: MEJORAMIENTO DE UN CENTRO DE SALUD