I express gratitude for the presence of Allah SWT, because of the grace and
hidayahnya I can complete the task of English language paper, entitled
"Hydroelectric DEVELOPMENT PLANNING IN PADANG
". English papers this task I set up to Task Value my final exams this semester.
I mengucapakan to thank those who have helped me in completing this paper.
Final words I hope this paper can be useful for the general reader and as a
writer I am aware that in making this paper is far from perfect, for that I accept
suggestions and constructive criticism for improvement towards the better.
For the attention I thank you.
TABLE OF CONTENTS
FOREWORD………………………………………………………….......
CHAPTER I INTRODUCTION
1. DEFINITIONS HYDROPOWER ................................................................
2. PLANNING IN PADANG HYDROPOWER .............................................
3. THEORY APPLIED HYDROPOWER BANDA KALI...........................
4. BENEFITS hydropower BANDA KALI...............................................
5. BENEFITS IVESTOR ..............................................................................
HYDROPOWER DEVELOPMENT PLANNING IN PADANG
1.DEFINITIONS HYDROPOWER
Hydroelectric power plant (HEPP) is one of the power plants that use
renewable energy in the form of water. One advantage of this plant is so
rapid response is very suitable for peak load conditions or during
disturbances in the network. In addition to their output power capacity
is the largest among other renewable energy, hydropower plants have
also been there since time immemorial.
2.PLANNING IN PADANG HYDROPOWER
River banda Kali has great potential for hydropower development such
as water discharge is large and heavy.
5.BENEFITS IVESTOR
Di susun oleh
ARDY MARLINO HALIM
NO BP:15101154250037