PROJECT :
1|P age
CONTENTS
2|P age
A. Type : Sacrificial magnesium anode
B. Design life : 2 Years or till commissioning of PCP
whichever is later
C. Pipeline coating : Three Layer Polyethylene/ Three Layer
The current density mentioned above shall over ride the same mentioned
vide cathodic protection system standard
3|P age
G. Polarisation coupons : Shall be provided
4|P age
h) In the vicinity of DC networks or grounding systems and HVDC grounding
systems where interference problems are suspected.
i) At crossings of other pipelines/ structures.
j) Locations where interference is expected.
k) At locations of (SV/ IP/ DT/ RT) stations.
l) Current measurement test station for each leg of each SV cum CP stations.
m) At any other locations considered necessary by OWNER/ OWNER's
representative.
The test station locations mentioned above shall override the same mentioned vide
cathodic protection system standard
F. Type of Anodes for anode ground : Tubular mixed metal oxide (MMO).
bed
a. No. of computerised test stn : One each CTSU for each section
and location of CTSU in
consultation with OWNER by CP
Contractor.
5|P age
I Polarisation coupons Refer item G of TCP
:
J Polarisation cell Solid State Type
:
K. Acquisition of land for By EPC Contractor
: Anode ground bed in the name of
Owner including installation of anode
junction boxes (AJB) and ROU for
anode ground bed cable laying
L.
between AJB & TRU
Chain link fencing around the ground : Shall be provided as per anode ground b.
bed
6|P age
R. Additional requirements (if any):
a) External Corrosion Sensing probe and reader should be very sensitive even
to read minute corrosion rates to a tune of 1 mil per year.
b) For each IP,SV,DT/RT stations, insulating joint (IJ) shall be provided
by EPC contractor for isolating the incoming Trunk line / Spurline,
outgoing Trunk line / Spurline, including Compressor stations, existing
consumer tapping (whichever is applicable) from the station piping, earthing
grids/ pits etc.
c) For protection of the carrier pipe inside casing pipe, any one of the
following two alternative options shall be considered by the pipeline EPC
contractor. The selection of any of the alternative options shall be as per sole
discretion of OWNER:
d) Bentonite filling at the annular space between casing and carrier shall be
provided for protection of carrier pipe inside the casing pipe. Discrete
Mg anode (quantity as required to achieve -850mV potential level), shall be
connected to casing pipe at the cased crossings in case casing and carrier
pipe is shorted (i.e. become in mechanical contact with each other) and the
short is not cleared after filling of Bentonite.
e) Petroleum jelly (as per ANNEXURE-I or equivalent) filling at the
annular space between casing and carrier without installation of zinc ribbon
& discrete Mg anode.
f) it alternate SV station, current measurement provision along with PSP
measurement to be provided. Converter for PSP and current output for
SCADA connectivity along with cable to be provided by CP contractor.
The pipeline shall be grounded through polarization cell with Zinc galvanic anode,
wherever the pipeline is either crossing or running in parallel with overhead EHV/
HV transmission lines of voltage grade 66 KV and above.
7|P age
2.1. Special requirements for SCADA input:
(I) For CPPSM UNIT:
DIGITAL
SL. NO. OF
MONITORING (M) (D) /
No DESCRIPTION SIGNAL TAG NO.
/ CONTROL (C) ANALOGU
. S
E A)
8|P age
(II) For CPTRU:
PIPELINE OVER
3 M DI 1 PL-OV
PROTECTED
PIPELINE
4 UNDER M 1
PROTECTED DI PL-UV
ALL REFERENCE
5 CELLS FAILED M DI 1 REFC-F
REFERENCE CELL-1
6 VOLTAGE M AI 1 REFC1-V
REFERENCE CELL-2
7 VOLTAGE M AI 1 REFC2-V
9 CPPSM-
CPTR IN MANUAL MODE M DI 1
MAN
CURRENT
10 INTERRUPTER START C DO 1 CI-ST
CURRENT
11 INTERRUPTER STOP C DO 1 CI-STP
9|P age
Legend:
Notes:
1 For any control signal the signal shall be available from
SCADA for less than 2 seconds only.
2 The rating of the potential free contact for digital input and
output signals from Equipment/ PLC/ RTU shall be 24 V DC,
1.5 A DC. Analogue signals shall be 4-20 mA, galvanically
isolated.
3 Provision for minimum two nos analogue and two nos of
digital input signal to SCADA System shall be available for
future use.
4 Provision for monitoring of current measurement with
PSP measurement at alternate SV station to SCADA System.
10 | P a g e
ANNEXURE-I
Specifications:
11 | P a g e