Anda di halaman 1dari 2

NATIONAL GRID CORPORATION OF THE PHILIPPINES

Visayas Operation and Maantenane Date: March 9, 2014


Maintenance and Testing Division A
Nasipit, Talamban, Cebu City Work Order No.: 81 0231

NON.DIRECTIONAL OVERCURRENT PROTECTION REISY TEST FORM


NGCP
1.0 General lnformation
Station : UBAY SS CT Ratio :
Equipt Protected : REACTOR Purposeoftest:@
Vottage [eve[ : 138 Kv P Preventive Maintenance
tr Resetting
D Repair / Reptacement
2.0 Relay lnformation
Make/Brand : ABB Modet/Type : SPAJ 14OC Seria[ Number : 596541

Retay Type :
[sinste onase flrnr"" nnur" [flectromechanica[ [Nrmericat/Digitat
3.0 Relay Setting
3.1 Phase Overcurrent Protection Function 3.2 Earth Overcurrent Protection Function
Parameters As Found As Left Parameters As Found As Left
Low set lp' 0.65 Low set le> 0.26
TMS/ Operating Time 0.55 IMS / Operating Time 0.60
0peratinq Curve Jperatinq Curve
High set lp>> 3.2s {iqh set le,, 1 .50
operating Time 0.04 f,perating Time 0.70
4.0 Secondary lnject lon
4.1 AS FOUND
PICKUP TEST OPERATING TIME TEST
,I5O%TAP
t, I 200%TAP 3OO%TAP 4OO%TAP I

Phase Expected Time


0.64 3.25 14.88 7.40 3.70 2.55 0.06
B 0.65 3.2s 14.97 7.47 3.75 2.57 0.06
c 0.64 3.25 14.95 7.47 3.75 2.56 0.06
Expected Time
0.260 1.5
N N 10.26 5.99 3.83 3.04 0.07
4.2 IS MADE)
PICKUP TEST OPERATING TIME TEST
I l>> 1 5O%TAP 2OO%TAP 3OO%TAP 4OO%TAP I

Phase Expected Time


A
B I
c C

Expected Time
N N

5.0 lntegrity
5.1 CT lnputs 5.3 DC Suppty

5.2 Annunciation
6.0 Assessment/Remarks
E:r Ex:r 5.4 Trip Circuit
ErE::r:r
llwitntn acceprabte timits For further evaluation

llOperating time within acceptabte timits Defective

[]lotn", remarks
APM 2014

Customer representative Test performed by

Name : JUNIPHER JOSEPH R. SAGAML Name : HAROLD IJTTEXOOZA / ROY S. RIVERA


Position : Principa[ Engineer, Ubay SS Position : Prin. Engr. / 5r. Technician
lnstrument used
NATIONAL GRID CORPORATION OF THE PHILIPPINES
Visayas Operation and Maintenance Date: March 9,2014
Marntenance and Testrng Oivision - A
Nasipit, Talamban, Cebu City Work Order No.: 81 0230

NGCP TMNSFORMER DIFFERENTIAL PROTECTION RELAY TEST FORM

1.0 General lnformation


Station : UBAY SS Purpose of test : E Commissioning
Transformer lD: SHUNT REACTOR dPreventive Maintenance
Transformer Rating: 15 MVA tr Resetting
Vottage (kV): 138 KV D Replacement
CT Ratio (Primary): Aux. CT Ratio (A): n/a
CT Ratio (Secondary): 1A Aux. CT Ratio (B): nla
Winding config.: Aux. CT Ratio (C): n/a

2.0 Relay lnformation


Make/Brand : SEG Modet/Type : MRDl Serial Number : T3111HA

Retay Type
IslnSre nnase [rnree Rnase EEtectromechanicat [lNr."ri.ut/Digitat IStatic
3.0 Relay Setting
Differentiat current setting:
ls - 25%ln d(ld),' 7 x ln
ln-1A ldiff=2.0xln
t - lnst. ldiff high set = 7.0 x ln

4.0 Secondary lnjection Test


4.1 AS FOUND - Pickup and Operating Time Test

Phase A
Phase
Pickup Time
Windins 1 0.96 0.03
windine 2 0.96 0.03

4.'l AS LEFT - Pickup and Operating Time Test

Phase A
Phase
Pickup Time
Winding 1

Windine 2
Winding 3

5.0 lntegrity Check


5.1 CT lnputs 5.3 DC Supply

5.2 Annunciation
E:l !l:r:r 5.4 Trip Circuit
Eff!ur:l
5.0 AssessmenURemarks
Within acceptabte [imits For further evatuation
Operating time within acceptable [imits Defective
Other remarks
APM 2014

Customer representative Test performed by

Name : JUNIPHER JOSEPH R. SAGAML Name : HAROLD r-/mrxoOzl / ROY S. RTVERA


Position Principal Engineer, Ubay SS Position : Prin. Engr. / Sr. T
lnstrument used DOBLE F6 1 50

Noted by