HOJA DE METRADOS / ESTRUCTURAS

OBRA
FÓRMULA 01
CLIENTE
LUGAR
REGION

TERRENO A

PART. DESCRIPCION UND. OBSTETRICA -


EMERGENCIA
RADIOLOGIA

09.01.00 ESTRUCTURAS
09.01.01 TRABAJOS PRELIMINARES
09.01.01.01 LIMPIEZA DE TERRENO MANUAL M2
09.01.01.02 TRAZO Y REPLANTEO M2
09.01.01.03 TRAZO Y REPLANTEO DURANTE EL PROCESO M2
09.01.02 MOVIMIENTOS DE TIERRAS
09.01.02.01 CORTES
09.01.02.01.01 CORTE GENERAL CON MAQUINARIA , H=0.40m M3
09.01.02.01 EXCAVACION
09.01.02.01.01 EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m M3
09.01.02.01.02 EXCAVACION PARA VIGAS DE CONEXIÓN M3
09.01.02.01.02 EXCAVACION PARA CIMIENTOS CORRIDOS M3
09.01.02.02 NIVELACION Y COMPACTACION
09.01.02.02.01 REFINE, COMPACTACION Y NIVELACION DE FONDO DE SUPERFICIE ZAPATA M2
09.01.02.02.02 REFINE, COMPACTACION Y NIVELACION DE FONDO DE SUPERFICIE CIMIENTOS CORRIDOS M2
09.01.02.02.02 REFINE, COMPACTACION Y NIVELACION DE SUPERFICIE FONDO DE VIGA DE CONEXIÓN M2
09.01.02.02.03 REFINE, COMPACTACION Y NIVELACION DE SUPERFICIE M2
09.01.02.03 RELLENOS CON MATERIAL DE PRESTAMO
09.01.02.03.01 RELLENO Y COMPACTO DE SUPERFICIE M3
09.01.02.03.01 RELLENO Y COMPACTO DE ZAPATAS M3
09.01.02.03.01 RELLENO Y COMPACTO DE VIGAS DE CONEXIÓN M3
09.01.02.04 MANEJO DE MATERIAL PROCEDENTE DE EXCAVACIONES
09.01.02.04.01 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES M3
09.01.02.04.02 ELIMINACION DE MATERIAL EXCEDENTE M3
09.01.03 OBRAS DE CONCRETO SIMPLE
09.01.03.01 SUB ZAPATAS
09.01.03.01.01 SUB ZAPATAS F´C=100KG/CM2 +30% PIEDRA GRANDE M3
09.01.03.01 SOLADOS
09.01.03.01.01 SOLADO F´C=100KG/CM2 M3
09.01.03.03 CIMIENTOS CORRIDOS
09.01.03.03.01 CIMIENTOS CORRIDOS CONCRETO F´C=140KG/CM2 + 30% PIEDRA DESPLAZADORA M3
09.01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA CIMIENTO CORRIDOS M2
09.01.03.03 SOBRECIMIENTOS
09.01.03.03.01 SOBRE CIMIENTOS CONCRETO F´C=175KG/CM2 + 25% PIEDRA DESPLAZADORA M3
09.01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.45 m M2
09.01.03.04 FALSO PISO
09.01.03.04.01 CONCRETO F´C=80KG/CM2 PARA FALSO PISO E=0.10M M2
09.01.04 OBRAS DE CONCRETO ARMADO
09.01.04.01 ZAPATAS Y LOSA DE FONDO

09.01.04.01.01 CONCRETO PARA LOSA DE FONDO F'C=245 KG/CM2 M3


09.01.04.01.02 ACERO PARA ZAPATAS Y LOSA DE FONDO F'y= 4200 Kg/Cm2 KG
09.01.04.01 ZAPATAS

09.01.04.01.01 CONCRETO PARA ZAPATA F'C=210 KG/CM2 M3


09.01.04.01.02 ACERO PARA ZAPATAS F'y= 4200 Kg/Cm2 KG
MUROS
09.01.04.02.01 CONCRETO EN MUROS f'c=245 kg/cm2 M3
09.01.04.02.02 ENCOFRADO Y DESENCOFRADO PARA MUROS M2
09.01.04.02.03 ACERO PARA MUROS F'y= 4200 Kg/Cm2 KG
09.01.04.02 VIGAS DE CONEXIÓN
09.01.04.02.01 CONCRETO EN VIGAS DE CONEXION f'c=210 kg/cm2 M3
09.01.04.02.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CONEXIÓN M2
09.01.04.02.03 ACERO PARA VIGAS DE CONEXIÓN F'y= 4200 Kg/Cm2 KG
09.01.04.04 COLUMNAS
09.01.04.04.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 M3
09.01.04.04.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS M2
09.01.04.04.03 ACERO PARA COLUMNAS F'y= 4200 Kg/Cm2 KG
09.01.04.05 VIGAS
09.01.04.05.01 CONCRETO EN VIGAS f'c=210 kg/cm2 M3
09.01.04.05.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS M2
09.01.04.05.03 ACERO PARA VIGAS F'y= 4200 Kg/Cm2 KG
09.01.04.06 LOSAS ALIGERADAS

09.01.04.06.01 CONCRETO PARA LOSAS ALIGERADAS F'C=210 KG/CM2 M3

09.01.04.06.02 ENCOFRADO Y DESENCOFRADO PARA LOSAS ALIGERADAS M2

09.01.04.06.04 LADRILLO HUECO DE ARCILLA 30X30X15 CM PARA TECHO ALIGERADO UND


09.01.04.06.05 ACERO PARA LOSAS ALIGERADAS F'y= 4200 Kg/Cm2 KG
09.01.04.06 LOSAS MACIZAS

09.01.04.06.01 CONCRETO PARA LOSAS MACIZAS F'C=210 KG/CM2 M3

09.01.04.06.02 ENCOFRADO Y DESENCOFRADO PARA LOSAS MACIZAS M2


09.01.04.06.05 ACERO PARA LOSAS MACIZAS F'y= 4200 Kg/Cm2 KG
09.01.04.04 LOSA SUPERIOR
09.01.04.04.01 CONCRETO EN LOSA SUPERIOR f'c=245 kg/cm2 M3
09.01.04.04.02 ENCOFRADO Y DESENCOFRADO PARA LOSA SUPERIOR M2
09.01.04.04.03 ACERO PARA LOSA SUPERIOR F'y= 4200 Kg/Cm2 KG
09.01.04.07 COLUMNETAS
09.01.04.07.01 CONCRETO F´C=175KG/CM2 EN COLUMNETAS M3
09.01.04.07.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS M2
09.01.04.07.03 ACERO PARA COLUMNETAS F'y= 4200 Kg/Cm2 KG
09.01.04.08 VIGAS DE CONFINAMIENTO
09.01.04.08.01 CONCRETO F´C=175KG/CM2 EN VIGAS DE CONFINAMIENTO M3
09.01.04.08.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CONFINAMIENTO M2
09.01.04.08.03 ACERO PARA VIGAS DE CONFINAMIENTO F'y= 4200 Kg/Cm2 KG
09.01.04.09 ESCALERAS
09.01.04.09.01 CONCRETO EN ESCALERAS f'c=210 kg/cm2 M3
09.01.04.09.02 ENCOFRADO Y DESENCOFRADO PARA ESCALERAS M2
09.01.04.09.03 ACERO EN ESCALERAS F'y= 4200 Kg/Cm2 KG
09.01.05 VARIOS

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)


09.01.05.01 UND

09.01.05 ESTRUCTURAS METALICAS


09.01.05.01 COLUMNAS METALICAS
09.01.05.01 COLUMNA METALICA TUBO CUADRADO 100X4mm PARA PORTICOS ML
09.01.05.01 COLUMNA METALICA TUBO RECTANGULAR 100x150X4mm PARA PORTICOS ML
09.01.05.01 COLUMNA METALICA TUBO RECTANGULAR 100x200X5mm PARA PORTICOS ML
09.01.05.01 COLUMNA METALICA TUBO RECTANGULAR 100x250X6mm PARA PORTICOS ML
09.01.05.01 VIGAS METALICAS
09.01.05.01 VIGA METALICA TUBO RECTANGULAR 80X140x3mm PARA PORTICOS ML
09.01.05.01 VIGA METALICA TUBO RECTANGULAR 60X120x3mm PARA PORTICOS ML
09.01.05.01 TIJERALES PRINCIPALES
09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 1 UND
09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 1 PZA
09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 2 UND
09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 2 PZA
09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 3 UND
09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 3 PZA
09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 4A UND
09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 4A PZA
09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 4B UND
09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 4B PZA
09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 4C UND
09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 4C PZA
09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 5 UND
09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 5 PZA
09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 6 UND
09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 6 PZA
09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 7 UND
09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 7 PZA
09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 8 UND
09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 8 PZA
09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 9 UND
09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 9 PZA
09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 10 UND
09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 10 PZA
09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 11 UND
09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 11 PZA
09.01.05.01 APOYOS Y FIJACION
09.01.05.01 SISTEMA DE APOYO FIJO EN COLUMNAS METALICAS 100X100mm UND
09.01.05.01 SISTEMA DE APOYO FIJO EN COLUMNAS METALICAS 100X150mm UND
09.01.05.01 SISTEMA DE APOYO FIJO EN COLUMNAS METALICAS 100X200mm UND
09.01.05.01 SISTEMA DE APOYO FIJO EN COLUMNAS METALICAS 100X250mm UND
09.01.05.01 SISTEMA DE APOYO FIJO EN TIJERAL METALICO UND
09.01.05.01 DISPOSITIVO DE APOYO MOVIL EN TIJERAL METALICO
09.01.05.01 ARRIOSTRES
09.01.05.01 ARRIOSTRE DE 3/8" PARA VIGUETAS ML
09.01.05.01 ARRIOSTRE DIAGONAL TUBO CUADRADO 40x2mm PARA PORTICOS ML
09.01.05.01 ARRIOSTRE DIAGONAL TUBO CUADRADO 60x2mm PARA PORTICOS ML
09.01.05.01 ARRIOSTRE DIAGONAL TUBO CUADRADO 80x3mm PARA PORTICOS ML
09.01.05.01 TENSORES
09.01.05.01 TENSOR DE 1/2" EN ARRIOSTRE DE TIJERALES ML
09.01.05.01 TENSOR DE 5/8" EN ARRIOSTRE DE TIJERALES ML
09.01.05.01 VIGUETAS
09.01.05.01 VIGUETA METALICA TIPO VT ML
09.01.05.01 ANCLAJE METÁLICO PARA VIGUETAS TIPO VT UND
09.01.05.01 MONTAJE DE TIPO VT PZA
09.01.05.01 VIGUETA METALICA TIPO VC ML
09.01.05.01 ANCLAJE METÁLICO PARA VIGUETAS TIPO VC UND
09.01.05.01 MONTAJE DE TIPO VC PZA
09.01.05.01 CORREAS METALICAS
09.01.05.01 CORREA METALICA PERFIL C5X6.7 ML
09.01.05.01 CORREA METALICA PERFIL C6X8.2 ML
DE METRADOS / ESTRUCTURAS

TERRENO A TERRENO B TERRENO C


PLANTEAMIENTO
MANTENIMIENTO
GENERAL( portada, rampa, TANQUE CISTERNA,
QUIRURGICO- (RESIDUOS SOLIDOS Y TOTAL TERRENO
MANTENIMIENTO FARMACIA HOSPITALIZACION escalera de emergencia, CAJA DE TRATAMIENTO TOTAL DE TERRENO A DIRECCION ALMACEN LAVANDERIA ALMACEN MAYOR TOTAL TERRENO C
ESTERILIZACION GRUPO B
veredas exteriores, cerco DE DESAGUE
ELECTROGENO)
perimetrico)

221.67 160.94 69.00 248.96 504.66 46.16 1251.39 101.64 161.95 263.59 86.56 86.56
221.67 69.00 248.96 504.66 46.16 1090.45 101.64 161.95 263.59 86.56 86.56
665.01 482.82 207.00 992.45 1966.49 46.16 4359.93 406.53 485.85 892.38 86.56 86.56

88.67 64.38 27.60 99.58 201.86 482.09 40.66 64.78 105.44 34.62 34.62

65.87 40.92 7.68 63.78 119.21 297.47 22.82 12.43 35.24 82.80 82.80
12.00 22.32 61.64 102.84 198.81 17.29 17.29
11.57 17.01 4.27 2.14 36.07 71.06 10.81 9.49 20.30

43.92 27.28 5.12 46.81 79.48 202.60 15.21 8.29 23.50 55.20 55.20
15.43 22.68 5.33 48.59 14.41 11.87
20.01 44.64 56.04 93.49 214.18 28.82 28.82
238.20 147.58 44.22 218.68 468.98 46.19 1163.85 89.13 155.38 244.51 86.56 86.56

95.28 59.03 17.69 87.47 187.59 447.06 35.65 62.15 97.80 86.56 86.56
50.77 10.74 2.05 21.26 32.43 117.25 5.76 3.31 9.08 48.00 48.00
36.58 36.58

111.81 100.32 14.93 283.94 277.56 165.71 954.27 50.14 108.38 158.51 146.78 146.78
388.90 301.49 101.18 283.94 953.47 165.71 2194.69 190.70 108.38 299.08 146.78 146.78

17.57 10.91 5.12 17.01 31.79 82.40 6.08 8.29 14.37 38.64 38.64

46.19 46.19

12.10 12.10
60.51 60.51

5.00 1.99 0.72 7.26 14.97 1.60 1.60


33.00 33.00

238.20 147.58 44.22 218.68 442.90 1091.58 89.13 62.15 151.28 86.56 86.56

14.11 14.11
774.48 774.48

26.35 16.37 2.05 25.51 47.69 117.96 9.13 3.31 12.44 22.08 22.08
1093.33 630.26 55.67 874.86 2119.19 4773.31 338.34 86.39 424.73 644.41 644.41

16.22
162.19
2812.07

4.36 10.04 11.90 26.30


15.77 33.48 79.31 125.90 254.45 19.82 19.82
2073.54 721.08 1659.69 3534.60 7988.91 691.62 691.62

30.06 29.74 0.45 39.52 88.59 188.35 14.25 1.01 15.26 5.76 5.76
277.14 345.14 4.80 388.90 803.99 1819.97 141.56 9.52 151.08 54.40 54.40
8991.90 7925.78 110.27 6578.67 22679.63 46286.24 3214.93 197.67 3412.60 197.67 197.67

23.53 21.17 24.19 46.23 115.13 12.20 12.20


152.37 28.88 184.17 316.25 681.68 72.61 72.61
2062.37 2059.67 3151.81 5518.56 12792.41 1356.54 1356.54

16.69 16.69

190.78 190.78

1500.00 1059.23 1589.00 2542.00 6690.23 566.00 566.00


1123.34 1123.34

0.33 0.33

1.65 1.65
47.16 47.16

6.75
39.73
659.89

66.19 66.19 75.21 75.21


299.84 299.84 497.53 497.53

0.83 0.83 0.92 0.92


16.60 16.60 11.26 11.26

14.77 14.77
86.12 86.12
1448.65 1448.65

21.00 27.00 6.00 39.00 57.00 15.00 165.00 24.00 6.00 30.00 54.00 54.00

56.84 56.84

30.94 30.94 71.50 71.50

5.00 5.00
5.00 5.00
3.00 3.00
3.00 3.00
1.00 1.00
1.00 1.00
3.00 3.00
3.00 3.00

10.00 10.00
10.00 10.00
3.00 3.00
3.00 3.00
5.00 5.00
5.00 5.00

4.00 4.00

36.00 36.00
14.00 14.00
5.00 4.00 10.00 19.00 3.00 3.00
44.40 44.40
131.40 89.10 278.40 498.90 62.80 100.00 162.80

63.20 63.20
369.00 143.70 442.80 955.50 113.50 172.70 286.20
HOJA DE METRADOS / ESTRUCTURAS

OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA,
DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE OBSTETRICIA
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
REGION : PASCO PROVINCIA: OXAPAMPA DISTRITO: OXAPAMPA

Nro. METRADO SUMA


PART. DESCRIPCION UND. UBICACIÓN
Elem LARGO ANCHO ALTO PARCIAL TOTAL
09.01.00 ESTRUCTURAS
09.01.01 TRABAJOS PRELIMINARES
09.01.01.01 LIMPIEZA DE TERRENO MANUAL M2 69.00
BLOQUE MANTENIMIENTO
CIMENTACION 1.00 Area= 69.00 69.00

09.01.01.02 TRAZO Y REPLANTEO M2 69.00


BLOQUE MANTENIMIENTO
CIMENTACION 1.00 Area= 69.00 69.00

09.01.01.03 TRAZO Y REPLANTEO DURANTE EL PROCESO M2 207.00


BLOQUE MANTENIMIENTO
CIMENTACION 1.00 Area= 69.00 69.00
1er PISO 1.00 Area= 69.00 69.00
Techo 1.00 Area= 69.00 69.00

09.01.02 MOVIMIENTOS DE TIERRAS


09.01.02.01 CORTES
09.01.02.01.01 CORTE GENERAL CON MAQUINARIA , H=0.40m M3 27.60
BLOQUE MANTENIMIENTO
SUPERFICIE 1.00 Area= 69.00 0.40 27.60

09.01.02.01 EXCAVACION
09.01.02.01.01 EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m M3 7.68
BLOQUE MANTENIMIENTO
Z-1 3.00 0.80 0.80 1.50 2.88
Z-2 5.00 0.80 0.80 1.50 4.80

09.01.02.01.02 EXCAVACION PARA CIMIENTOS CORRIDOS M3 4.27


BLOQUE MANTENIMIENTO EJE C 1.00 6.63 0.40 0.80 2.12
EJE 3 1.00 6.70 0.40 0.80 2.14

09.01.02.02 NIVELACION Y COMPACTACION


09.01.02.02.01 REFINE, COMPACTACION Y NIVELACION DE FONDO DE SUPERFICIE ZAPATA M2 5.12
BLOQUE MANTENIMIENTO Z-1 3.00 0.80 0.80 1.92
Z-2 5.00 0.80 0.80 3.20

09.01.02.02.01 REFINE, COMPACTACION Y NIVELACION DE FONDO DE SUPERFICIE CIMIENTOS CORRIDOS M2 5.33


BLOQUE MANTENIMIENTO EJE C 1.00 6.63 0.40 2.65
EJE 3 1.00 6.70 0.40 2.68

09.01.02.02.03 REFINE, COMPACTACION Y NIVELACION DE SUPERFICIE M2 44.22


BLOQUE MANTENIMIENTO
RESDUOS SOLIDOS 1.00 Area= 12.13 12.13
PASILLO 1.00 Area= 8.13 8.13
GRUPO ELECTROGE 1.00 Area= 21.11 21.11
CUARTO DE LIMPIEZ 1.00 Area= 2.85 2.85

09.01.02.03 RELLENOS CON MATERIAL DE PRESTAMO


09.01.02.03.01 RELLENO Y COMPACTO DE SUPERFICIE M3 17.69
BLOQUE MANTENIMIENTO
RESDUOS SOLIDOS 1.00 Area= 12.13 0.40 4.85
PASILLO 1.00 Area= 8.13 0.40 3.25
GRUPO ELECTROGE 1.00 Area= 21.11 0.40 8.44
CUARTO DE LIMPIEZ 1.00 Area= 2.85 0.40 1.14

09.01.02.03.01 RELLENO Y COMPACTO DE ZAPATAS M3 2.05


BLOQUE MANTENIMIENTO
ZAPATAS Z-1 3.00 0.80 0.80 0.40 0.77
Z-2 5.00 0.80 0.80 0.40 1.28

09.01.02.04 MANEJO DE MATERIAL PROCEDENTE DE EXCAVACIONES


09.01.02.04.01 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES M3 14.93
EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m 1.00 7.68 7.68
EXCAVACION PARA CIMIENTOS CORRIDOS 1.00 4.27 4.27
Sub Total 11.95
+2.5% esponjamiento 14.93

09.01.02.04.02 ELIMINACION DE MATERIAL EXCEDENTE M3 101.18


EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m 1.00 7.68 7.68
EXCAVACION PARA CIMIENTOS CORRIDOS 1.00 4.27 4.27
CORTE GENERAL CON MAQUINARIA , H=0.40m 1.00 69.00 69.00
Sub Total 80.95
+2.5% esponjamiento 101.18

09.01.03 OBRAS DE CONCRETO SIMPLE


09.01.03.01 SUB ZAPATAS
09.01.03.01.01 SUB ZAPATAS F´C=100KG/CM2 +30% PIEDRA GRANDE M3 5.12
BLOQUE MANTENIMIENTO
Z-1 3.00 0.80 0.80 1.00 1.92
Z-2 5.00 0.80 0.80 1.00 3.20

09.01.03.03 CIMIENTOS CORRIDOS


09.01.03.03.01 SOBRE CIMIENTOS CONCRETO F´C=140KG/CM2 + 30% PIEDRA DESPLAZADORA M3 3.47
BLOQUE MANTENIMIENTO EJE C 1.00 6.63 0.40 0.65 1.72
EJE 3 1.00 6.70 0.40 0.65 1.74

09.01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA CIMIENTOS CORRIDOS M2 17.33


BLOQUE MANTENIMIENTO EJE C 2.00 6.63 0.65 8.62
EJE 3 2.00 6.70 0.65 8.71

09.01.03.03 SOBRECIMIENTOS
09.01.03.03.01 SOBRE CIMIENTOS CONCRETO F´C=175KG/CM2 + 25% PIEDRA DESPLAZADORA M3 0.72
BLOQUE MANTENIMIENTO EJE C 1.00 6.63 0.12 0.45 0.36
EJE 3 1.00 6.70 0.12 0.45 0.36

09.01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.30 m M2 12.00


BLOQUE MANTENIMIENTO EJE C 2.00 6.63 0.45 5.97
EJE 3 2.00 6.70 0.45 6.03

09.01.03.04 FALSO PISO


09.01.03.04.01 CONCRETO F´C=80KG/CM2 PARA FALSO PISO E=0.10M M2 44.22
BLOQUE MANTENIMIENTO
PRIMER PISO RESDUOS SOLIDOS 1.00 Area= 12.13 12.13
PASILLO 1.00 Area= 8.13 8.13
GRUPO ELECTROGE 1.00 Area= 21.11 21.11
CUARTO DE LIMPIEZ 1.00 Area= 2.85 2.85

09.01.04 OBRAS DE CONCRETO ARMADO


09.01.04.01 ZAPATAS

09.01.04.01.01 CONCRETO PARA ZAPATA F'C=210 KG/CM2 M3 2.05


BLOQUE MANTENIMIENTO
Z-1 3.00 0.80 0.80 0.40 0.77
Z-2 5.00 0.80 0.80 0.40 1.28

09.01.04.01.02 ACERO PARA ZAPATAS F'y= 4200 Kg/Cm2 KG 55.67


(VER METRADO ACERO 55.67 55.67

09.01.04.04 COLUMNAS
09.01.04.04.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 M3 0.45
BLOQUE MANTENIMIENTO
PRIMER PISO C-1 8.00 0.40 0.35 0.40 0.45

09.01.04.04.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS M2 4.80


BLOQUE MANTENIMIENTO
PRIMER PISO C-1 8.00 Perimetro= 1.50 0.40 4.80

09.01.04.04.03 ACERO PARA COLUMNAS F'y= 4200 Kg/Cm2 KG 110.27


(VER METRADO ACERO 110.27 110.27

09.01.05 VARIOS

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)


09.01.05.01 UND 6.00
EN ZAPATAS (7,14,28 Días) 1.00 3.00 3.00
EN COLUMNAS (7,14,28 Días) 1.00 3.00 3.00

09.01.05 ESTRUCTURAS METALICAS


09.01.05.01 COLUMNAS METALICAS
09.01.05.01 COLUMNA METALICA TUBO CUADRADO 100X4mm PARA PORTICOS ML 218.44

09.01.05.01 COLUMNA METALICA TUBO RECTANGULAR 100x140X4mm PARA PORTICOS ML 8.00 4.75 38.00 38.00

09.01.05.01 COLUMNA METALICA TUBO RECTANGULAR 100x200X5mm PARA PORTICOS ML 8.00 4.75 38.00 38.00

09.01.05.01 COLUMNA METALICA TUBO RECTANGULAR 100x250X6mm PARA PORTICOS ML 8.00 4.75 38.00 38.00

09.01.05.01 VIGAS METALICAS


09.01.05.01 VIGA METALICA TUBO RECTANGULAR 40X80x3mm PARA PORTICOS ML 52.68
EJE 1, EJE 3 4.00 6.47 25.88
EJE A, EJE C 4.00 6.70 26.80

09.01.05.01 VIGA METALICA TUBO RECTANGULAR 80X140x3mm PARA PORTICOS ML 25.88


4.00 6.47 25.88

09.01.05.01 VIGA METALICA TUBO RECTANGULAR 60X120x3mm PARA PORTICOS ML 25.88


4.00 6.47 25.88

09.01.05.01 TIJERALES PRINCIPALES


09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 4C UND 3.00
3.00 3.00

09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 4C PZA 3.00


3.00 3.00

09.01.05.01 APOYOS Y FIJACION


09.01.05.01 SISTEMA DE APOYO FIJO EN COLUMNAS METALICAS 100X100mm UND 8.00 8.00 8.00

09.01.05.01 SISTEMA DE APOYO FIJO EN COLUMNAS METALICAS 100X140mm UND 8.00 8.00 8.00
09.01.05.01 SISTEMA DE APOYO FIJO EN COLUMNAS METALICAS 100X200mm UND 8.00 8.00 8.00

09.01.05.01 SISTEMA DE APOYO FIJO EN COLUMNAS METALICAS 100X250mm UND 8.00 8.00 8.00

09.01.05.01 SISTEMA DE APOYO FIJO EN TIJERAL METALICO UND 8.00 8.00 8.00

09.01.05.01 DISPOSITIVO DE APOYO MOVIL EN TIJERAL METALICO UND 8.00 8.00 8.00

09.01.05.01 ARRIOSTRES
09.01.05.01 ARRIOSTRE DIAGONAL TUBO CUADRADO 40x2.5mm PARA PORTICOS ML 56.92
EJE 1, EJE 3 4.00 3.63 14.52
4.00 3.63 14.52
EJE A, EJE C 4.00 3.13 12.52
4.00 3.84 15.36

09.01.05.01 ARRIOSTRE DIAGONAL TUBO CUADRADO 60x2mm PARA PORTICOS ML EJE 1, EJE 3 4.00 3.63 14.52 14.52

09.01.05.01 ARRIOSTRE DIAGONAL TUBO CUADRADO 80x3mm PARA PORTICOS ML EJE 1, EJE 3 4.00 3.63 14.52 14.52

09.01.05.01 TEMPLADORES
09.01.05.01 TENSOR DE 1/2" EN ARRIOSTRE DE TIJERALES ML 44.40
ENTRE 1-2 4.00 5.35 21.40
ENTRE 2-3 4.00 5.75 23.00

09.01.05.01 TENSOR DE 5/8" EN ARRIOSTRE DE TIJERALES ML 21.40


ENTRE 1-2 4.00 5.35 21.40

09.01.05.01 CORREAS METALICAS


09.01.05.01 CORREA METALICA PERFIL C5X6.7 ML 8.00 7.90 63.20 63.20

09.01.05.01 CORREA METALICA PERFIL C6X8.2 ML 8.00 7.90 63.20 63.20


HOJA DE METRADOS DE ACERO
OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE OBSTETRICIA
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
ф 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1" 1 3/8"
Obs: Traslape Normal: para acero vertical y acero horizontal con H<0.30m TIPOS DE TRASLAPE: Normal 0.40 0.40 0.40 0.50 0.60 0.70 1.15 2.30
Traslape Superior: para horizontal con H>0.30m Superior 0.40 0.40 0.45 0.60 0.75 0.90 1.45 3.20
(H=Peralte efectivo) Peso (kg/m) 0.22 0.40 0.56 0.99 1.55 2.24 3.99 7.91

Datos Dimensiones RESULTADOS


ACERO longitud # 6mm 8mm 3/8 1/2 5/8 3/4 1 1 3/8
item descripción Cantidad Tipo
descripción Ø # de piezas s/emp emp. ML ML ML ML ML ML ML ML

09.01.04.01 ZAPATAS
09.01.04.01.02 ACERO PARA ZAPATAS F'y= 4200 Kg/Cm2
BLOQUE MANTENIMIENTO
Z-1 1 Normal Acero Longitudinal 1/2 '' 4 0.60 - - - - 2.40 - - - -
1 Normal Acero Transversal 1/2 '' 4 0.55 - - - - 2.20 - - - -
Z-2 6 Normal Acero Longitudinal 1/2 '' 4 0.80 - - - - 19.20 - - - -
6 Normal Acero Transversal 1/2 '' 5 0.55 - - - - 16.50 - - - -
Z-3 6 Normal Acero Longitudinal 1/2 '' 5 0.70 - - - - 21.00 - - - -
6 Normal Acero Transversal 1/2 '' 5 0.70 - - - - 21.00 - - - -
Z-4 1 Normal Acero Longitudinal 1/2 '' 5 0.50 - - - - 2.50 - - - -
1 Normal Acero Transversal 1/2 '' 3 0.70 - - - - 2.10 - - - -

Total ml - - 86.90 - - - -
Total piezas - - 10.00 - - - -
Kg - - 86.39 - - - -
Total Kg 86.39

05.03.00 COLUMNAS
05.03.01 ACERO PARA COLUMNAS F'y= 4200 Kg/Cm2
BLOQUE MANTENIMIENTO
C-1 14 Normal Acero Longitudinal 1/2 '' 8 1.10 - - - - 123.20 - - - -
14 Normal Estribos 3/8 '' 6 1.60 - - - 134.40 - - - - -
- - - - - - - - -
Total ml - 134.40 123.20 - - - -
Total piezas - 15.00 14.00 - - - -
Kg - 75.20 122.47 - - - -
Total Kg 197.67
HOJA DE METRADOS / ESTRUCTURAS

OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA
DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE FARMACIA
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
REGION : PASCO PROVINCIA: OXAPAMPA DISTRITO: OXAPAMPA

Nro. METRADO SUMA


PART. DESCRIPCION UND. UBICACIÓN
Elem LARGO ANCHO ALTO PARCIAL TOTAL
09.01.00 ESTRUCTURAS
09.01.01 TRABAJOS PRELIMINARES
09.01.01.01 LIMPIEZA DE TERRENO MANUAL M2 248.96
BLOQUE FARMACIA
CIMENTACION 1.00 Area= 248.96 248.96

09.01.01.02 TRAZO Y REPLANTEO M2 248.96


BLOQUE FARMACIA
CIMENTACION 1.00 Area= 248.96 248.96

09.01.01.03 TRAZO Y REPLANTEO DURANTE EL PROCESO M2 992.45


BLOQUE FARMACIA
CIMENTACION 1.00 Area= 248.96 248.96
1er PISO 1.00 Area= 243.12 243.12
2do PISO 1.00 Area= 210.52 210.52
TECHO 1.00 Area= 289.85 289.85

09.01.02 MOVIMIENTOS DE TIERRAS


09.01.02.01 CORTES
09.01.02.01.01 CORTE GENERAL CON MAQUINARIA , H=0.40m M3 99.58
BLOQUE FARMACIA
SUPERFICIE 1.00 Area= 248.96 0.40 99.58

09.01.02.01 EXCAVACION
09.01.02.01.01 EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m M3 63.78
BLOQUE FARMACIA
Z-1 2.00 1.80 1.50 1.50 8.10
Z-2 6.00 1.60 1.30 1.50 18.72
Z-3 7.00 1.60 1.00 1.50 16.80
Z-4 1.00 Area= 2.68 1.50 4.02
Z-5 1.00 1.40 1.00 1.50 2.10
Z-6 1.00 1.40 0.80 1.50 1.68
Z-7 1.00 1.40 1.40 1.50 2.94
Z-8 1.00 1.60 1.00 1.50 2.40
Z-9 1.00 Area= 4.68 1.50 7.02

09.01.02.01.02 EXCAVACION PARA VIGAS DE CONEXIÓN M3 61.64


BLOQUE FARMACIA
EJE 1, ENTRE EJE B y C 1.00 3.20 0.80 1.10 2.82
EJE 1, ENTRE EJE C y D 1.00 1.85 0.80 1.10 1.63
EJE 1, ENTRE EJE D y E 1.00 3.45 0.80 1.10 3.04
EJE 1, ENTRE EJE E y F 1.00 3.55 0.80 1.10 3.12
EJE 2, ENTRE EJE E y F 1.00 4.10 0.80 1.10 3.61
EJE 3, ENTRE EJE A y B 1.00 3.29 0.80 1.10 2.90
EJE 3, ENTRE EJE E y F 1.00 4.10 0.80 1.10 3.61
EJE 4, ENTRE EJE A y B 1.00 3.27 0.80 1.10 2.88
EJE 4, ENTRE EJE B y C 1.00 3.18 0.80 1.10 2.80
EJE 4, ENTRE EJE C y D 1.00 1.85 0.80 1.10 1.63
EJE 4, ENTRE EJE D y E 1.00 3.45 0.80 1.10 3.04
EJE 4, ENTRE EJE E y F 1.00 3.75 0.80 1.10 3.30
EJE A, ENTRE EJE 3 y 4 1.00 3.27 0.80 1.10 2.88
EJE B, ENTRE EJE 1 y 2 1.00 1.85 0.80 1.10 1.63
EJE B, ENTRE EJE 2 y 3 1.00 1.52 0.80 1.10 1.34
EJE B, ENTRE EJE 3 y 4 1.00 1.99 0.80 1.10 1.75
EJE C, ENTRE EJE 1 y 2 1.00 1.85 0.80 1.10 1.63
EJE C, ENTRE EJE 2 y 3 1.00 1.52 0.80 1.10 1.34
EJE C, ENTRE EJE 3 y 4 1.00 2.90 0.80 1.10 2.55
EJE D, ENTRE EJE 1 y 2 1.00 1.85 0.80 1.10 1.63
EJE D, ENTRE EJE 2 y 3 1.00 1.52 0.80 1.10 1.34
EJE D, ENTRE EJE 3 y 4 1.00 2.90 0.80 1.10 2.55
EJE E, ENTRE EJE 1 y 2 1.00 1.75 0.80 1.10 1.54
EJE E, ENTRE EJE 2 y 3 1.00 1.32 0.80 1.10 1.16
EJE E, ENTRE EJE 3 y 4 1.00 2.80 0.80 1.10 2.46
EJE F, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.10 1.14
EJE F, ENTRE EJE 3 y 4 1.00 2.67 0.80 1.10 2.35

09.01.02.01.02 EXCAVACION PARA CIMIENTOS CORRIDOS M3 2.14


BLOQUE FARMACIA
ENTRE A-B 1.00 7.35 0.40 0.50 1.47
EJE A, ENTRE 3-4 1.00 3.37 0.40 0.50 0.67

09.01.02.02 NIVELACION Y COMPACTACION


09.01.02.02.01 REFINE, COMPACTACION Y NIVELACION DE FONDO DE SUPERFICIE M2 46.81
BLOQUE FARMACIA
ZAPATAS Z-1 2.00 1.80 1.50 5.40
HOJA DE METRADOS / ESTRUCTURAS

OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA
DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE FARMACIA
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
REGION : PASCO PROVINCIA: OXAPAMPA DISTRITO: OXAPAMPA

Nro. METRADO SUMA


PART. DESCRIPCION UND. UBICACIÓN
Elem LARGO ANCHO ALTO PARCIAL TOTAL
Z-2 6.00 1.60 1.30 12.48
Z-3 7.00 1.60 1.00 11.20
Z-4 1.00 Area= 2.68 2.68
Z-5 1.00 1.40 1.00 1.40
Z-6 1.00 1.40 0.80 1.12
Z-7 1.00 1.40 1.40 1.96
Z-8 1.00 1.60 1.00 1.60
Z-9 1.00 Area= 4.68 4.68

CIMIENTOS ENTRE A-B 1.00 7.35 0.40 2.94


EJE A, ENTRE 3-4 1.00 3.37 0.40 1.35

09.01.02.02.02 REFINE, COMPACTACION Y NIVELACION DE SUPERFICIE FONDO DE M2 56.04


BLOQUE FARMACIA
EJE 1, ENTRE EJE B y C 1.00 3.20 0.80 2.56
EJE 1, ENTRE EJE C y D 1.00 1.85 0.80 1.48
EJE 1, ENTRE EJE D y E 1.00 3.45 0.80 2.76
EJE 1, ENTRE EJE E y F 1.00 3.55 0.80 2.84
EJE 2, ENTRE EJE E y F 1.00 4.10 0.80 3.28
EJE 3, ENTRE EJE A y B 1.00 3.29 0.80 2.63
EJE 3, ENTRE EJE E y F 1.00 4.10 0.80 3.28
EJE 4, ENTRE EJE A y B 1.00 3.27 0.80 2.62
EJE 4, ENTRE EJE B y C 1.00 3.18 0.80 2.54
EJE 4, ENTRE EJE C y D 1.00 1.85 0.80 1.48
EJE 4, ENTRE EJE D y E 1.00 3.45 0.80 2.76
EJE 4, ENTRE EJE E y F 1.00 3.75 0.80 3.00
EJE A, ENTRE EJE 3 y 4 1.00 3.27 0.80 2.62
EJE B, ENTRE EJE 1 y 2 1.00 1.85 0.80 1.48
EJE B, ENTRE EJE 2 y 3 1.00 1.52 0.80 1.22
EJE B, ENTRE EJE 3 y 4 1.00 1.99 0.80 1.59
EJE C, ENTRE EJE 1 y 2 1.00 1.85 0.80 1.48
EJE C, ENTRE EJE 2 y 3 1.00 1.52 0.80 1.22
EJE C, ENTRE EJE 3 y 4 1.00 2.90 0.80 2.32
EJE D, ENTRE EJE 1 y 2 1.00 1.85 0.80 1.48
EJE D, ENTRE EJE 2 y 3 1.00 1.52 0.80 1.22
EJE D, ENTRE EJE 3 y 4 1.00 2.90 0.80 2.32
EJE E, ENTRE EJE 1 y 2 1.00 1.75 0.80 1.40
EJE E, ENTRE EJE 2 y 3 1.00 1.32 0.80 1.06
EJE E, ENTRE EJE 3 y 4 1.00 2.80 0.80 2.24
EJE F, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.04
EJE F, ENTRE EJE 3 y 4 1.00 2.67 0.80 2.14

09.01.02.02.03 REFINE, COMPACTACION Y NIVELACION DE SUPERFICIE M2 218.68


BLOQUE FARMACIA
CONTROL 1.00 Area= 14.84 14.84
FARMACIA 1.00 Area= 48.58 48.58
DISP. Y EXPEDITO GENE 1.00 Area= 11.15 11.15
DISP. Y EXPEDITO EME 1.00 Area= 11.05 11.05
ADMISION 1.00 Area= 12.74 12.74
HISTORIA CLINICA 1.00 Area= 21.44 21.44
SIS-REFERENCIA-CONTR 1.00 Area= 33.00 33.00
ESPERA 1.00 Area= 37.86 37.86
S.H. MUJERES 1.00 Area= 9.33 9.33
S.H. VARONES 1.00 Area= 12.01 12.01
S.H. DISCAPACITADOS 1.00 Area= 4.45 4.45
CUARTO DE LIMPIEZA 1.00 Area= 2.23 2.23

09.01.02.03 RELLENOS CON MATERIAL DE PRESTAMO


09.01.02.03.01 RELLENO Y COMPACTO DE SUPERFICIE M3 87.47
BLOQUE FARMACIA
CONTROL 1.00 Area= 14.84 0.40 5.94
FARMACIA 1.00 Area= 48.58 0.40 19.43
DISP. Y EXPEDITO GENE 1.00 Area= 11.15 0.40 4.46
DISP. Y EXPEDITO EME 1.00 Area= 11.05 0.40 4.42
ADMISION 1.00 Area= 12.74 0.40 5.10
HISTORIA CLINICA 1.00 Area= 21.44 0.40 8.58
SIS-REFERENCIA-CONTR 1.00 Area= 33.00 0.40 13.20
ESPERA 1.00 Area= 37.86 0.40 15.14
S.H. MUJERES 1.00 Area= 9.33 0.40 3.73
S.H. VARONES 1.00 Area= 12.01 0.40 4.80
S.H. DISCAPACITADOS 1.00 Area= 4.45 0.40 1.78
CUARTO DE LIMPIEZA 1.00 Area= 2.23 0.40 0.89

09.01.02.03.01 RELLENO Y COMPACTO DE ZAPATAS M3 21.26


HOJA DE METRADOS / ESTRUCTURAS

OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA
DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE FARMACIA
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
REGION : PASCO PROVINCIA: OXAPAMPA DISTRITO: OXAPAMPA

Nro. METRADO SUMA


PART. DESCRIPCION UND. UBICACIÓN
Elem LARGO ANCHO ALTO PARCIAL TOTAL
BLOQUE FARMACIA

ZAPATAS Z-1 2.00 1.80 1.50 0.50 2.70


Z-2 6.00 1.60 1.30 0.50 6.24
Z-3 7.00 1.60 1.00 0.50 5.60
Z-4 1.00 Area= 2.68 0.50 1.34
Z-5 1.00 1.40 1.00 0.50 0.70
Z-6 1.00 1.40 0.80 0.50 0.56
Z-7 1.00 1.40 1.40 0.50 0.98
Z-8 1.00 1.60 1.00 0.50 0.80
Z-9 1.00 Area= 4.68 0.50 2.34

09.01.02.03.01 RELLENO Y COMPACTO DE VIGAS DE CONEXIÓN M3 36.58


BLOQUE FARMACIA
EJE 1, ENTRE EJE B y C 1.00 3.20 0.50 1.00 1.60
EJE 1, ENTRE EJE C y D 1.00 1.85 0.50 1.00 0.93
EJE 1, ENTRE EJE D y E 1.00 3.45 0.50 1.00 1.73
EJE 1, ENTRE EJE E y F 1.00 3.55 0.50 1.00 1.78
EJE 2, ENTRE EJE E y F 1.00 4.10 0.50 1.00 2.05
EJE 3, ENTRE EJE A y B 1.00 3.29 0.50 1.00 1.65
EJE 3, ENTRE EJE E y F 1.00 4.10 0.50 1.00 2.05
EJE 4, ENTRE EJE A y B 1.00 3.27 0.50 1.00 1.64
EJE 4, ENTRE EJE B y C 1.00 3.18 0.50 1.00 1.59
EJE 4, ENTRE EJE C y D 1.00 1.85 0.50 1.00 0.93
EJE 4, ENTRE EJE D y E 1.00 3.45 0.50 1.00 1.73
EJE 4, ENTRE EJE E y F 1.00 3.75 0.50 1.00 1.88
EJE A, ENTRE EJE 3 y 4 1.00 3.27 0.55 1.00 1.80
EJE B, ENTRE EJE 1 y 2 1.00 1.85 0.55 1.00 1.02
EJE B, ENTRE EJE 2 y 3 1.00 1.52 0.55 1.00 0.84
EJE B, ENTRE EJE 3 y 4 1.00 1.99 0.55 1.00 1.09
EJE C, ENTRE EJE 1 y 2 1.00 1.85 0.55 1.00 1.02
EJE C, ENTRE EJE 2 y 3 1.00 1.52 0.55 1.00 0.84
EJE C, ENTRE EJE 3 y 4 1.00 2.90 0.55 1.00 1.60
EJE D, ENTRE EJE 1 y 2 1.00 1.85 0.55 1.00 1.02
EJE D, ENTRE EJE 2 y 3 1.00 1.52 0.55 1.00 0.84
EJE D, ENTRE EJE 3 y 4 1.00 2.90 0.55 1.00 1.60
EJE E, ENTRE EJE 1 y 2 1.00 1.75 0.55 1.00 0.96
EJE E, ENTRE EJE 2 y 3 1.00 1.32 0.55 1.00 0.73
EJE E, ENTRE EJE 3 y 4 1.00 2.80 0.55 1.00 1.54
EJE F, ENTRE EJE 2 y 3 1.00 1.30 0.55 1.00 0.72
EJE F, ENTRE EJE 3 y 4 1.00 2.67 0.55 1.00 1.47

09.01.02.04 MANEJO DE MATERIAL PROCEDENTE DE EXCAVACIONES


09.01.02.04.01 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES M3 283.94
CORTE GENERAL CON MAQUINARIA , H=0.40m 1.00 99.58 99.58
EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m 1.00 63.78 63.78
EXCAVACION PARA VIGAS DE CONEXIÓN 1.00 61.64 61.64
EXCAVACION PARA CIMIENTOS CORRIDOS 1.00 2.14 2.14
Sub Total 227.15
+2.5% esponjamiento 283.94

09.01.02.04.02 ELIMINACION DE MATERIAL EXCEDENTE M3 283.94


CORTE GENERAL CON MAQUINARIA , H=0.40m 1.00 99.58 99.58
EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m 1.00 63.78 63.78
EXCAVACION PARA VIGAS DE CONEXIÓN 1.00 61.64 61.64
EXCAVACION PARA CIMIENTOS CORRIDOS 1.00 2.14 2.14
Sub Total 227.15
+2.5% esponjamiento 283.94

09.01.03 OBRAS DE CONCRETO SIMPLE


09.01.03.01 SUB ZAPATAS
09.01.03.01.01 SUB ZAPATAS F´C=100KG/CM2 +30% PIEDRA GRANDE M3 17.01
BLOQUE FARMACIA
Z-1 2.00 1.80 1.50 0.40 2.16
Z-2 6.00 1.60 1.30 0.40 4.99
Z-3 7.00 1.60 1.00 0.40 4.48
Z-4 1.00 Area= 2.68 0.40 1.07
HOJA DE METRADOS / ESTRUCTURAS

OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA
DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE FARMACIA
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
REGION : PASCO PROVINCIA: OXAPAMPA DISTRITO: OXAPAMPA

Nro. METRADO SUMA


PART. DESCRIPCION UND. UBICACIÓN
Elem LARGO ANCHO ALTO PARCIAL TOTAL
Z-5 1.00 1.40 1.00 0.40 0.56
Z-6 1.00 1.40 0.80 0.40 0.45
Z-7 1.00 1.40 1.40 0.40 0.78
Z-8 1.00 1.60 1.00 0.40 0.64
Z-9 1.00 Area= 4.68 0.40 1.87

09.01.03.03 CIMIENTOS CORRIDOS


09.01.03.03.01 CIMIENTOS CORRIDOS CONCRETO F´C=140KG/CM2 + 30% PIEDRA M3 12.10
BLOQUE FARMACIA
EJE 1, ENTRE EJE A Y B 1.00 1.63 0.40 0.75 0.49
EJE 1, ENTRE EJE B y C 1.00 4.20 0.40 0.75 1.26
EJE 1, ENTRE EJE C y D 1.00 2.85 0.40 0.75 0.86
EJE 1, ENTRE EJE D y E 1.00 4.45 0.40 0.75 1.34
EJE 1, ENTRE EJE E y F 1.00 5.05 0.40 0.75 1.52
EJE 3, ENTRE EJE A y B 1.00 1.23 0.40 0.75 0.37
EJE 4, ENTRE EJE B y C 1.00 2.02 0.40 0.75 0.61
EJE 4, ENTRE EJE C y D 1.00 1.85 0.40 0.75 0.56
EJE 4, ENTRE EJE D y E 1.00 3.45 0.40 0.75 1.04
ENTRE A-B, ENTRE 1-3 1.00 7.35 0.40 0.75 2.21
EJE A, ENTRE EJE 3 y 4 1.00 4.43 0.40 0.75 1.33
EJE F, ENTRE EJE 3 y 4 1.00 1.83 0.40 0.75 0.55

09.01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA CIMIENTO CORRID M2 60.51


BLOQUE FARMACIA
EJE 1, ENTRE EJE A Y B 2.00 1.63 0.75 2.45
EJE 1, ENTRE EJE B y C 2.00 4.20 0.75 6.30
EJE 1, ENTRE EJE C y D 2.00 2.85 0.75 4.28
EJE 1, ENTRE EJE D y E 2.00 4.45 0.75 6.68
EJE 1, ENTRE EJE E y F 2.00 5.05 0.75 7.58
EJE 3, ENTRE EJE A y B 2.00 1.23 0.75 1.85
EJE 4, ENTRE EJE B y C 2.00 2.02 0.75 3.03
EJE 4, ENTRE EJE C y D 2.00 1.85 0.75 2.78
EJE 4, ENTRE EJE D y E 2.00 3.45 0.75 5.18
ENTRE A-B, ENTRE 1-3 2.00 7.35 0.75 11.03
EJE A, ENTRE EJE 3 y 4 2.00 4.43 0.75 6.65
EJE F, ENTRE EJE 3 y 4 2.00 1.83 0.75 2.75

09.01.03.03 SOBRECIMIENTOS
09.01.03.03.01 SOBRE CIMIENTOS CONCRETO F´C=175KG/CM2 + 25% PIEDRA DE M3 7.26
BLOQUE FARMACIA
EJE 1, ENTRE EJE A Y B 1.00 1.63 0.40 0.45 0.29
EJE 1, ENTRE EJE B y C 1.00 4.20 0.40 0.45 0.76
EJE 1, ENTRE EJE C y D 1.00 2.85 0.40 0.45 0.51
EJE 1, ENTRE EJE D y E 1.00 4.45 0.40 0.45 0.80
EJE 1, ENTRE EJE E y F 1.00 5.05 0.40 0.45 0.91
EJE 3, ENTRE EJE A y B 1.00 1.23 0.40 0.45 0.22
EJE 4, ENTRE EJE B y C 1.00 2.02 0.40 0.45 0.36
EJE 4, ENTRE EJE C y D 1.00 1.85 0.40 0.45 0.33
EJE 4, ENTRE EJE D y E 1.00 3.45 0.40 0.45 0.62
ENTRE A-B, ENTRE 1-3 1.00 7.35 0.40 0.45 1.32
EJE A, ENTRE EJE 3 y 4 1.00 4.43 0.40 0.45 0.80
EJE F, ENTRE EJE 3 y 4 1.00 1.83 0.40 0.45 0.33

09.01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HAM2 33.00


BLOQUE FARMACIA
EJE 1, ENTRE EJE A Y B 2.00 1.63 0.45 1.47
EJE 1, ENTRE EJE B y C 2.00 4.20 0.45 3.78
EJE 1, ENTRE EJE C y D 2.00 2.85 0.45 2.57
EJE 1, ENTRE EJE D y E 2.00 4.45 0.45 4.01
EJE 1, ENTRE EJE E y F 2.00 5.05 0.45 4.55
EJE 3, ENTRE EJE A y B 2.00 1.23 0.45 1.11
EJE 4, ENTRE EJE B y C 2.00 2.02 0.45 1.82
EJE 4, ENTRE EJE C y D 2.00 1.85 0.45 1.67
EJE 4, ENTRE EJE D y E 2.00 3.45 0.45 3.11
ENTRE A-B, ENTRE 1-3 1.00 7.35 0.45 3.31
EJE A, ENTRE EJE 3 y 4 2.00 4.43 0.45 3.99
EJE F, ENTRE EJE 3 y 4 2.00 1.83 0.45 1.65

09.01.03.04 FALSO PISO


09.01.03.04.01 CONCRETO F´C=80KG/CM2 PARA FALSO PISO E=0.10M M2 218.68
BLOQUE FARMACIA

PRIMER PISO CONTROL 1.00 Area= 14.84 14.84


FARMACIA 1.00 Area= 48.58 48.58
DISP. Y EXPEDITO GENE 1.00 Area= 11.15 11.15
HOJA DE METRADOS / ESTRUCTURAS

OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA
DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE FARMACIA
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
REGION : PASCO PROVINCIA: OXAPAMPA DISTRITO: OXAPAMPA

Nro. METRADO SUMA


PART. DESCRIPCION UND. UBICACIÓN
Elem LARGO ANCHO ALTO PARCIAL TOTAL
DISP. Y EXPEDITO EME 1.00 Area= 11.05 11.05
ADMISION 1.00 Area= 12.74 12.74
HISTORIA CLINICA 1.00 Area= 21.44 21.44
SIS-REFERENCIA-CONTR 1.00 Area= 33.00 33.00
ESPERA 1.00 Area= 37.86 37.86
S.H. MUJERES 1.00 Area= 9.33 9.33
S.H. VARONES 1.00 Area= 12.01 12.01
S.H. DISCAPACITADOS 1.00 Area= 4.45 4.45
CUARTO DE LIMPIEZA 1.00 Area= 2.23 2.23

09.01.04 OBRAS DE CONCRETO ARMADO


09.01.04.01 ZAPATAS

09.01.04.01.01 CONCRETO PARA ZAPATA F'C=210 KG/CM2 M3 25.51


BLOQUE FARMACIA

Z-1 2.00 1.80 1.50 0.60 3.24


Z-2 6.00 1.60 1.30 0.60 7.49
Z-3 7.00 1.60 1.00 0.60 6.72
Z-4 1.00 Area= 2.68 0.60 1.61
Z-5 1.00 1.40 1.00 0.60 0.84
Z-6 1.00 1.40 0.80 0.60 0.67
Z-7 1.00 1.40 1.40 0.60 1.18
Z-8 1.00 1.60 1.00 0.60 0.96
Z-9 1.00 Area= 4.68 0.60 2.81

09.01.04.01.02 ACERO PARA ZAPATAS F'y= 4200 Kg/Cm2 KG 874.86


(VER METRADO ACERO) 874.86 874.86

09.01.04.02 VIGAS DE CONEXIÓN


09.01.04.02.01 CONCRETO EN VIGAS DE CONEXION f'c=210 kg/cm2 M3 11.90
BLOQUE FARMACIA

EJE 1, ENTRE EJE B y C 1.00 3.20 0.30 0.60 0.58


EJE 1, ENTRE EJE C y D 1.00 1.85 0.30 0.60 0.33
EJE 1, ENTRE EJE D y E 1.00 3.45 0.30 0.60 0.62
EJE 1, ENTRE EJE E y F 1.00 3.55 0.30 0.60 0.64
EJE 2, ENTRE EJE E y F 1.00 4.10 0.30 0.60 0.74
EJE 3, ENTRE EJE A y B 1.00 3.29 0.30 0.60 0.59
EJE 3, ENTRE EJE E y F 1.00 4.10 0.30 0.60 0.74
EJE 4, ENTRE EJE A y B 1.00 3.27 0.30 0.60 0.59
EJE 4, ENTRE EJE B y C 1.00 3.18 0.30 0.60 0.57
EJE 4, ENTRE EJE C y D 1.00 1.85 0.30 0.60 0.33
EJE 4, ENTRE EJE D y E 1.00 3.45 0.30 0.60 0.62
EJE 4, ENTRE EJE E y F 1.00 3.75 0.30 0.60 0.68
EJE A, ENTRE EJE 3 y 4 1.00 3.27 0.30 0.60 0.59
EJE B, ENTRE EJE 1 y 2 1.00 1.85 0.30 0.50 0.28
EJE B, ENTRE EJE 2 y 3 1.00 1.52 0.30 0.50 0.23
EJE B, ENTRE EJE 3 y 4 1.00 1.99 0.30 0.70 0.42
EJE C, ENTRE EJE 1 y 2 1.00 1.85 0.30 0.50 0.28
EJE C, ENTRE EJE 2 y 3 1.00 1.52 0.30 0.50 0.23
EJE C, ENTRE EJE 3 y 4 1.00 2.90 0.30 0.50 0.44
EJE D, ENTRE EJE 1 y 2 1.00 1.85 0.30 0.50 0.28
EJE D, ENTRE EJE 2 y 3 1.00 1.52 0.30 0.50 0.23
EJE D, ENTRE EJE 3 y 4 1.00 2.90 0.30 0.50 0.44
EJE E, ENTRE EJE 1 y 2 1.00 1.75 0.30 0.50 0.26
EJE E, ENTRE EJE 2 y 3 1.00 1.32 0.30 0.50 0.20
EJE E, ENTRE EJE 3 y 4 1.00 2.80 0.30 0.50 0.42
EJE F, ENTRE EJE 2 y 3 1.00 1.30 0.30 0.50 0.20
EJE F, ENTRE EJE 3 y 4 1.00 2.67 0.30 0.50 0.40

09.01.04.02.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CONEXIÓN M2 79.31


BLOQUE FARMACIA
EJE 1, ENTRE EJE B y C 2.00 3.20 0.60 3.84
EJE 1, ENTRE EJE C y D 2.00 1.85 0.60 2.22
EJE 1, ENTRE EJE D y E 2.00 3.45 0.60 4.14
EJE 1, ENTRE EJE E y F 2.00 3.55 0.60 4.26
EJE 2, ENTRE EJE E y F 2.00 4.10 0.60 4.92
EJE 3, ENTRE EJE A y B 2.00 3.29 0.60 3.95
EJE 3, ENTRE EJE E y F 2.00 4.10 0.60 4.92
EJE 4, ENTRE EJE A y B 2.00 3.27 0.60 3.92
EJE 4, ENTRE EJE B y C 2.00 3.18 0.60 3.82
EJE 4, ENTRE EJE C y D 2.00 1.85 0.60 2.22
EJE 4, ENTRE EJE D y E 2.00 3.45 0.60 4.14
EJE 4, ENTRE EJE E y F 2.00 3.75 0.60 4.50
EJE A, ENTRE EJE 3 y 4 2.00 3.27 0.60 3.92
HOJA DE METRADOS / ESTRUCTURAS

OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA
DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE FARMACIA
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
REGION : PASCO PROVINCIA: OXAPAMPA DISTRITO: OXAPAMPA

Nro. METRADO SUMA


PART. DESCRIPCION UND. UBICACIÓN
Elem LARGO ANCHO ALTO PARCIAL TOTAL
EJE B, ENTRE EJE 1 y 2 2.00 1.85 0.50 1.85
EJE B, ENTRE EJE 2 y 3 2.00 1.52 0.50 1.52
EJE B, ENTRE EJE 3 y 4 2.00 1.99 0.70 2.79
EJE C, ENTRE EJE 1 y 2 2.00 1.85 0.50 1.85
EJE C, ENTRE EJE 2 y 3 2.00 1.52 0.50 1.52
EJE C, ENTRE EJE 3 y 4 2.00 2.90 0.50 2.90
EJE D, ENTRE EJE 1 y 2 2.00 1.85 0.50 1.85
EJE D, ENTRE EJE 2 y 3 2.00 1.52 0.50 1.52
EJE D, ENTRE EJE 3 y 4 2.00 2.90 0.50 2.90
EJE E, ENTRE EJE 1 y 2 2.00 1.75 0.50 1.75
EJE E, ENTRE EJE 2 y 3 2.00 1.32 0.50 1.32
EJE E, ENTRE EJE 3 y 4 2.00 2.80 0.50 2.80
EJE F, ENTRE EJE 2 y 3 2.00 1.30 0.50 1.30
EJE F, ENTRE EJE 3 y 4 2.00 2.67 0.50 2.67

09.01.04.02.03 ACERO PARA VIGAS DE CONEXIÓN F'y= 4200 Kg/Cm2 KG 1659.69


(VER METRADO ACERO) 1659.69 1659.69

09.01.04.04 COLUMNAS
09.01.04.04.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 M3 39.52
BLOQUE FARMACIA
PRIMER PISO C-1 2.00 0.50 0.30 5.50 1.65
C-2A 14.00 0.60 0.30 5.50 13.86
C-2B 2.00 0.60 0.30 5.50 1.98
C-3 2.00 Secc= 0.47 5.50 5.14
C-4 2.00 0.70 0.30 5.50 2.31
SEGUNDO PISO C-1 2.00 0.50 0.30 4.05 1.22
C-2A 14.00 0.60 0.30 4.05 10.21
C-3 2.00 0.60 0.30 4.05 1.46
C-4 2.00 0.70 0.30 4.05 1.70

09.01.04.04.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS M2 388.90


BLOQUE FARMACIA
PRIMER PISO C-1 2.00 P= 1.60 5.50 17.60
C-2A 14.00 P= 1.80 5.50 138.60
C-2B 2.00 P= 1.80 5.50 19.80
C-3 2.00 P= 4.10 5.50 45.10
C-4 2.00 P= 2.00 5.50 22.00
SEGUNDO PISO C-1 2.00 P= 1.60 4.05 12.96
C-2A 14.00 P= 1.80 4.05 102.06
C-3 2.00 P= 1.80 4.05 14.58
C-4 2.00 P= 2.00 4.05 16.20

09.01.04.04.03 ACERO PARA COLUMNAS F'y= 4200 Kg/Cm2 KG 6578.67


(VER METRADO ACERO) 6578.67 6578.67

09.01.04.05 VIGAS
09.01.04.05.01 CONCRETO EN VIGAS f'c=210 kg/cm2 M3 24.19
BLOQUE FARMACIA
1ER PISO EJE 1, ENTRE EJE A y B 1.00 1.75 0.30 0.50 0.26
EJE 1, ENTRE EJE B y C 1.00 4.20 0.30 0.50 0.63
EJE 1, ENTRE EJE C y D 1.00 2.85 0.30 0.50 0.43
EJE 1, ENTRE EJE D y E 1.00 4.45 0.30 0.50 0.67
EJE 1, ENTRE EJE E y F 1.00 5.05 0.30 0.50 0.76
EJE 2, ENTRE EJE A y B 1.00 1.75 0.30 0.50 0.26
EJE 2, ENTRE EJE B y C 1.00 4.20 0.30 0.50 0.63
EJE 2, ENTRE EJE C y D 1.00 2.85 0.30 0.50 0.43
EJE 2, ENTRE EJE D y E 1.00 4.35 0.30 0.50 0.65
EJE 2, ENTRE EJE E y F 1.00 5.05 0.30 0.50 0.76
EJE 3, ENTRE EJE A y B 1.00 4.19 0.30 0.50 0.63
EJE 3, ENTRE EJE B y C 1.00 4.20 0.30 0.50 0.63
EJE 3, ENTRE EJE C y D 1.00 2.85 0.30 0.50 0.43
EJE 3, ENTRE EJE D y E 1.00 4.35 0.30 0.50 0.65
EJE 3, ENTRE EJE E y F 1.00 5.05 0.30 0.50 0.76
EJE 4, ENTRE EJE A y B 1.00 4.19 0.30 0.50 0.63
EJE 4, ENTRE EJE B y C 1.00 4.20 0.30 0.50 0.63
EJE 4, ENTRE EJE C y D 1.00 2.85 0.30 0.50 0.43
EJE 4, ENTRE EJE D y E 1.00 4.45 0.30 0.50 0.67
EJE 4, ENTRE EJE E y F 1.00 5.05 0.30 0.50 0.76
EJE A, ENTRE EJE 3 y 4 1.00 4.07 0.25 0.40 0.41
EJE B, ENTRE EJE 1 y 2 1.00 2.98 0.25 0.40 0.30
EJE B, ENTRE EJE 2 y 3 1.00 2.52 0.25 0.40 0.25
EJE B, ENTRE EJE 3 y 4 1.00 2.92 0.25 0.40 0.29
EJE C, ENTRE EJE 1 y 2 1.00 2.98 0.25 0.40 0.30
EJE C, ENTRE EJE 2 y 3 1.00 2.52 0.25 0.40 0.25
EJE C, ENTRE EJE 3 y 4 1.00 4.07 0.25 0.40 0.41
HOJA DE METRADOS / ESTRUCTURAS

OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA
DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE FARMACIA
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
REGION : PASCO PROVINCIA: OXAPAMPA DISTRITO: OXAPAMPA

Nro. METRADO SUMA


PART. DESCRIPCION UND. UBICACIÓN
Elem LARGO ANCHO ALTO PARCIAL TOTAL
EJE D, ENTRE EJE 1 y 2 1.00 2.98 0.25 0.40 0.30
EJE D, ENTRE EJE 2 y 3 1.00 2.52 0.25 0.40 0.25
EJE D, ENTRE EJE 3 y 4 1.00 4.07 0.25 0.40 0.41
EJE E, ENTRE EJE 1 y 2 1.00 2.98 0.25 0.40 0.30
EJE E, ENTRE EJE 2 y 3 1.00 2.52 0.25 0.40 0.25
EJE E, ENTRE EJE 3 y 4 1.00 4.07 0.25 0.40 0.41
EJE F, ENTRE EJE 1 y 2 1.00 1.83 0.25 0.40 0.18
EJE F, ENTRE EJE 2 y 3 1.00 2.52 0.25 0.40 0.25
EJE F, ENTRE EJE 3 y 4 1.00 4.07 0.25 0.40 0.41
V-101 ( 0.25X0.20) 1.00 4.72 0.25 0.20 0.24
VB ( 0.15X0.20) 1.00 5.80 0.25 0.20 0.29

2DO PISO
EJE 1, ENTRE EJE B y C 1.00 4.20 0.30 0.40 0.50
EJE 1, ENTRE EJE C y D 1.00 2.85 0.30 0.40 0.34
EJE 1, ENTRE EJE D y E 1.00 4.45 0.30 0.40 0.53
EJE 1, ENTRE EJE E y F 1.00 5.05 0.30 0.40 0.61
EJE 4, ENTRE EJE B y C 1.00 4.20 0.30 0.40 0.50
EJE 4, ENTRE EJE C y D 1.00 2.85 0.30 0.40 0.34
EJE 4, ENTRE EJE D y E 1.00 4.45 0.30 0.40 0.53
EJE 4, ENTRE EJE E y F 1.00 5.05 0.30 0.40 0.61
EJE A, ENTRE EJE 3 y 4 1.00 4.07 0.25 0.40 0.41
EJE B, ENTRE EJE 1 y 2 1.00 2.98 0.25 0.40 0.30
EJE B, ENTRE EJE 2 y 3 1.00 2.52 0.25 0.40 0.25
EJE B, ENTRE EJE 3 y 4 1.00 2.92 0.25 0.40 0.29
EJE D, ENTRE EJE 1 y 2 1.00 2.98 0.25 0.40 0.30
EJE D, ENTRE EJE 2 y 3 1.00 2.52 0.25 0.40 0.25
EJE D, ENTRE EJE 3 y 4 1.00 4.07 0.25 0.40 0.41
+ EJE F, ENTRE EJE 1 y 2 1.00 1.83 0.25 0.40 0.18
EJE F, ENTRE EJE 2 y 3 1.00 2.52 0.25 0.40 0.25
EJE F, ENTRE EJE 3 y 4 1.00 4.07 0.25 0.40 0.41

09.01.04.05.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS M2 184.17


BLOQUE FARMACIA
1ER PISO EJE 1, ENTRE EJE A y B 1.00 1.75 P= 1.10 1.93
EJE 1, ENTRE EJE B y C 1.00 4.20 P= 1.10 4.62
EJE 1, ENTRE EJE C y D 1.00 2.85 P= 1.10 3.14
EJE 1, ENTRE EJE D y E 1.00 4.45 P= 1.10 4.90
EJE 1, ENTRE EJE E y F 1.00 5.05 P= 1.10 5.56
EJE 2, ENTRE EJE A y B 1.00 1.75 P= 0.90 1.58
EJE 2, ENTRE EJE B y C 1.00 4.20 P= 0.90 3.78
EJE 2, ENTRE EJE C y D 1.00 2.85 P= 0.90 2.57
EJE 2, ENTRE EJE D y E 1.00 4.35 P= 0.90 3.92
EJE 2, ENTRE EJE E y F 1.00 5.05 P= 0.90 4.55
EJE 3, ENTRE EJE A y B 1.00 4.19 P= 0.90 3.77
EJE 3, ENTRE EJE B y C 1.00 4.20 P= 0.90 3.78
EJE 3, ENTRE EJE C y D 1.00 2.85 P= 0.90 2.57
EJE 3, ENTRE EJE D y E 1.00 4.35 P= 0.90 3.92
EJE 3, ENTRE EJE E y F 1.00 5.05 P= 0.90 4.55
EJE 4, ENTRE EJE A y B 1.00 4.19 P= 1.10 4.61
EJE 4, ENTRE EJE B y C 1.00 4.20 P= 1.10 4.62
EJE 4, ENTRE EJE C y D 1.00 2.85 P= 1.10 3.14
EJE 4, ENTRE EJE D y E 1.00 4.45 P= 1.10 4.90
EJE 4, ENTRE EJE E y F 1.00 5.05 P= 1.10 5.56
EJE A, ENTRE EJE 3 y 4 1.00 4.07 P= 0.65 2.65
EJE B, ENTRE EJE 1 y 2 1.00 2.98 P= 0.65 1.94
EJE B, ENTRE EJE 2 y 3 1.00 2.52 P= 0.65 1.64
EJE B, ENTRE EJE 3 y 4 1.00 2.92 P= 0.65 1.90
EJE C, ENTRE EJE 1 y 2 1.00 2.98 P= 0.65 1.94
EJE C, ENTRE EJE 2 y 3 1.00 2.52 P= 0.65 1.64
EJE C, ENTRE EJE 3 y 4 1.00 4.07 P= 0.65 2.65
EJE D, ENTRE EJE 1 y 2 1.00 2.98 P= 0.65 1.94
EJE D, ENTRE EJE 2 y 3 1.00 2.52 P= 0.65 1.64
EJE D, ENTRE EJE 3 y 4 1.00 4.07 P= 0.65 2.65
EJE E, ENTRE EJE 1 y 2 1.00 2.98 P= 0.65 1.94
EJE E, ENTRE EJE 2 y 3 1.00 2.52 P= 0.65 1.64
EJE E, ENTRE EJE 3 y 4 1.00 4.07 P= 0.65 2.65
EJE F, ENTRE EJE 1 y 2 1.00 1.83 P= 0.85 1.56
EJE F, ENTRE EJE 2 y 3 1.00 2.52 P= 0.85 2.14
EJE F, ENTRE EJE 3 y 4 1.00 4.07 P= 0.85 3.46
V-101 ( 0.25X0.20) 1.00 4.72 P= 0.40 1.89
VB ( 0.15X0.20) 1.00 5.80 P= 0.35 2.03

2DO PISO
EJE 1, ENTRE EJE B y C 1.00 4.20 P= 1.10 4.62
EJE 1, ENTRE EJE C y D 1.00 2.85 P= 1.10 3.14
HOJA DE METRADOS / ESTRUCTURAS

OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA
DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE FARMACIA
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
REGION : PASCO PROVINCIA: OXAPAMPA DISTRITO: OXAPAMPA

Nro. METRADO SUMA


PART. DESCRIPCION UND. UBICACIÓN
Elem LARGO ANCHO ALTO PARCIAL TOTAL
EJE 1, ENTRE EJE D y E 1.00 4.45 P= 1.10 4.90
EJE 1, ENTRE EJE E y F 1.00 5.05 P= 1.10 5.56
EJE 4, ENTRE EJE B y C 1.00 4.20 P= 1.10 4.62
EJE 4, ENTRE EJE C y D 1.00 2.85 P= 1.10 3.14
EJE 4, ENTRE EJE D y E 1.00 4.45 P= 1.10 4.90
EJE 4, ENTRE EJE E y F 1.00 5.05 P= 1.10 5.56
EJE A, ENTRE EJE 3 y 4 1.00 4.07 P= 1.05 4.27
EJE B, ENTRE EJE 1 y 2 1.00 2.98 P= 1.05 3.13
EJE B, ENTRE EJE 2 y 3 1.00 2.52 P= 1.05 2.65
EJE B, ENTRE EJE 3 y 4 1.00 2.92 P= 1.05 3.07
EJE D, ENTRE EJE 1 y 2 1.00 2.98 P= 1.05 3.13
EJE D, ENTRE EJE 2 y 3 1.00 2.52 P= 1.05 2.65
EJE D, ENTRE EJE 3 y 4 1.00 4.07 P= 1.05 4.27
+ EJE F, ENTRE EJE 1 y 2 1.00 1.83 P= 1.05 1.92
EJE F, ENTRE EJE 2 y 3 1.00 2.52 P= 1.05 2.65
EJE F, ENTRE EJE 3 y 4 1.00 4.07 P= 1.05 4.27

09.01.04.05.03 ACERO PARA VIGAS F'y= 4200 Kg/Cm2 KG 3151.81


(VER METRADO ACERO) 3151.81 3151.81

09.01.04.06 LOSAS ALIGERADAS

09.01.04.06.01 CONCRETO PARA LOSAS ALIGERADAS F'C=210 KG/CM2 M3 16.69


BLOQUE FARMACIA f (m3/m2)
PRIMER PISO ENTRE 1-2, ENTRE A-B 1.00 2.98 1.55 0.0875 0.40
ENTRE 1-2, ENTRE B-C 1.00 0.66 4.72 0.0875 0.27
ENTRE 1-2, ENTRE C-D 1.00 2.98 3.20 0.0875 0.83
ENTRE 1-2, ENTRE D-E 1.00 2.98 4.80 0.0875 1.25
ENTRE 1-2, ENTRE F-E 1.00 2.98 5.58 0.0875 1.45
ENTRE 2-3, ENTRE A-B 1.00 2.52 1.55 0.0875 0.34
ENTRE 2-3, ENTRE B-C 1.00 2.52 4.72 0.0875 1.04
ENTRE 2-3, ENTRE C-D 1.00 2.52 3.20 0.0875 0.71
ENTRE 2-3, ENTRE D-E 1.00 2.52 4.80 0.0875 1.06
ENTRE 2-3, ENTRE F-E 1.00 2.52 5.58 0.0875 1.23
ENTRE 3-4, ENTRE A-B 1.00 4.07 4.44 0.0875 1.58
ENTRE 3-4, ENTRE B-C 1.00 4.07 4.72 0.0875 1.68
ENTRE 3-4, ENTRE C-D 1.00 4.07 3.20 0.0875 1.14
ENTRE 3-4, ENTRE D-E 1.00 4.07 4.80 0.0875 1.71
ENTRE 3-4, ENTRE F-E 1.00 4.07 5.58 0.0875 1.99

09.01.04.06.02 ENCOFRADO Y DESENCOFRADO PARA LOSAS ALIGERADAS M2 190.78


BLOQUE FARMACIA
PRIMER PISO ENTRE 1-2, ENTRE A-B 1.00 2.98 1.55 4.62
ENTRE 1-2, ENTRE B-C 1.00 0.66 4.72 3.12
ENTRE 1-2, ENTRE C-D 1.00 2.98 3.20 9.54
ENTRE 1-2, ENTRE D-E 1.00 2.98 4.80 14.30
ENTRE 1-2, ENTRE F-E 1.00 2.98 5.58 16.63
ENTRE 2-3, ENTRE A-B 1.00 2.52 1.55 3.91
ENTRE 2-3, ENTRE B-C 1.00 2.52 4.72 11.89
ENTRE 2-3, ENTRE C-D 1.00 2.52 3.20 8.06
ENTRE 2-3, ENTRE D-E 1.00 2.52 4.80 12.10
ENTRE 2-3, ENTRE F-E 1.00 2.52 5.58 14.06
ENTRE 3-4, ENTRE A-B 1.00 4.07 4.44 18.07
ENTRE 3-4, ENTRE B-C 1.00 4.07 4.72 19.21
ENTRE 3-4, ENTRE C-D 1.00 4.07 3.20 13.02
ENTRE 3-4, ENTRE D-E 1.00 4.07 4.80 19.54
ENTRE 3-4, ENTRE F-E 1.00 4.07 5.58 22.71

09.01.04.06.04 LADRILLO HUECO DE ARCILLA 30X30X15 CM PARA TECHO ALIGER UND 1589.00
BLOQUE FARMACIA f (m3/m2)
PRIMER PISO ENTRE 1-2, ENTRE A-B 1.00 2.98 1.55 8.3330 38.00
ENTRE 1-2, ENTRE B-C 1.00 0.66 4.72 8.3300 26.00
ENTRE 1-2, ENTRE C-D 1.00 2.98 3.20 8.3300 79.00
ENTRE 1-2, ENTRE D-E 1.00 2.98 4.80 8.3300 119.00
ENTRE 1-2, ENTRE F-E 1.00 2.98 5.58 8.3300 139.00
ENTRE 2-3, ENTRE A-B 1.00 2.52 1.55 8.3300 33.00
ENTRE 2-3, ENTRE B-C 1.00 2.52 4.72 8.3300 99.00
ENTRE 2-3, ENTRE C-D 1.00 2.52 3.20 8.3300 67.00
ENTRE 2-3, ENTRE D-E 1.00 2.52 4.80 8.3300 101.00
ENTRE 2-3, ENTRE F-E 1.00 2.52 5.58 8.3300 117.00
ENTRE 3-4, ENTRE A-B 1.00 4.07 4.44 8.3300 151.00
ENTRE 3-4, ENTRE B-C 1.00 4.07 4.72 8.3300 160.00
ENTRE 3-4, ENTRE C-D 1.00 4.07 3.20 8.3300 108.00
ENTRE 3-4, ENTRE D-E 1.00 4.07 4.80 8.3300 163.00
ENTRE 3-4, ENTRE F-E 1.00 4.07 5.58 8.3300 189.00
HOJA DE METRADOS / ESTRUCTURAS

OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA
DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE FARMACIA
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
REGION : PASCO PROVINCIA: OXAPAMPA DISTRITO: OXAPAMPA

Nro. METRADO SUMA


PART. DESCRIPCION UND. UBICACIÓN
Elem LARGO ANCHO ALTO PARCIAL TOTAL

09.01.04.06.05 ACERO PARA LOSAS ALIGERADAS F'y= 4200 Kg/Cm2 KG 1123.34


(VER METRADO ACERO) 1123.34 1123.34
09.01.04.06 LOSAS MACIZAS

09.01.04.06.01 CONCRETO PARA LOSAS MACIZAS F'C=210 KG/CM2 M3 0.33


BLOQUE FARMACIA
PRIMER PISO ENTRE 1-2, ENTRE A-B 1.00 2.12 0.78 0.20 0.33

09.01.04.06.02 ENCOFRADO Y DESENCOFRADO PARA LOSAS MACIZAS M2 1.65


BLOQUE FARMACIA
PRIMER PISO ENTRE 1-2, ENTRE A-B 1.00 2.12 0.78 1.65

09.01.04.06.05 ACERO PARA LOSAS MACIZAS F'y= 4200 Kg/Cm2 KG 47.16


(VER METRADO ACERO) 47.16 47.16

09.01.05 VARIOS

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)


09.01.05.01 UND 39.00
EN ZAPATAS (7,14,28 Días) 1.00 9.00 9.00
VIGAS DE CONEXIÓN (7,14,28 Días) 1.00 3.00 3.00
EN COLUMNAS (7,14,28 Días) 1.00 12.00 12.00
EN VIGAS (7,14,28 Días) 1.00 6.00 6.00
EN LOSA ALIGERADA (7,14,28 Días) 1.00 6.00 6.00
EN ESCALERAS (7,14,28 Días) 1.00 3.00 3.00

09.01.05 ESTRUCTURAS METALICAS


09.01.05.01 TIJERALES PRINCIPALES
09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 5 UND 5.00
5.00 5.00

09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 5 PZA 5.00


5.00 5.00

09.01.05.01 APOYOS Y FIJACION


09.01.05.01 SISTEMA DE APOYO FIJO EN TIJERAL METALICO UND 5.00 5.00 5.00

09.01.05.01 DISPOSITIVO DE APOYO MOVIL EN TIJERAL METALICO UND 5.00 5.00 5.00

09.01.05.01 TEMPLADORES
09.01.05.01 TENSOR DE 5/8" EN ARRIOSTRE DE TIJERALES ML 123.60
ENTRE B-C 4.00 7.20 28.80
ENTRE C-D 4.00 7.15 28.60
ENTRE D-E 4.00 8.00 32.00
ENTRE E-F 4.00 8.55 34.20
0.00

09.01.05.01 CORREAS METALICAS


09.01.05.01 CORREA METALICA PERFIL C6X8.2 ML 10.00 22.25 222.50 222.50
HOJA DE METRADOS DE ACERO
OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE FARMACIA
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
ф 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"
Obs: Traslape Normal: para acero vertical y acero horizontal con H<0.30m TIPOS DE TRASLAPE: Normal 0.40 0.40 0.40 0.50 0.60 0.70 1.15
Traslape Superior: para horizontal con H>0.30m Superior 0.40 0.40 0.45 0.60 0.75 0.90 1.45
(H=Peralte efectivo) Peso (kg/m) 0.22 0.40 0.56 0.99 1.55 2.24 3.99

Datos Dimensiones RESULTADOS


ACERO longitud # 6mm 8mm 3/8 1/2 5/8 3/4 1
item descripción Cantidad Tipo
descripción Ø # de piezas s/emp emp. ML ML ML ML ML ML ML

09.01.04.01 ZAPATAS
09.01.04.01.02 ACERO PARA ZAPATAS F'y= 4200 Kg/Cm2
BLOQUE FARMACIAOSPITALIZACION
Z-1 2 Normal Acero Longitudinal 3/4 '' 8 1.66 - - - - - - 26.56 -
2 Normal Acero Transversal 3/4 '' 9 1.66 - - - - - - 29.88 -
Z-2 6 Normal Acero Longitudinal 3/4 '' 7 1.46 - - - - - - 61.32 -
6 Normal Acero Transversal 3/4 '' 8 1.16 - - - - - - 55.68 -
Z-3 7 Normal Acero Longitudinal 3/4 '' 5 1.46 - - - - - - 51.10 -
7 Normal Acero Transversal 3/4 '' 8 0.86 - - - - - - 48.16 -
Z-4 1 Normal Acero Longitudinal 3/4 '' 6 1.76 - - - - - - 10.56 -
1 Normal Acero Transversal 3/4 '' 10 1.06 - - - - - - 10.60 -
1 Normal Acero Longitudinal 3/4 '' 6 0.26 - - - - - 1.56 -
1 Normal Acero Transversal 3/4 '' 2 0.86 - - - - - 1.72 -
Z-5 1 Normal Acero Longitudinal 3/4 '' 5 0.86 - - - - - - 4.30 -
1 Normal Acero Transversal 3/4 '' 5 1.26 - - - - - - 6.30 -
Z-6 1 Normal Acero Longitudinal 3/4 '' 7 0.66 - - - - - - 4.62 -
1 Normal Acero Transversal 3/4 '' 4 1.26 - - - - - - 5.04 -
Z-7 1 Normal Acero Longitudinal 3/4 '' 7 1.26 - - - - - - 8.82 -
1 Normal Acero Transversal 3/4 '' 7 1.26 - - - - - - 8.82 -
Z-8 1 Normal Acero Longitudinal 3/4 '' 8 0.86 - - - - - - 6.88 -
1 Normal Acero Transversal 3/4 '' 5 1.46 - - - - - - 7.30 -
Z-9 1 Normal Acero Longitudinal 3/4 '' 21 0.86 - - - - - - 18.06 -
1 Normal Acero Transversal 3/4 '' 5 4.06 - - - - - - 20.30 -
1 Normal Acero Longitudinal 3/4 '' 4 0.46 - - - - - 1.84 -
1 Normal Acero Transversal 3/4 '' 3 0.66 - - - - - 1.98 -

Total ml - - - - 391.40 -
Total piezas - - - - 44.00 -
Kg - - - - 874.86 -
Total Kg 874.86

05.02.00 VIGAS DE CONEXIÓN


05.02.03 ACERO PARA VIGAS DE CIMENTACION F'y= 4200 Kg/Cm2
BLOQUE FARMACIA
EJE 1 1 Superior Acero Longitudinal Sup. 5/8 '' 3 20.10 2 - - - - 64.80 - -
1 Normal Baston Longitudinal Sup. 1/2 '' 2 3.60 - - - - 7.20 - - -
1 Normal Acero Longitudinal Inf. 5/8 '' 3 20.10 2 - - - - 63.90 - -
1 Normal Estribos 3/8 '' 97 1.68 - - - 162.96 - - - -
EJE 2 1 Superior Acero Longitudinal Sup. 5/8 '' 3 6.85 - - - - - 20.55 - -
1 Normal Acero Longitudinal Inf. 5/8 '' 3 6.85 - - - - - 20.55 - -
1 Normal Estribos 3/8 '' 28 1.68 - - - 47.04 - - - -
EJE 3 1 Superior Acero Longitudinal Sup. 5/8 '' 3 6.85 - - - - - 20.55 - -
1 Normal Baston Longitudinal Sup. 1/2 '' 2 3.60 - - - - 7.20 - - -
1 Normal Acero Longitudinal Inf. 5/8 '' 3 6.85 - - - - - 20.55 - -
1 Normal Estribos 3/8 '' 28 1.68 - - - 47.04 - - - -
1 Superior Acero Longitudinal Sup. 5/8 '' 3 5.80 - - - - 17.40 - -
1 Normal Acero Longitudinal Inf. 5/8 '' 3 5.80 - - - - 17.40 - -
1 Normal Estribos 3/8 '' 25 1.68 - - 42.00 - - - -
EJE 4 1 Superior Acero Longitudinal Sup. 5/8 '' 3 24.90 2 - - - - 79.20 - -
1 Normal Baston Longitudinal Sup. 5/8 '' 2 3.50 - - - - - 7.00 - -
1 Normal Acero Longitudinal Inf. 5/8 '' 3 24.90 2 - - - - 78.30 - -
1 Normal Estribos 3/8 '' 122 1.68 - - - 204.96 - - - -
HOJA DE METRADOS DE ACERO
OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE FARMACIA
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
ф 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"
Obs: Traslape Normal: para acero vertical y acero horizontal con H<0.30m TIPOS DE TRASLAPE: Normal 0.40 0.40 0.40 0.50 0.60 0.70 1.15
Traslape Superior: para horizontal con H>0.30m Superior 0.40 0.40 0.45 0.60 0.75 0.90 1.45
(H=Peralte efectivo) Peso (kg/m) 0.22 0.40 0.56 0.99 1.55 2.24 3.99

Datos Dimensiones RESULTADOS


ACERO longitud # 6mm 8mm 3/8 1/2 5/8 3/4 1
item descripción Cantidad Tipo
descripción Ø # de piezas s/emp emp. ML ML ML ML ML ML ML
EJE A 1 Superior Acero Longitudinal Sup. 5/8 '' 2 5.25 - - - - - 10.50 - -
1 Superior Acero Longitudinal Sup. 1/2 '' 1 5.25 - - - - 5.25 - - -
1 Normal Acero Longitudinal Inf. 5/8 '' 2 5.25 - - - - - 10.50 - -
1 Normal Acero Longitudinal Inf. 1/2 '' 1 5.25 - - - - 5.25 - - -
1 Normal Estribos 3/8 '' 24 1.38 - - - 33.12 - - - -
EJE B 1 Superior Acero Longitudinal Sup. 5/8 '' 3 7.00 - - - - - 21.00 - -
1 Superior Acero Longitudinal Sup. 5/8 '' 1 5.25 - - - - - 5.25 - -
1 Superior Acero Longitudinal Lateral 3/8 '' 4 4.50 - - - 18.00 - - - -
1 Normal Acero Longitudinal Inf. 5/8 '' 3 11.40 1 - - - - 36.00 - -
1 Normal Estribos 3/8 '' 37 1.38 - - - 51.06 - - - -
1 Normal Estribos 3/8 '' 20 1.52 - - 30.40 - - - -
EJE C 1 Superior Acero Longitudinal Sup. 5/8 '' 3 11.35 1 - - - - 36.30 - -
1 Normal Baston Longitudinal Sup. 1/2 '' 2 2.10 - - - - 4.20 - - -
1 Normal Baston Longitudinal Sup. 1/2 '' 2 2.60 - - - - 5.20 - - -
1 Normal Acero Longitudinal Inf. 5/8 '' 3 11.35 1 - - - - 35.85 - -
1 Normal Estribos 3/8 '' 62 1.38 - - - 85.56 - - - -
EJE D 1 Superior Acero Longitudinal Sup. 5/8 '' 3 11.35 1 - - - - 36.30 - -
1 Normal Baston Longitudinal Sup. 1/2 '' 2 2.10 - - - - 4.20 - - -
1 Normal Baston Longitudinal Sup. 1/2 '' 2 2.60 - - - - 5.20 - - -
1 Normal Acero Longitudinal Inf. 5/8 '' 3 11.35 1 - - - - 35.85 - -
1 Normal Estribos 3/8 '' 61 1.38 - - - 84.18 - - - -
EJE E 1 Superior Acero Longitudinal Sup. 5/8 '' 3 11.35 1 - - - - 36.30 - -
1 Normal Baston Longitudinal Sup. 1/2 '' 2 2.10 - - - - 4.20 - - -
1 Normal Baston Longitudinal Sup. 1/2 '' 2 2.60 - - - - 5.20 - - -
1 Normal Acero Longitudinal Inf. 5/8 '' 3 11.35 1 - - - - 35.85 - -
1 Normal Estribos 3/8 '' 61 1.38 - - - 84.18 - - - -
EJE F 1 Superior Acero Longitudinal Sup. 5/8 '' 3 8.06 - - - - - 24.18 - -
1 Normal Baston Longitudinal Sup. 1/2 '' 2 2.75 - - - - 5.50 - - -
1 Normal Acero Longitudinal Inf. 5/8 '' 3 8.06 - - - - - 24.18 - -
1 Normal Estribos 3/8 '' 44 1.38 - - - 60.72 - - - -
- - - - - - - -
Total ml - 951.22 51.40 693.46 - -
Total piezas - 106.00 6.00 78.00 - -
Kg - 532.21 51.10 1,076.39 - -
Total Kg 1659.69

05.03.00 COLUMNAS
05.03.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2
BLOQUE FARMACIA
C-1 2 Normal Acero Longitudinal 3/4 '' 4 6.55 - - - - - - 52.40 -
2 Normal Acero Longitudinal 5/8 '' 4 6.55 - - - - - 52.40 - -
2 Normal Estribos 3/8 '' 42 1.55 - - - 130.20 - - - -
2 Normal Estribos 3/8 '' 42 0.40 - - - 33.60 - - - -
C-2A 14 Normal Acero Longitudinal 3/4 '' 4 10.55 1 - - - - - 610.40 -
14 Normal Acero Longitudinal 5/8 '' 6 10.55 1 - - - - 936.60 - -
14 Normal Estribos 3/8 '' 67 1.68 - - - 1,575.84 - - - -
14 Normal Estribos 3/8 '' 67 1.04 - - - 975.52 - - - -
C-2B 2 Normal Acero Longitudinal 3/4 '' 4 6.55 1 - - - - - 55.20 -
2 Normal Acero Longitudinal 5/8 '' 6 6.55 - - - - - 78.60 - -
2 Normal Estribos 3/8 '' 43 1.68 - - - 144.48 - - - -
2 Normal Estribos 3/8 '' 43 1.04 - - - 89.44 - - - -
C-3 2 Normal Acero Longitudinal 3/4 '' 8 6.55 1 - - - - - 110.40 -
2 Normal Acero Longitudinal 5/8 '' 15 6.55 - - - - - 196.50 - -
HOJA DE METRADOS DE ACERO
OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE FARMACIA
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
ф 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"
Obs: Traslape Normal: para acero vertical y acero horizontal con H<0.30m TIPOS DE TRASLAPE: Normal 0.40 0.40 0.40 0.50 0.60 0.70 1.15
Traslape Superior: para horizontal con H>0.30m Superior 0.40 0.40 0.45 0.60 0.75 0.90 1.45
(H=Peralte efectivo) Peso (kg/m) 0.22 0.40 0.56 0.99 1.55 2.24 3.99

Datos Dimensiones RESULTADOS


ACERO longitud # 6mm 8mm 3/8 1/2 5/8 3/4 1
item descripción Cantidad Tipo
descripción Ø # de piezas s/emp emp. ML ML ML ML ML ML ML
2 Normal Estribos 3/8 '' 43 3.34 - - - 287.24 - - - -
2 Normal Estribos 3/8 '' 43 1.70 - - - 146.20 - - - -
2 Normal Estribos 3/8 '' 43 1.10 - - 94.60 - - - -
2 Normal Estribos 3/8 '' 43 0.93 - - 79.55 - - - -
2 Normal Estribos 3/8 '' 172 0.56 - - 192.64 - - - -
2 Normal Acero Longitudinal 3/4 '' 4 5.25 - - - - - 42.00 -
2 Normal Acero Longitudinal 5/8 '' 6 5.25 - - - - 63.00 - -
2 Normal Estribos 3/8 '' 29 1.55 - - 89.90 - - - -
2 Normal Estribos 3/8 '' 29 0.40 - - 23.20 - - - -
C-4 2 Normal Acero Longitudinal 3/4 '' 6 6.55 1 - - - - - 82.80 -
2 Normal Acero Longitudinal 5/8 '' 4 6.55 - - - - - 52.40 - -
2 Normal Estribos 3/8 '' 43 1.88 - - - 161.68 - - - -
2 Normal Estribos 3/8 '' 43 1.15 - - - 98.90 - - - -
- - - - - - -
Total ml - 4,122.99 - 1,379.50 953.20 -
Total piezas - 459.00 - 154.00 106.00 -
Kg - 2,306.81 - 2,141.26 2,130.59 -
Total Kg 6578.67

05.05.00 VIGAS
05.05.03 ACERO PARA VIGAS F'y= 4200 Kg/Cm2
Primer Piso - - - - - - -
EJE 1 1 Normal Acero Long. Superior 3/4 '' 2 21.65 2 - - - - - 46.10 -
1 Normal Baston Long. Superior 5/8 '' 1 2.80 - - - - - 2.80 - -
1 Normal Baston Long. Superior 5/8 '' 1 2.90 - - - - - 2.90 - -
1 Normal Baston Long. Superior 5/8 '' 1 3.80 - - - - - 3.80 - -
1 Normal Acero Long. Inferior 3/4 '' 2 21.65 2 - - - - - 46.10 -
1 Normal Estribos 3/8 '' 144 1.48 - - - 213.12 - - - -
EJE 2 1 Normal Acero Long. Superior 3/4 '' 2 21.65 2 - - - - - 46.10 -
1 Normal Baston Long. Superior 5/8 '' 1 2.80 - - - - - 2.80 - -
1 Normal Baston Long. Superior 5/8 '' 1 2.90 - - - - - 2.90 - -
1 Normal Baston Long. Superior 5/8 '' 1 2.90 - - - - - 2.90 - -
1 Normal Baston Long. Superior 5/8 '' 1 3.80 - - - - - 3.80 - -
1 Normal Baston Long. Superior 5/8 '' 1 2.30 - - - - - 2.30 - -
1 Normal Acero Long. Inferior 3/4 '' 2 21.65 2 - - - - - 46.10 -
1 Normal Estribos 3/8 '' 144 1.48 - - - 213.12 - - - -
EJE 3 1 Normal Acero Long. Superior 3/4 '' 2 24.80 2 - - - - - 52.40 -
1 Normal Baston Long. Superior 3/4 '' 1 3.20 - - - - - - 3.20 -
1 Normal Baston Long. Superior 3/4 '' 1 2.90 - - - - - - 2.90 -
1 Normal Baston Long. Superior 5/8 '' 1 2.90 - - - - - 2.90 - -
1 Normal Baston Long. Superior 5/8 '' 2 3.80 - - - - - 7.60 - -
1 Normal Baston Long. Superior 3/4 '' 1 2.30 - - - - - - 2.30 -
1 Normal Acero Long. Inferior 3/4 '' 2 24.80 2 - - - - - 52.40 -
1 Normal Baston Long. Superior 5/8 '' 1 2.60 - - - - - 2.60 - -
1 Normal Estribos 3/8 '' 160 1.48 - - - 236.80 - - - -
EJE 4 1 Normal Acero Long. Superior 3/4 '' 2 24.80 2 - - - - - 52.40 -
1 Normal Baston Long. Superior 5/8 '' 1 3.20 - - - - - 3.20 - -
1 Normal Baston Long. Superior 5/8 '' 1 2.90 - - - - - 2.90 - -
1 Normal Baston Long. Superior 5/8 '' 1 2.90 - - - - - 2.90 - -
1 Normal Baston Long. Superior 5/8 '' 1 3.70 - - - - - 3.70 - -
1 Normal Baston Long. Superior 5/8 '' 1 2.30 - - - - - 2.30 - -
1 Normal Acero Long. Inferior 3/4 '' 2 24.80 2 - - - - - 52.40 -
1 Normal Baston Long. Superior 5/8 '' 1 2.60 - - - - - 2.60 - -
1 Normal Estribos 3/8 '' 165 1.48 - - - 244.20 - - - -
EJE A 1 Normal Acero Long. Superior 1/2 '' 2 5.25 - - - - 10.50 - - -
1 Normal Acero Long. Inferior 1/2 '' 2 5.25 - - - - 10.50 - - -
HOJA DE METRADOS DE ACERO
OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE FARMACIA
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
ф 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"
Obs: Traslape Normal: para acero vertical y acero horizontal con H<0.30m TIPOS DE TRASLAPE: Normal 0.40 0.40 0.40 0.50 0.60 0.70 1.15
Traslape Superior: para horizontal con H>0.30m Superior 0.40 0.40 0.45 0.60 0.75 0.90 1.45
(H=Peralte efectivo) Peso (kg/m) 0.22 0.40 0.56 0.99 1.55 2.24 3.99

Datos Dimensiones RESULTADOS


ACERO longitud # 6mm 8mm 3/8 1/2 5/8 3/4 1
item descripción Cantidad Tipo
descripción Ø # de piezas s/emp emp. ML ML ML ML ML ML ML
1 Normal Estribos 3/8 '' 31 1.18 - - - 36.58 - - - -
EJE B 1 Normal Acero Long. Superior 5/8 '' 2 11.35 1 - - - - 23.90 - -
1 Normal Baston Long. Superior 5/8 '' 1 2.20 - - - - - 2.20 - -
1 Normal Baston Long. Superior 5/8 '' 1 2.70 - - - - - 2.70 - -
1 Normal Acero Long. Inferior 5/8 '' 2 11.35 1 - - - - 23.90 - -
1 Normal Estribos 3/8 '' 67 1.18 - - - 79.06 - - - -
EJE C 1 Normal Acero Long. Superior 5/8 '' 2 11.35 1 - - - - 23.90 - -
1 Normal Baston Long. Superior 5/8 '' 1 1.70 - - - - - 1.70 - -
1 Normal Acero Long. Inferior 5/8 '' 2 11.35 1 - - - - 23.90 - -
1 Normal Estribos 3/8 '' 77 1.18 - - - 90.86 - - - -
EJE D 1 Normal Acero Long. Superior 5/8 '' 2 11.35 1 - - - - 23.90 - -
1 Normal Baston Long. Superior 5/8 '' 1 2.70 - - - - - 2.70 - -
1 Normal Baston Long. Superior 5/8 '' 1 1.70 - - - - - 1.70 - -
1 Normal Acero Long. Inferior 5/8 '' 2 11.35 1 - - - - 23.90 - -
1 Normal Estribos 3/8 '' 75 1.18 - - - 88.50 - - - -
EJE E 1 Normal Acero Long. Superior 5/8 '' 2 11.35 1 - - - - 23.90 - -
1 Normal Baston Long. Superior 5/8 '' 1 2.70 - - - - - 2.70 - -
1 Normal Baston Long. Superior 1/2 '' 1 1.70 - - - - 1.70 - - -
1 Normal Acero Long. Inferior 5/8 '' 2 11.35 1 - - - - 23.90 - -
1 Normal Estribos 3/8 '' 76 1.18 - - - 89.68 - - - -
EJE F 1 Normal Acero Long. Superior 5/8 '' 2 11.35 1 - - - - 23.90 - -
1 Normal Baston Long. Superior 1/2 '' 1 2.70 - - - - 2.70 - - -
1 Normal Baston Long. Superior 1/2 '' 1 1.70 - - - - 1.70 - - -
1 Normal Acero Long. Inferior 5/8 '' 2 11.35 1 - - - - 23.90 - -
1 Normal Estribos 3/8 '' 75 1.18 - - - 88.50 - - - -
Segundo Piso - - - - - - - -
EJE 1 1 Normal Acero Long. Superior 1/2 '' 3 20.05 2 - - - 63.15 - - -
1 Normal Acero Long. Inferior 3/4 '' 3 20.05 2 - - - - - 64.35 -
1 Normal Estribos 3/8 '' 124 1.28 - - - 158.72 - - - -
EJE 4 1 Normal Acero Long. Superior 1/2 '' 3 20.05 2 - - - 63.15 - - -
1 Normal Acero Long. Inferior 3/4 '' 3 20.05 2 - - - - - 64.35 -
1 Normal Estribos 3/8 '' 124 1.28 - - - 158.72 - - - -
EJE B 1 Normal Acero Long. Superior 1/2 '' 2 11.35 1 - - - 23.70 - - -
1 Normal Acero Long. Inferior 3/4 '' 2 11.35 1 - - - - - 24.10 -
1 Normal Estribos 3/8 '' 77 1.18 - - - 90.86 - - - -
EJE D 1 Normal Acero Long. Superior 1/2 '' 2 11.35 1 - - - 23.70 - - -
1 Normal Acero Long. Inferior 3/4 '' 2 11.35 1 - - - - - 24.10 -
1 Normal Estribos 3/8 '' 77 1.18 - - - 90.86 - - - -
EJE F 1 Normal Acero Long. Superior 1/2 '' 2 11.35 1 - - - 23.70 - - -
1 Normal Acero Long. Inferior 3/4 '' 2 11.35 1 - - - - - 24.10 -
1 Normal Estribos 3/8 '' 77 1.18 - - - 90.86 - - - -
- - - - - - -
- - - - - - -
Total ml - 1,970.44 224.50 307.60 603.40 -
Total piezas - 219.00 25.00 35.00 68.00 -
Kg - 1,102.46 223.18 477.46 1,348.72 -
Total Kg 3151.81

05.06.00 LOSAS ALIGERADAS


05.06.03 ACERO PARA LOSAS ALIGERADAS F'y= 4200 Kg/Cm2
BLOQUE FARMACIA
PRIMER PISO
ENTRE 3-4, ENTRE A-B
1 Normal Baston Superior 1/2 '' 7 1.65 - - - - 11.55 - - -
1 Normal Baston Superior 1/2 '' 7 1.65 - - - - 11.55 - - -
1 Normal Baston Inferior 1/2 '' 7 4.55 - - - - 31.85 - - -
HOJA DE METRADOS DE ACERO
OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE FARMACIA
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
ф 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"
Obs: Traslape Normal: para acero vertical y acero horizontal con H<0.30m TIPOS DE TRASLAPE: Normal 0.40 0.40 0.40 0.50 0.60 0.70 1.15
Traslape Superior: para horizontal con H>0.30m Superior 0.40 0.40 0.45 0.60 0.75 0.90 1.45
(H=Peralte efectivo) Peso (kg/m) 0.22 0.40 0.56 0.99 1.55 2.24 3.99

Datos Dimensiones RESULTADOS


ACERO longitud # 6mm 8mm 3/8 1/2 5/8 3/4 1
item descripción Cantidad Tipo
descripción Ø # de piezas s/emp emp. ML ML ML ML ML ML ML
1 Normal Baston Inferior 1/2 '' 7 2.45 - - - - 17.15 - - -
ENTRE 1-4, ENTRE A-B - - - - - - -
1 Normal Baston Superior 1/2 '' 4 1.65 - - - - 6.60 - - -
1 Normal Baston Superior 1/2 '' 4 5.40 - - - - 21.60 - - -
1 Normal Baston Superior 3/8 '' 4 2.10 - - - 8.40 - - - -
1 Normal Baston Superior 1/2 '' 4 1.35 - - - - 5.40 - - -
1 Normal Baston Inferior 1/2 '' 4 10.65 1 - - - 44.60 - - -
1 Normal Baston Inferior 1/2 '' 4 2.47 - - - - 9.86 - - -
ENTRE 1-4, ENTRE B-C - - - - - - -
1 Normal Baston Superior 1/2 '' 12 1.65 - - - - 19.80 - - -
1 Normal Baston Superior 1/2 '' 12 5.65 - - - - 67.80 - - -
1 Normal Baston Superior 3/8 '' 12 2.10 - - - 25.20 - - - -
1 Normal Baston Superior 1/2 '' 12 1.35 - - - - 16.20 - - -
1 Normal Baston Inferior 1/2 '' 12 8.20 - - - - 98.40 - - -
1 Normal Baston Inferior 1/2 '' 12 2.47 - - - - 29.59 - - -
ENTRE 1-4, ENTRE C-F - - - - - - -
1 Normal Baston Superior 1/2 '' 31 1.65 - - - - 51.15 - - -
1 Normal Baston Superior 1/2 '' 31 5.40 - - - - 167.40 - - -
1 Normal Baston Superior 3/8 '' 31 2.10 - - - 65.10 - - - -
1 Normal Baston Superior 1/2 '' 31 1.35 - - - - 41.85 - - -
1 Normal Baston Inferior 1/2 '' 31 10.65 1 - - - 345.65 - - -
1 Normal Baston Inferior 1/2 '' 31 2.47 - - - - 76.45 - - -
- - - - - - -
As Temp. - - - - - - -
1 Normal Acero longitudnal 6mm 19 24.10 457.90 - - - - - -
1 Normal acero transversal 6mm 12 4.55 54.60 - - - - - -
1 Normal Acero longitudnal 6mm 15 21.30 324.83 - - - - - -
1 Normal acero transversal 6mm 12 8.35 99.16 - - - - - -
1 Normal acero transversal 6mm 65 10.65 695.66 - - - - - -
- - - - - - -
Total ml - 98.70 1,074.45 - - -
Total piezas - 11.00 120.00 - - -
Kg - 55.22 1,068.11 - - -
Total Kg 1123.34

05.04.00 LOSAS MACIZAS


05.04.03 ACERO PARA LOSAS MACIZAS F'y= 4200 Kg/Cm2
BLOQUE FARMACIA
Primer Piso - - - - - - - -
1.00 Normal Acero Longitudinal 1/2 '' 4 2.57 - - - - 10.28 - - -
1.00 Normal acero transversal 1/2 '' 11 1.25 - - - - 13.44 - - -
1.00 Normal Acero Longitudinal 1/2 '' 4 2.57 - - - - 10.28 - - -
1.00 Normal acero transversal 1/2 '' 11 1.25 - - - - 13.44 - - -

Total ml - - 47.44 - - -
Total piezas - - 6.00 - - -
Kg - - 47.16 - - -
Total Kg 47.16
A DE METRADOS DE ACERO

1 3/8"
2.30
3.20
7.91

1 3/8
ML

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
874.86

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
A DE METRADOS DE ACERO

1 3/8"
2.30
3.20
7.91

1 3/8
ML
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1659.69

-
-
-
-
-
-
-
-
-
-
-
-
-
-
A DE METRADOS DE ACERO

1 3/8"
2.30
3.20
7.91

1 3/8
ML
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
6578.67

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
A DE METRADOS DE ACERO

1 3/8"
2.30
3.20
7.91

1 3/8
ML
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
3151.81

-
-
-
A DE METRADOS DE ACERO

1 3/8"
2.30
3.20
7.91

1 3/8
ML
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1123.34

-
-
-
-
-

-
-
-
47.16
HOJA DE METRADOS / ESTRUCTURAS
:"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA, DEPARTAMENTO PASCO,
OBRA
REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE QUIRURGICO
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
REGION : PASCO PROVINCIA: OXAPAMPA DISTRITO: OXAPAMPA

Nro. METRADO SUMA


PART. DESCRIPCION UND. UBICACIÓN
Elem LARGO ANCHO ALTO PARCIAL TOTAL
09.01.00 ESTRUCTURAS
09.01.01 TRABAJOS PRELIMINARES
09.01.01.01 LIMPIEZA DE TERRENO MANUAL M2 221.67
BLOQUE QUIRURGICO
CIMENTACION 1.00 Area= 221.67 221.67

09.01.01.02 TRAZO Y REPLANTEO M2 221.67


BLOQUE QUIRURGICO
CIMENTACION 1.00 Area= 221.67 221.67

09.01.01.03 TRAZO Y REPLANTEO DURANTE EL PROCESO M2 665.01


BLOQUE QUIRURGICO
CIMENTACION 1.00 Area= 221.67 221.67
1er PISO 1.00 Area= 221.67 221.67
2do PISO 1.00 Area= 221.67 221.67

09.01.02 MOVIMIENTOS DE TIERRAS


09.01.02.01 CORTES
09.01.02.01.01 CORTE GENERAL CON MAQUINARIA , H=0.40m M3 88.67
BLOQUE QUIRURGICO
SUPERFICIE 1.00 Area= 221.67 0.40 88.67

09.01.02.01 EXCAVACION
09.01.02.01.01 EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m M3 65.87
BLOQUE QUIRURGICO
Z-1 2.00 1.40 1.40 1.50 5.88
Z-2 2.00 1.80 1.00 1.50 5.40
Z-3 4.00 1.85 1.05 1.50 11.66
Z-4 6.00 1.70 1.40 1.50 21.42
Z-5 2.00 1.95 1.05 1.50 6.14
Z-6 1.00 1.50 1.05 1.50 2.36
1.00 3.55 1.00 1.50 5.33
Z-7 1.00 1.50 1.05 1.50 2.36
1.00 3.55 1.00 1.50 5.33

09.01.02.01.02 EXCAVACION PARA VIGAS DE CONEXIÓN M3 12.00


BLOQUE QUIRURGICO
EJE 1, ENTRE EJE D y C 1.00 1.60 0.80 0.60 0.77
EJE 1, ENTRE EJE C y D 1.00 1.75 0.80 0.60 0.84
EJE 1, ENTRE EJE A y B 1.00 1.26 0.80 0.60 0.60
EJE 2, ENTRE EJE A y B 1.00 1.82 0.80 0.60 0.87
EJE 2, ENTRE EJE B y C 1.00 2.15 0.80 0.60 1.03
EJE 2, ENTRE EJE C y D 1.00 2.15 0.80 0.60 1.03
EJE 3, ENTRE EJE A y B 1.00 1.81 0.80 0.60 0.87
EJE 3, ENTRE EJE B y C 1.00 2.15 0.80 0.60 1.03
EJE 3, ENTRE EJE C y D 1.00 2.15 0.80 0.60 1.03
EJE 4, ENTRE EJE A y B 1.00 1.81 0.80 0.60 0.87
EJE 4, ENTRE EJE B y C 1.00 2.15 0.80 0.60 1.03
EJE 4, ENTRE EJE C y D 1.00 2.15 0.80 0.60 1.03
EJE 5, ENTRE EJE B y C 1.00 2.06 0.80 0.60 0.99

09.01.02.01.02 EXCAVACION PARA CIMIENTOS CORRIDOS M3 11.57


BLOQUE QUIRURGICO
EJE 1, ENTRE EJE D -C 1.00 3.37 0.40 0.75 1.01
EJE 5, ENTRE EJE D -C 1.00 2.97 0.40 0.75 0.89
EJE 5, ENTRE EJE C -B 1.00 3.20 0.40 0.75 0.96
EJE 5, ENTRE EJE A -B 1.00 2.69 0.40 0.75 0.81
EJE A, ENTRE EJE 1 -2 1.00 2.06 0.40 0.75 0.62
EJE A, ENTRE EJE 2 -3 1.00 2.32 0.40 0.75 0.70
EJE A, ENTRE EJE 3 -4 1.00 1.72 0.40 0.75 0.52
EJE A, ENTRE EJE 4 -5 1.00 4.61 0.40 0.75 1.38
EJE D, ENTRE EJE 1-2 1.00 4.81 0.40 0.75 1.44
EJE D, ENTRE EJE 2-3 1.00 2.89 0.40 0.75 0.87
EJE D, ENTRE EJE 3-4 1.00 3.32 0.40 0.75 1.00
EJE D, ENTRE EJE 4-5 1.00 4.61 0.40 0.75 1.38
09.01.02.02 NIVELACION Y COMPACTACION
09.01.02.02.01 REFINE, COMPACTACION Y NIVELACION DE FONDO DE SUPERFICIE ZAPATA M2 43.92

BLOQUE QUIRURGICO Z-1 2.00 1.40 1.40 3.92


Z-2 2.00 1.80 1.00 3.60
Z-3 4.00 1.85 1.05 7.77
Z-4 6.00 1.70 1.40 14.28
Z-5 2.00 1.95 1.05 4.10
Z-6 1.00 1.50 1.05 1.58
1.00 3.55 1.00 3.55
Z-7 1.00 1.50 1.05 1.58
1.00 3.55 1.00 3.55

09.01.02.02.01 REFINE, COMPACTACION Y NIVELACION DE FONDO DE SUPERFICIE CIMIENTOS CORRIDOS M2 15.43

BLOQUE QUIRURGICO EJE 1, ENTRE EJE D -C 1.00 3.37 0.40 1.35


EJE 5, ENTRE EJE D -C 1.00 2.97 0.40 1.19
EJE 5, ENTRE EJE C -B 1.00 3.20 0.40 1.28
EJE 5, ENTRE EJE A -B 1.00 2.69 0.40 1.08
EJE A, ENTRE EJE 1 -2 1.00 2.06 0.40 0.82
EJE A, ENTRE EJE 2 -3 1.00 2.32 0.40 0.93
EJE A, ENTRE EJE 3 -4 1.00 1.72 0.40 0.69
EJE A, ENTRE EJE 4 -5 1.00 4.61 0.40 1.84
EJE D, ENTRE EJE 1-2 1.00 4.81 0.40 1.92
EJE D, ENTRE EJE 2-3 1.00 2.89 0.40 1.16
EJE D, ENTRE EJE 3-4 1.00 3.32 0.40 1.33
EJE D, ENTRE EJE 4-5 1.00 4.61 0.40 1.84
09.01.02.02.02 REFINE, COMPACTACION Y NIVELACION DE SUPERFICIE FONDO DE VIGA DE CONEXIÓN M2 20.01

BLOQUE QUIRURGICO EJE 1, ENTRE EJE D y C 1.00 1.60 0.80 1.28


EJE 1, ENTRE EJE C y D 1.00 1.75 0.80 1.40
EJE 1, ENTRE EJE A y B 1.00 1.26 0.80 1.01
EJE 2, ENTRE EJE A y B 1.00 1.82 0.80 1.46
EJE 2, ENTRE EJE B y C 1.00 2.15 0.80 1.72
EJE 2, ENTRE EJE C y D 1.00 2.15 0.80 1.72
EJE 3, ENTRE EJE A y B 1.00 1.81 0.80 1.45
EJE 3, ENTRE EJE B y C 1.00 2.15 0.80 1.72
EJE 3, ENTRE EJE C y D 1.00 2.15 0.80 1.72
EJE 4, ENTRE EJE A y B 1.00 1.81 0.80 1.45
EJE 4, ENTRE EJE B y C 1.00 2.15 0.80 1.72
EJE 4, ENTRE EJE C y D 1.00 2.15 0.80 1.72
EJE 5, ENTRE EJE B y C 1.00 2.06 0.80 1.65

09.01.02.02.03 REFINE, COMPACTACION Y NIVELACION DE SUPERFICIE M2 238.20


BLOQUE QUIRURGICO
AREA DE ESPERA 1.00 Area= 92.03 92.03
ALMACEN DE MEDICAMENTOS 1.00 Area= 10.91 10.91
ESTACION DE ENFERMERAS 1.00 Area= 6.07 6.07
ROPA LIMPIA 1.00 Area= 3.15 3.15
ROPA SUCIA-ALMACEN DE RS 1.00 Area= 8.19 8.19
OFICINA-ALMACEN ANESTECICO 1.00 Area= 11.12 11.12
SALA DE LEGRADO 1.00 Area= 13.48 13.48
SALA DE OPERACIONES 1.00 Area= 28.52 28.52
LAVADO DE CIRUJANOS 1.00 Area= 15.72 15.72
SALA DE RECUPERACIONES 1.00 Area= 16.52 16.52
ALAMACEN-MATERIAL ESTERIL 1.00 Area= 20.33 20.33
PRELAVADO INSTRUMENTAL 1.00 Area= 2.89 2.89
CUARTO DE LIMPIEZA 1.00 Area= 2.13 2.13
TOMAS DE MUESTRA 1.00 Area= 7.14 7.14

09.01.02.03 RELLENOS CON MATERIAL DE PRESTAMO


09.01.02.03.01 RELLENO Y COMPACTO DE SUPERFICIE M3 95.28
BLOQUE QUIRURGICO
AREA DE ESPERA 1.00 Area= 92.03 0.40 36.81
ALMACEN DE MEDICAMENTOS 1.00 Area= 10.91 0.40 4.36
ESTACION DE ENFERMERAS 1.00 Area= 6.07 0.40 2.43
ROPA LIMPIA 1.00 Area= 3.15 0.40 1.26
ROPA SUCIA-ALMACEN DE RS 1.00 Area= 8.19 0.40 3.28
OFICINA-ALMACEN ANESTECICO 1.00 Area= 11.12 0.40 4.45
SALA DE LEGRADO 1.00 Area= 13.48 0.40 5.39
SALA DE OPERACIONES 1.00 Area= 28.52 0.40 11.41
LAVADO DE CIRUJANOS 1.00 Area= 15.72 0.40 6.29
SALA DE RECUPERACIONES 1.00 Area= 16.52 0.40 6.61
ALAMACEN-MATERIAL ESTERIL 1.00 Area= 20.33 0.40 8.13
PRELAVADO INSTRUMENTAL 1.00 Area= 2.89 0.40 1.16
CUARTO DE LIMPIEZA 1.00 Area= 2.13 0.40 0.85
TOMAS DE MUESTRA 1.00 Area= 7.14 0.40 2.86

09.01.02.03.01 RELLENO Y COMPACTO DE ZAPATAS M3 50.77


BLOQUE QUIRURGICO

ZAPATAS Z-1 2.00 Area= 1.48 0.50 1.48


Z-2 2.00 Area= 1.52 1.50 4.56
Z-3 4.00 Area= 1.53 1.50 9.20
Z-4 6.00 Area= 2.04 1.50 18.36
Z-5 2.00 Area= 1.62 1.50 4.86
Z-6 1.00 Area= 4.23 1.50 6.35
Z-7 1.00 Area= 3.98 1.50 5.97

09.01.02.04 MANEJO DE MATERIAL PROCEDENTE DE EXCAVACIONES


09.01.02.04.01 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES M3 111.81
EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m 1.00 65.87 65.87
EXCAVACION PARA VIGAS DE CONEXIÓN 1.00 12.00 12.00
EXCAVACION PARA CIMIENTOS CORRIDOS 1.00 11.57 11.57
Sub Total 89.45
+2.5% esponjamiento 111.81

09.01.02.04.02 ELIMINACION DE MATERIAL EXCEDENTE M3 388.90


EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m 1.00 65.87 65.87
EXCAVACION PARA VIGAS DE CONEXIÓN 1.00 12.00 12.00
EXCAVACION PARA CIMIENTOS CORRIDOS 1.00 11.57 11.57
CORTE GENERAL CON MAQUINARIA , H=0.40m 1.00 221.67 221.67
Sub Total 311.12
+2.5% esponjamiento 388.90

09.01.03 OBRAS DE CONCRETO SIMPLE


09.01.03.01 SUB ZAPATAS
09.01.03.01.01 SUB ZAPATAS F´C=100KG/CM2 +30% PIEDRA GRANDE M3 17.57
BLOQUE QUIRURGICO
Z-1 2.00 1.40 1.40 0.40 1.57
Z-2 2.00 1.80 1.00 0.40 1.44
Z-3 4.00 1.85 1.05 0.40 3.11
Z-4 6.00 1.70 1.40 0.40 5.71
Z-5 2.00 1.95 1.05 0.40 1.64
Z-6 1.00 1.50 1.05 0.40 0.63
1.00 3.55 1.00 0.40 1.42
Z-7 1.00 1.50 1.05 0.40 0.63
1.00 3.55 1.00 0.40 1.42

09.01.03.03 SOBRECIMIENTOS
09.01.03.03.01 SOBRE CIMIENTOS CONCRETO F´C=175KG/CM2 + 25% PIEDRA DESPLAZADORA M3 5.00
BLOQUE QUIRURGICO
EJE 1, ENTRE EJE D -C 1.00 3.37 0.12 0.45 0.18
EJE 5, ENTRE EJE D -C 1.00 2.97 0.12 0.45 0.16
EJE 5, ENTRE EJE C -B 1.00 3.20 0.12 0.45 0.17
EJE 5, ENTRE EJE A -B 1.00 2.69 0.12 0.45 0.15
EJE A, ENTRE EJE 1 -2 1.00 2.06 0.12 0.45 0.11
EJE A, ENTRE EJE 2 -3 1.00 2.32 0.12 1.45 0.40
EJE A, ENTRE EJE 3 -4 1.00 1.72 0.12 1.45 0.30
EJE A, ENTRE EJE 4 -5 1.00 4.61 0.12 1.45 0.80
EJE D, ENTRE EJE 1-2 1.00 4.81 0.12 1.45 0.84
EJE D, ENTRE EJE 2-3 1.00 2.89 0.12 1.45 0.50
EJE D, ENTRE EJE 3-4 1.00 3.32 0.12 1.45 0.58
EJE D, ENTRE EJE 4-5 1.00 4.61 0.12 1.45 0.80

09.01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.30 m M2 17.36


BLOQUE QUIRURGICO
EJE 1, ENTRE EJE D -C 1.00 3.37 0.45 1.52
EJE 5, ENTRE EJE D -C 1.00 2.97 0.45 1.34
EJE 5, ENTRE EJE C -B 1.00 3.20 0.45 1.44
EJE 5, ENTRE EJE A -B 1.00 2.69 0.45 1.21
EJE A, ENTRE EJE 1 -2 1.00 2.06 0.45 0.93
EJE A, ENTRE EJE 2 -3 1.00 2.32 0.45 1.04
EJE A, ENTRE EJE 3 -4 1.00 1.72 0.45 0.77
EJE A, ENTRE EJE 4 -5 1.00 4.61 0.45 2.07
EJE D, ENTRE EJE 1-2 1.00 4.81 0.45 2.16
EJE D, ENTRE EJE 2-3 1.00 2.89 0.45 1.30
EJE D, ENTRE EJE 3-4 1.00 3.32 0.45 1.49
EJE D, ENTRE EJE 4-5 1.00 4.61 0.45 2.07
09.01.03.03 CIMIENTOS CORRIDOS
09.01.03.03.01 SOBRE CIMIENTOS CONCRETO F´C=140KG/CM2 + 30% PIEDRA DESPLAZADORA M3 3.47
BLOQUE QUIRURGICO
EJE 1, ENTRE EJE D -C 1.00 3.37 0.12 0.75 0.30
EJE 5, ENTRE EJE D -C 1.00 2.97 0.12 0.75 0.27
EJE 5, ENTRE EJE C -B 1.00 3.20 0.12 0.75 0.29
EJE 5, ENTRE EJE A -B 1.00 2.69 0.12 0.75 0.24
EJE A, ENTRE EJE 1 -2 1.00 2.06 0.12 0.75 0.19
EJE A, ENTRE EJE 2 -3 1.00 2.32 0.12 0.75 0.21
EJE A, ENTRE EJE 3 -4 1.00 1.72 0.12 0.75 0.15
EJE A, ENTRE EJE 4 -5 1.00 4.61 0.12 0.75 0.41
EJE D, ENTRE EJE 1-2 1.00 4.81 0.12 0.75 0.43
EJE D, ENTRE EJE 2-3 1.00 2.89 0.12 0.75 0.26
EJE D, ENTRE EJE 3-4 1.00 3.32 0.12 0.75 0.30
EJE D, ENTRE EJE 4-5 1.00 4.61 0.12 0.75 0.41

09.01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA CIMIENTOS CORRIDOS M2 28.93


BLOQUE QUIRURGICO
EJE 1, ENTRE EJE D -C 1.00 3.37 0.75 2.53
EJE 5, ENTRE EJE D -C 1.00 2.97 0.75 2.23
EJE 5, ENTRE EJE C -B 1.00 3.20 0.75 2.40
EJE 5, ENTRE EJE A -B 1.00 2.69 0.75 2.02
EJE A, ENTRE EJE 1 -2 1.00 2.06 0.75 1.55
EJE A, ENTRE EJE 2 -3 1.00 2.32 0.75 1.74
EJE A, ENTRE EJE 3 -4 1.00 1.72 0.75 1.29
EJE A, ENTRE EJE 4 -5 1.00 4.61 0.75 3.46
EJE D, ENTRE EJE 1-2 1.00 4.81 0.75 3.61
EJE D, ENTRE EJE 2-3 1.00 2.89 0.75 2.17
EJE D, ENTRE EJE 3-4 1.00 3.32 0.75 2.49
EJE D, ENTRE EJE 4-5 1.00 4.61 0.75 3.46

09.01.03.04 FALSO PISO


09.01.03.04.01 CONCRETO F´C=80KG/CM2 PARA FALSO PISO E=0.10M M2 238.20
BLOQUE QUIRURGICO
PRIMER PISO AREA DE ESPERA 1.00 Area= 92.03 92.03
ALMACEN DE MEDICAMENTOS 1.00 Area= 10.91 10.91
ESTACION DE ENFERMERAS 1.00 Area= 6.07 6.07
ROPA LIMPIA 1.00 Area= 3.15 3.15
ROPA SUCIA-ALMACEN DE RS 1.00 Area= 8.19 8.19
OFICINA-ALMACEN ANESTECICO 1.00 Area= 11.12 11.12
SALA DE LEGRADO 1.00 Area= 13.48 13.48
SALA DE OPERACIONES 1.00 Area= 28.52 28.52
LAVADO DE CIRUJANOS 1.00 Area= 15.72 15.72
SALA DE RECUPERACIONES 1.00 Area= 16.52 16.52
ALAMACEN-MATERIAL ESTERIL 1.00 Area= 20.33 20.33
PRELAVADO INSTRUMENTAL 1.00 Area= 2.89 2.89
CUARTO DE LIMPIEZA 1.00 Area= 2.13 2.13
TOMAS DE MUESTRA 1.00 Area= 7.14 7.14

09.01.04 OBRAS DE CONCRETO ARMADO


09.01.04.01 ZAPATAS

09.01.04.01.01 CONCRETO PARA ZAPATA F'C=210 KG/CM2 M3 26.35


BLOQUE QUIRURGICO
Z-1 2.00 1.40 1.40 0.60 2.35
Z-2 2.00 1.80 1.00 0.60 2.16
Z-3 4.00 1.85 1.05 0.60 4.66
Z-4 6.00 1.70 1.40 0.60 8.57
Z-5 2.00 1.95 1.05 0.60 2.46
Z-6 1.00 1.50 1.05 0.60 0.95
1.00 3.55 1.00 0.60 2.13
Z-7 1.00 1.50 1.05 0.60 0.95
1.00 3.55 1.00 0.60 2.13

09.01.04.01.02 ACERO PARA ZAPATAS F'y= 4200 Kg/Cm2 KG 1093.33


(VER METRADO ACERO) 1093.33 1093.33

09.01.04.02 VIGAS DE CONEXIÓN


09.01.04.02.01 CONCRETO EN VIGAS DE CONEXION f'c=210 kg/cm2 M3 4.36
BLOQUE QUIRURGICO
EJE B, ENTRE EJE 5 y 6 1.00 1.27 0.30 0.60 0.23
EJE 1, ENTRE EJE D y C 1.00 1.60 0.30 0.60 0.29
EJE 1, ENTRE EJE C y D 1.00 1.75 0.30 0.60 0.32
EJE 1, ENTRE EJE A y B 1.00 1.26 0.30 0.60 0.23
EJE 2, ENTRE EJE A y B 1.00 1.82 0.30 0.60 0.33
EJE 2, ENTRE EJE B y C 1.00 2.15 0.30 0.60 0.39
EJE 2, ENTRE EJE C y D 1.00 2.15 0.30 0.60 0.39
EJE 3, ENTRE EJE A y B 1.00 1.81 0.30 0.60 0.33
EJE 3, ENTRE EJE B y C 1.00 2.15 0.30 0.60 0.39
EJE 3, ENTRE EJE C y D 1.00 2.15 0.30 0.60 0.39
EJE 4, ENTRE EJE A y B 1.00 1.81 0.30 0.60 0.33
EJE 4, ENTRE EJE B y C 1.00 2.15 0.30 0.60 0.39
EJE 4, ENTRE EJE C y D 1.00 2.15 0.30 0.60 0.39
EJE 5, ENTRE EJE B y C 1.00 2.06 0.30 0.60 0.37
09.01.04.02.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CONEXIÓN M2 15.77
BLOQUE QUIRURGICO
EJE B, ENTRE EJE 5 y 6 1.00 1.27 0.60 0.76
EJE 1, ENTRE EJE D y C 1.00 1.60 0.60 0.96
EJE 1, ENTRE EJE C y D 1.00 1.75 0.60 1.05
EJE 1, ENTRE EJE A y B 1.00 1.26 0.60 0.76
EJE 2, ENTRE EJE A y B 1.00 1.82 0.60 1.09
EJE 2, ENTRE EJE B y C 1.00 2.15 0.60 1.29
EJE 2, ENTRE EJE C y D 1.00 2.15 0.60 1.29
EJE 3, ENTRE EJE A y B 1.00 1.81 0.60 1.09
EJE 3, ENTRE EJE B y C 1.00 2.15 0.60 1.29
EJE 3, ENTRE EJE C y D 1.00 2.15 0.60 1.29
EJE 4, ENTRE EJE A y B 1.00 1.81 0.60 1.09
EJE 4, ENTRE EJE B y C 1.00 2.15 0.60 1.29
EJE 4, ENTRE EJE C y D 1.00 2.15 0.60 1.29
EJE 5, ENTRE EJE B y C 1.00 2.06 0.60 1.24

09.01.04.02.03 ACERO PARA VIGAS DE CONEXIÓN F'y= 4200 Kg/Cm2 KG 2073.54


(VER METRADO ACERO) 2073.54 2073.54

09.01.04.04 COLUMNAS
09.01.04.04.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 M3 30.06
BLOQUE QUIRURGICO
PRIMER PISO C-1 3.00 Secc.= 0.33 4.70 4.65
C-2 1.00 Secc.= 0.24 4.70 1.13
C-3 10.00 Secc.= 0.18 4.70 8.23
C-4 6.00 Secc.= 0.21 4.70 5.92

SEGUNDO PISO C-1 3.00 Secc.= 0.33 3.40 3.37


C-2 1.00 Secc.= 0.24 3.40 0.82
C-3 10.00 Secc.= 0.18 3.40 5.95

09.01.04.04.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS M2 277.14


BLOQUE QUIRURGICO
PRIMER PISO C-1 3.00 Perimetro= 2.80 4.70 39.48
C-2 1.00 Perimetro= 2.20 4.70 10.34
C-3 10.00 Perimetro= 1.70 4.70 79.90
C-4 6.00 Perimetro= 1.90 4.70 53.58

SEGUNDO PISO C-1 3.00 Perimetro= 2.80 3.40 28.56


C-2 1.00 Perimetro= 2.20 3.40 7.48
C-3 10.00 Perimetro= 1.70 3.40 57.80

09.01.04.04.03 ACERO PARA COLUMNAS F'y= 4200 Kg/Cm2 KG 8991.90


(VER METRADO ACERO) 8991.90 8991.90

09.01.04.05 VIGAS
09.01.04.05.01 CONCRETO EN VIGAS f'c=210 kg/cm2 M3 23.53
BLOQUE QUIRURGICO
PRIMER PISO EJE 1, ENTRE EJE A y B 1.00 2.69 0.30 0.40 0.32
EJE 1, ENTRE EJE B y C 1.00 3.20 0.30 0.40 0.38
EJE 1, ENTRE EJE C y D 1.00 2.97 0.30 0.40 0.36
EJE 2, ENTRE EJE A y B 1.00 2.69 0.30 0.40 0.32
EJE 2, ENTRE EJE B y C 1.00 3.20 0.30 0.40 0.38
EJE 2, ENTRE EJE C y D 1.00 2.97 0.30 0.40 0.36
EJE 3, ENTRE EJE A y B 1.00 2.69 0.30 0.40 0.32
EJE 3, ENTRE EJE B y C 1.00 3.20 0.30 0.40 0.38
EJE 3, ENTRE EJE C y D 1.00 2.97 0.30 0.40 0.36
EJE 4, ENTRE EJE A y B 1.00 2.69 0.30 0.40 0.32
EJE 4, ENTRE EJE B y C 1.00 3.20 0.30 0.40 0.38
EJE 4, ENTRE EJE C y D 1.00 2.97 0.30 0.40 0.36
EJE 5, ENTRE EJE A y B 1.00 2.69 0.30 0.40 0.32
EJE 5, ENTRE EJE B y C 1.00 3.20 0.30 0.40 0.38
EJE 5, ENTRE EJE C y D 1.00 2.97 0.30 0.40 0.36
EJE A, ENTRE EJE 1 y 2 1.00 5.11 0.30 0.50 0.77
EJE A, ENTRE EJE 2 y 3 1.00 4.84 0.30 0.50 0.73
EJE A, ENTRE EJE 3 y 4 1.00 3.32 0.30 0.50 0.50
EJE A, ENTRE EJE 4 y 5 1.00 4.61 0.30 0.50 0.69
EJE B, ENTRE EJE 1 y 2 1.00 5.11 0.30 0.50 0.77
EJE B, ENTRE EJE 2 y 3 1.00 4.84 0.30 0.50 0.73
EJE B, ENTRE EJE 3 y 4 1.00 3.32 0.30 0.50 0.50
EJE B, ENTRE EJE 4 y 5 1.00 4.61 0.30 0.50 0.69
EJE C, ENTRE EJE 1 y 2 1.00 5.11 0.30 0.50 0.77
EJE C, ENTRE EJE 2 y 3 1.00 4.84 0.30 0.50 0.73
EJE C, ENTRE EJE 3 y 4 1.00 3.32 0.30 0.50 0.50
EJE C, ENTRE EJE 4 y 5 1.00 4.61 0.30 0.50 0.69
EJE D, ENTRE EJE 1 y 2 1.00 5.11 0.30 0.50 0.77
EJE D, ENTRE EJE 2 y 3 1.00 4.84 0.30 0.50 0.73
EJE D, ENTRE EJE 3 y 4 1.00 3.32 0.30 0.50 0.50
EJE D, ENTRE EJE 4 y 5 1.00 4.61 0.30 0.50 0.69

SEGUNDO PISO EJE 1, ENTRE EJE A y B 1.00 2.69 0.30 0.40 0.32
EJE 1, ENTRE EJE B y C 1.00 3.20 0.30 0.40 0.38
EJE 1, ENTRE EJE C y D 1.00 2.97 0.30 0.40 0.36
EJE 5, ENTRE EJE A y B 1.00 2.69 0.30 0.40 0.32
EJE 5, ENTRE EJE B y C 1.00 3.20 0.30 0.40 0.38
EJE 5, ENTRE EJE C y D 1.00 2.97 0.30 0.40 0.36
EJE A, ENTRE EJE 1 y 2 1.00 5.11 0.30 0.50 0.77
EJE A, ENTRE EJE 2 y 3 1.00 4.84 0.30 0.50 0.73
EJE A, ENTRE EJE 3 y 4 1.00 3.32 0.30 0.50 0.50
EJE A, ENTRE EJE 4 y 5 1.00 4.61 0.30 0.50 0.69
EJE D, ENTRE EJE 1 y 2 1.00 5.11 0.30 0.50 0.77
EJE D, ENTRE EJE 2 y 3 1.00 4.84 0.30 0.50 0.73
EJE D, ENTRE EJE 3 y 4 1.00 3.32 0.30 0.50 0.50
EJE D, ENTRE EJE 4 y 5 1.00 4.61 0.30 0.50 0.69

09.01.04.05.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS M2 152.37


BLOQUE QUIRURGICO
PRIMER PISO EJE 1, ENTRE EJE A y B 1.00 2.69 0.90 2.42
EJE 1, ENTRE EJE B y C 1.00 3.20 0.90 2.88
EJE 1, ENTRE EJE C y D 1.00 2.97 0.90 2.67
EJE 2, ENTRE EJE A y B 1.00 2.69 0.90 2.42
EJE 2, ENTRE EJE B y C 1.00 3.20 0.90 2.88
EJE 2, ENTRE EJE C y D 1.00 2.97 0.90 2.67
EJE 3, ENTRE EJE A y B 1.00 2.69 0.90 2.42
EJE 3, ENTRE EJE B y C 1.00 3.20 0.90 2.88
EJE 3, ENTRE EJE C y D 1.00 2.97 0.90 2.67
EJE 4, ENTRE EJE A y B 1.00 2.69 0.90 2.42
EJE 4, ENTRE EJE B y C 1.00 3.20 0.90 2.88
EJE 4, ENTRE EJE C y D 1.00 2.97 0.90 2.67
EJE 5, ENTRE EJE A y B 1.00 2.69 0.90 2.42
EJE 5, ENTRE EJE B y C 1.00 3.20 0.90 2.88
EJE 5, ENTRE EJE C y D 1.00 2.97 0.90 2.67
EJE A, ENTRE EJE 1 y 2 1.00 5.11 0.90 4.60
EJE A, ENTRE EJE 2 y 3 1.00 4.84 0.90 4.36
EJE A, ENTRE EJE 3 y 4 1.00 3.32 0.90 2.99
EJE A, ENTRE EJE 4 y 5 1.00 4.61 0.90 4.15
EJE B, ENTRE EJE 1 y 2 1.00 5.11 0.90 4.60
EJE B, ENTRE EJE 2 y 3 1.00 4.84 0.90 4.36
EJE B, ENTRE EJE 3 y 4 1.00 3.32 0.90 2.99
EJE B, ENTRE EJE 4 y 5 1.00 4.61 0.90 4.15
EJE C, ENTRE EJE 1 y 2 1.00 5.11 0.90 4.60
EJE C, ENTRE EJE 2 y 3 1.00 4.84 0.90 4.36
EJE C, ENTRE EJE 3 y 4 1.00 3.32 0.90 2.99
EJE C, ENTRE EJE 4 y 5 1.00 4.61 0.90 4.15
EJE D, ENTRE EJE 1 y 2 1.00 5.11 0.90 4.60
EJE D, ENTRE EJE 2 y 3 1.00 4.84 0.90 4.36
EJE D, ENTRE EJE 3 y 4 1.00 3.32 0.90 2.99
EJE D, ENTRE EJE 4 y 5 1.00 4.61 0.90 4.15

SEGUNDO PISO EJE 1, ENTRE EJE A y B 1.00 2.69 0.90 2.42


EJE 1, ENTRE EJE B y C 1.00 3.20 0.90 2.88
EJE 1, ENTRE EJE C y D 1.00 2.97 0.90 2.67
EJE 5, ENTRE EJE A y B 1.00 2.69 0.90 2.42
EJE 5, ENTRE EJE B y C 1.00 3.20 0.90 2.88
EJE 5, ENTRE EJE C y D 1.00 2.97 0.90 2.67
EJE A, ENTRE EJE 1 y 2 1.00 5.11 0.90 4.60
EJE A, ENTRE EJE 2 y 3 1.00 4.84 0.90 4.36
EJE A, ENTRE EJE 3 y 4 1.00 3.32 0.90 2.99
EJE A, ENTRE EJE 4 y 5 1.00 4.61 0.90 4.15
EJE D, ENTRE EJE 1 y 2 1.00 5.11 0.90 4.60
EJE D, ENTRE EJE 2 y 3 1.00 4.84 0.90 4.36
EJE D, ENTRE EJE 3 y 4 1.00 3.32 0.90 2.99
EJE D, ENTRE EJE 4 y 5 1.00 4.61 0.90 4.15

09.01.04.05.03 ACERO PARA VIGAS F'y= 4200 Kg/Cm2 KG 2062.37


(VER METRADO ACERO) 2062.37 2062.37

09.01.04.06 LOSAS ALIGERADAS

09.01.04.06.01 CONCRETO PARA LOSA ALIGERADA F'C=210 KG/CM2 M3 15.74


BLOQUE QUIRURGICO f (m3/m2)
PRIMER PISO ENTRE 1-2, ENTRE A-B 1.00 5.21 3.09 0.0875 1.41
ENTRE 1-2, ENTRE B-C 1.00 5.21 3.20 0.0875 1.46
ENTRE 1-2, ENTRE C-D 1.00 5.21 3.42 0.0875 1.56
ENTRE 2-3, ENTRE A-B 1.00 4.94 3.09 0.0875 1.34
ENTRE 2-3, ENTRE B-C 1.00 4.94 3.20 0.0875 1.38
ENTRE 2-3, ENTRE C-D 1.00 4.94 3.42 0.0875 1.48
ENTRE 3-4, ENTRE A-B 1.00 3.37 3.09 0.0875 0.91
ENTRE 3-4, ENTRE B-C 1.00 3.37 3.20 0.0875 0.94
ENTRE 3-4, ENTRE C-D 1.00 3.37 3.42 0.0875 1.01
ENTRE 4-5, ENTRE A-B 1.00 5.01 3.09 0.0875 1.35
ENTRE 4-5, ENTRE B-C 1.00 5.01 3.20 0.0875 1.40
ENTRE 4-5, ENTRE C-D 1.00 5.01 3.42 0.0875 1.50

09.01.04.06.02 ENCOFRADO Y DESENCOFRADO PARA LOSAS M2 179.93


BLOQUE QUIRURGICO
PRIMER PISO
ENTRE 1-2, ENTRE A-B 1.00 5.21 3.09 16.10
ENTRE 1-2, ENTRE B-C 1.00 5.21 3.20 16.67
ENTRE 1-2, ENTRE C-D 1.00 5.21 3.42 17.82
ENTRE 2-3, ENTRE A-B 1.00 4.94 3.09 15.26
ENTRE 2-3, ENTRE B-C 1.00 4.94 3.20 15.81
ENTRE 2-3, ENTRE C-D 1.00 4.94 3.42 16.89
ENTRE 3-4, ENTRE A-B 1.00 3.37 3.09 10.41
ENTRE 3-4, ENTRE B-C 1.00 3.37 3.20 10.78
ENTRE 3-4, ENTRE C-D 1.00 3.37 3.42 11.53
ENTRE 4-5, ENTRE A-B 1.00 5.01 3.09 15.48
ENTRE 4-5, ENTRE B-C 1.00 5.01 3.20 16.03
ENTRE 4-5, ENTRE C-D 1.00 5.01 3.42 17.13

09.01.04.06.04 LADRILLO HUECO DE ARCILLA 30X30X15 CM PARA TECHO ALIGERADO UND 1500.00
BLOQUE QUIRURGICO f(und/m2)

UNA DIRECCION ENTRE 1-2, ENTRE A-B 1.00 5.21 3.09 8.33 134.00
ENTRE 1-2, ENTRE B-C 1.00 5.21 3.20 8.33 139.00
ENTRE 1-2, ENTRE C-D 1.00 5.21 3.42 8.33 148.00
ENTRE 2-3, ENTRE A-B 1.00 4.94 3.09 8.33 127.00
ENTRE 2-3, ENTRE B-C 1.00 4.94 3.20 8.33 132.00
ENTRE 2-3, ENTRE C-D 1.00 4.94 3.42 8.33 141.00
ENTRE 3-4, ENTRE A-B 1.00 3.37 3.09 8.33 87.00
ENTRE 3-4, ENTRE B-C 1.00 3.37 3.20 8.33 90.00
ENTRE 3-4, ENTRE C-D 1.00 3.37 3.42 8.33 96.00
ENTRE 4-5, ENTRE A-B 1.00 5.01 3.09 8.33 129.00
ENTRE 4-5, ENTRE B-C 1.00 5.01 3.20 8.33 134.00
ENTRE 4-5, ENTRE C-D 1.00 5.01 3.42 8.33 143.00

09.01.04.06.05 ACERO PARA LOSAS F'y= 4200 Kg/Cm2 KG 1331.97


(VER METRADO ACERO) 1331.97 1331.97

09.01.05 VARIOS
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)
09.01.05.01 UND 21.00
EN ZAPATAS (7,14,28 Días) 1.00 6.00 6.00
EN COLUMNAS (7,14,28 Días) 1.00 9.00 9.00
EN LOSA ALIGERADA (7,14,28 Días) 1.00 6.00 6.00

09.01.05 ESTRUCTURAS METALICAS


09.01.05.01 TIJERALES PRINCIPALES
09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 3 UND 5.00
5.00 5.00

09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 3 PZA 5.00


5.00 5.00

09.01.05.01 APOYOS Y FIJACION


09.01.05.01 SISTEMA DE APOYO FIJO EN TIJERAL METALICO UND 5.00 5.00 5.00

09.01.05.01 DISPOSITIVO DE APOYO MOVIL EN TIJERAL METALICO UND 5.00 5.00 5.00

09.01.05.01 TEMPLADORES
09.01.05.01 TENSOR DE 5/8" EN ARRIOSTRE DE TIJERALES ML 131.40
ENTRE 1-2 4.00 8.60 34.40
ENTRE 2-3 4.00 8.35 33.40
ENTRE 3-4 4.00 7.60 30.40
ENTRE 4-5 4.00 8.30 33.20
0.00

09.01.05.01 CORREAS METALICAS


09.01.05.01 CORREA METALICA PERFIL C6X8.2 ML 10.00 36.90 369.00 369.00
HOJA DE METRADOS DE ACERO
OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS -BLOQUE QUIRURGICO
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
ф 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1" 1 3/8"
Obs: Traslape Normal: para acero vertical y acero horizontal con H<0.30m TIPOS DE TRASLAPE: Normal 0.40 0.40 0.40 0.50 0.60 0.70 1.15 2.30
Traslape Superior: para horizontal con H>0.30m Superior 0.40 0.40 0.45 0.60 0.75 0.90 1.45 3.20
(H=Peralte efectivo) Peso (kg/m) 0.22 0.40 0.56 0.99 1.55 2.24 3.99 7.91

Datos Dimensiones RESULTADOS


ACERO longitud # 6mm 8mm 3/8 1/2 5/8 3/4 1 1 3/8
item descripción Cantidad Tipo
descripción Ø # de piezas s/emp emp. ML ML ML ML ML ML ML ML

09.01.04.01 ZAPATAS
09.01.04.01.02 ACERO PARA ZAPATAS F'y= 4200 Kg/Cm2
BLOQUE QUIRURGICO
Z-1 2 Normal Acero Longitudinal 3/4 '' 7 1.26 - - - - - - 17.64 - -
2 Normal Acero Transversal 3/4 '' 7 1.26 - - - - - - 17.64 - -

Z-2 2 Normal Acero Longitudinal 3/4 '' 5 0.86 - - - - - - 8.60 - -


2 Normal Acero Transversal 3/4 '' 9 1.66 - - - - - - 29.88 - -
- - - - - - - - -
- - - - - - - - -
Z-3 4 Normal Acero Longitudinal 3/4 '' 9 1.71 - - - - - - 61.56 - -
4 Normal Acero Transversal 3/4 '' 5 0.91 - - - - - - 18.20 - -
- - - - - - - - -
Z-4 6 Normal Acero Longitudinal 3/4 '' 9 1.56 - - - - - - 84.24 - -
6 Normal Acero Transversal 3/4 '' 7 1.26 - - - - - - 52.92 - -
- - - - - - - - -
Z-5 2 Normal Acero Longitudinal 3/4 '' 10 1.56 - - - - - - 31.20 - -
2 Normal Acero Transversal 3/4 '' 5 0.91 - - - - - - 9.10 - -
- - - - - - - - -
Z-6 1 Normal Acero Longitudinal 3/4 '' 8 1.36 - - - - - - 10.88 - -
1 Normal Acero Transversal 3/4 '' 5 0.91 - - - - - - 4.55 - -
1 Normal Acero Longitudinal 3/4 '' 5 0.86 - - - - - - 4.30 - -
1 Normal Acero Transversal 3/4 '' 18 3.41 - - - - - - 61.38 - -
- - - - - - - - -
Z-7 1 Normal Acero Longitudinal 3/4 '' 8 0.81 - - - - - - 6.48 - -
1 Normal Acero Transversal 3/4 '' 5 1.66 - - - - - - 8.30 - -
1 Normal Acero Longitudinal 3/4 '' 5 0.86 - - - - - - 4.30 - -
1 Normal Acero Transversal 3/4 '' 17 3.41 - - - - - - 57.97 - -
Total ml - - - - - 489.14 - -
Total piezas - - - - - 55.00 - -
Kg - - - - - 1,093.33 - -
Total Kg 1093.33

05.02.00 VIGAS DE CONEXIÓN


05.02.03 ACERO PARA VIGAS DE CIMENTACION F'y= 4200 Kg/Cm2
BLOQUE QUIRURGICO
EJE A, B,C y D ENTRE EJE 1 y 5 4 Normal Acero Longitudinal Sup. 3/4 '' 2 20.52 2 - - - - - 175.36 - -
4 Normal Acero Longitudinal Sup. 5/8 '' 1 20.52 2 - - - - 86.88 - - -
4 Normal Acero Refuerzo Sup. 5/8 '' 2 6.48
4 Normal Acero Longitudinal Inf. 3/4 '' 2 20.59 2 - - - - - 175.92 - -
4 Normal Acero Longitudinal Inf. 5/8 '' 1 20.59 2 - - - - 87.16 - - -
4 Normal Estribos 3/8 '' 101 1.68 - - - 678.72 - - - - -

EJE 1 al 5, ENTRE EJE A y D 5 Normal Acero Longitudinal Sup. 3/4 '' 2 11.48 1 - - - - - 121.80 - -
5 Normal Acero Longitudinal Sup. 5/8 '' 1 11.48 1 - - - - 60.40 - - -
5 Normal Acero Refuerzo Sup. 5/8 '' 2 4.04
5 Normal Acero Longitudinal Inf. 3/4 '' 2 11.49 1 - - - - - 121.90 - -
5 Normal Acero Longitudinal Inf. 5/8 '' 1 11.49 1 - - - - 60.45 - - -
5 Normal Estribos 3/8 '' 101 1.68 - - - 848.40 - - - - -
Total ml - - 678.72 - 234.44 594.98 - -
Total piezas - - 76.00 - 27.00 67.00 - -
Kg - - 379.74 - 363.90 1,329.90 - -
Total Kg 2073.54

05.03.00 COLUMNAS
05.03.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2
BLOQUE QUIRURGICO
C-1 3 Normal Acero Longitudinal 3/4 '' 8 10.60 1 - - - - - 271.20 - -
3 Normal Acero Longitudinal 5/8 '' 10 10.60 1 - - - - 336.00 - - -
3 Normal Estribos 3/8 '' 62 3.56 - - - 662.16 - - - - -
3 Normal Estribos 3/8 '' 62 3.56 - - - 662.16 - - - - -
3 Normal Estribos 3/8 '' 124 1.49 - - - 554.28 - - - - -

C-2 1 Normal Acero Longitudinal 3/4 '' 8 10.60 1 - - - - - 90.40 - -


1 Normal Acero Longitudinal 5/8 '' 6 10.60 - - - - 63.60 - - -
1 Normal Estribos 3/8 '' 62 3.56 - - - 220.72 - - - - -
1 Normal Estribos 3/8 '' 62 2.36 - - - 146.32 - - - - -
1 Normal Estribos 3/8 '' 62 1.50 - - - 93.00 - - - - -

C-3 10 Normal Acero Longitudinal 3/4 '' 4 10.60 1 - - - - - 452.00 - -


10 Normal Acero Longitudinal 5/8 '' 6 10.60 1 - - - - 672.00 - - -
10 Normal Estribos 3/8 '' 62 2.96 - - - 1,835.20 - - - - -
10 Normal Estribos 3/8 '' 62 2.07 - - - 1,283.40 - - - - -
- - -
C-4 6 Normal Acero Longitudinal 3/4 '' 6 10.60 1 - 406.80
6 Normal Acero Longitudinal 5/8 '' 4 10.60 1 - - - - 268.80 - - -
6 Normal Estribos 3/8 '' 62 3.36 - - - 1,249.92 - - - - -
6 Normal Estribos 3/8 '' 62 2.07 - - - 770.04 - - - - -
- - - - - - - - -
Total ml - - 7,477.20 - 1,340.40 1,220.40 - -
Total piezas - - 831.00 - 149.00 136.00 - -
Kg - - 4,183.49 - 2,080.57 2,727.84 - -
Total Kg 8991.90

05.05.00 VIGAS
05.05.03 ACERO PARA VIGAS F'y= 4200 Kg/Cm2
BLOQUE QUIRURGICO
Primer Piso - - - - - - - -
V- 105 al 109(0.30 x 0.40) - - - - - - - - -
EJE 1 al 5, ENTRE EJE A y D 5 Normal Acero Long. Superior 5/8 '' 2 11.28 1 - - - - 118.80 - - -
5 Normal Acero Long. Inferior 5/8 '' 2 11.28 1 - - - - 118.80 - - -
5 Normal Refuerzo Superior 1/2 '' 1 8.04 - - - - 40.20 - - - -
5 Normal Refuerzo Inferior 1/2 '' 1 6.27 - - - - 31.35 - - - -
5 Normal Estribos 3/8 '' 64 0.96 - - - 307.20 - - - - -
V- 101 al 104(0.30 x 0.50) - - - - - - - - -
EJE A al D, ENTRE EJE 1 y 5 5 Normal Acero Long. Superior 5/8 '' 2 11.28 1 - - - - 118.80 - - -
5 Normal Acero Long. Inferior 5/8 '' 2 11.28 1 - - - - 118.80 - - -
5 Normal Refuerzo Superior 5/8 '' 2 8.04 - - - - - 80.40 - - -
5 Normal Refuerzo Inferior 1/2 '' 1 6.27 - - - - 31.35 - - - -
5 Normal Estribos 3/8 '' 125 1.16 - - - 725.00 - - - - -
Segundo Piso
V- 205 y 209(0.30 x 0.40)
EJE 1 y 2 ENTRE EJE A y D 2 Normal Acero Long. Superior 5/8 '' 2 11.28 1 - - - - 47.52 - - -
2 Normal Acero Long. Inferior 5/8 '' 2 11.28 1 - - - - 47.52 - - -
2 Normal Refuerzo Superior 1/2 '' 1 8.04 - - - - 16.08 - - - -
2 Normal Refuerzo Inferior 1/2 '' 1 6.27 - - - - 12.54 - - - -
2 Normal Estribos 3/8 '' 64 0.96

V-201 y 204 (0.30 x 0.40) - - - - - - - - -


EJE A y D, ENTRE EJE 1 y 5 2 Normal Acero Long. Superior 5/8 '' 2 11.28 1 - - - - 47.52 - - -
2 Normal Acero Long. Inferior 5/8 '' 2 11.28 1 - - - - 47.52 - - -
2 Normal Refuerzo Superior 5/8 '' 2 8.04 - - - - - 32.16 - - -
2 Normal Refuerzo Inferior 1/2 '' 1 6.27 - - - - 12.54 - - - -
2 Normal Estribos 3/8 '' 125 0.96 - - - 240.00 - - - - -
Total ml - - 1,272.20 144.06 777.84 - - -
Total piezas - - 142.00 17.00 87.00 - - -
Kg - - 711.80 143.21 1,207.36 - - -
Total Kg 2062.37

05.06.00 LOSAS ALIGERADAS


05.06.03 ACERO PARA LOSAS F'y= 4200 Kg/Cm2
BLOQUE QUIRURGICO
PRIMER PISO
ENTRE EJE 1 y5, ENTRE EJE A y D
Baston Superior 1 Normal 1/2 '' 41 7.72 - - - - 316.52 - - - -
Baston Superior 1 Normal 3/8 '' 41 3.40 - - - 139.40 - - - - -
Baston Inferior 1 Normal 1/2 '' 41 10.85 1 - - - 465.35 - - - -
- - - - - - - -
ACERO DE TEMPERATURA
TRANSVERSAL 1 Normal 6mm 80 20.03 2 1,668.90 - - - - - - -
LONGITUDINAL 1 Normal 6mm 44 10.96 1 498.02 - - - - - - -

ACERO DE TEMPERATURA
Total ml 2,166.92 - 139.40 781.87 - - - -
Total piezas 241.00 - 16.00 87.00 - - - -
Kg 476.72 - 77.99 777.26 - - - -
Total Kg 1331.97
HOJA DE METRADOS / ESTRUCTURAS
:"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA, DEPARTAMENTO
OBRA
PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE HOSPITALIZACION
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
REGION : PASCO PROVINCIA: OXAPAMPA DISTRITO: OXAPAMPA

Nro. METRADO SUMA


PART. DESCRIPCION UND. UBICACIÓN
Elem LARGO ANCHO ALTO PARCIAL TOTAL
09.01.00 ESTRUCTURAS
09.01.01 TRABAJOS PRELIMINARES
09.01.01.01 LIMPIEZA DE TERRENO MANUAL M2 504.66
BLOQUE HOSPITALIZACION
CIMENTACION 1.00 Area= 504.66 504.66

09.01.01.02 TRAZO Y REPLANTEO M2 504.66


BLOQUE HOSPITALIZACION
CIMENTACION 1.00 Area= 504.66 504.66

09.01.01.03 TRAZO Y REPLANTEO DURANTE EL PROCESO M2 1966.49


BLOQUE HOSPITALIZACION
CIMENTACION 1.00 Area= 504.66 504.66
1er PISO 1.00 Area= 504.66 504.66
2do PISO 1.00 Area= 478.59 478.59
TECHO 1.00 Area= 478.59 478.59

09.01.02 MOVIMIENTOS DE TIERRAS


09.01.02.01 CORTES
09.01.02.01.01 CORTE GENERAL CON MAQUINARIA , H=0.40m M3 201.86
BLOQUE HOSPITALIZACION
SUPERFICIE 1.00 Area= 504.66 0.40 201.86

09.01.02.01 EXCAVACION
09.01.02.01.01 EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m M3 119.21
BLOQUE HOSPITALIZACION
Z-1 2.00 1.40 1.40 1.50 5.88
Z-2 12.00 2.00 1.10 1.50 39.60
Z-3 2.00 1.35 1.35 1.50 5.47
Z-4 1.00 0.75 1.50 1.50 1.69
Z-5 1.00 0.80 1.60 1.50 1.92
Z-6 2.00 1.05 2.00 1.50 6.30
Z-7 12.00 1.60 1.40 1.50 40.32
Z-8 2.00 1.95 1.35 1.50 7.90
Z-9 2.00 2.60 1.30 1.50 10.14

09.01.02.01.02 EXCAVACION PARA VIGAS DE CONEXIÓN M3 102.84


BLOQUE HOSPITALIZACION
EJE 1, ENTRE EJE A y B 1.00 3.02 0.80 1.10 2.66
EJE 1, ENTRE EJE B y C 1.00 1.80 0.80 1.10 1.58
EJE 1, ENTRE EJE C y D 1.00 3.35 0.80 1.10 2.95
EJE 1, ENTRE EJE D y E 1.00 1.45 0.80 1.10 1.28
EJE 1, ENTRE EJE F y G 1.00 3.30 0.80 1.10 2.90
EJE 1, ENTRE EJE G y H 1.00 1.80 0.80 1.10 1.58
EJE 1, ENTRE EJE H y I 1.00 3.40 0.80 1.10 2.99
EJE 1, ENTRE EJE I y J 1.00 1.47 0.80 1.10 1.29
EJE 2, ENTRE EJE A y B 1.00 3.02 0.80 1.10 2.66
EJE 2, ENTRE EJE D y E 1.00 1.45 0.80 1.10 1.28
EJE 2, ENTRE EJE I y J 1.00 1.47 0.80 1.10 1.29
EJE 3, ENTRE EJE A y B 1.00 3.02 0.80 1.10 2.66
EJE 3, ENTRE EJE D y E 1.00 1.45 0.80 1.10 1.28
EJE 3, ENTRE EJE I y J 1.00 1.47 0.80 1.10 1.29
EJE 4, ENTRE EJE A y B 1.00 3.02 0.80 1.10 2.66
EJE 4, ENTRE EJE B y C 1.00 1.80 0.80 1.10 1.58
EJE 4, ENTRE EJE C y D 1.00 3.35 0.80 1.10 2.95
EJE 4, ENTRE EJE D y E 1.00 1.45 0.80 1.10 1.28
EJE 4, ENTRE EJE F y G 1.00 3.30 0.80 1.10 2.90
EJE 4, ENTRE EJE G y H 1.00 1.80 0.80 1.10 1.58
EJE 4, ENTRE EJE H y I 1.00 3.40 0.80 1.10 2.99
EJE 4, ENTRE EJE I y J 1.00 1.47 0.80 1.10 1.29
EJE A, ENTRE EJE 1 y 2 1.00 2.59 0.80 1.10 2.28
EJE A, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.10 1.14
EJE A, ENTRE EJE 3 y 4 1.00 2.69 0.80 1.10 2.37
EJE B, ENTRE EJE 1 y 2 1.00 2.59 0.80 1.10 2.28
EJE B, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.10 1.14
EJE B, ENTRE EJE 3 y 4 1.00 2.69 0.80 1.10 2.37
EJE C, ENTRE EJE 1 y 2 1.00 2.59 0.80 1.10 2.28
EJE C, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.10 1.14
EJE C, ENTRE EJE 3 y 4 1.00 2.69 0.80 1.10 2.37
EJE D, ENTRE EJE 1 y 2 1.00 2.59 0.80 1.10 2.28
EJE D, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.10 1.14
EJE D, ENTRE EJE 3 y 4 1.00 2.69 0.80 1.10 2.37
EJE E, ENTRE EJE 1 y 2 1.00 2.59 0.80 1.10 2.28
EJE E, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.10 1.14
EJE E, ENTRE EJE 3 y 4 1.00 2.69 0.80 1.10 2.37
EJE F, ENTRE EJE 1 y 2 1.00 2.59 0.80 1.10 2.28
EJE F, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.10 1.14
EJE F, ENTRE EJE 3 y 4 1.00 2.69 0.80 1.10 2.37
EJE G, ENTRE EJE 1 y 2 1.00 2.59 0.80 1.10 2.28
EJE G, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.10 1.14
EJE G, ENTRE EJE 3 y 4 1.00 2.69 0.80 1.10 2.37
EJE H, ENTRE EJE 1 y 2 1.00 2.59 0.80 1.10 2.28
EJE H, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.10 1.14
EJE H, ENTRE EJE 3 y 4 1.00 2.69 0.80 1.10 2.37
EJE I, ENTRE EJE 1 y 2 1.00 2.59 0.80 1.10 2.28
EJE I, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.10 1.14
EJE I, ENTRE EJE 3 y 4 1.00 2.69 0.80 1.10 2.37
EJE J, ENTRE EJE 1 y 2 1.00 2.59 0.80 1.10 2.28
EJE J, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.10 1.14
EJE J, ENTRE EJE 3 y 4 1.00 2.69 0.80 1.10 2.37

09.01.02.01.02 EXCAVACION PARA CIMIENTOS CORRIDOS M3 36.07


BLOQUE MANTENIMIENTO
EJE 1, ENTRE EJE D -C 1.00 3.37 0.40 0.75 1.01
EJE 1, ENTRE EJE A y B 1.00 3.02 0.40 0.75 0.91
EJE 1, ENTRE EJE B y C 1.00 1.80 0.40 0.75 0.54
EJE 1, ENTRE EJE C y D 1.00 3.35 0.40 0.75 1.01
EJE 1, ENTRE EJE D y E 1.00 1.45 0.40 0.75 0.44
EJE 1, ENTRE EJE F y G 1.00 3.30 0.40 0.75 0.99
EJE 1, ENTRE EJE G y H 1.00 1.80 0.40 0.75 0.54
EJE 1, ENTRE EJE H y I 1.00 3.40 0.40 0.75 1.02
EJE 1, ENTRE EJE I y J 1.00 1.47 0.40 0.75 0.44
EJE 2, ENTRE EJE A y B 1.00 3.02 0.40 0.75 0.91
EJE 2, ENTRE EJE D y E 1.00 1.45 0.40 0.75 0.44
EJE 2, ENTRE EJE I y J 1.00 1.47 0.40 0.75 0.44
EJE 3, ENTRE EJE A y B 1.00 3.02 0.40 0.75 0.91
EJE 3, ENTRE EJE D y E 1.00 1.45 0.40 0.75 0.44
EJE 3, ENTRE EJE I y J 1.00 1.47 0.40 0.75 0.44
EJE 4, ENTRE EJE A y B 1.00 3.02 0.40 0.75 0.91
EJE 4, ENTRE EJE B y C 1.00 1.80 0.40 0.75 0.54
EJE 4, ENTRE EJE C y D 1.00 3.35 0.40 0.75 1.01
EJE 4, ENTRE EJE D y E 1.00 1.45 0.40 0.75 0.44
EJE 4, ENTRE EJE F y G 1.00 3.30 0.40 0.75 0.99
EJE 4, ENTRE EJE G y H 1.00 1.80 0.40 0.75 0.54
EJE 4, ENTRE EJE H y I 1.00 3.40 0.40 0.75 1.02
EJE 4, ENTRE EJE I y J 1.00 1.47 0.40 0.75 0.44
EJE A, ENTRE EJE 1 y 2 1.00 2.59 0.40 0.75 0.78
EJE A, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.75 0.39
EJE A, ENTRE EJE 3 y 4 1.00 2.69 0.40 0.75 0.81
EJE B, ENTRE EJE 1 y 2 1.00 2.59 0.40 0.75 0.78
EJE B, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.75 0.39
EJE B, ENTRE EJE 3 y 4 1.00 2.69 0.40 0.75 0.81
EJE C, ENTRE EJE 1 y 2 1.00 2.59 0.40 0.75 0.78
EJE C, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.75 0.39
EJE C, ENTRE EJE 3 y 4 1.00 2.69 0.40 0.75 0.81
EJE D, ENTRE EJE 1 y 2 1.00 2.59 0.40 0.75 0.78
EJE D, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.75 0.39
EJE D, ENTRE EJE 3 y 4 1.00 2.69 0.40 0.75 0.81
EJE E, ENTRE EJE 1 y 2 1.00 2.59 0.40 0.75 0.78
EJE E, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.75 0.39
EJE E, ENTRE EJE 3 y 4 1.00 2.69 0.40 0.75 0.81
EJE F, ENTRE EJE 1 y 2 1.00 2.59 0.40 0.75 0.78
EJE F, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.75 0.39
EJE F, ENTRE EJE 3 y 4 1.00 2.69 0.40 0.75 0.81
EJE G, ENTRE EJE 1 y 2 1.00 2.59 0.40 0.75 0.78
EJE G, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.75 0.39
EJE G, ENTRE EJE 3 y 4 1.00 2.69 0.40 0.75 0.81
EJE H, ENTRE EJE 1 y 2 1.00 2.59 0.40 0.75 0.78
EJE H, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.75 0.39
EJE H, ENTRE EJE 3 y 4 1.00 2.69 0.40 0.75 0.81
EJE I, ENTRE EJE 1 y 2 1.00 2.59 0.40 0.75 0.78
EJE I, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.75 0.39
EJE I, ENTRE EJE 3 y 4 1.00 2.69 0.40 0.75 0.81
EJE J, ENTRE EJE 1 y 2 1.00 2.59 0.40 0.75 0.78
EJE J, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.75 0.39
EJE J, ENTRE EJE 3 y 4 1.00 2.69 0.40 0.75 0.81
09.01.02.02 NIVELACION Y COMPACTACION
09.01.02.02.01 REFINE, COMPACTACION Y NIVELACION DE FONDO DE SUPERFICIE ZAPATA M2 79.48

BLOQUE HOSPITALIZACION Z-1 2.00 1.40 1.40 3.92


Z-2 12.00 2.00 1.10 26.40
Z-3 2.00 1.35 1.35 3.65
Z-4 1.00 0.75 1.50 1.13
Z-5 1.00 0.80 1.60 1.28
Z-6 2.00 1.05 2.00 4.20
Z-7 12.00 1.60 1.40 26.88
Z-8 2.00 1.95 1.35 5.27
Z-9 2.00 2.60 1.30 6.76

09.01.02.02.01 REFINE, COMPACTACION Y NIVELACION DE FONDO DE SUPERFICIE CIMIENTOS M2 48.59


CORRIDOS
BLOQUE MANTENIMIENTO EJE 1, ENTRE EJE D y E 1.00 1.25 0.40 0.50
EJE 1, ENTRE EJE D -C 1.00 3.37 0.40 1.35
EJE 1, ENTRE EJE A y B 1.00 3.02 0.40 1.21
EJE 1, ENTRE EJE B y C 1.00 1.80 0.40 0.72
EJE 1, ENTRE EJE C y D 1.00 3.35 0.40 1.34
EJE 1, ENTRE EJE D y E 1.00 1.45 0.40 0.58
EJE 1, ENTRE EJE F y G 1.00 3.30 0.40 1.32
EJE 1, ENTRE EJE G y H 1.00 1.80 0.40 0.72
EJE 1, ENTRE EJE H y I 1.00 3.40 0.40 1.36
EJE 1, ENTRE EJE I y J 1.00 1.47 0.40 0.59
EJE 2, ENTRE EJE A y B 1.00 3.02 0.40 1.21
EJE 2, ENTRE EJE D y E 1.00 1.45 0.40 0.58
EJE 2, ENTRE EJE I y J 1.00 1.47 0.40 0.59
EJE 3, ENTRE EJE A y B 1.00 3.02 0.40 1.21
EJE 3, ENTRE EJE D y E 1.00 1.45 0.40 0.58
EJE 3, ENTRE EJE I y J 1.00 1.47 0.40 0.59
EJE 4, ENTRE EJE A y B 1.00 3.02 0.40 1.21
EJE 4, ENTRE EJE B y C 1.00 1.80 0.40 0.72
EJE 4, ENTRE EJE C y D 1.00 3.35 0.40 1.34
EJE 4, ENTRE EJE D y E 1.00 1.45 0.40 0.58
EJE 4, ENTRE EJE F y G 1.00 3.30 0.40 1.32
EJE 4, ENTRE EJE G y H 1.00 1.80 0.40 0.72
EJE 4, ENTRE EJE H y I 1.00 3.40 0.40 1.36
EJE 4, ENTRE EJE I y J 1.00 1.47 0.40 0.59
EJE A, ENTRE EJE 1 y 2 1.00 2.59 0.40 1.04
EJE A, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.52
EJE A, ENTRE EJE 3 y 4 1.00 2.69 0.40 1.08
EJE B, ENTRE EJE 1 y 2 1.00 2.59 0.40 1.04
EJE B, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.52
EJE B, ENTRE EJE 3 y 4 1.00 2.69 0.40 1.08
EJE C, ENTRE EJE 1 y 2 1.00 2.59 0.40 1.04
EJE C, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.52
EJE C, ENTRE EJE 3 y 4 1.00 2.69 0.40 1.08
EJE D, ENTRE EJE 1 y 2 1.00 2.59 0.40 1.04
EJE D, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.52
EJE D, ENTRE EJE 3 y 4 1.00 2.69 0.40 1.08
EJE E, ENTRE EJE 1 y 2 1.00 2.59 0.40 1.04
EJE E, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.52
EJE E, ENTRE EJE 3 y 4 1.00 2.69 0.40 1.08
EJE F, ENTRE EJE 1 y 2 1.00 2.59 0.40 1.04
EJE F, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.52
EJE F, ENTRE EJE 3 y 4 1.00 2.69 0.40 1.08
EJE G, ENTRE EJE 1 y 2 1.00 2.59 0.40 1.04
EJE G, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.52
EJE G, ENTRE EJE 3 y 4 1.00 2.69 0.40 1.08
EJE H, ENTRE EJE 1 y 2 1.00 2.59 0.40 1.04
EJE H, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.52
EJE H, ENTRE EJE 3 y 4 1.00 2.69 0.40 1.08
EJE I, ENTRE EJE 1 y 2 1.00 2.59 0.40 1.04
EJE I, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.52
EJE I, ENTRE EJE 3 y 4 1.00 2.69 0.40 1.08
EJE J, ENTRE EJE 1 y 2 1.00 2.59 0.40 1.04
EJE J, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.52
EJE J, ENTRE EJE 3 y 4 1.00 2.69 0.40 1.08

09.01.02.02.02 M2 93.49
REFINE, COMPACTACION Y NIVELACION DE SUPERFICIE FONDO DE VIGA DE CONEXIÓN
BLOQUE HOSPITALIZACION EJE 1, ENTRE EJE A y B 1.00 3.02 0.80 2.42
EJE 1, ENTRE EJE B y C 1.00 1.80 0.80 1.44
EJE 1, ENTRE EJE C y D 1.00 3.35 0.80 2.68
EJE 1, ENTRE EJE D y E 1.00 1.45 0.80 1.16
EJE 1, ENTRE EJE F y G 1.00 3.30 0.80 2.64
EJE 1, ENTRE EJE G y H 1.00 1.80 0.80 1.44
EJE 1, ENTRE EJE H y I 1.00 3.40 0.80 2.72
EJE 1, ENTRE EJE I y J 1.00 1.47 0.80 1.18
EJE 2, ENTRE EJE A y B 1.00 3.02 0.80 2.42
EJE 2, ENTRE EJE D y E 1.00 1.45 0.80 1.16
EJE 2, ENTRE EJE I y J 1.00 1.47 0.80 1.18
EJE 3, ENTRE EJE A y B 1.00 3.02 0.80 2.42
EJE 3, ENTRE EJE D y E 1.00 1.45 0.80 1.16
EJE 3, ENTRE EJE I y J 1.00 1.47 0.80 1.18
EJE 4, ENTRE EJE A y B 1.00 3.02 0.80 2.42
EJE 4, ENTRE EJE B y C 1.00 1.80 0.80 1.44
EJE 4, ENTRE EJE C y D 1.00 3.35 0.80 2.68
EJE 4, ENTRE EJE D y E 1.00 1.45 0.80 1.16
EJE 4, ENTRE EJE F y G 1.00 3.30 0.80 2.64
EJE 4, ENTRE EJE G y H 1.00 1.80 0.80 1.44
EJE 4, ENTRE EJE H y I 1.00 3.40 0.80 2.72
EJE 4, ENTRE EJE I y J 1.00 1.47 0.80 1.18
EJE A, ENTRE EJE 1 y 2 1.00 2.59 0.80 2.07
EJE A, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.04
EJE A, ENTRE EJE 3 y 4 1.00 2.69 0.80 2.15
EJE B, ENTRE EJE 1 y 2 1.00 2.59 0.80 2.07
EJE B, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.04
EJE B, ENTRE EJE 3 y 4 1.00 2.69 0.80 2.15
EJE C, ENTRE EJE 1 y 2 1.00 2.59 0.80 2.07
EJE C, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.04
EJE C, ENTRE EJE 3 y 4 1.00 2.69 0.80 2.15
EJE D, ENTRE EJE 1 y 2 1.00 2.59 0.80 2.07
EJE D, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.04
EJE D, ENTRE EJE 3 y 4 1.00 2.69 0.80 2.15
EJE E, ENTRE EJE 1 y 2 1.00 2.59 0.80 2.07
EJE E, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.04
EJE E, ENTRE EJE 3 y 4 1.00 2.69 0.80 2.15
EJE F, ENTRE EJE 1 y 2 1.00 2.59 0.80 2.07
EJE F, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.04
EJE F, ENTRE EJE 3 y 4 1.00 2.69 0.80 2.15
EJE G, ENTRE EJE 1 y 2 1.00 2.59 0.80 2.07
EJE G, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.04
EJE G, ENTRE EJE 3 y 4 1.00 2.69 0.80 2.15
EJE H, ENTRE EJE 1 y 2 1.00 2.59 0.80 2.07
EJE H, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.04
EJE H, ENTRE EJE 3 y 4 1.00 2.69 0.80 2.15
EJE I, ENTRE EJE 1 y 2 1.00 2.59 0.80 2.07
EJE I, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.04
EJE I, ENTRE EJE 3 y 4 1.00 2.69 0.80 2.15
EJE J, ENTRE EJE 1 y 2 1.00 2.59 0.80 2.07
EJE J, ENTRE EJE 2 y 3 1.00 1.30 0.80 1.04
EJE J, ENTRE EJE 3 y 4 1.00 2.69 0.80 2.15

09.01.02.02.03 REFINE, COMPACTACION Y NIVELACION DE SUPERFICIE M2 468.98


BLOQUE HOSPITALIZACION
CIRCULACION 1.00 Area= 118.81 118.81
HOSP. OBSTETRICA 1.00 Area= 18.22 18.22
ESCALERA 1.00 Area= 26.16 26.16
SS.HH 2.00 Area= 3.46 6.91
HOSP. OBSTETRICA 1.00 Area= 17.72 17.72
REPOSTERIA 1.00 Area= 8.30 8.30
CUARTO SEPTICO 1.00 Area= 4.27 4.27
ALMACENAMIENTO INTERMEDIO 1.00 Area= 4.66 4.66
NEONATOLOGIA 1.00 Area= 18.04 18.04
ESTACION DE ENFERMERAS 1.00 Area= 11.47 11.47
SS.HH 2.00 Area= 3.46 6.91
UCCI 1.00 Area= 17.10 17.10
CIRUJIA DAMAS 1.00 Area= 16.83 16.83
CIRUJIA DAMAS 1.00 Area= 18.13 18.13
SS.HH 2.00 Area= 3.37 6.75
SS.HH 2.00 Area= 3.42 6.83
CIRUJIA VARONES 1.00 Area= 18.01 18.01
MEDICINA VARONES 1.00 Area= 17.75 17.75
CIRUJIA VARONES 1.00 Area= 25.26 25.26
SS.HH 1.00 Area= 3.48 3.48
MEDICINA VARONES 1.00 Area= 18.37 18.37
SS.HH 2.00 Area= 3.42 6.83
MEDICINA DAMAS 1.00 Area= 23.33 23.33
MEDICINA DAMAS 1.00 Area= 22.75 22.75
VEREDAS 1.00 Area= 26.08 26.08

09.01.02.03 RELLENOS CON MATERIAL DE PRESTAMO


09.01.02.03.01 RELLENO Y COMPACTO DE SUPERFICIE M3 187.59
BLOQUE HOSPITALIZACION
CIRCULACION 1.00 Area= 118.81 0.40 47.52
HOSP. OBSTETRICA 1.00 Area= 18.22 0.40 7.29
ESCALERA 1.00 Area= 26.16 0.40 10.47
SS.HH 2.00 Area= 3.46 0.40 2.77
HOSP. OBSTETRICA 1.00 Area= 17.72 0.40 7.09
REPOSTERIA 1.00 Area= 8.30 0.40 3.32
CUARTO SEPTICO 1.00 Area= 4.27 0.40 1.71
ALMACENAMIENTO INTERMEDIO 1.00 Area= 4.66 0.40 1.86
NEONATOLOGIA 1.00 Area= 18.04 0.40 7.22
ESTACION DE ENFERMERAS 1.00 Area= 11.47 0.40 4.59
SS.HH 2.00 Area= 3.46 0.40 2.76
UCCI 1.00 Area= 17.10 0.40 6.84
CIRUJIA DAMAS 1.00 Area= 16.83 0.40 6.73
CIRUJIA DAMAS 1.00 Area= 18.13 0.40 7.25
SS.HH 2.00 Area= 3.37 0.40 2.70
SS.HH 2.00 Area= 3.42 0.40 2.73
CIRUJIA VARONES 1.00 Area= 18.01 0.40 7.20
MEDICINA VARONES 1.00 Area= 17.75 0.40 7.10
CIRUJIA VARONES 1.00 Area= 25.26 0.40 10.10
SS.HH 1.00 Area= 3.48 0.40 1.39
MEDICINA VARONES 1.00 Area= 18.37 0.40 7.35
SS.HH 2.00 Area= 3.42 0.40 2.73
MEDICINA DAMAS 1.00 Area= 23.33 0.40 9.33
MEDICINA DAMAS 1.00 Area= 22.75 0.40 9.10
VEREDAS 1.00 Area= 26.08 0.40 10.43

09.01.02.03.01 RELLENO Y COMPACTO DE ZAPATAS M3 32.43


BLOQUE HOSPITALIZACION

ZAPATAS Z-1 2.00 Area= 1.42 0.50 1.42


Z-2 12.00 Area= 1.71 0.50 10.25
Z-3 2.00 Area= 1.37 0.50 1.37
Z-4 2.00 Area= 0.84 0.50 0.84
Z-5 2.00 Area= 0.98 0.50 0.98
Z-6 2.00 Area= 1.81 0.50 1.81
Z-7 12.00 Area= 1.86 0.50 11.15
Z-8 2.00 Area= 2.03 0.50 2.03
Z-9 2.00 Area= 2.57 0.50 2.57

09.01.02.04 MANEJO DE MATERIAL PROCEDENTE DE EXCAVACIONES


09.01.02.04.01 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES M3 277.56
EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m 1.00 119.21 119.21
EXCAVACION PARA VIGAS DE CONEXIÓN 1.00 102.84 102.84
EXCAVACION PARA CIMIENTOS CORRIDOS 1.00 36.07
Sub Total 222.05
+2.5% esponjamiento 277.56

09.01.02.04.02 ELIMINACION DE MATERIAL EXCEDENTE M3 953.47


EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m 1.00 119.21 119.21
EXCAVACION PARA VIGAS DE CONEXIÓN 1.00 102.84 102.84
EXCAVACION PARA CIMIENTOS CORRIDOS 1.00 36.07 36.07
CORTE GENERAL CON MAQUINARIA , H=0.40m 1.00 504.66 504.66
Sub Total 762.78
+2.5% esponjamiento 953.47

09.01.03 OBRAS DE CONCRETO SIMPLE


09.01.03.01 SUB ZAPATAS
09.01.03.01.01 SUB ZAPATAS F´C=100KG/CM2 +30% PIEDRA GRANDE M3 31.79
BLOQUE HOSPITALIZACION
Z-1 2.00 1.40 1.40 0.40 1.57
Z-2 12.00 2.00 1.10 0.40 10.56
Z-3 2.00 1.35 1.35 0.40 1.46
Z-4 1.00 0.75 1.50 0.40 0.45
Z-5 1.00 0.80 1.60 0.40 0.51
Z-6 2.00 1.05 2.00 0.40 1.68
Z-7 12.00 1.60 1.40 0.40 10.75
Z-8 2.00 1.95 1.35 0.40 2.11
Z-9 2.00 2.60 1.30 0.40 2.70

09.01.03.03 SOBRECIMIENTOS
09.01.03.03.01 SOBRE CIMIENTOS CONCRETO F´C=140KG/CM2 + 30% PIEDRA MEDIANA M3 3.47
BLOQUE HOSPITALIZACION
EJE A, ENTRE EJE 1-2 1.00 3.94 0.12 0.45 0.21
EJE A, ENTRE EJE 2-3 1.00 0.40 0.12 0.45 0.02
EJE J, ENTRE EJE 1-2 1.00 4.19 0.12 0.45 0.23
EJE J, ENTRE EJE 2-3 1.00 2.50 0.12 0.45 0.14
EJE J, ENTRE EJE 3-4 1.00 4.19 0.12 0.45 0.23
EJE 1, ENTRE EJE A-B 1.00 4.42 0.12 0.45 0.24
EJE 1, ENTRE EJE B-C 1.00 3.00 0.12 0.45 0.16
EJE 1, ENTRE EJE C-D 1.00 4.55 0.12 0.45 0.25
EJE 1, ENTRE EJE D-E 1.00 2.57 0.12 0.45 0.14
EJE 1, ENTRE EJE F-G 1.00 4.43 0.12 0.45 0.24
EJE 1, ENTRE EJE G-H 1.00 3.00 0.12 0.45 0.16
EJE 1, ENTRE EJE H-I 1.00 4.60 0.12 0.45 0.25
EJE 1, ENTRE EJE I-J 1.00 2.82 0.12 0.45 0.15
EJE 4, ENTRE EJE C-D 1.00 2.15 0.12 0.45 0.12
EJE 4, ENTRE EJE D-E 1.00 2.57 0.12 0.45 0.14
EJE 4, ENTRE EJE D-E 1.00 2.57 0.12 0.45 0.14
EJE 4, ENTRE EJE F-G 1.00 4.43 0.12 0.45 0.24
EJE 4, ENTRE EJE G-H 1.00 3.00 0.12 0.45 0.16
EJE 4, ENTRE EJE H-I 1.00 2.20 0.12 0.45 0.12
EJE 4, ENTRE EJE H-I 1.00 2.82 0.12 0.45 0.15

09.01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.30 m M2 28.96


BLOQUE HOSPITALIZACION
EJE A, ENTRE EJE 1-2 1.00 3.94 0.45 1.77
EJE A, ENTRE EJE 2-3 1.00 0.40 0.45 0.18
EJE J, ENTRE EJE 1-2 1.00 4.19 0.45 1.89
EJE J, ENTRE EJE 2-3 1.00 2.50 0.45 1.13
EJE J, ENTRE EJE 3-4 1.00 4.19 0.45 1.89
EJE 1, ENTRE EJE A-B 1.00 4.42 0.45 1.99
EJE 1, ENTRE EJE B-C 1.00 3.00 0.45 1.35
EJE 1, ENTRE EJE C-D 1.00 4.55 0.45 2.05
EJE 1, ENTRE EJE D-E 1.00 2.57 0.45 1.16
EJE 1, ENTRE EJE F-G 1.00 4.43 0.45 1.99
EJE 1, ENTRE EJE G-H 1.00 3.00 0.45 1.35
EJE 1, ENTRE EJE H-I 1.00 4.60 0.45 2.07
EJE 1, ENTRE EJE I-J 1.00 2.82 0.45 1.27
EJE 4, ENTRE EJE C-D 1.00 2.15 0.45 0.97
EJE 4, ENTRE EJE D-E 1.00 2.57 0.45 1.16
EJE 4, ENTRE EJE D-E 1.00 2.57 0.45 1.16
EJE 4, ENTRE EJE F-G 1.00 4.43 0.45 1.99
EJE 4, ENTRE EJE G-H 1.00 3.00 0.45 1.35
EJE 4, ENTRE EJE H-I 1.00 2.20 0.45 0.99
EJE 4, ENTRE EJE H-I 1.00 2.82 0.45 1.27

09.01.03.03 CIMIENTOS CORRIDOS


09.01.03.03.01 CIMIENTOS CORRIDO CONCRETO F´C=140KG/CM2 + 30% PIEDRA DESPLAZADORA M3 36.07
BLOQUE MANTENIMIENTO
EJE 1, ENTRE EJE D -C 1.00 3.37 0.40 0.75 1.01
EJE 1, ENTRE EJE A y B 1.00 3.02 0.40 0.75 0.91
EJE 1, ENTRE EJE B y C 1.00 1.80 0.40 0.75 0.54
EJE 1, ENTRE EJE C y D 1.00 3.35 0.40 0.75 1.01
EJE 1, ENTRE EJE D y E 1.00 1.45 0.40 0.75 0.44
EJE 1, ENTRE EJE F y G 1.00 3.30 0.40 0.75 0.99
EJE 1, ENTRE EJE G y H 1.00 1.80 0.40 0.75 0.54
EJE 1, ENTRE EJE H y I 1.00 3.40 0.40 0.75 1.02
EJE 1, ENTRE EJE I y J 1.00 1.47 0.40 0.75 0.44
EJE 2, ENTRE EJE A y B 1.00 3.02 0.40 0.75 0.91
EJE 2, ENTRE EJE D y E 1.00 1.45 0.40 0.75 0.44
EJE 2, ENTRE EJE I y J 1.00 1.47 0.40 0.75 0.44
EJE 3, ENTRE EJE A y B 1.00 3.02 0.40 0.75 0.91
EJE 3, ENTRE EJE D y E 1.00 1.45 0.40 0.75 0.44
EJE 3, ENTRE EJE I y J 1.00 1.47 0.40 0.75 0.44
EJE 4, ENTRE EJE A y B 1.00 3.02 0.40 0.75 0.91
EJE 4, ENTRE EJE B y C 1.00 1.80 0.40 0.75 0.54
EJE 4, ENTRE EJE C y D 1.00 3.35 0.40 0.75 1.01
EJE 4, ENTRE EJE D y E 1.00 1.45 0.40 0.75 0.44
EJE 4, ENTRE EJE F y G 1.00 3.30 0.40 0.75 0.99
EJE 4, ENTRE EJE G y H 1.00 1.80 0.40 0.75 0.54
EJE 4, ENTRE EJE H y I 1.00 3.40 0.40 0.75 1.02
EJE 4, ENTRE EJE I y J 1.00 1.47 0.40 0.75 0.44
EJE A, ENTRE EJE 1 y 2 1.00 2.59 0.40 0.75 0.78
EJE A, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.75 0.39
EJE A, ENTRE EJE 3 y 4 1.00 2.69 0.40 0.75 0.81
EJE B, ENTRE EJE 1 y 2 1.00 2.59 0.40 0.75 0.78
EJE B, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.75 0.39
EJE B, ENTRE EJE 3 y 4 1.00 2.69 0.40 0.75 0.81
EJE C, ENTRE EJE 1 y 2 1.00 2.59 0.40 0.75 0.78
EJE C, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.75 0.39
EJE C, ENTRE EJE 3 y 4 1.00 2.69 0.40 0.75 0.81
EJE D, ENTRE EJE 1 y 2 1.00 2.59 0.40 0.75 0.78
EJE D, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.75 0.39
EJE D, ENTRE EJE 3 y 4 1.00 2.69 0.40 0.75 0.81
EJE E, ENTRE EJE 1 y 2 1.00 2.59 0.40 0.75 0.78
EJE E, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.75 0.39
EJE E, ENTRE EJE 3 y 4 1.00 2.69 0.40 0.75 0.81
EJE F, ENTRE EJE 1 y 2 1.00 2.59 0.40 0.75 0.78
EJE F, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.75 0.39
EJE F, ENTRE EJE 3 y 4 1.00 2.69 0.40 0.75 0.81
EJE G, ENTRE EJE 1 y 2 1.00 2.59 0.40 0.75 0.78
EJE G, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.75 0.39
EJE G, ENTRE EJE 3 y 4 1.00 2.69 0.40 0.75 0.81
EJE H, ENTRE EJE 1 y 2 1.00 2.59 0.40 0.75 0.78
EJE H, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.75 0.39
EJE H, ENTRE EJE 3 y 4 1.00 2.69 0.40 0.75 0.81
EJE I, ENTRE EJE 1 y 2 1.00 2.59 0.40 0.75 0.78
EJE I, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.75 0.39
EJE I, ENTRE EJE 3 y 4 1.00 2.69 0.40 0.75 0.81
EJE J, ENTRE EJE 1 y 2 1.00 2.59 0.40 0.75 0.78
EJE J, ENTRE EJE 2 y 3 1.00 1.30 0.40 0.75 0.39
EJE J, ENTRE EJE 3 y 4 1.00 2.69 0.40 0.75 0.81

09.01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA CIMIENTOS CORRIDOS M2 90.17


BLOQUE MANTENIMIENTO
EJE 1, ENTRE EJE D -C 1.00 3.37 0.75 2.53
EJE 1, ENTRE EJE A y B 1.00 3.02 0.75 2.27
EJE 1, ENTRE EJE B y C 1.00 1.80 0.75 1.35
EJE 1, ENTRE EJE C y D 1.00 3.35 0.75 2.51
EJE 1, ENTRE EJE D y E 1.00 1.45 0.75 1.09
EJE 1, ENTRE EJE F y G 1.00 3.30 0.75 2.48
EJE 1, ENTRE EJE G y H 1.00 1.80 0.75 1.35
EJE 1, ENTRE EJE H y I 1.00 3.40 0.75 2.55
EJE 1, ENTRE EJE I y J 1.00 1.47 0.75 1.10
EJE 2, ENTRE EJE A y B 1.00 3.02 0.75 2.27
EJE 2, ENTRE EJE D y E 1.00 1.45 0.75 1.09
EJE 2, ENTRE EJE I y J 1.00 1.47 0.75 1.10
EJE 3, ENTRE EJE A y B 1.00 3.02 0.75 2.27
EJE 3, ENTRE EJE D y E 1.00 1.45 0.75 1.09
EJE 3, ENTRE EJE I y J 1.00 1.47 0.75 1.10
EJE 4, ENTRE EJE A y B 1.00 3.02 0.75 2.27
EJE 4, ENTRE EJE B y C 1.00 1.80 0.75 1.35
EJE 4, ENTRE EJE C y D 1.00 3.35 0.75 2.51
EJE 4, ENTRE EJE D y E 1.00 1.45 0.75 1.09
EJE 4, ENTRE EJE F y G 1.00 3.30 0.75 2.48
EJE 4, ENTRE EJE G y H 1.00 1.80 0.75 1.35
EJE 4, ENTRE EJE H y I 1.00 3.40 0.75 2.55
EJE 4, ENTRE EJE I y J 1.00 1.47 0.75 1.10
EJE A, ENTRE EJE 1 y 2 1.00 2.59 0.75 1.94
EJE A, ENTRE EJE 2 y 3 1.00 1.30 0.75 0.98
EJE A, ENTRE EJE 3 y 4 1.00 2.69 0.75 2.02
EJE B, ENTRE EJE 1 y 2 1.00 2.59 0.75 1.94
EJE B, ENTRE EJE 2 y 3 1.00 1.30 0.75 0.98
EJE B, ENTRE EJE 3 y 4 1.00 2.69 0.75 2.02
EJE C, ENTRE EJE 1 y 2 1.00 2.59 0.75 1.94
EJE C, ENTRE EJE 2 y 3 1.00 1.30 0.75 0.98
EJE C, ENTRE EJE 3 y 4 1.00 2.69 0.75 2.02
EJE D, ENTRE EJE 1 y 2 1.00 2.59 0.75 1.94
EJE D, ENTRE EJE 2 y 3 1.00 1.30 0.75 0.98
EJE D, ENTRE EJE 3 y 4 1.00 2.69 0.75 2.02
EJE E, ENTRE EJE 1 y 2 1.00 2.59 0.75 1.94
EJE E, ENTRE EJE 2 y 3 1.00 1.30 0.75 0.98
EJE E, ENTRE EJE 3 y 4 1.00 2.69 0.75 2.02
EJE F, ENTRE EJE 1 y 2 1.00 2.59 0.75 1.94
EJE F, ENTRE EJE 2 y 3 1.00 1.30 0.75 0.98
EJE F, ENTRE EJE 3 y 4 1.00 2.69 0.75 2.02
EJE G, ENTRE EJE 1 y 2 1.00 2.59 0.75 1.94
EJE G, ENTRE EJE 2 y 3 1.00 1.30 0.75 0.98
EJE G, ENTRE EJE 3 y 4 1.00 2.69 0.75 2.02
EJE H, ENTRE EJE 1 y 2 1.00 2.59 0.75 1.94
EJE H, ENTRE EJE 2 y 3 1.00 1.30 0.75 0.98
EJE H, ENTRE EJE 3 y 4 1.00 2.69 0.75 2.02
EJE I, ENTRE EJE 1 y 2 1.00 2.59 0.75 1.94
EJE I, ENTRE EJE 2 y 3 1.00 1.30 0.75 0.98
EJE I, ENTRE EJE 3 y 4 1.00 2.69 0.75 2.02
EJE J, ENTRE EJE 1 y 2 1.00 2.59 0.75 1.94
EJE J, ENTRE EJE 2 y 3 1.00 1.30 0.75 0.98
EJE J, ENTRE EJE 3 y 4 1.00 2.69 0.75 2.02

09.01.03.04 FALSO PISO


09.01.03.04.01 CONCRETO F´C=80KG/CM2 PARA FALSO PISO E=0.10M M2 442.90
BLOQUE HOSPITALIZACION

PRIMER PISO CIRCULACION 1.00 Area= 118.81 118.81


HOSP. OBSTETRICA 1.00 Area= 18.22 18.22
ESCALERA 1.00 Area= 26.16 26.16
SS.HH 2.00 Area= 3.46 6.91
HOSP. OBSTETRICA 1.00 Area= 17.72 17.72
REPOSTERIA 1.00 Area= 8.30 8.30
CUARTO SEPTICO 1.00 Area= 4.27 4.27
ALMACENAMIENTO INTERMEDIO 1.00 Area= 4.66 4.66
NEONATOLOGIA 1.00 Area= 18.04 18.04
ESTACION DE ENFERMERAS 1.00 Area= 11.47 11.47
SS.HH 2.00 Area= 3.46 6.91
UCCI 1.00 Area= 17.10 17.10
CIRUJIA DAMAS 1.00 Area= 16.83 16.83
CIRUJIA DAMAS 1.00 Area= 18.13 18.13
SS.HH 2.00 Area= 3.37 6.75
SS.HH 2.00 Area= 3.42 6.83
CIRUJIA VARONES 1.00 Area= 18.01 18.01
MEDICINA VARONES 1.00 Area= 17.75 17.75
CIRUJIA VARONES 1.00 Area= 25.26 25.26
SS.HH 1.00 Area= 3.48 3.48
MEDICINA VARONES 1.00 Area= 18.37 18.37
SS.HH 2.00 Area= 3.42 6.83
MEDICINA DAMAS 1.00 Area= 23.33 23.33
MEDICINA DAMAS 1.00 Area= 22.75 22.75

09.01.04 OBRAS DE CONCRETO ARMADO


09.01.04.01 ZAPATAS

09.01.04.01.01 CONCRETO PARA ZAPATA F'C=210 KG/CM2 M3 47.69


BLOQUE HOSPITALIZACION

Z-1 2.00 1.40 1.40 0.60 2.35


Z-2 12.00 2.00 1.10 0.60 15.84
Z-3 2.00 1.35 1.35 0.60 2.19
Z-4 1.00 0.75 1.50 0.60 0.68
Z-5 1.00 0.80 1.60 0.60 0.77
Z-6 2.00 1.05 2.00 0.60 2.52
Z-7 12.00 1.60 1.40 0.60 16.13
Z-8 2.00 1.95 1.35 0.60 3.16
Z-9 2.00 2.60 1.30 0.60 4.06

09.01.04.01.02 ACERO PARA ZAPATAS F'y= 4200 Kg/Cm2 KG 2119.19


(VER METRADO ACERO) 2119.19 2119.19

09.01.04.02 VIGAS DE CONEXIÓN


09.01.04.02.01 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 M3 18.88
BLOQUE HOSPITALIZACION

EJE 1, ENTRE EJE A y B 1.00 3.02 0.30 0.60 0.54


EJE 1, ENTRE EJE B y C 1.00 1.80 0.30 0.60 0.32
EJE 1, ENTRE EJE C y D 1.00 3.35 0.30 0.60 0.60
EJE 1, ENTRE EJE D y E 1.00 1.45 0.30 0.60 0.26
EJE 1, ENTRE EJE F y G 1.00 3.30 0.30 0.60 0.59
EJE 1, ENTRE EJE G y H 1.00 1.80 0.30 0.60 0.32
EJE 1, ENTRE EJE H y I 1.00 3.40 0.30 0.60 0.61
EJE 1, ENTRE EJE I y J 1.00 1.47 0.30 0.50 0.22
EJE 2, ENTRE EJE A y B 1.00 3.02 0.30 0.60 0.54
EJE 2, ENTRE EJE D y E 1.00 1.45 0.30 0.60 0.26
EJE 2, ENTRE EJE I y J 1.00 1.47 0.30 0.50 0.22
EJE 3, ENTRE EJE A y B 1.00 3.02 0.30 0.60 0.54
EJE 3, ENTRE EJE D y E 1.00 1.45 0.30 0.60 0.26
EJE 3, ENTRE EJE I y J 1.00 1.47 0.30 0.50 0.22
EJE 4, ENTRE EJE A y B 1.00 3.02 0.30 0.60 0.54
EJE 4, ENTRE EJE B y C 1.00 1.80 0.30 0.60 0.32
EJE 4, ENTRE EJE C y D 1.00 3.35 0.30 0.60 0.60
EJE 4, ENTRE EJE D y E 1.00 1.45 0.30 0.60 0.26
EJE 4, ENTRE EJE F y G 1.00 3.30 0.30 0.60 0.59
EJE 4, ENTRE EJE G y H 1.00 1.80 0.30 0.60 0.32
EJE 4, ENTRE EJE H y I 1.00 3.40 0.30 0.60 0.61
EJE 4, ENTRE EJE I y J 1.00 1.47 0.30 0.50 0.22
EJE A, ENTRE EJE 1 y 2 1.00 2.59 0.30 0.50 0.39
EJE A, ENTRE EJE 2 y 3 1.00 1.30 0.30 0.50 0.20
EJE A, ENTRE EJE 3 y 4 1.00 2.69 0.30 0.50 0.40
EJE B, ENTRE EJE 1 y 2 1.00 2.59 0.30 0.50 0.39
EJE B, ENTRE EJE 2 y 3 1.00 1.30 0.30 0.50 0.20
EJE B, ENTRE EJE 3 y 4 1.00 2.69 0.30 0.50 0.40
EJE C, ENTRE EJE 1 y 2 1.00 2.59 0.30 0.50 0.39
EJE C, ENTRE EJE 2 y 3 1.00 1.30 0.30 0.50 0.20
EJE C, ENTRE EJE 3 y 4 1.00 2.69 0.30 0.50 0.40
EJE D, ENTRE EJE 1 y 2 1.00 2.59 0.30 0.50 0.39
EJE D, ENTRE EJE 2 y 3 1.00 1.30 0.30 0.50 0.20
EJE D, ENTRE EJE 3 y 4 1.00 2.69 0.30 0.50 0.40
EJE E, ENTRE EJE 1 y 2 1.00 2.59 0.30 0.50 0.39
EJE E, ENTRE EJE 2 y 3 1.00 1.30 0.30 0.50 0.20
EJE E, ENTRE EJE 3 y 4 1.00 2.69 0.30 0.50 0.40
EJE F, ENTRE EJE 1 y 2 1.00 2.59 0.30 0.50 0.39
EJE F, ENTRE EJE 2 y 3 1.00 1.30 0.30 0.50 0.20
EJE F, ENTRE EJE 3 y 4 1.00 2.69 0.30 0.50 0.40
EJE G, ENTRE EJE 1 y 2 1.00 2.59 0.30 0.50 0.39
EJE G, ENTRE EJE 2 y 3 1.00 1.30 0.30 0.50 0.20
EJE G, ENTRE EJE 3 y 4 1.00 2.69 0.30 0.50 0.40
EJE H, ENTRE EJE 1 y 2 1.00 2.59 0.30 0.50 0.39
EJE H, ENTRE EJE 2 y 3 1.00 1.30 0.30 0.50 0.20
EJE H, ENTRE EJE 3 y 4 1.00 2.69 0.30 0.50 0.40
EJE I, ENTRE EJE 1 y 2 1.00 2.59 0.30 0.50 0.39
EJE I, ENTRE EJE 2 y 3 1.00 1.30 0.30 0.50 0.20
EJE I, ENTRE EJE 3 y 4 1.00 2.69 0.30 0.50 0.40
EJE J, ENTRE EJE 1 y 2 1.00 2.59 0.30 0.50 0.39
EJE J, ENTRE EJE 2 y 3 1.00 1.30 0.30 0.50 0.20
EJE J, ENTRE EJE 3 y 4 1.00 2.69 0.30 0.50 0.40

09.01.04.02.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CONEXIÓN M2 125.90


BLOQUE HOSPITALIZACION
EJE 1, ENTRE EJE A y B 2.00 3.02 0.60 3.62
EJE 1, ENTRE EJE B y C 2.00 1.80 0.60 2.16
EJE 1, ENTRE EJE C y D 2.00 3.35 0.60 4.02
EJE 1, ENTRE EJE D y E 2.00 1.45 0.60 1.74
EJE 1, ENTRE EJE F y G 2.00 3.30 0.60 3.96
EJE 1, ENTRE EJE G y H 2.00 1.80 0.60 2.16
EJE 1, ENTRE EJE H y I 2.00 3.40 0.60 4.08
EJE 1, ENTRE EJE I y J 2.00 1.47 0.50 1.47
EJE 2, ENTRE EJE A y B 2.00 3.02 0.60 3.62
EJE 2, ENTRE EJE D y E 2.00 1.45 0.60 1.74
EJE 2, ENTRE EJE I y J 2.00 1.47 0.50 1.47
EJE 3, ENTRE EJE A y B 2.00 3.02 0.60 3.62
EJE 3, ENTRE EJE D y E 2.00 1.45 0.60 1.74
EJE 3, ENTRE EJE I y J 2.00 1.47 0.50 1.47
EJE 4, ENTRE EJE A y B 2.00 3.02 0.60 3.62
EJE 4, ENTRE EJE B y C 2.00 1.80 0.60 2.16
EJE 4, ENTRE EJE C y D 2.00 3.35 0.60 4.02
EJE 4, ENTRE EJE D y E 2.00 1.45 0.60 1.74
EJE 4, ENTRE EJE F y G 2.00 3.30 0.60 3.96
EJE 4, ENTRE EJE G y H 2.00 1.80 0.60 2.16
EJE 4, ENTRE EJE H y I 2.00 3.40 0.60 4.08
EJE 4, ENTRE EJE I y J 2.00 1.47 0.50 1.47
EJE A, ENTRE EJE 1 y 2 2.00 2.59 0.50 2.59
EJE A, ENTRE EJE 2 y 3 2.00 1.30 0.50 1.30
EJE A, ENTRE EJE 3 y 4 2.00 2.69 0.50 2.69
EJE B, ENTRE EJE 1 y 2 2.00 2.59 0.50 2.59
EJE B, ENTRE EJE 2 y 3 2.00 1.30 0.50 1.30
EJE B, ENTRE EJE 3 y 4 2.00 2.69 0.50 2.69
EJE C, ENTRE EJE 1 y 2 2.00 2.59 0.50 2.59
EJE C, ENTRE EJE 2 y 3 2.00 1.30 0.50 1.30
EJE C, ENTRE EJE 3 y 4 2.00 2.69 0.50 2.69
EJE D, ENTRE EJE 1 y 2 2.00 2.59 0.50 2.59
EJE D, ENTRE EJE 2 y 3 2.00 1.30 0.50 1.30
EJE D, ENTRE EJE 3 y 4 2.00 2.69 0.50 2.69
EJE E, ENTRE EJE 1 y 2 2.00 2.59 0.50 2.59
EJE E, ENTRE EJE 2 y 3 2.00 1.30 0.50 1.30
EJE E, ENTRE EJE 3 y 4 2.00 2.69 0.50 2.69
EJE F, ENTRE EJE 1 y 2 2.00 2.59 0.50 2.59
EJE F, ENTRE EJE 2 y 3 2.00 1.30 0.50 1.30
EJE F, ENTRE EJE 3 y 4 2.00 2.69 0.50 2.69
EJE G, ENTRE EJE 1 y 2 2.00 2.59 0.50 2.59
EJE G, ENTRE EJE 2 y 3 2.00 1.30 0.50 1.30
EJE G, ENTRE EJE 3 y 4 2.00 2.69 0.50 2.69
EJE H, ENTRE EJE 1 y 2 2.00 2.59 0.50 2.59
EJE H, ENTRE EJE 2 y 3 2.00 1.30 0.50 1.30
EJE H, ENTRE EJE 3 y 4 2.00 2.69 0.50 2.69
EJE I, ENTRE EJE 1 y 2 2.00 2.59 0.50 2.59
EJE I, ENTRE EJE 2 y 3 2.00 1.30 0.50 1.30
EJE I, ENTRE EJE 3 y 4 2.00 2.69 0.50 2.69
EJE J, ENTRE EJE 1 y 2 2.00 2.59 0.50 2.59
EJE J, ENTRE EJE 2 y 3 2.00 1.30 0.50 1.30
EJE J, ENTRE EJE 3 y 4 2.00 2.69 0.50 2.69

09.01.04.02.03 ACERO PARA VIGAS DE CONEXIÓN F'y= 4200 Kg/Cm2 KG 3534.60


(VER METRADO ACERO) 3534.60 3534.60

09.01.04.04 COLUMNAS
09.01.04.04.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 M3 88.59
BLOQUE HOSPITALIZACION
PRIMER PISO C-3 2.00 0.60 0.30 5.50 1.98
C-4 2.00 Secc.= 0.30 5.50 3.30
C-1A 12.00 Secc.= 0.27 5.50 17.82
C-2A 11.00 Secc.= 0.27 5.50 16.34
C-1B 10.00 Secc.= 0.27 5.50 14.85
C-2B 2.00 Secc.= 0.27 5.50 2.97
C-5 1.00 0.60 0.40 5.50 1.32

SEGUNDO PISO C-3 2.00 0.60 0.30 4.05 1.46


C-4 2.00 Secc.= 0.30 4.05 2.43
C-1A 12.00 Secc.= 0.27 4.05 13.12
C-2A 11.00 Secc.= 0.27 4.05 12.03
C-5 1.00 0.60 0.40 4.05 0.97

09.01.04.04.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS M2 803.99


BLOQUE HOSPITALIZACION
PRIMER PISO
C-3 2.00 Perimetro= 1.80 5.00 18.00
C-4 2.00 Perimetro= 2.60 5.00 26.00
C-1A 12.00 Perimetro= 2.40 5.00 144.00
C-2A 11.00 Perimetro= 2.40 5.00 132.00
C-1B 10.00 Perimetro= 2.40 5.00 120.00
C-2B 2.00 Perimetro= 2.40 5.00 24.00
C-5 1.00 Perimetro= 2.00 5.00 10.00

SEGUNDO PISO C-3 2.00 Perimetro= 1.80 5.00 18.00


C-4 2.00 Perimetro= 2.60 5.00 26.00
C-1A 12.00 Perimetro= 2.40 5.00 144.00
C-2A 11.00 Perimetro= 2.40 5.00 132.00
C-5 1.00 Perimetro= 2.00 5.00 10.00

09.01.04.04.03 ACERO PARA COLUMNAS F'y= 4200 Kg/Cm2 KG 22679.63


(VER METRADO ACERO) 22679.63 22679.63

09.01.04.05 VIGAS
09.01.04.05.01 CONCRETO EN VIGAS f'c=210 kg/cm2 M3 46.23
BLOQUE HOSPITALIZACION
PRIMER PISO EJE 1, ENTRE A-B 1.00 4.42 0.30 0.50 0.66
EJE 1, ENTRE B-C 1.00 3.00 0.30 0.50 0.45
EJE 1, ENTRE C-D 1.00 4.55 0.30 0.50 0.68
EJE 1, ENTRE D-E 1.00 2.57 0.30 0.50 0.39
EJE 1, ENTRE F-G 1.00 4.43 0.30 0.50 0.66
EJE 1, ENTRE G-H 1.00 3.00 0.30 0.50 0.45
EJE 1, ENTRE H-I 1.00 4.60 0.30 0.50 0.69
EJE 1, ENTRE I-J 1.00 2.82 0.30 0.50 0.42

EJE 2, ENTRE A-B 1.00 4.42 0.30 0.50 0.66


EJE 2, ENTRE B-C 1.00 3.00 0.30 0.50 0.45
EJE 2, ENTRE C-D 1.00 4.55 0.30 0.50 0.68
EJE 2, ENTRE D-E 1.00 2.57 0.30 0.50 0.39
EJE 2, ENTRE F-G 1.00 4.43 0.30 0.50 0.66
EJE 2, ENTRE G-H 1.00 3.00 0.30 0.50 0.45
EJE 2, ENTRE H-I 1.00 4.60 0.30 0.50 0.69
EJE 2, ENTRE I-J 1.00 2.82 0.30 0.50 0.42

EJE 3, ENTRE A-B 1.00 4.42 0.30 0.50 0.66


EJE 3, ENTRE B-C 1.00 3.00 0.30 0.50 0.45
EJE 3, ENTRE C-D 1.00 4.55 0.30 0.50 0.68
EJE 3, ENTRE D-E 1.00 2.57 0.30 0.50 0.39
EJE 3, ENTRE F-G 1.00 4.43 0.30 0.50 0.66
EJE 3, ENTRE G-H 1.00 3.00 0.30 0.50 0.45
EJE 3, ENTRE H-I 1.00 4.60 0.30 0.50 0.69
EJE 3, ENTRE I-J 1.00 2.82 0.30 0.50 0.42

EJE 4, ENTRE A-B 1.00 4.42 0.30 0.50 0.66


EJE 4, ENTRE B-C 1.00 3.00 0.30 0.50 0.45
EJE 4, ENTRE C-D 1.00 4.55 0.30 0.50 0.68
EJE 4, ENTRE D-E 1.00 2.57 0.30 0.50 0.39
EJE 4, ENTRE F-G 1.00 4.43 0.30 0.50 0.66
EJE 4, ENTRE G-H 1.00 3.00 0.30 0.50 0.45
EJE 4, ENTRE H-I 1.00 4.60 0.30 0.50 0.69
EJE 4, ENTRE I-J 1.00 2.82 0.30 0.50 0.42

EJE A, ENTRE 1-2 1.00 3.94 0.30 0.50 0.59


EJE A, ENTRE 2-3 1.00 2.80 0.30 0.50 0.42
EJE A, ENTRE 3-4 1.00 4.14 0.30 0.50 0.62

EJE B, ENTRE 1-2 1.00 3.94 0.30 0.50 0.59


EJE B, ENTRE 2-3 1.00 2.80 0.30 0.50 0.42
EJE B, ENTRE 3-4 1.00 4.14 0.30 0.50 0.62
EJE C, ENTRE 1-2 1.00 3.94 0.30 0.50 0.59
EJE C, ENTRE 2-3 1.00 2.80 0.30 0.50 0.42
EJE C, ENTRE 3-4 1.00 4.14 0.30 0.50 0.62

EJE D, ENTRE 1-2 1.00 3.94 0.30 0.50 0.59


EJE D, ENTRE 2-3 1.00 2.80 0.30 0.50 0.42
EJE D, ENTRE 3-4 1.00 4.14 0.30 0.50 0.62

EJE E, ENTRE 1-2 1.00 3.94 0.30 0.50 0.59


EJE E, ENTRE 2-3 1.00 2.80 0.30 0.50 0.42
EJE E, ENTRE 3-4 1.00 4.14 0.30 0.50 0.62

EJE F, ENTRE 1-2 1.00 3.94 0.30 0.50 0.59


EJE F, ENTRE 2-3 1.00 2.80 0.30 0.50 0.42
EJE F, ENTRE 3-4 1.00 4.14 0.30 0.50 0.62

EJE G, ENTRE 1-2 1.00 3.94 0.30 0.50 0.59


EJE G, ENTRE 2-3 1.00 2.80 0.30 0.50 0.42
EJE G, ENTRE 3-4 1.00 4.14 0.30 0.50 0.62

EJE H, ENTRE 1-2 1.00 3.94 0.30 0.50 0.59


EJE H, ENTRE 2-3 1.00 2.80 0.30 0.50 0.42
EJE H, ENTRE 3-4 1.00 4.14 0.30 0.50 0.62

EJE I, ENTRE 1-2 1.00 3.94 0.30 0.50 0.59


EJE I, ENTRE 2-3 1.00 2.80 0.30 0.50 0.42
EJE I, ENTRE 3-4 1.00 4.14 0.30 0.50 0.62

EJE J, ENTRE 1-2 1.00 3.94 0.30 0.50 0.59


EJE J, ENTRE 2-3 1.00 2.80 0.30 0.50 0.42
EJEJ, ENTRE 3-4 1.00 4.14 0.30 0.50 0.62

SEGUNDO PISO EJE 1, ENTRE A-B 1.00 4.42 0.30 0.40 0.53
EJE 1, ENTRE B-C 1.00 3.00 0.30 0.40 0.36
EJE 1, ENTRE C-D 1.00 4.55 0.30 0.40 0.55
EJE 1, ENTRE D-E 1.00 2.57 0.30 0.40 0.31
EJE 1, ENTRE F-G 1.00 4.43 0.30 0.40 0.53
EJE 1, ENTRE G-H 1.00 3.00 0.30 0.40 0.36
EJE 1, ENTRE H-I 1.00 4.60 0.30 0.40 0.55
EJE 1, ENTRE I-J 1.00 2.82 0.30 0.40 0.34

EJE 4, ENTRE A-B 1.00 4.42 0.30 0.40 0.53


EJE 4, ENTRE B-C 1.00 3.00 0.30 0.40 0.36
EJE 4, ENTRE C-D 1.00 4.55 0.30 0.40 0.55
EJE 4, ENTRE D-E 1.00 2.57 0.30 0.40 0.31
EJE 4, ENTRE F-G 1.00 4.43 0.30 0.40 0.53
EJE 4, ENTRE G-H 1.00 3.00 0.30 0.40 0.36
EJE 4, ENTRE H-I 1.00 4.60 0.30 0.40 0.55
EJE 4, ENTRE I-J 1.00 2.82 0.30 0.40 0.34

EJE A, ENTRE 1-2 1.00 3.94 0.30 0.40 0.47


EJE A, ENTRE 2-3 1.00 2.80 0.30 0.40 0.34
EJE A, ENTRE 3-4 1.00 4.14 0.30 0.40 0.50

EJE E, ENTRE 1-2 1.00 3.94 0.30 0.40 0.47


EJE E, ENTRE 2-3 1.00 2.80 0.30 0.40 0.34
EJE E, ENTRE 3-4 1.00 4.14 0.30 0.40 0.50

EJE F, ENTRE 1-2 1.00 3.94 0.30 0.40 0.47


EJE F, ENTRE 2-3 1.00 2.80 0.30 0.40 0.34
EJE F, ENTRE 3-4 1.00 4.14 0.30 0.40 0.50

EJE J, ENTRE 1-2 1.00 3.94 0.30 0.40 0.47


EJE J, ENTRE 2-3 1.00 2.80 0.30 0.40 0.34
EJEJ, ENTRE 3-4 1.00 4.14 0.30 0.40 0.50

09.01.04.05.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS M2 316.25


BLOQUE HOSPITALIZACION
PRIMER PISO EJE 1, ENTRE A-B 1.00 4.42 0.90 3.98
EJE 1, ENTRE B-C 1.00 3.00 0.90 2.70
EJE 1, ENTRE C-D 1.00 4.55 0.90 4.10
EJE 1, ENTRE D-E 1.00 2.57 0.90 2.31
EJE 1, ENTRE F-G 1.00 4.43 0.90 3.99
EJE 1, ENTRE G-H 1.00 3.00 0.90 2.70
EJE 1, ENTRE H-I 1.00 4.60 0.90 4.14
EJE 1, ENTRE I-J 1.00 2.82 0.90 2.54

EJE 2, ENTRE A-B 1.00 4.42 0.90 3.98


EJE 2, ENTRE B-C 1.00 3.00 0.90 2.70
EJE 2, ENTRE C-D 1.00 4.55 0.90 4.10
EJE 2, ENTRE D-E 1.00 2.57 0.90 2.31
EJE 2, ENTRE F-G 1.00 4.43 0.90 3.99
EJE 2, ENTRE G-H 1.00 3.00 0.90 2.70
EJE 2, ENTRE H-I 1.00 4.60 0.90 4.14
EJE 2, ENTRE I-J 1.00 2.82 0.90 2.54

EJE 3, ENTRE A-B 1.00 4.42 0.90 3.98


EJE 3, ENTRE B-C 1.00 3.00 0.90 2.70
EJE 3, ENTRE C-D 1.00 4.55 0.90 4.10
EJE 3, ENTRE D-E 1.00 2.57 0.90 2.31
EJE 3, ENTRE F-G 1.00 4.43 0.90 3.99
EJE 3, ENTRE G-H 1.00 3.00 0.90 2.70
EJE 3, ENTRE H-I 1.00 4.60 0.90 4.14
EJE 3, ENTRE I-J 1.00 2.82 0.90 2.54

EJE 4, ENTRE A-B 1.00 4.42 0.90 3.98


EJE 4, ENTRE B-C 1.00 3.00 0.90 2.70
EJE 4, ENTRE C-D 1.00 4.55 0.90 4.10
EJE 4, ENTRE D-E 1.00 2.57 0.90 2.31
EJE 4, ENTRE F-G 1.00 4.43 0.90 3.99
EJE 4, ENTRE G-H 1.00 3.00 0.90 2.70
EJE 4, ENTRE H-I 1.00 4.60 0.90 4.14
EJE 4, ENTRE I-J 1.00 2.82 0.90 2.54

EJE A, ENTRE 1-2 1.00 3.94 0.90 3.55


EJE A, ENTRE 2-3 1.00 2.80 0.90 2.52
EJE A, ENTRE 3-4 1.00 4.14 0.90 3.73

EJE B, ENTRE 1-2 1.00 3.94 0.90 3.55


EJE B, ENTRE 2-3 1.00 2.80 0.90 2.52
EJE B, ENTRE 3-4 1.00 4.14 0.90 3.73

EJE C, ENTRE 1-2 1.00 3.94 0.90 3.55


EJE C, ENTRE 2-3 1.00 2.80 0.90 2.52
EJE C, ENTRE 3-4 1.00 4.14 0.90 3.73

EJE D, ENTRE 1-2 1.00 3.94 0.90 3.55


EJE D, ENTRE 2-3 1.00 2.80 0.90 2.52
EJE D, ENTRE 3-4 1.00 4.14 0.90 3.73

EJE E, ENTRE 1-2 1.00 3.94 0.90 3.55


EJE E, ENTRE 2-3 1.00 2.80 0.90 2.52
EJE E, ENTRE 3-4 1.00 4.14 0.90 3.73

EJE F, ENTRE 1-2 1.00 3.94 0.90 3.55


EJE F, ENTRE 2-3 1.00 2.80 0.90 2.52
EJE F, ENTRE 3-4 1.00 4.14 0.90 3.73

EJE G, ENTRE 1-2 1.00 3.94 0.90 3.55


EJE G, ENTRE 2-3 1.00 2.80 0.90 2.52
EJE G, ENTRE 3-4 1.00 4.14 0.90 3.73

EJE H, ENTRE 1-2 1.00 3.94 0.90 3.55


EJE H, ENTRE 2-3 1.00 2.80 0.90 2.52
EJE H, ENTRE 3-4 1.00 4.14 0.90 3.73

EJE I, ENTRE 1-2 1.00 3.94 0.90 3.55


EJE I, ENTRE 2-3 1.00 2.80 0.90 2.52
EJE I, ENTRE 3-4 1.00 4.14 0.90 3.73

EJE J, ENTRE 1-2 1.00 3.94 0.90 3.55


EJE J, ENTRE 2-3 1.00 2.80 0.90 2.52
EJEJ, ENTRE 3-4 1.00 4.14 0.90 3.73

SEGUNDO PISO EJE 1, ENTRE A-B 1.00 4.42 1.10 4.86


EJE 1, ENTRE B-C 1.00 3.00 1.10 3.30
EJE 1, ENTRE C-D 1.00 4.55 1.10 5.01
EJE 1, ENTRE D-E 1.00 2.57 1.10 2.83
EJE 1, ENTRE F-G 1.00 4.43 1.10 4.87
EJE 1, ENTRE G-H 1.00 3.00 1.10 3.30
EJE 1, ENTRE H-I 1.00 4.60 1.10 5.06
EJE 1, ENTRE I-J 1.00 2.82 1.10 3.10

EJE 4, ENTRE A-B 1.00 4.42 1.10 4.86


EJE 4, ENTRE B-C 1.00 3.00 1.10 3.30
EJE 4, ENTRE C-D 1.00 4.55 1.10 5.01
EJE 4, ENTRE D-E 1.00 2.57 1.10 2.83
EJE 4, ENTRE F-G 1.00 4.43 1.10 4.87
EJE 4, ENTRE G-H 1.00 3.00 1.10 3.30
EJE 4, ENTRE H-I 1.00 4.60 1.10 5.06
EJE 4, ENTRE I-J 1.00 2.82 1.10 3.10

EJE A, ENTRE 1-2 1.00 3.94 1.10 4.33


EJE A, ENTRE 2-3 1.00 2.80 1.10 3.08
EJE A, ENTRE 3-4 1.00 4.14 1.10 4.55

EJE E, ENTRE 1-2 1.00 3.94 1.10 4.33


EJE E, ENTRE 2-3 1.00 2.80 1.10 3.08
EJE E, ENTRE 3-4 1.00 4.14 1.10 4.55

EJE F, ENTRE 1-2 1.00 3.94 1.10 4.33


EJE F, ENTRE 2-3 1.00 2.80 1.10 3.08
EJE F, ENTRE 3-4 1.00 4.14 1.10 4.55

EJE J, ENTRE 1-2 1.00 3.94 1.10 4.33


EJE J, ENTRE 2-3 1.00 2.80 1.10 3.08
EJEJ, ENTRE 3-4 1.00 4.14 1.10 4.55

09.01.04.05.03 ACERO PARA VIGAS F'y= 4200 Kg/Cm2 KG 5518.56


(VER METRADO ACERO) 5518.56 5518.56

09.01.04.06 LOSAS ALIGERADAS

09.01.04.06.01 CONCRETO PARA LOSA ALIGERADA F'C=210 KG/CM2 M3 40.84


BLOQUE HOSPITALIZACION f (m3/m2)
PRIMER PISO ENTRE 1-2, ENTRE A-B 1.00 4.92 4.64 0.1156 2.64
DOBLE SENTIDO ENTRE 1-2, ENTRE B-C 1.00 4.64 3.40 0.1156 1.82
ENTRE 1-2, ENTRE C-D 1.00 4.95 4.64 0.1156 2.66
ENTRE 1-2, ENTRE D-E 1.00 4.64 3.07 0.1156 1.65
ENTRE 1-2, ENTRE F-G 1.00 4.93 4.64 0.1156 2.64
ENTRE 1-2, ENTRE G-H 1.00 4.64 3.40 0.1156 1.82
ENTRE 1-2, ENTRE H-I 1.00 5.00 4.64 0.1156 2.68
ENTRE 1-2, ENTRE I-J 1.00 4.64 3.32 0.1156 1.78
UN SENTIDO ENTRE 2-3, ENTRE A-B 1.00 4.92 2.80 0.0875 1.21
ENTRE 2-3, ENTRE B-C 1.00 3.40 2.80 0.0875 0.83
ENTRE 2-3, ENTRE C-D 1.00 4.95 2.80 0.0875 1.21
ENTRE 2-3, ENTRE D-E 1.00 3.07 2.80 0.0875 0.75
ENTRE 2-3, ENTRE F-G 1.00 4.93 2.80 0.0875 1.21
ENTRE 2-3, ENTRE G-H 1.00 3.40 2.80 0.0875 0.83
ENTRE 2-3, ENTRE H-I 1.00 5.00 2.80 0.0875 1.23
ENTRE 2-3, ENTRE I-J 1.00 3.32 2.80 0.0875 0.81
DOBLE SENTIDO ENTRE 3-4, ENTRE B-C 1.00 3.40 4.64 0.1156 1.82
ENTRE 3-4, ENTRE C-D 1.00 4.95 4.64 0.1156 2.66
ENTRE 3-4, ENTRE D-E 1.00 3.07 4.64 0.1156 1.65
ENTRE 3-4, ENTRE F-G 1.00 4.93 4.64 0.1156 2.64
ENTRE 3-4, ENTRE G-H 1.00 3.40 4.64 0.1156 1.82
ENTRE 3-4, ENTRE H-I 1.00 5.00 4.64 0.1156 2.68
ENTRE 3-4, ENTRE I-J 1.00 3.32 4.64 0.1156 1.78

09.01.04.06.02 ENCOFRADO Y DESENCOFRADO PARA LOSAS M2 375.69


BLOQUE HOSPITALIZACION
PRIMER PISO
ENTRE 1-2, ENTRE A-B 1.00 4.92 4.64 22.83
ENTRE 1-2, ENTRE B-C 1.00 4.64 3.40 15.78
ENTRE 1-2, ENTRE C-D 1.00 4.95 4.64 22.97
ENTRE 1-2, ENTRE D-E 1.00 4.64 3.07 14.24
ENTRE 1-2, ENTRE F-G 1.00 4.93 4.64 22.88
ENTRE 1-2, ENTRE G-H 1.00 4.64 3.40 15.78
ENTRE 1-2, ENTRE H-I 1.00 5.00 4.64 23.20
ENTRE 1-2, ENTRE I-J 1.00 4.64 3.32 15.40
ENTRE 2-3, ENTRE A-B 1.00 4.92 2.80 13.78
ENTRE 2-3, ENTRE B-C 1.00 3.40 2.80 9.52
ENTRE 2-3, ENTRE C-D 1.00 4.95 2.80 13.86
ENTRE 2-3, ENTRE D-E 1.00 3.07 2.80 8.60
ENTRE 2-3, ENTRE F-G 1.00 4.93 2.80 13.80
ENTRE 2-3, ENTRE G-H 1.00 3.40 2.80 9.52
ENTRE 2-3, ENTRE H-I 1.00 5.00 2.80 14.00
ENTRE 2-3, ENTRE I-J 1.00 3.32 2.80 9.30
ENTRE 3-4, ENTRE B-C 1.00 3.40 4.64 15.78
ENTRE 3-4, ENTRE C-D 1.00 4.95 4.64 22.97
ENTRE 3-4, ENTRE D-E 1.00 3.07 4.64 14.24
ENTRE 3-4, ENTRE F-G 1.00 4.93 4.64 22.88
ENTRE 3-4, ENTRE G-H 1.00 3.40 4.64 15.78
ENTRE 3-4, ENTRE H-I 1.00 5.00 4.64 23.20
ENTRE 3-4, ENTRE I-J 1.00 3.32 4.64 15.40

09.01.04.06.04 LADRILLO HUECO DE ARCILLA 30X30X15 CM PARA TECHO ALIGERADO UND 2542.00
BLOQUE HOSPITALIZACION f(und/m2)

DOBLE DIRECCION ENTRE 1-2, ENTRE A-B 1.00 4.92 4.64 6.25 143.00
ENTRE 1-2, ENTRE B-C 1.00 4.64 3.40 6.25 99.00
ENTRE 1-2, ENTRE C-D 1.00 4.95 4.64 6.25 144.00
ENTRE 1-2, ENTRE D-E 1.00 4.64 3.07 6.25 89.00
ENTRE 1-2, ENTRE F-G 1.00 4.93 4.64 6.25 143.00
ENTRE 1-2, ENTRE G-H 1.00 4.64 3.40 6.25 99.00
ENTRE 1-2, ENTRE H-I 1.00 5.00 4.64 6.25 145.00
ENTRE 1-2, ENTRE I-J 1.00 4.64 3.32 6.25 96.00
UNA DIRECCION ENTRE 2-3, ENTRE A-B 1.00 4.92 2.80 8.33 115.00
ENTRE 2-3, ENTRE B-C 1.00 3.40 2.80 8.33 79.00
ENTRE 2-3, ENTRE C-D 1.00 4.95 2.80 8.33 115.00
ENTRE 2-3, ENTRE D-E 1.00 3.07 2.80 8.33 72.00
ENTRE 2-3, ENTRE F-G 1.00 4.93 2.80 8.33 115.00
ENTRE 2-3, ENTRE G-H 1.00 3.40 2.80 8.33 79.00
ENTRE 2-3, ENTRE H-I 1.00 5.00 2.80 8.33 117.00
ENTRE 2-3, ENTRE I-J 1.00 3.32 2.80 8.33 77.00
DOBLE DIRECCION ENTRE 3-4, ENTRE B-C 1.00 3.40 4.64 6.25 99.00
ENTRE 3-4, ENTRE C-D 1.00 4.95 4.64 6.25 144.00
ENTRE 3-4, ENTRE D-E 1.00 3.07 4.64 6.25 89.00
ENTRE 3-4, ENTRE F-G 1.00 4.93 4.64 6.25 143.00
ENTRE 3-4, ENTRE G-H 1.00 3.40 4.64 6.25 99.00
ENTRE 3-4, ENTRE H-I 1.00 5.00 4.64 6.25 145.00
ENTRE 3-4, ENTRE I-J 1.00 3.32 4.64 6.25 96.00

09.01.04.06.05 ACERO PARA LOSAS F'y= 4200 Kg/Cm2 KG 3024.71


(VER METRADO ACERO) 3024.71 3024.71

09.01.04.09 ESCALERAS
09.01.04.09.01 CONCRETO EN ESCALERAS f'c=210 kg/cm2 M3 14.77
BLOQUE HOSPITALIZACION
TRAMO 01 1.00 Secc.= 1.48 2.60 3.85
TRAMO 02, TRAMO 04 2.00 Secc.= 1.40 2.60 7.28
TRAMO 03 1.00 Secc.= 1.40 2.60 3.65

09.01.04.09.02 ENCOFRADO Y DESENCOFRADO PARA ESCALERAS M2 86.12


BLOQUE HOSPITALIZACION
TRAMO 01
LATERAL 1.00 Secc.= 1.32 1.32
CONTRAPASO 11.00 2.60 0.16 4.62
BASE 1.00 5.47 2.60 14.22
TRAMO 02 Y TRAMO 04
LATERAL 2.00 Secc.= 1.40 2.80
CONTRAPASO 22.00 2.60 0.16 9.23
BASE 2.00 6.14 2.60 31.93
TRAMO 03
LATERAL 1.00 Secc.= 1.40 1.40
CONTRAPASO 11.00 2.60 0.16 4.62
BASE 1.00 6.15 2.60 15.99

09.01.04.09.03 ACERO EN ESCALERAS F'y= 4200 Kg/Cm2 KG 1448.65


(VER METRADO ACERO) 1448.65 1448.65

09.01.05 VARIOS

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 57.00


09.01.05.01
EN ZAPATAS (7,14,28 Días) 1.00 15.00 15.00
EN COLUMNAS (7,14,28 Días) 1.00 27.00 27.00
EN LOSA ALIGERADA (7,14,28 Días) 1.00 12.00 12.00
EN ESCALERAS (7,14,28 Días) 1.00 3.00 3.00

09.01.05 ESTRUCTURAS METALICAS


09.01.05.01 TIJERALES PRINCIPALES
09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 6 UND 10.00
10.00 10.00

09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 6 PZA 10.00


10.00 10.00

09.01.05.01 APOYOS Y FIJACION


09.01.05.01 SISTEMA DE APOYO FIJO EN TIJERAL METALICO UND 10.00 10.00 10.00

09.01.05.01 DISPOSITIVO DE APOYO MOVIL EN TIJERAL METALICO UND 10.00 10.00 10.00

09.01.05.01 TEMPLADORES
09.01.05.01 TENSOR DE 5/8" EN ARRIOSTRE DE TIJERALES ML 278.40
ENTRE A-B 4.00 9.10 36.40
ENTRE B-C 4.00 8.30 33.20
ENTRE C-D 4.00 9.10 36.40
ENTRE D-E 4.00 8.30 33.20
ENTRE F-G 4.00 9.10 36.40
ENTRE G-H 4.00 8.30 33.20
ENTRE H-I 4.00 9.10 36.40
ENTRE I-J 4.00 8.30 33.20
0.00

09.01.05.01 CORREAS METALICAS


09.01.05.01 CORREA METALICA PERFIL C6X8.2 ML 12.00 36.90 442.80 442.80
HOJA DE M
OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD
FÓRMULA : ESTRUCTURAS
01 -BLOQUE HOSPITALIZACION
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA

Obs: Traslape Normal: para acero vertical y acero horizontal con H<0.30m
Traslape Superior: para horizontal con H>0.30m
(H=Peralte efectivo)

Datos Dimensiones

item descripción Cantidad Tipo


descripción Ø

09.01.04.01 ZAPATAS
09.01.04.01.02 ACERO PARA ZAPATAS F'y= 4200 Kg/Cm2
BLOQUE HOSPITALIZACION
Z-1 2 Normal Acero Longitudinal 3/4 ''
2 Normal Acero Transversal 3/4 ''

Z-2 12 Normal Acero Longitudinal 3/4 ''


12 Normal Acero Transversal 3/4 ''

Z-3 2 Normal Acero Longitudinal 3/4 ''


2 Normal Acero Transversal 3/4 ''

Z-4 1 Normal Acero Longitudinal 3/4 ''


1 Normal Acero Transversal 3/4 ''

Z-5 1 Normal Acero Longitudinal 3/4 ''


1 Normal Acero Transversal 3/4 ''

Z-6 2 Normal Acero Longitudinal 3/4 ''


2 Normal Acero Transversal 3/4 ''

Z-7 12 Normal Acero Longitudinal 3/4 ''


12 Normal Acero Transversal 3/4 ''

Z-8 2 Normal Acero Longitudinal Inf. 3/4 ''


2 Normal Acero Transversal Inf. 3/4 ''
2 Normal Acero Longitudinal Sup. 3/4 ''
2 Normal Acero Transversal Sup. 3/4 ''

Z-9 2 Normal Acero Longitudinal Inf. 3/4 ''


2 Normal Acero Transversal Inf. 3/4 ''
2 Normal Acero Longitudinal Sup. 3/4 ''
2 Normal Acero Transversal Sup. 3/4 ''

Total ml
Total piezas
Kg
Total Kg

05.02.00 VIGAS DE CONEXIÓN


05.02.03 ACERO PARA VIGAS DE CIMENTACION F'y= 4200 Kg/Cm2
BLOQUE HOSPITALIZACION
EJE 1 y 4, ENTRE EJE A y J 2 Normal Acero Longitudinal Superior 3/4 ''
2 Normal Acero Longitudinal Superior 5/8 ''
2 Normal Acero refuerzo superior 3/4 ''
2 Normal Acero Longitudinal inferior 3/4 ''
2 Normal Acero Longitudinal inferior 5/8 ''
2 Normal Estribos 3/8 ''
2 Normal Estribos 3/8 ''

EJE 2 y 3, ENTRE EJE A y B 2 Normal Acero Longitudinal Superior 3/4 ''


2 Normal Acero Longitudinal Superior 5/8 ''
2 Normal Acero refuerzo superior 3/4 ''
2 Normal Acero Longitudinal inferior 3/4 ''
2 Normal Acero Longitudinal inferior 5/8 ''
2 Normal Estribos 3/8 ''

EJE A a J, ENTRE EJE 1 y 4 10 Normal Acero Longitudinal Superior 3/4 ''


10 Normal Acero refuerzo superior 3/4 ''
10 Normal Acero Longitudinal inferior 3/4 ''
10 Normal Estribos 3/8 ''
Total ml
Total piezas
Kg
Total Kg

05.03.00 COLUMNAS
05.03.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2
BLOQUE HOSPITALIZACION
C-3 2 Normal Acero Longitudinal 3/4 ''
2 Normal Acero Longitudinal 5/8 ''
2 Normal Estribos 3/8 ''
2 Normal Estribos 3/8 ''
C-4 2 Normal Acero Longitudinal 3/4 ''
2 Normal Acero Longitudinal 5/8 ''
2 Normal Estribos 3/8 ''
2 Normal Estribos 3/8 ''
C-1A 12 Normal Acero Longitudinal 3/4 ''
12 Normal Acero Longitudinal 5/8 ''
12 Normal Estribos 3/8 ''
12 Normal Estribos 3/8 ''
C-2A 11 Normal Acero Longitudinal 3/4 ''
11 Normal Acero Longitudinal 5/8 ''
11 Normal Estribos 3/8 ''
11 Normal Estribos 3/8 ''
C-1B 10 Normal Acero Longitudinal 3/4 ''
10 Normal Estribos 5/8 ''
10 Normal Estribos 3/8 ''
10 Normal Estribos 3/8 ''
C-2B 2 Normal Acero Longitudinal 3/4 ''
2 Normal Acero Longitudinal 5/8 ''
2 Normal Estribos 3/8 ''
2 Normal Estribos 3/8 ''
C-5 1 Normal Acero Longitudinal 3/4 ''
1 Normal Acero Longitudinal 5/8 ''
1 Normal Estribos 3/8 ''
1 Normal Estribos 3/8 ''

Total ml
Total piezas
Kg
Total Kg

05.05.00 VIGAS
05.05.03 ACERO PARA VIGAS F'y= 4200 Kg/Cm2

Primer Piso
V- 101 al 104(0.30 x 0.50)
EJE 1,2,3,4 ENTRE A-J 4 Normal Acero Long. Inferior 3/4 ''
4 Normal Acero Long. Superior 3/4 ''
4 Normal Refuerzo inferior 5/8 ''
4 Normal Refuerzo Superior 3/4 ''
4 Normal Estribos 3/8 ''
V-105 al 114 (0.25 x 0.50)
EJE A al J ENTRE 1-4 10 Normal Acero Long. Inferior 5/8 ''
10 Normal Acero Long. Superior 5/8 ''
10 Normal Refuerzo Superior 3/4 ''
10 Normal Estribos 3/8 ''

Segundo Piso
V- 201 y 204(0.30 x 0.40)
EJE 1 y 4 ENTRE A-J 2 Normal Acero Long. Inferior 1/2 ''
2 Normal Acero Long. Superior 1/2 ''
2 Normal Estribos 3/8 ''

V-205,209,210, 214 (0.25 x 0.40)


EJE A al J ENTRE 1-4 4 Normal Acero Long. Inferior 1/2 ''
4 Normal Acero Long. Superior 1/2 ''
4 Normal Estribos 3/8 ''

Total ml
Total piezas
Kg
Total Kg

05.06.00 LOSAS ALIGERADAS


05.06.03 ACERO PARA LOSAS F'y= 4200 Kg/Cm2
BLOQUE HOSPITALIZACION
PRIMER PISO
LOSA SENTIDO 1
ENTRE 1-2, ENTRE A-E
Baston Superior 1 Normal 1/2 ''
Baston Superior 1 Normal 3/8 ''
Baston Inferior 1 Normal 1/2 ''

ENTRE 3-4, ENTRE A-E


Baston Superior 1 Normal 1/2 ''
Baston Superior 1 Normal 3/8 ''
Baston Inferior 1 Normal 1/2 ''
ENTRE 1-2, ENTRE F-J
Baston Superior 1 Normal 1/2 ''
Baston Superior 1 Normal 3/8 ''
Baston Inferior 1 Normal 1/2 ''

ENTRE 3-4, ENTRE B-J


Baston Superior 1 Normal 1/2 ''
Baston Superior 1 Normal 3/8 ''
Baston Inferior 1 Normal 1/2 ''

LOSA SENTIDO 2
ENTRE A-B, ENTRE 1-3
Baston Superior 1 Normal 1/2 ''
Baston Superior 1 Normal 3/8 ''
Baston Inferior 1 Normal 1/2 ''

ENTRE B-E, ENTRE 1-4


Baston Superior 1 Normal 1/2 ''
Baston Superior 1 Normal 3/8 ''
Baston Inferior 1 Normal 1/2 ''

ENTRE F-J, ENTRE 1-4


Baston Superior 1 Normal 1/2 ''
Baston Superior 1 Normal 3/8 ''
Baston Inferior 1 Normal 1/2 ''

Total ml
Total piezas
Kg
Total Kg

05.07.00 ESCALERAS
05.07.03 ACERO EN ESCALERAS F'y= 4200 Kg/Cm2
BLOQUE A - ESTE
TRAMO 01
1 Normal Acero Longitudinal Sup. 1/2 ''
1 Normal Acero Longitudinal Inf. 1/2 ''
1 Normal Acero Longitudinal Inf. 1/2 ''
1 Normal Acero Transv Sup. 3/8 ''
1 Normal Acero Transv Inf. 3/8 ''
TRAMO 02
1 Normal Acero Longitudinal Sup. 1/2 ''
1 Normal Acero Longitudinal Sup. 1/2 ''
1 Normal Acero Longitudinal Inf. 1/2 ''
1 Normal Acero Transv Sup. 3/8 ''
1 Normal Acero Transv Inf. 3/8 ''
TRAMO 03
1 Normal Acero Longitudinal Sup. 1/2 ''
1 Normal Acero Longitudinal Inf. 1/2 ''
1 Normal Acero Longitudinal Inf. 1/2 ''
1 Normal Acero Transv Sup. 3/8 ''
1 Normal Acero Transv Inf. 3/8 ''
TRAMO 04
1 Normal Acero Longitudinal Sup. 1/2 ''
1 Normal Acero Longitudinal Sup. 1/2 ''
1 Normal Acero Longitudinal Inf. 1/2 ''
1 Normal Acero Transv Sup. 3/8 ''
1 Normal Acero Transv Inf. 3/8 ''

Total ml
Total piezas
Kg
Total Kg
HOJA DE METRADOS DE ACERO
S SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO

ф 6mm 8mm 3/8" 1/2" 5/8"


TIPOS DE TRASLAPE: Normal 0.40 0.40 0.40 0.50 0.60
Superior 0.40 0.40 0.45 0.60 0.75
Peso (kg/m) 0.22 0.40 0.56 0.99 1.55

ensiones RESULTADOS
ACERO longitud # 6mm 8mm 3/8 1/2 5/8
# de piezas s/emp emp. ML ML ML ML ML

7 1.26 - - - - - -
7 1.26 - - - - - -

10 1.86 - - - - - -
6 0.96 - - - - - -
- - - - - -
- - - - - -
7 1.21 - - - - - -
7 1.21 - - - - - -
- - - - - -
4 0.61 - - - - - -
8 1.36 - - - - - -
- - - - - -
4 0.66 - - - - - -
8 1.46 - - - - - -
- - - - - -
5 0.91 - - - - - -
10 1.86 - - - - - -
- - - - - -
8 1.46 - - - - - -
7 1.26 - - - - - -
- - - - - -
10 1.81 - - - - - -
7 1.21 - - - - - -
10 1.81 - - - - - -
7 1.21 - - - - - -
- - - - - -
13 2.46 - - - - - -
7 1.16 - - - - - -
13 2.46 - - - - - -
7 1.16 - - - - - -

- - - - -
- - - - -
- - - - -
2119.19

2 37.82 4 - - - - -
1 37.82 4 - - - - 80.44
2 3.11 - - - - - -
2 36.55 4 - - - - -
1 36.55 4 - - - - 77.90
159 1.68 - - - 534.24 - -
21 1.68 - - - 70.56 - -
- - - - -
2 6.29 - - - - - -
1 6.29 - - - - - 12.58
2 3.11 - - - - - -
2 6.29 - - - - - -
1 6.29 - - - - - 12.58
25 1.68 - - - 84.00 - -
- - - - -
2 13.83 1 - - - - -
1 5.70 - - - - - -
2 13.83 1 - - - - -
67 1.48 - - - 991.60 - -
- - 1,680.40 - 183.50
- - 187.00 - 21.00
- - 940.18 - 284.83
3534.60

4 10.75 1 - - - - -
6 10.75 1 - - - - 136.20
63 3.16 - - - 398.16 - -
63 1.87 - - - 235.62 - -
10 10.75 1 - - - - -
4 10.75 - - - - 86.00
126 3.56 - - - 897.12 - -
126 1.73 - - - 435.96 - -
8 10.75 1 - - - - -
6 10.75 1 - - - - 817.20
63 3.56 - - - 2,691.36 - -
63 2.79 - - - 2,109.24 - -
8 10.75 1 - - - - -
6 10.75 1 - - - - 749.10
126 3.16 - - - 4,379.76 - -
126 1.53 - - - 2,120.58 - -
8 10.75 1 - - - - -
6 10.75 1 - - - - 681.00
63 3.56 - - - 2,242.80 - -
63 2.79 - - - 1,757.70 - -
8 10.75 1 - - - - -
6 10.75 1 - - - - 136.20
126 3.16 - - - 796.32 - -
126 1.53 - - - 385.56 - -
6 10.75 1 - - - - -
4 10.75 1 - - - - 45.40
63 3.56 - - - 224.28 - -
63 2.27 - - - 143.01 - -
- - - - -
- - 18,817.47 - 2,651.10
- - 2,091.00 - 295.00
- - 10,528.37 - 4,115.04
22679.63

- - - - -
- - - - - -
2 37.19 4 - - - - -
2 37.19 4 - - - - -
1 8.58 - - - - - 34.31
1 20.75 2 - - - - -
215 1.48 - - - 1,272.80 - -
- - - - - -
2 13.88 1 - - - - 289.60
2 13.88 1 - - - - 289.60
1 10.12 1 - - - - -
81 1.48 - - - 1,198.80 - -

3 37.19 4 - - - 235.14 -
3 37.19 4 - - - 235.14 -
201 1.28 - - - 514.56 - -

- - - - - -
3 13.88 1 - - - 172.56 -
3 13.88 1 - - - 172.56 -
75 1.28 - - - 384.00 - -

- - 3,370.16 815.40 613.51


- - 375.00 91.00 69.00
- - 1,885.60 810.59 952.29
5518.56

10 11.82 1 - - - 123.17 -
10 3.10 - - - 31.00 - -
10 17.76 1 - - - 182.61 -
- - - - -

10 8.47 - - - - 84.70 -
10 3.97 - - - 39.71 - -
10 12.52 1 - - - 130.23 -
10 12.22 1 - - - 127.19 -
10 6.14 - - - 61.43 - -
10 18.07 2 - - - 190.65 -
- - - - -

10 12.22 1 - - - 127.20 -
10 6.14 - - - 61.43 - -
10 18.05 2 - - - 190.51 -
- - - - - -

11 6.66 - - - - 73.23 -
11 2.21 - - - 24.31 - -
11 8.23 - - - - 90.48 -

24 10.03 1 - - - 252.60 -
24 4.42 - - - 105.96 - -
24 13.16 1 - - - 327.79 -

36 10.03 1 - - - 378.90 -
36 4.42 - - - 158.94 - -
36 13.16 1 - - - 491.69 -

- - 482.78 2,770.94 -
- - 54.00 308.00 -
- - 270.12 2,754.59 -
3024.71

18 6.87 - - - - 123.66 -
18 4.59 - - - - 82.62 -
18 2.88 - - - - 51.84 -
30 2.60 - - - 78.00 - -
32 2.60 - - - 83.20 - -
-
18 3.33 - - - - 59.94 -
18 4.92 - - - - 88.56 -
18 7.19 - - - - 129.42 -
32 2.60 - - - 83.20 - -
35 2.60 - - - 91.00 - -
-
18 6.82 - - - - 122.76 -
18 4.83 - - - - 86.94 -
18 2.87 - - - - 51.66 -
31 2.60 - - - 80.60 - -
34 2.60 - - - 88.40 - -
-
18 3.33 - - - - 59.94 -
18 4.92 - - - - 88.56 -
18 7.19 - - - - 129.42 -
32 2.60 - - - 83.20 - -
35 2.60 - - - 91.00 - -
- - - - -
- - - - -
- - 678.60 1,075.32 -
- - 76.00 120.00 -
- - 379.68 1,068.98 -
1448.65
NTO PASCO, REGION PASCO.

3/4" 1" 1 3/8"


0.70 1.15 2.30
0.90 1.45 3.20
2.24 3.99 7.91

3/4 1 1 3/8
ML ML ML

17.64 - -
17.64 - -

223.20 - -
69.12 - -
- - -
- - -
16.94 - -
16.94 - -
- - -
2.44 - -
10.88 - -
- - -
2.64 - -
11.68 - -
- - -
9.10 - -
37.20 - -
- - -
140.16 - -
105.84 - -
- - -
36.20 - -
16.94 - -
36.20 - -
16.94 - -
- - -
63.96 - -
16.24 - -
63.96 - -
16.24 - -

948.10 - -
106.00 - -
2,119.19 - -
2119.19 1980.61

162.48 - -
- - -
12.44 - -
157.40 - -
- - -
- - -
- - -
- - -
25.16 - -
- - -
12.44 - -
25.16 - -
- - -
- - -
- - -
290.60 - -
57.00 - -
290.60 - -
- - -
1,033.28 - -
115.00 - -
2,309.59 - -
3534.60

91.60 - -
- - -
- - -
- - -
229.00 - -
- - -
- - -
- - -
1,099.20 - -
- - -
- - -
- - -
1,007.60 - -
- - -
- - -
- - -
916.00 - -
- - -
- - -
- - -
183.20 - -
- - -
- - -
- - -
68.70 - -
- - -
- - -
- - -
- - -
3,595.30 - -
400.00 - -
8,036.21 - -
22679.63 22

- - -
- - -
319.92 - -
319.92 - -
- - -
88.60 - -
- - -
- - -
- - -
- - -
108.21 - -
- - -

- - -
- - -
- - -

- - -
- - -
- - -
- - -

836.65 - -
93.00 - -
1,870.08 - -
5518.56

- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -

- - -
- - -
- - -

- - -
- - -
- - -

- - -
- - -
- - -

- - -
- - -
- - -
3024.71

- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
1448.65
HOJA DE METRADOS / ESTRUCTURAS
:"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA,
OBRA DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE MANTENIMIENTO
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
REGION : PASCO PROVINCIA: OXAPAMPA DISTRITO: OXAPAMPA

Nro. METRADO SUMA


PART. DESCRIPCION UND. UBICACIÓN
Elem LARGO ANCHO ALTO PARCIAL TOTAL
09.01.00 ESTRUCTURAS
09.01.01 TRABAJOS PRELIMINARES
09.01.01.01 LIMPIEZA DE TERRENO MANUAL M2 160.94
BLOQUE MANTENIMIENTO
CIMENTACION 1.00 Area= 160.94 160.94

09.01.01.02 || M2 160.94
BLOQUE MANTENIMIENTO
CIMENTACION 1.00 Area= 160.94 160.94

09.01.01.03 TRAZO Y REPLANTEO DURANTE EL PROCESO M2 482.82


BLOQUE MANTENIMIENTO
CIMENTACION 1.00 Area= 160.94 160.94
1er PISO 1.00 Area= 160.94 160.94
2do PISO 1.00 Area= 160.94 160.94

09.01.02 MOVIMIENTOS DE TIERRAS


09.01.02.01 CORTES
09.01.02.01.01 CORTE GENERAL CON MAQUINARIA , H=0.40m M3 64.38
BLOQUE MANTENIMIENTO
SUPERFICIE 1.00 Area= 160.94 0.40 64.38

09.01.02.01 EXCAVACION
09.01.02.01.01 EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m M3 40.92
BLOQUE MANTENIMIENTO
Z-1 3.00 1.15 1.15 1.50 5.95
Z-2 4.00 1.60 0.80 1.50 7.68
Z-3 3.00 1.50 0.95 1.50 6.41
Z-4 2.00 1.40 1.30 1.50 5.46
Z-5 1.00 1.65 1.35 1.50 3.34
Z-6 1.00 1.45 1.35 1.50 2.94
Z-7 1.00 1.15 1.05 1.50 1.81
Z-8 1.00 1.45 1.35 1.50 2.94
Z-9 1.00 1.90 0.95 1.50 2.71
Z-10 1.00 1.50 0.75 1.50 1.69

09.01.02.01.02 EXCAVACION PARA VIGAS DE CONEXIÓN M3 22.32


BLOQUE MANTENIMIENTO
EJE 1, ENTRE EJE D y E 1.00 1.25 0.80 0.50 0.50
EJE 1, ENTRE EJE E y F 1.00 2.15 0.80 0.50 0.86
EJE 2, ENTRE EJE A y B 1.00 1.73 0.80 0.50 0.69
EJE 2, ENTRE EJE B y C 1.00 2.87 0.80 0.50 1.15
EJE 2, ENTRE EJE E y F 1.00 2.65 0.80 0.50 1.06
EJE 3, ENTRE EJE A y B 1.00 1.78 0.80 0.50 0.71
EJE 3, ENTRE EJE B y C 1.00 2.92 0.80 0.50 1.17
EJE 3, ENTRE EJE C y D 1.00 2.65 0.80 0.50 1.06
EJE 4, ENTRE EJE A y B 1.00 1.30 0.80 0.50 0.52
EJE 4, ENTRE EJE B y C 1.00 2.57 0.80 0.50 1.03
EJE 4, ENTRE EJE C y D 1.00 2.12 0.80 0.50 0.85
EJE A, ENTRE EJE 2 y 3 1.00 2.62 0.80 0.50 1.05
EJE A, ENTRE EJE 3 y 4 1.00 2.94 0.80 0.50 1.18
EJE B, ENTRE EJE 3 y 4 1.00 3.24 0.80 0.50 1.30
EJE C, ENTRE EJE 3 y 4 1.00 3.16 0.80 0.50 1.26
EJE D, ENTRE EJE 1 y 2 1.00 2.80 0.80 0.50 1.12
EJE D, ENTRE EJE 3 y 4 1.00 3.16 0.80 0.50 1.26
EJE E, ENTRE EJE 1 y 2 1.00 2.77 0.80 0.50 1.11
EJE E, ENTRE EJE 3 y 4 1.00 3.29 0.80 0.50 1.32
EJE F, ENTRE EJE 1 y 2 1.00 2.47 0.80 0.50 0.99
EJE F, ENTRE EJE 2 y 3 1.00 2.52 0.80 0.50 1.01
EJE F, ENTRE EJE 3 y 4 1.00 2.84 0.80 0.50 1.14

09.01.02.01.02 EXCAVACION PARA CIMIENTOS CORRIDOS M3 17.01


BLOQUE MANTENIMIENTO
EJE 1, ENTRE EJE D -C 1.00 3.37 0.40 0.75 1.01
EJE 1, ENTRE EJE D y E 1.00 1.25 0.40 0.75 0.38
EJE 1, ENTRE EJE E y F 1.00 2.15 0.40 0.75 0.65
EJE 2, ENTRE EJE A y B 1.00 1.73 0.40 0.75 0.52
EJE 2, ENTRE EJE B y C 1.00 2.87 0.40 0.75 0.86
EJE 2, ENTRE EJE E y F 1.00 2.65 0.40 0.75 0.80
EJE 3, ENTRE EJE A y B 1.00 1.78 0.40 0.75 0.53
EJE 3, ENTRE EJE B y C 1.00 2.92 0.40 0.75 0.88
EJE 3, ENTRE EJE C y D 1.00 2.65 0.40 0.75 0.80
EJE 4, ENTRE EJE A y B 1.00 1.30 0.40 0.75 0.39
EJE 4, ENTRE EJE B y C 1.00 2.57 0.40 0.75 0.77
EJE 4, ENTRE EJE C y D 1.00 2.12 0.40 0.75 0.64
EJE A, ENTRE EJE 2 y 3 1.00 2.62 0.40 0.75 0.79
EJE A, ENTRE EJE 3 y 4 1.00 2.94 0.40 0.75 0.88
EJE B, ENTRE EJE 3 y 4 1.00 3.24 0.40 0.75 0.97
EJE C, ENTRE EJE 3 y 4 1.00 3.16 0.40 0.75 0.95
EJE D, ENTRE EJE 1 y 2 1.00 2.80 0.40 0.75 0.84
EJE D, ENTRE EJE 3 y 4 1.00 3.16 0.40 0.75 0.95
EJE E, ENTRE EJE 1 y 2 1.00 2.77 0.40 0.75 0.83
EJE E, ENTRE EJE 3 y 4 1.00 3.29 0.40 0.75 0.99
EJE F, ENTRE EJE 2 y 3 1.00 2.52 0.40 0.75 0.76
EJE F, ENTRE EJE 3 y 4 1.00 2.84 0.40 0.75 0.85

09.01.02.02 NIVELACION Y COMPACTACION


09.01.02.02.01 M2 27.28
REFINE, COMPACTACION Y NIVELACION DE FONDO DE SUPERFICIE ZAPATA
BLOQUE MANTENIMIENTO
Z-1 3.00 1.15 1.15 3.97
Z-2 4.00 1.60 0.80 5.12
Z-3 3.00 1.50 0.95 4.28
Z-4 2.00 1.40 1.30 3.64
Z-5 1.00 1.65 1.35 2.23
Z-6 1.00 1.45 1.35 1.96
Z-7 1.00 1.15 1.05 1.21
Z-8 1.00 1.45 1.35 1.96
Z-9 1.00 1.90 0.95 1.81
Z-10 1.00 1.50 0.75 1.13

09.01.02.02.01 REFINE, COMPACTACION Y NIVELACION DE FONDO DE SUPERFICIE M2 22.68


CIMIENTOS CORRIDOS
BLOQUE MANTENIMIENTO
EJE 1, ENTRE EJE D -C 1.00 3.37 0.40 1.35
EJE 1, ENTRE EJE D y E 1.00 1.25 0.40 0.50
EJE 1, ENTRE EJE E y F 1.00 2.15 0.40 0.86
EJE 2, ENTRE EJE A y B 1.00 1.73 0.40 0.69
EJE 2, ENTRE EJE B y C 1.00 2.87 0.40 1.15
EJE 2, ENTRE EJE E y F 1.00 2.65 0.40 1.06
EJE 3, ENTRE EJE A y B 1.00 1.78 0.40 0.71
EJE 3, ENTRE EJE B y C 1.00 2.92 0.40 1.17
EJE 3, ENTRE EJE C y D 1.00 2.65 0.40 1.06
EJE 4, ENTRE EJE A y B 1.00 1.30 0.40 0.52
EJE 4, ENTRE EJE B y C 1.00 2.57 0.40 1.03
EJE 4, ENTRE EJE C y D 1.00 2.12 0.40 0.85
EJE A, ENTRE EJE 2 y 3 1.00 2.62 0.40 1.05
EJE A, ENTRE EJE 3 y 4 1.00 2.94 0.40 1.18
EJE B, ENTRE EJE 3 y 4 1.00 3.24 0.40 1.30
EJE C, ENTRE EJE 3 y 4 1.00 3.16 0.40 1.26
EJE D, ENTRE EJE 1 y 2 1.00 2.80 0.40 1.12
EJE D, ENTRE EJE 3 y 4 1.00 3.16 0.40 1.26
EJE E, ENTRE EJE 1 y 2 1.00 2.77 0.40 1.11
EJE E, ENTRE EJE 3 y 4 1.00 3.29 0.40 1.32
EJE F, ENTRE EJE 2 y 3 1.00 2.52 0.40 1.01
EJE F, ENTRE EJE 3 y 4 1.00 2.84 0.40 1.14

09.01.02.02.02 REFINE, COMPACTACION Y NIVELACION DE SUPERFICIE FONDO DE VIGA DE M2 44.64


CONEXIÓN
BLOQUE MANTENIMIENTO
EJE 1, ENTRE EJE D y E 1.00 1.25 0.80 1.00
EJE 1, ENTRE EJE E y F 1.00 2.15 0.80 1.72
EJE 2, ENTRE EJE A y B 1.00 1.73 0.80 1.38
EJE 2, ENTRE EJE B y C 1.00 2.87 0.80 2.30
EJE 2, ENTRE EJE E y F 1.00 2.65 0.80 2.12
EJE 3, ENTRE EJE A y B 1.00 1.78 0.80 1.42
EJE 3, ENTRE EJE B y C 1.00 2.92 0.80 2.34
EJE 3, ENTRE EJE C y D 1.00 2.65 0.80 2.12
EJE 4, ENTRE EJE A y B 1.00 1.30 0.80 1.04
EJE 4, ENTRE EJE B y C 1.00 2.57 0.80 2.06
EJE 4, ENTRE EJE C y D 1.00 2.12 0.80 1.70
EJE A, ENTRE EJE 2 y 3 1.00 2.62 0.80 2.10
EJE A, ENTRE EJE 3 y 4 1.00 2.94 0.80 2.35
EJE B, ENTRE EJE 3 y 4 1.00 3.24 0.80 2.59
EJE C, ENTRE EJE 3 y 4 1.00 3.16 0.80 2.53
EJE D, ENTRE EJE 1 y 2 1.00 2.80 0.80 2.24
EJE D, ENTRE EJE 3 y 4 1.00 3.16 0.80 2.53
EJE E, ENTRE EJE 1 y 2 1.00 2.77 0.80 2.22
EJE E, ENTRE EJE 3 y 4 1.00 3.29 0.80 2.63
EJE F, ENTRE EJE 1 y 2 1.00 2.47 0.80 1.98
EJE F, ENTRE EJE 2 y 3 1.00 2.52 0.80 2.02
EJE F, ENTRE EJE 3 y 4 1.00 2.84 0.80 2.27

09.01.02.02.03 REFINE, COMPACTACION Y NIVELACION DE SUPERFICIE M2 147.58


BLOQUE MANTENIMIENTO
SUB ESTACION 1.00 Area= 16.63 16.63
CIRCULACION 1.00 Area= 33.30 33.30
CUARTO DE BOMBAS 1.00 Area= 15.77 15.77
CENTRAL DE GASES 1.00 Area= 17.56 17.56
DEPOSITO-MORTUORIO 1.00 Area= 30.16 30.16
SS.HH VARONES - MUJERES 1.00 Area= 22.89 22.89
ESPERA FAMILIARES 1.00 Area= 11.27 11.27

09.01.02.03 RELLENOS CON MATERIAL DE PRESTAMO


09.01.02.03.01 RELLENO Y COMPACTO DE SUPERFICIE M3 59.03
BLOQUE MANTENIMIENTO
SUB ESTACION 1.00 Area= 16.63 0.40 6.65
CIRCULACION 1.00 Area= 33.30 0.40 13.32
CUARTO DE BOMBAS 1.00 Area= 15.77 0.40 6.31
CENTRAL DE GASES 1.00 Area= 17.56 0.40 7.02
DEPOSITO-MORTUORIO 1.00 Area= 30.16 0.40 12.06
SS.HH VARONES - MUJERES 1.00 Area= 22.89 0.40 9.16
ESPERA FAMILIARES 1.00 Area= 11.27 0.40 4.51

09.01.02.03.01 RELLENO Y COMPACTO DE ZAPATAS M3 10.74


BLOQUE MANTENIMIENTO

ZAPATAS Z-1 3.00 Area= 0.93 0.50 1.40


Z-2 4.00 Area= 0.96 0.50 1.92
Z-3 3.00 Area= 1.22 0.50 1.83
Z-4 2.00 Area= 1.55 0.50 1.55
Z-5 1.00 Area= 1.79 0.50 0.90
Z-6 1.00 Area= 1.53 0.50 0.77
Z-7 1.00 Area= 0.99 0.50 0.50
Z-8 1.00 Area= 1.50 0.50 0.75
Z-9 1.00 Area= 1.37 0.50 0.69
Z-10 1.00 Area= 0.92 0.50 0.46

09.01.02.04 MANEJO DE MATERIAL PROCEDENTE DE EXCAVACIONES


09.01.02.04.01 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES M3 100.32
EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m 1.00 40.92 40.92
EXCAVACION PARA VIGAS DE CONEXIÓN 1.00 22.32 22.32
EXCAVACION PARA CIMIENTOS CORRIDOS 1.00 17.01 17.01
Sub Total 80.25
+2.5% esponjamiento 100.32

09.01.02.04.02 ELIMINACION DE MATERIAL EXCEDENTE M3 301.49


EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m 1.00 40.92 40.92
EXCAVACION PARA VIGAS DE CONEXIÓN 1.00 22.32 22.32
EXCAVACION PARA CIMIENTOS CORRIDOS 1.00 17.01 17.01
CORTE GENERAL CON MAQUINARIA , H=0.40m 1.00 160.94 160.94
Sub Total 241.19
+2.5% esponjamiento 301.49

09.01.03 OBRAS DE CONCRETO SIMPLE


09.01.03.01 SUB ZAPATAS
09.01.03.01.01 SUB ZAPATAS F´C=100KG/CM2 +30% PIEDRA GRANDE M3 10.91
BLOQUE MANTENIMIENTO
Z-1 3.00 1.15 1.15 0.40 1.59
Z-2 4.00 1.60 0.80 0.40 2.05
Z-3 3.00 1.50 0.95 0.40 1.71
Z-4 2.00 1.40 1.30 0.40 1.46
Z-5 1.00 1.65 1.35 0.40 0.89
Z-6 1.00 1.45 1.35 0.40 0.78
Z-7 1.00 1.15 1.05 0.40 0.48
Z-8 1.00 1.45 1.35 0.40 0.78
Z-9 1.00 1.90 0.95 0.40 0.72
Z-10 1.00 1.50 0.75 0.40 0.45

09.01.03.03 SOBRECIMIENTOS
09.01.03.03.01 SOBRE CIMIENTOS CONCRETO F´C=175KG/CM2 + 25% PIEDRA M3 1.99
DESPLAZADORA
BLOQUE MANTENIMIENTO EJE 1, ENTRE EJE E -F 1.00 2.80 0.12 0.45 0.15
EJE 2, ENTRE EJE A -B 1.00 2.50 0.12 0.45 0.14
EJE 2, ENTRE EJE B -C 1.00 3.65 0.12 0.45 0.20
EJE 2, ENTRE EJE E -F 1.00 3.10 0.12 0.45 0.17
EJE 3, ENTRE EJE E -F 1.00 3.10 0.12 0.45 0.17
EJE 4, ENTRE EJE A y B 1.00 1.86 0.12 0.45 0.10
EJE 4, ENTRE EJE B y C 1.00 1.21 0.12 0.45 0.07
EJE 4, ENTRE EJE E y F 1.00 2.80 0.12 0.45 0.15
EJE A, ENTRE EJE 2 y 3 1.00 2.12 0.12 0.45 0.11
EJE E, ENTRE EJE 1 y 2 1.00 1.70 0.12 0.45 0.09
EJE E, ENTRE EJE 2 y 3 1.00 1.70 0.12 0.45 0.09
EJE E, ENTRE EJE 3 y 4 1.00 2.04 0.12 0.45 0.11
EJE F, ENTRE EJE 1 y 2 1.00 2.97 0.12 0.45 0.16
EJE F, ENTRE EJE 2 y 3 1.00 2.00 0.12 0.45 0.11
EJE F, ENTRE EJE 23y 4 1.00 3.34 0.12 0.45 0.18

09.01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA M2 16.60


0.30 m
BLOQUE MANTENIMIENTO
EJE 1, ENTRE EJE E -F 1.00 2.80 0.45 1.26
EJE 2, ENTRE EJE A -B 1.00 2.50 0.45 1.13
EJE 2, ENTRE EJE B -C 1.00 3.65 0.45 1.64
EJE 2, ENTRE EJE E -F 1.00 3.10 0.45 1.40
EJE 3, ENTRE EJE E -F 1.00 3.10 0.45 1.40
EJE 4, ENTRE EJE A y B 1.00 1.86 0.45 0.84
EJE 4, ENTRE EJE B y C 1.00 1.21 0.45 0.54
EJE 4, ENTRE EJE E y F 1.00 2.80 0.45 1.26
EJE A, ENTRE EJE 2 y 3 1.00 2.12 0.45 0.95
EJE E, ENTRE EJE 1 y 2 1.00 1.70 0.45 0.77
EJE E, ENTRE EJE 2 y 3 1.00 1.70 0.45 0.77
EJE E, ENTRE EJE 3 y 4 1.00 2.04 0.45 0.92
EJE F, ENTRE EJE 1 y 2 1.00 2.97 0.45 1.34
EJE F, ENTRE EJE 2 y 3 1.00 2.00 0.45 0.90
EJE F, ENTRE EJE 23y 4 1.00 3.34 0.45 1.50

09.01.03.03 CIMIENTOS CORRIDOS


09.01.03.03.01 SOBRE CIMIENTOS CONCRETO F´C=140KG/CM2 + 30% PIEDRA M3 16.74
DESPLAZADORA
BLOQUE MANTENIMIENTO
EJE 1, ENTRE EJE D y E 1.00 1.25 0.40 0.75 0.38
EJE 1, ENTRE EJE E y F 1.00 2.15 0.40 0.75 0.65
EJE 2, ENTRE EJE A y B 1.00 1.73 0.40 0.75 0.52
EJE 2, ENTRE EJE B y C 1.00 2.87 0.40 0.75 0.86
EJE 2, ENTRE EJE E y F 1.00 2.65 0.40 0.75 0.80
EJE 3, ENTRE EJE A y B 1.00 1.78 0.40 0.75 0.53
EJE 3, ENTRE EJE B y C 1.00 2.92 0.40 0.75 0.88
EJE 3, ENTRE EJE C y D 1.00 2.65 0.40 0.75 0.80
EJE 4, ENTRE EJE A y B 1.00 1.30 0.40 0.75 0.39
EJE 4, ENTRE EJE B y C 1.00 2.57 0.40 0.75 0.77
EJE 4, ENTRE EJE C y D 1.00 2.12 0.40 0.75 0.64
EJE A, ENTRE EJE 2 y 3 1.00 2.62 0.40 0.75 0.79
EJE A, ENTRE EJE 3 y 4 1.00 2.94 0.40 0.75 0.88
EJE B, ENTRE EJE 3 y 4 1.00 3.24 0.40 0.75 0.97
EJE C, ENTRE EJE 3 y 4 1.00 3.16 0.40 0.75 0.95
EJE D, ENTRE EJE 1 y 2 1.00 2.80 0.40 0.75 0.84
EJE D, ENTRE EJE 3 y 4 1.00 3.16 0.40 0.75 0.95
EJE E, ENTRE EJE 1 y 2 1.00 2.77 0.40 0.75 0.83
EJE E, ENTRE EJE 3 y 4 1.00 3.29 0.40 0.75 0.99
EJE F, ENTRE EJE 1 y 2 1.00 2.47 0.40 0.75 0.74
EJE F, ENTRE EJE 2 y 3 1.00 2.52 0.40 0.75 0.76
EJE F, ENTRE EJE 3 y 4 1.00 2.84 0.40 0.75 0.85

09.01.03.03.02 M2 41.85
ENCOFRADO Y DESENCOFRADO NORMAL PARA CIMIENTOS CORRIDOS

BLOQUE MANTENIMIENTO EJE 1, ENTRE EJE D y E 1.00 1.25 0.75 0.94


EJE 1, ENTRE EJE E y F 1.00 2.15 0.75 1.61
EJE 2, ENTRE EJE A y B 1.00 1.73 0.75 1.30
EJE 2, ENTRE EJE B y C 1.00 2.87 0.75 2.15
EJE 2, ENTRE EJE E y F 1.00 2.65 0.75 1.99
EJE 3, ENTRE EJE A y B 1.00 1.78 0.75 1.34
EJE 3, ENTRE EJE B y C 1.00 2.92 0.75 2.19
EJE 3, ENTRE EJE C y D 1.00 2.65 0.75 1.99
EJE 4, ENTRE EJE A y B 1.00 1.30 0.75 0.98
EJE 4, ENTRE EJE B y C 1.00 2.57 0.75 1.93
EJE 4, ENTRE EJE C y D 1.00 2.12 0.75 1.59
EJE A, ENTRE EJE 2 y 3 1.00 2.62 0.75 1.97
EJE A, ENTRE EJE 3 y 4 1.00 2.94 0.75 2.21
EJE B, ENTRE EJE 3 y 4 1.00 3.24 0.75 2.43
EJE C, ENTRE EJE 3 y 4 1.00 3.16 0.75 2.37
EJE D, ENTRE EJE 1 y 2 1.00 2.80 0.75 2.10
EJE D, ENTRE EJE 3 y 4 1.00 3.16 0.75 2.37
EJE E, ENTRE EJE 1 y 2 1.00 2.77 0.75 2.08
EJE E, ENTRE EJE 3 y 4 1.00 3.29 0.75 2.47
EJE F, ENTRE EJE 1 y 2 1.00 2.47 0.75 1.85
EJE F, ENTRE EJE 2 y 3 1.00 2.52 0.75 1.89
EJE F, ENTRE EJE 3 y 4 1.00 2.84 0.75 2.13

09.01.03.04 FALSO PISO


09.01.03.04.01 CONCRETO F´C=80KG/CM2 PARA FALSO PISO E=0.10M M2 147.58
BLOQUE MANTENIMIENTO
PRIMER PISO
SUB ESTACION 1.00 Area= 16.63 16.63
CIRCULACION 1.00 Area= 33.30 33.30
CUARTO DE BOMBAS 1.00 Area= 15.77 15.77
CENTRAL DE GASES 1.00 Area= 17.56 17.56
DEPOSITO-MORTUORIO 1.00 Area= 30.16 30.16
SS.HH VARONES - MUJERES 1.00 Area= 22.89 22.89
ESPERA FAMILIARES 1.00 Area= 11.27 11.27

09.01.04 OBRAS DE CONCRETO ARMADO


09.01.04.01 ZAPATAS

09.01.04.01.01 CONCRETO PARA ZAPATA F'C=210 KG/CM2 M3 16.37


BLOQUE MANTENIMIENTO
Z-1 3.00 1.15 1.15 0.60 2.38
Z-2 4.00 1.60 0.80 0.60 3.07
Z-3 3.00 1.50 0.95 0.60 2.57
Z-4 2.00 1.40 1.30 0.60 2.18
Z-5 1.00 1.65 1.35 0.60 1.34
Z-6 1.00 1.45 1.35 0.60 1.17
Z-7 1.00 1.15 1.05 0.60 0.72
Z-8 1.00 1.45 1.35 0.60 1.17
Z-9 1.00 1.90 0.95 0.60 1.08
Z-10 1.00 1.50 0.75 0.60 0.68

09.01.04.01.02 ACERO PARA ZAPATAS F'y= 4200 Kg/Cm2 KG 630.26


(VER METRADO ACERO) 630.26 630.26

09.01.04.02 VIGAS DE CONEXIÓN


09.01.04.02.01 CONCRETO EN VIGAS DE CONEXION f'c=210 kg/cm2 M3 10.04
BLOQUE MANTENIMIENTO
EJE 1, ENTRE EJE D y E 1.00 1.25 0.30 0.60 0.23
EJE 1, ENTRE EJE E y F 1.00 2.15 0.30 0.60 0.39
EJE 2, ENTRE EJE A y B 1.00 1.73 0.30 0.60 0.31
EJE 2, ENTRE EJE B y C 1.00 2.87 0.30 0.60 0.52
EJE 2, ENTRE EJE E y F 1.00 2.65 0.30 0.60 0.48
EJE 3, ENTRE EJE A y B 1.00 1.78 0.30 0.60 0.32
EJE 3, ENTRE EJE B y C 1.00 2.92 0.30 0.60 0.53
EJE 3, ENTRE EJE C y D 1.00 2.65 0.30 0.60 0.48
EJE 4, ENTRE EJE A y B 1.00 1.30 0.30 0.60 0.23
EJE 4, ENTRE EJE B y C 1.00 2.57 0.30 0.60 0.46
EJE 4, ENTRE EJE C y D 1.00 2.12 0.30 0.60 0.38
EJE A, ENTRE EJE 2 y 3 1.00 2.62 0.30 0.60 0.47
EJE A, ENTRE EJE 3 y 4 1.00 2.94 0.30 0.60 0.53
EJE B, ENTRE EJE 3 y 4 1.00 3.24 0.30 0.60 0.58
EJE C, ENTRE EJE 3 y 4 1.00 3.16 0.30 0.60 0.57
EJE D, ENTRE EJE 1 y 2 1.00 2.80 0.30 0.60 0.50
EJE D, ENTRE EJE 3 y 4 1.00 3.16 0.30 0.60 0.57
EJE E, ENTRE EJE 1 y 2 1.00 2.77 0.30 0.60 0.50
EJE E, ENTRE EJE 3 y 4 1.00 3.29 0.30 0.60 0.59
EJE F, ENTRE EJE 1 y 2 1.00 2.47 0.30 0.60 0.44
EJE F, ENTRE EJE 2 y 3 1.00 2.52 0.30 0.60 0.45
EJE F, ENTRE EJE 3 y 4 1.00 2.84 0.30 0.60 0.51

09.01.04.02.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CONEXIÓN M2 33.48


BLOQUE MANTENIMIENTO

EJE 1, ENTRE EJE D y E 1.00 1.25 0.60 0.75


EJE 1, ENTRE EJE E y F 1.00 2.15 0.60 1.29
EJE 2, ENTRE EJE A y B 1.00 1.73 0.60 1.04
EJE 2, ENTRE EJE B y C 1.00 2.87 0.60 1.72
EJE 2, ENTRE EJE E y F 1.00 2.65 0.60 1.59
EJE 3, ENTRE EJE A y B 1.00 1.78 0.60 1.07
EJE 3, ENTRE EJE B y C 1.00 2.92 0.60 1.75
EJE 3, ENTRE EJE C y D 1.00 2.65 0.60 1.59
EJE 4, ENTRE EJE A y B 1.00 1.30 0.60 0.78
EJE 4, ENTRE EJE B y C 1.00 2.57 0.60 1.54
EJE 4, ENTRE EJE C y D 1.00 2.12 0.60 1.27
EJE A, ENTRE EJE 2 y 3 1.00 2.62 0.60 1.57
EJE A, ENTRE EJE 3 y 4 1.00 2.94 0.60 1.76
EJE B, ENTRE EJE 3 y 4 1.00 3.24 0.60 1.94
EJE C, ENTRE EJE 3 y 4 1.00 3.16 0.60 1.90
EJE D, ENTRE EJE 1 y 2 1.00 2.80 0.60 1.68
EJE D, ENTRE EJE 3 y 4 1.00 3.16 0.60 1.90
EJE E, ENTRE EJE 1 y 2 1.00 2.77 0.60 1.66
EJE E, ENTRE EJE 3 y 4 1.00 3.29 0.60 1.97
EJE F, ENTRE EJE 1 y 2 1.00 2.47 0.60 1.48
EJE F, ENTRE EJE 2 y 3 1.00 2.52 0.60 1.51
EJE F, ENTRE EJE 3 y 4 1.00 2.84 0.60 1.70

09.01.04.02.03 ACERO PARA VIGAS DE CONEXIÓN F'y= 4200 Kg/Cm2 KG 721.08


(VER METRADO ACERO) 721.08 721.08

09.01.04.04 COLUMNAS
09.01.04.04.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 M3 29.74
BLOQUE MANTENIMIENTO
PRIMER PISO C-1 1.00 Secc.= 0.24 4.70 1.13
C-2 10.00 Secc.= 0.21 4.70 9.87
C-3 8.00 Secc.= 0.15 4.70 5.64
C-4 2.00 Secc.= 0.20 4.70 1.88

SEGUNDO PISO C-2 10.00 Secc.= 0.21 3.40 7.14


C-3 8.00 Secc.= 0.15 3.40 4.08

09.01.04.04.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS M2 345.14


BLOQUE MANTENIMIENTO
PRIMER PISO
C-1 1.00 Perimetro= 2.20 5.50 12.10
C-2 10.00 Perimetro= 2.00 5.50 110.00
C-3 8.00 Perimetro= 1.60 5.50 70.40
C-4 2.00 Perimetro= 1.80 5.50 19.80

SEGUNDO PISO C-2 10.00 Perimetro= 2.00 4.05 81.00


C-3 8.00 Perimetro= 1.60 4.05 51.84

09.01.04.04.03 ACERO PARA COLUMNAS F'y= 4200 Kg/Cm2 KG 7925.78


(VER METRADO ACERO) 7925.78 7925.78

09.01.04.05 VIGAS
09.01.04.05.01 CONCRETO EN VIGAS f'c=210 kg/cm2 M3 21.17
BLOQUE MANTENIMIENTO
PRIMER PISO EJE 1, ENTRE EJE D y E 1.00 2.25 0.30 0.40 0.27
EJE 1, ENTRE EJE E y F 1.00 3.25 0.30 0.40 0.39
EJE 2, ENTRE EJE A y B 1.00 2.50 0.30 0.40 0.30
EJE 2, ENTRE EJE B y C 1.00 3.65 0.30 0.40 0.44
EJE 2, ENTRE EJE D y E 1.00 2.45 0.30 0.40 0.29
EJE 2, ENTRE EJE E y F 1.00 3.55 0.30 0.40 0.43
EJE 3, ENTRE EJE A y B 1.00 2.55 0.30 0.40 0.31
EJE 3, ENTRE EJE B y C 1.00 3.70 0.30 0.40 0.44
EJE 3, ENTRE EJE D y E 1.00 2.45 0.30 0.40 0.29
EJE 3, ENTRE EJE E y F 1.00 3.55 0.30 0.40 0.43
EJE 4, ENTRE EJE A y B 1.00 2.50 0.30 0.40 0.30
EJE 4, ENTRE EJE B y C 1.00 3.65 0.30 0.40 0.44
EJE 4, ENTRE EJE D y E 1.00 2.25 0.30 0.40 0.27
EJE 4, ENTRE EJE E y F 1.00 3.25 0.30 0.40 0.39
EJE A, ENTRE EJE 2 y 3 1.00 3.62 0.30 0.50 0.54
EJE A, ENTRE EJE 3 y 4 1.00 3.99 0.30 0.50 0.60
EJE B, ENTRE EJE 2 y 3 1.00 3.62 0.30 0.50 0.54
EJE B, ENTRE EJE 3 y 4 1.00 3.99 0.30 0.50 0.60
EJE C, ENTRE EJE 2 y 3 1.00 3.62 0.30 0.50 0.54
EJE C, ENTRE EJE 3 y 4 1.00 3.99 0.30 0.50 0.60
EJE D, ENTRE EJE 1 y 2 1.00 3.62 0.30 0.50 0.54
EJE D, ENTRE EJE 2 y 3 1.00 3.62 0.30 0.50 0.54
EJE D, ENTRE EJE 3 y 4 1.00 3.99 0.30 0.50 0.60
EJE E, ENTRE EJE 1 y 2 1.00 3.62 0.30 0.50 0.54
EJE E, ENTRE EJE 2 y 3 1.00 3.62 0.30 0.50 0.54
EJE E, ENTRE EJE 3 y 4 1.00 3.99 0.30 0.50 0.60
EJE F, ENTRE EJE 1 y 2 1.00 3.62 0.30 0.50 0.54
EJE F, ENTRE EJE 2 y 3 1.00 3.62 0.30 0.50 0.54
EJE F, ENTRE EJE 3 y 4 1.00 3.99 0.30 0.50 0.60

SEGUNDO PISO EJE 1, ENTRE EJE D y E 1.00 2.25 0.30 0.40 0.27
EJE 1, ENTRE EJE E y F 1.00 3.25 0.30 0.40 0.39
EJE 4, ENTRE EJE A y B 1.00 2.50 0.30 0.40 0.30
EJE 4, ENTRE EJE B y C 1.00 3.65 0.30 0.40 0.44
EJE 4, ENTRE EJE D y E 1.00 2.25 0.30 0.40 0.27
EJE 4, ENTRE EJE E y F 1.00 3.25 0.30 0.40 0.39
EJE A, ENTRE EJE 2 y 3 1.00 3.62 0.30 0.50 0.54
EJE A, ENTRE EJE 3 y 4 1.00 3.99 0.30 0.50 0.60
EJE C, ENTRE EJE 2 y 3 1.00 3.62 0.30 0.50 0.54
EJE C, ENTRE EJE 3 y 4 1.00 3.99 0.30 0.50 0.60
EJE D, ENTRE EJE 1 y 2 1.00 3.62 0.30 0.50 0.54
EJE D, ENTRE EJE 2 y 3 1.00 3.62 0.30 0.50 0.54
EJE D, ENTRE EJE 3 y 4 1.00 3.99 0.30 0.50 0.60
EJE F, ENTRE EJE 1 y 2 1.00 3.62 0.30 0.50 0.54
EJE F, ENTRE EJE 2 y 3 1.00 3.62 0.30 0.50 0.54
EJE F, ENTRE EJE 3 y 4 1.00 3.99 0.30 0.50 0.60

09.01.04.05.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS M2 28.88


BLOQUE MANTENIMIENTO
PRIMER PISO EJE 1, ENTRE EJE D y E 1.00 2.25 0.30 0.40 0.27
EJE 1, ENTRE EJE E y F 1.00 3.25 0.30 0.40 0.39
EJE 2, ENTRE EJE A y B 1.00 2.50 0.30 0.40 0.30
EJE 2, ENTRE EJE B y C 1.00 3.65 0.30 0.40 0.44
EJE 2, ENTRE EJE D y E 1.00 2.45 0.30 0.40 0.29
EJE 2, ENTRE EJE E y F 1.00 3.55 0.30 0.40 0.43
EJE 3, ENTRE EJE A y B 1.00 2.55 0.30 0.40 0.31
EJE 3, ENTRE EJE B y C 1.00 3.70 0.30 0.40 0.44
EJE 3, ENTRE EJE D y E 1.00 2.45 0.30 0.40 0.29
EJE 3, ENTRE EJE E y F 1.00 3.55 0.30 0.40 0.43
EJE 4, ENTRE EJE A y B 1.00 2.50 0.30 0.40 0.30
EJE 4, ENTRE EJE B y C 1.00 3.65 0.30 0.40 0.44
EJE 4, ENTRE EJE D y E 1.00 2.25 0.30 0.40 0.27
EJE 4, ENTRE EJE E y F 1.00 3.25 0.30 0.40 0.39
EJE A, ENTRE EJE 2 y 3 1.00 3.62 0.30 0.50 0.54
EJE A, ENTRE EJE 3 y 4 1.00 3.99 0.30 0.50 0.60
EJE B, ENTRE EJE 2 y 3 1.00 3.62 0.30 0.50 0.54
EJE B, ENTRE EJE 3 y 4 1.00 3.99 0.30 0.50 0.60
EJE C, ENTRE EJE 2 y 3 1.00 3.62 0.30 0.50 0.54
EJE C, ENTRE EJE 3 y 4 1.00 3.99 0.30 0.50 0.60
EJE D, ENTRE EJE 1 y 2 1.00 3.62 0.30 0.50 0.54
EJE D, ENTRE EJE 2 y 3 1.00 3.62 0.30 0.50 0.54
EJE D, ENTRE EJE 3 y 4 1.00 3.99 0.30 0.50 0.60
EJE E, ENTRE EJE 1 y 2 1.00 3.62 0.30 0.50 0.54
EJE E, ENTRE EJE 2 y 3 1.00 3.62 0.30 0.50 0.54
EJE E, ENTRE EJE 3 y 4 1.00 3.99 0.30 0.50 0.60
EJE F, ENTRE EJE 1 y 2 1.00 3.62 0.30 0.50 0.54
EJE F, ENTRE EJE 2 y 3 1.00 3.62 0.30 0.50 0.54
EJE F, ENTRE EJE 3 y 4 1.00 3.99 0.30 0.50 0.60

SEGUNDO PISO EJE 1, ENTRE EJE D y E 1.00 2.25 0.30 0.40 0.27
EJE 1, ENTRE EJE E y F 1.00 3.25 0.30 0.40 0.39
EJE 4, ENTRE EJE A y B 1.00 2.50 0.30 0.40 0.30
EJE 4, ENTRE EJE B y C 1.00 3.65 0.30 0.40 0.44
EJE 4, ENTRE EJE D y E 1.00 2.25 0.30 0.40 0.27
EJE 4, ENTRE EJE E y F 1.00 3.25 0.30 0.40 0.39
EJE A, ENTRE EJE 2 y 3 1.00 3.62 0.30 0.50 0.54
EJE A, ENTRE EJE 3 y 4 1.00 3.99 0.30 0.50 0.60
EJE C, ENTRE EJE 2 y 3 1.00 3.62 0.30 0.50 0.54
EJE C, ENTRE EJE 3 y 4 1.00 3.99 0.30 0.50 0.60
EJE D, ENTRE EJE 1 y 2 1.00 3.62 0.30 0.50 0.54
EJE D, ENTRE EJE 2 y 3 1.00 3.62 0.30 0.50 0.54
EJE D, ENTRE EJE 3 y 4 1.00 3.99 0.30 0.50 0.60
EJE F, ENTRE EJE 1 y 2 1.00 3.62 0.30 0.50 0.54
EJE F, ENTRE EJE 2 y 3 1.00 3.62 0.30 0.50 0.54
EJE F, ENTRE EJE 3 y 4 1.00 3.99 0.30 0.50 0.60

09.01.04.05.03 ACERO PARA VIGAS F'y= 4200 Kg/Cm2 KG 2059.67


(VER METRADO ACERO) 2059.67 2059.67

09.01.04.06 LOSAS ALIGERADAS

09.01.04.06.01 CONCRETO PARA LOSA ALIGERADA F'C=210 KG/CM2 M3 11.13


BLOQUE MANTENIMIENTO f (m3/m2)
PRIMER PISO ENTRE EJE 1-2, ENTRE EJE D y E 1.00 3.82 2.45 0.0875 0.82
ENTRE EJE 1-2, ENTRE EJE E y F 1.00 3.82 3.65 0.0875 1.22
ENTRE EJE 2-3, ENTRE EJE A y B 1.00 3.82 2.70 0.0875 0.90
ENTRE EJE 2-3, ENTRE EJE B y C 1.00 3.82 3.85 0.0875 1.29
ENTRE EJE 2-3, ENTRE EJE D y E 1.00 3.82 2.45 0.0875 0.82
ENTRE EJE 2-3, ENTRE EJE E y F 1.00 3.82 3.65 0.0875 1.22
ENTRE EJE 3-4, ENTRE EJE A y B 1.00 4.39 2.70 0.0875 1.04
ENTRE EJE 3-4, ENTRE EJE B y C 1.00 4.39 3.85 0.0875 1.48
ENTRE EJE 3-4, ENTRE EJE D y E 1.00 4.39 2.45 0.0875 0.94
ENTRE EJE 3-4, ENTRE EJE E y F 1.00 4.39 3.65 0.0875 1.40

09.01.04.06.02 ENCOFRADO Y DESENCOFRADO PARA LOSAS M2 127.16


BLOQUE MANTENIMIENTO
PRIMER PISO
ENTRE EJE 1-2, ENTRE EJE D y E 1.00 3.82 2.45 9.36
ENTRE EJE 1-2, ENTRE EJE E y F 1.00 3.82 3.65 13.94
ENTRE EJE 2-3, ENTRE EJE A y B 1.00 3.82 2.70 10.31
ENTRE EJE 2-3, ENTRE EJE B y C 1.00 3.82 3.85 14.71
ENTRE EJE 2-3, ENTRE EJE D y E 1.00 3.82 2.45 9.36
ENTRE EJE 2-3, ENTRE EJE E y F 1.00 3.82 3.65 13.94
ENTRE EJE 3-4, ENTRE EJE A y B 1.00 4.39 2.70 11.85
ENTRE EJE 3-4, ENTRE EJE B y C 1.00 4.39 3.85 16.90
ENTRE EJE 3-4, ENTRE EJE D y E 1.00 4.39 2.45 10.76
ENTRE EJE 3-4, ENTRE EJE E y F 1.00 4.39 3.65 16.02
09.01.04.06.04 LADRILLO HUECO DE ARCILLA 30X30X15 CM PARA TECHO ALIGERADO UND 1059.23

BLOQUE MANTENIMIENTO f(und/m2)


UNA DIRECCION ENTRE EJE 1-2, ENTRE EJE D y E 1.00 3.82 2.45 8.33 77.96
ENTRE EJE 1-2, ENTRE EJE E y F 1.00 3.82 3.65 8.33 116.15
ENTRE EJE 2-3, ENTRE EJE A y B 1.00 3.82 2.70 8.33 85.92
ENTRE EJE 2-3, ENTRE EJE B y C 1.00 3.82 3.85 8.33 122.51
ENTRE EJE 2-3, ENTRE EJE D y E 1.00 3.82 2.45 8.33 77.96
ENTRE EJE 2-3, ENTRE EJE E y F 1.00 3.82 3.65 8.33 116.15
ENTRE EJE 3-4, ENTRE EJE A y B 1.00 4.39 2.70 8.33 98.74
ENTRE EJE 3-4, ENTRE EJE B y C 1.00 4.39 3.85 8.33 140.79
ENTRE EJE 3-4, ENTRE EJE D y E 1.00 4.39 2.45 8.33 89.59
ENTRE EJE 3-4, ENTRE EJE E y F 1.00 4.39 3.65 8.33 133.48

09.01.04.06.05 ACERO PARA LOSAS F'y= 4200 Kg/Cm2 KG 777.30


(VER METRADO ACERO) 777.30 777.30

09.01.04.07 COLUMNETAS
09.01.04.07.01 CONCRETO EN COLUMNETAS M3 2.84
BLOQUE H
Co-01 EJE F, ENTRE EJE 1 y 2 2.00 0.20 0.15 4.42 0.27
EJE F, ENTRE EJE 1 y 2 1.00 0.20 0.15 2.05 0.06
EJE F, ENTRE EJE 2 y 3 2.00 0.20 0.15 4.42 0.27
EJE F, ENTRE EJE 2 y 3 1.00 0.20 0.15 2.05 0.06
EJE F, ENTRE EJE 3 y 4 2.00 0.20 0.15 4.42 0.27
EJE F, ENTRE EJE 3 y 4 1.00 0.20 0.15 2.05 0.06
EJE E, ENTRE EJE 1 y 2 2.00 0.20 0.15 4.42 0.27
EJE E, ENTRE EJE 2 y 3 2.00 0.20 0.15 4.42 0.27
EJE E, ENTRE EJE 3 y 4 2.00 0.20 0.15 4.42 0.27
EJE 1, ENTRE EJE E y F 2.00 0.20 0.15 4.42 0.27
EJE 2, ENTRE EJE E y F 2.00 0.20 0.15 4.42 0.27
EJE 3, ENTRE EJE E y F 2.00 0.20 0.15 4.42 0.27
EJE 4, ENTRE EJE E y F 2.00 0.20 0.15 4.42 0.27

09.01.04.07.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS M2 66.19


BLOQUE H

EJE F, ENTRE EJE 1 y 2 2.00 Perimetro= 0.70 4.42 6.19


EJE F, ENTRE EJE 1 y 2 1.00 Perimetro= 0.70 2.05 1.44
EJE F, ENTRE EJE 2 y 3 2.00 Perimetro= 0.70 4.42 6.19
EJE F, ENTRE EJE 2 y 3 1.00 Perimetro= 0.70 2.05 1.44
EJE F, ENTRE EJE 3 y 4 2.00 Perimetro= 0.70 4.42 6.19
EJE F, ENTRE EJE 3 y 4 1.00 Perimetro= 0.70 2.05 1.44
EJE E, ENTRE EJE 1 y 2 2.00 Perimetro= 0.70 4.42 6.19
EJE E, ENTRE EJE 2 y 3 2.00 Perimetro= 0.70 4.42 6.19
EJE E, ENTRE EJE 3 y 4 2.00 Perimetro= 0.70 4.42 6.19
EJE 1, ENTRE EJE E y F 2.00 Perimetro= 0.70 4.42 6.19
EJE 2, ENTRE EJE E y F 2.00 Perimetro= 0.70 4.42 6.19
EJE 3, ENTRE EJE E y F 2.00 Perimetro= 0.70 4.42 6.19
EJE 4, ENTRE EJE E y F 2.00 Perimetro= 0.70 4.42 6.19

09.01.04.07.03 ACERO PARA COLUMNETAS F'y= 4200 Kg/Cm2 KG 299.84


(VER METRADO ACERO) 299.84 299.84

09.01.04.08 VIGAS DE CONFINAMIENTO


09.01.04.08.01 CONCRETO F´C=175KG/CM2 EN VIGAS DE CONFINAMIENTO M3 0.83
PRIMER PISO
EJE 1, ENTRE EJE E -F 1.00 2.80 0.15 0.15 0.06
EJE 2, ENTRE EJE A -B 1.00 2.50 0.15 0.15 0.06
EJE 2, ENTRE EJE B -C 1.00 3.65 0.15 0.15 0.08
EJE 2, ENTRE EJE E -F 1.00 3.10 0.15 0.15 0.07
EJE 3, ENTRE EJE E -F 1.00 3.10 0.15 0.15 0.07
EJE 4, ENTRE EJE A y B 1.00 1.86 0.15 0.15 0.04
EJE 4, ENTRE EJE B y C 1.00 1.21 0.15 0.15 0.03
EJE 4, ENTRE EJE E y F 1.00 2.80 0.15 0.15 0.06
EJE A, ENTRE EJE 2 y 3 1.00 2.12 0.15 0.15 0.05
EJE E, ENTRE EJE 1 y 2 1.00 1.70 0.15 0.15 0.04
EJE E, ENTRE EJE 2 y 3 1.00 1.70 0.15 0.15 0.04
EJE E, ENTRE EJE 3 y 4 1.00 2.04 0.15 0.15 0.05
EJE F, ENTRE EJE 1 y 2 1.00 2.97 0.15 0.15 0.07
EJE F, ENTRE EJE 2 y 3 1.00 2.00 0.15 0.15 0.05
EJE F, ENTRE EJE 23y 4 1.00 3.34 0.15 0.15 0.08

09.01.04.08.02 M2 16.60
ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CONFINAMIENTO

PRIMER PISO EJE 1, ENTRE EJE E -F 1.00 2.80 P= 0.45 1.26


EJE 2, ENTRE EJE A -B 1.00 2.50 P= 0.45 1.13
EJE 2, ENTRE EJE B -C 1.00 3.65 P= 0.45 1.64
EJE 2, ENTRE EJE E -F 1.00 3.10 P= 0.45 1.40
EJE 3, ENTRE EJE E -F 1.00 3.10 P= 0.45 1.40
EJE 4, ENTRE EJE A y B 1.00 1.86 P= 0.45 0.84
EJE 4, ENTRE EJE B y C 1.00 1.21 P= 0.45 0.54
EJE 4, ENTRE EJE E y F 1.00 2.80 P= 0.45 1.26
EJE A, ENTRE EJE 2 y 3 1.00 2.12 P= 0.45 0.95
EJE E, ENTRE EJE 1 y 2 1.00 1.70 P= 0.45 0.77
EJE E, ENTRE EJE 2 y 3 1.00 1.70 P= 0.45 0.77
EJE E, ENTRE EJE 3 y 4 1.00 2.04 P= 0.45 0.92
EJE F, ENTRE EJE 1 y 2 1.00 2.97 P= 0.45 1.34
EJE F, ENTRE EJE 2 y 3 1.00 2.00 P= 0.45 0.90
EJE F, ENTRE EJE 23y 4 1.00 3.34 P= 0.45 1.50
09.01.04.08.03 ACERO EN VIGUETAS F'y= 4200 Kg/Cm2 KG 92.43
(VER METRADO ACERO) 92.43 92.43
09.01.05 VARIOS
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)
09.01.05.01 UND 27.00
EN ZAPATAS (7,14,28 Días) 1.00 6.00 6.00
EN COLUMNAS (7,14,28 Días) 1.00 9.00 9.00
EN LOSA ALIGERADA (7,14,28 Días) 1.00 6.00 6.00
EN COLUMNETAS (7,14,28 Días) 1.00 3.00 3.00
EN VIGAS DE CONFINAMEINTO (7,14,28 Días) 1.00 3.00 3.00

09.01.05 ESTRUCTURAS METALICAS


09.01.05.01 TIJERALES PRINCIPALES
09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 4A UND 3.00
3.00 3.00

09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 4A PZA 3.00


3.00 3.00

09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 4B UND 1.00


1.00 1.00

09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 4B PZA 1.00


1.00 1.00

09.01.05.01 APOYOS Y FIJACION

09.01.05.01 SISTEMA DE APOYO FIJO EN TIJERAL METALICO UND 4.00 4.00 4.00

09.01.05.01 DISPOSITIVO DE APOYO MOVIL EN TIJERAL METALICO UND 7.00 7.00 7.00

09.01.05.01 TEMPLADORES
09.01.05.01 TENSOR DE 5/8" EN ARRIOSTRE DE TIJERALES ML 89.10
ENTRE 1-2 2.00 8.70 17.40
ENTRE 2-3 2.00 17.70 35.40
ENTRE 3-4 2.00 18.15 36.30

09.01.05.01 CORREAS METALICAS


09.01.05.01 CORREA METALICA PERFIL C6X8.2 ML 143.70
5.00 10.80 54.00
6.00 14.95 89.70
HOJA DE M
OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD
FÓRMULA : ESTRUCTURAS -BLOQUE MANTENIMIENTO
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA

Obs: Traslape Normal: para acero vertical y acero horizontal con H<0.30m
Traslape Superior: para horizontal con H>0.30m
(H=Peralte efectivo)

Datos Dimensiones

item descripción Cantidad Tipo


descripción Ø

09.01.04.01 ZAPATAS
09.01.04.01.02 ACERO PARA ZAPATAS F'y= 4200 Kg/Cm2
BLOQUE MANTENIMIENTO
Z-1 3 Normal Acero Longitudinal 3/4 ''
3 Normal Acero Transversal 3/4 ''

Z-2 4 Normal Acero Longitudinal 3/4 ''


4 Normal Acero Transversal 3/4 ''

Z-3 3 Normal Acero Longitudinal 3/4 ''


3 Normal Acero Transversal 3/4 ''

Z-4 2 Normal Acero Longitudinal 3/4 ''


2 Normal Acero Transversal 3/4 ''

Z-5 1 Normal Acero Longitudinal 3/4 ''


1 Normal Acero Transversal 3/4 ''

Z-6 1 Normal Acero Longitudinal 3/4 ''


1 Normal Acero Transversal 3/4 ''

Z-7 1 Normal Acero Longitudinal 3/4 ''


1 Normal Acero Transversal 3/4 ''

Z-8 1 Normal Acero Longitudinal 3/4 ''


1 Normal Acero Transversal 3/4 ''

Z-9 1 Normal Acero Longitudinal 3/4 ''


1 Normal Acero Transversal 3/4 ''

Z-10 1 Normal Acero Longitudinal 3/4 ''


1 Normal Acero Transversal 3/4 ''
Total ml
Total piezas
Kg
Total Kg

05.02.00 VIGAS DE CONEXIÓN


05.02.03 ACERO PARA VIGAS DE CIMENTACION F'y= 4200 Kg/Cm2
BLOQUE MANTENIMIENTO
EJE A ENTRE EJE 1 y 5 1 Normal Acero Longitudinal Sup. 5/8 ''
1 Normal Acero Longitudinal Sup. 1/2 ''
1 Normal Acero Longitudinal Inferior 5/8 ''
1 Normal Acero Longitudinal Inferior 1/2 ''
1 Normal Estribos 3/8 ''

EJE B ENTRE EJE 3 y 4 1 Normal Acero Longitudinal Sup. 5/8 ''


1 Normal Acero Longitudinal Sup. 1/2 ''
1 Normal Acero Longitudinal Inf. 5/8 ''
1 Normal Acero Longitudinal Inf. 1/2 ''
1 Normal Estribos 3/8 ''

EJE C ENTRE EJE 3 y 4 1 Normal Acero Longitudinal Sup. 5/8 ''


1 Normal Acero Longitudinal Sup. 5/8 ''
1 Normal Estribos 3/8 ''

EJE D ENTRE EJE 1 y 2 1 Normal Acero Longitudinal Sup. 5/8 ''


1 Normal Acero Longitudinal Sup. 5/8 ''
1 Normal Estribos 3/8 ''

EJE D ENTRE EJE 3 y 4 1 Normal Acero Longitudinal Sup. 5/8 ''


1 Normal Acero Longitudinal Sup. 5/8 ''
1 Normal Estribos 3/8 ''

EJE E ENTRE EJE 1 y 2 1 Normal Acero Longitudinal Sup. 5/8 ''


1 Normal Acero Longitudinal Sup. 1/2 ''
1 Normal Acero Longitudinal Inf. 5/8 ''
1 Normal Acero Longitudinal Inf. 1/2 ''
1 Normal Acero refuerzo Sup. 1/2 ''
1 Normal Estribos 3/8 ''

EJE E ENTRE EJE 3 y 4 1 Normal Acero Longitudinal Sup. 5/8 ''


1 Normal Acero Longitudinal Sup. 1/2 ''
1 Normal Acero Longitudinal Inf. 5/8 ''
1 Normal Acero Longitudinal Inf. 1/2 ''
1 Normal Acero refuerzo Sup. 1/2 ''
1 Normal Estribos 3/8 ''

EJE F ENTRE EJE 1 y 4 1 Normal Acero Longitudinal Sup. 5/8 ''


1 Normal Acero Longitudinal Sup. 1/2 ''
1 Normal Acero Longitudinal Inf. 5/8 ''
1 Normal Acero Longitudinal Inf. 1/2 ''
1 Normal Acero refuerzo Sup. 1/2 ''
1 Normal Estribos 3/8 ''

Total ml
Total piezas
Kg
Total Kg

05.03.00 COLUMNAS
05.03.01 ACERO PARA COLUMNAS F'y= 4200 Kg/Cm2
BLOQUE MANTENIMIENTO
C-1 1 Normal Acero Longitudinal 3/4 ''
1 Normal Acero Longitudinal 5/8 ''
1 Normal Estribos 3/8 ''
1 Normal Estribos 3/8 ''

C-2 10 Normal Acero Longitudinal 3/4 ''


10 Normal Acero Longitudinal 5/8 ''
10 Normal Estribos 3/8 ''
10 Normal Estribos 3/8 ''

C-3 8 Normal Acero Longitudinal 3/4 ''


8 Normal Acero Longitudinal 5/8 ''
8 Normal Estribos 3/8 ''
8 Normal Estribos 3/8 ''

C-4 2 Normal Acero Longitudinal 3/4 ''


2 Normal Acero Longitudinal 5/8 ''
2 Normal Estribos 3/8 ''
2 Normal Estribos 3/8 ''

Total ml
Total piezas
Kg
Total Kg

05.05.00 VIGAS
05.05.03 ACERO PARA VIGAS F'y= 4200 Kg/Cm2
BLOQUE MANTENIMIENTO
Primer Piso
V- 101 (0.30 x 0.50)
EJE A, ENTRE EJE 2 y 4 1 Normal Acero Long. Superior 5/8 ''
1 Normal Acero Long. Inferior 5/8 ''
1 Normal Refuerzo Superior 1/2 ''
1 Normal Estribos 3/8 ''
V- 102(0.30 x 0.50)
EJE B , ENTRE EJE 2 y 4 1 Normal Acero Long. Superior 3/4 ''
1 Normal Acero Long. Inferior 3/4 ''
1 Normal Refuerzo Superior 5/8 ''
1 Normal Estribos 3/8 ''

V- 103(0.30 x 0.50)
EJE C , ENTRE EJE 2 y 4 1 Normal Acero Long. Superior 5/8 ''
1 Normal Acero Long. Inferior 5/8 ''
1 Normal Refuerzo Superior 1/2 ''
1 Normal Estribos 3/8 ''

V- 104(0.30 x 0.50)
EJE D , ENTRE EJE 1 y 4 1 Normal Acero Long. Superior 5/8 ''
1 Normal Acero Long. Inferior 5/8 ''
1 Normal Refuerzo Superior 5/8 ''
1 Normal Estribos 3/8 ''

V- 105(0.30 x 0.50)
EJE E , ENTRE EJE 1 y 4 1 Normal Acero Long. Superior 3/4 ''
1 Normal Acero Long. Inferior 3/4 ''
1 Normal Refuerzo Superior 5/8 ''
1 Normal Estribos 3/8 ''
V- 105(0.30 x 0.50)
EJE F , ENTRE EJE 1 y 4 1 Normal Acero Long. Superior 5/8 ''
1 Normal Acero Long. Inferior 5/8 ''
1 Normal Refuerzo Superior 5/8 ''
1 Normal Estribos 3/8 ''

V- 107(0.30 x 0.40)
EJE 1 , ENTRE EJE D y F 1 Normal Acero Long. Superior 5/8 ''
1 Normal Acero Long. Inferior 5/8 ''
1 Normal Refuerzo Superior 1/2 ''
1 Normal Estribos 3/8 ''

V- 108(0.30 x 0.40)
EJE 2 , ENTRE EJE A y C 1 Normal Acero Long. Superior 5/8 ''
1 Normal Acero Long. Inferior 5/8 ''
1 Normal Refuerzo Superior 1/2 ''
1 Normal Estribos 3/8 ''

V- 108(0.30 x 0.40)
EJE 2 , ENTRE EJE D y F 1 Normal Acero Long. Superior 5/8 ''
1 Normal Acero Long. Inferior 5/8 ''
1 Normal Refuerzo Superior 1/2 ''
1 Normal Estribos 3/8 ''

V- 109(0.30 x 0.40)
EJE 3 , ENTRE EJE A y C 1 Normal Acero Long. Superior 5/8 ''
1 Normal Acero Long. Inferior 5/8 ''
1 Normal Refuerzo Superior 1/2 ''
1 Normal Refuerzo Superior 5/8 ''
1 Normal Estribos 3/8 ''

V- 109(0.30 x 0.40)
EJE 3 , ENTRE EJE D y F 1 Normal Acero Long. Superior 5/8 ''
1 Normal Acero Long. Inferior 5/8 ''
1 Normal Refuerzo Superior 1/2 ''
1 Normal Estribos 3/8 ''

V- 110(0.30 x 0.40)
EJE 4 , ENTRE EJE A y C 1 Normal Acero Long. Superior 5/8 ''
1 Normal Acero Long. Inferior 5/8 ''
1 Normal Refuerzo Superior 1/2 ''
1 Normal Estribos 3/8 ''

V- 110(0.30 x 0.40)
EJE 4 , ENTRE EJE D y F 1 Normal Acero Long. Superior 5/8 ''
1 Normal Acero Long. Inferior 5/8 ''
1 Normal Refuerzo Superior 1/2 ''
1 Normal Estribos 3/8 ''

Segundo Piso
V- 207(0.30 x 0.40)
EJE 1 , ENTRE EJE D y F 1 Normal Acero Long. Superior 1/2 ''
1 Normal Acero Long. Inferior 1/2 ''
1 Normal Estribos 3/8 ''

V- 108(0.30 x 0.40)
EJE 2 , ENTRE EJE A y C 1 Normal Acero Long. Superior 1/2 ''
1 Normal Acero Long. Inferior 1/2 ''
1 Normal Estribos 3/8 ''

V- 110(0.30 x 0.40)
EJE 4 , ENTRE EJE A y C 1 Normal Acero Long. Superior 1/2 ''
1 Normal Acero Long. Inferior 1/2 ''
1 Normal Estribos 3/8 ''

V- 110(0.30 x 0.40)
EJE 4 , ENTRE EJE D y F 1 Normal Acero Long. Superior 1/2 ''
1 Normal Acero Long. Inferior 1/2 ''
1 Normal Estribos 3/8 ''

V- 103(0.30 x 0.40)
EJE C , ENTRE EJE 2 y 4 1 Normal Acero Long. Superior 1/2 ''
1 Normal Acero Long. Inferior 1/2 ''
1 Normal Estribos 3/8 ''

V- 104(0.30 x 0.40)
EJE D , ENTRE EJE 1 y 4 1 Normal Acero Long. Superior 1/2 ''
1 Normal Acero Long. Inferior 1/2 ''
1 Normal Estribos 3/8 ''

V- 105(0.30 x 0.40)
EJE F , ENTRE EJE 1 y 4 1 Normal Acero Long. Superior 1/2 ''
1 Normal Acero Long. Inferior 1/2 ''
1 Normal Estribos 3/8 ''

Total ml
Total piezas
Kg
Total Kg

05.06.00 LOSAS ALIGERADAS


05.06.03 ACERO PARA LOSAS F'y= 4200 Kg/Cm2
BLOQUE MANTENIMIENTO
PRIMER PISO
ENTRE EJE 1 y 2, ENTRE EJE D y F
Baston Superior 1 Normal 1/2 ''
Baston Superior 1 Normal 3/8 ''
Baston Inferior 1 Normal 1/2 ''

ENTRE EJE 2 y 4, ENTRE EJE A y C


Baston Superior 1 Normal 1/2 ''
Baston Superior 1 Normal 3/8 ''
Baston Inferior 1 Normal 1/2 ''

ENTRE EJE 2 y 4, ENTRE EJE D y F


Baston Superior 1 Normal 1/2 ''
Baston Superior 1 Normal 3/8 ''
Baston Inferior 1 Normal 1/2 ''

ACERO DE TEMPERATURA
ENTRE EJE 2 y 4, ENTRE EJE A y C
TRANSVERSAL 1 Normal 6mm
LONGITUDINAL 1 Normal 6mm

ENTRE EJE 1 y 4, ENTRE EJE D y F


TRANSVERSAL 1 Normal 6mm
LONGITUDINAL 1 Normal 6mm
Total ml
Total piezas
Kg
Total Kg

05.04.00 COLUMNETAS
05.04.03 ACERO PARA COLUMNETAS F'y= 4200 Kg/Cm2
BLOQUE MANTENIMIENTO
Primer Piso
Co-01 20.00 Normal Acero Longitudinal 3/8 ''
20.00 Normal Estribos 6mm

Co-01 3.00 Normal Acero Longitudinal 3/8 ''


3.00 Normal Estribos 6mm

Total ml
Total piezas
Kg
Total Kg

05.06.00 VIGAS DE CONFINAMIENTO


05.08.03 ACERO EN VIGUETAS F'y= 4200 Kg/Cm2
BLOQUE MANTENIMIENTO

EJE 1, ENTRE EJE E -F 1 Normal Acero Longitudinal 8mm


1 Normal Estribos 6mm
EJE 2, ENTRE EJE A -B 1 Normal Acero Longitudinal 8mm
1 Normal Estribos 6mm
EJE 2, ENTRE EJE B -C 1 Normal Acero Longitudinal 8mm
1 Normal Estribos 6mm
EJE 2, ENTRE EJE E -F 1 Normal Acero Longitudinal 8mm
1 Normal Estribos 6mm
EJE 3, ENTRE EJE E -F 1 Normal Acero Longitudinal 8mm
1 Normal Estribos 6mm
EJE 4, ENTRE EJE A y B 1 Normal Acero Longitudinal 8mm
1 Normal Estribos 6mm
EJE 4, ENTRE EJE B y C 1 Normal Acero Longitudinal 8mm
1 Normal Estribos 6mm
EJE 4, ENTRE EJE E y F 1 Normal Acero Longitudinal 8mm
1 Normal Estribos 6mm
EJE A, ENTRE EJE 2 y 3 1 Normal Acero Longitudinal 8mm
1 Normal Estribos 6mm
EJE E, ENTRE EJE 1 y 2 1 Normal Acero Longitudinal 8mm
1 Normal Estribos 6mm
EJE E, ENTRE EJE 2 y 3 1 Normal Acero Longitudinal 8mm
1 Normal Estribos 6mm
EJE E, ENTRE EJE 3 y 4 1 Normal Acero Longitudinal 8mm
1 Normal Estribos 6mm
EJE F, ENTRE EJE 1 y 2 1 Normal Acero Longitudinal 8mm
1 Normal Estribos 6mm
EJE F, ENTRE EJE 2 y 3 1 Normal Acero Longitudinal 8mm
1 Normal Estribos 6mm
EJE F, ENTRE EJE 23y 4 1 Normal Acero Longitudinal 8mm
1 Normal Estribos 6mm
Total ml
Total piezas
Kg
Total Kg

05.07.00 ESCALERAS
05.07.03 ACERO EN ESCALERAS F'y= 4200 Kg/Cm2
BLOQUE MANTENIMIENTO
TRAMO 01
1 Normal Acero Longitudinal Sup. 1/2 ''
1 Normal Acero Longitudinal Inf. 1/2 ''
1 Normal Acero Longitudinal Inf. 1/2 ''
1 Normal Acero Transv Sup. 3/8 ''
1 Normal Acero Transv Inf. 3/8 ''
TRAMO 02
1 Normal Acero Longitudinal Sup. 1/2 ''
1 Normal Acero Longitudinal Sup. 1/2 ''
1 Normal Acero Longitudinal Inf. 1/2 ''
1 Normal Acero Transv Sup. 3/8 ''
1 Normal Acero Transv Inf. 3/8 ''
TRAMO 03
1 Normal Acero Longitudinal Sup. 1/2 ''
1 Normal Acero Longitudinal Inf. 1/2 ''
1 Normal Acero Longitudinal Inf. 1/2 ''
1 Normal Acero Transv Sup. 3/8 ''
1 Normal Acero Transv Inf. 3/8 ''
TRAMO 04
1 Normal Acero Longitudinal Sup. 1/2 ''
1 Normal Acero Longitudinal Sup. 1/2 ''
1 Normal Acero Longitudinal Inf. 1/2 ''
1 Normal Acero Transv Sup. 3/8 ''
1 Normal Acero Transv Inf. 3/8 ''

Total ml
Total piezas
Kg
Total Kg
HOJA DE METRADOS DE ACERO
S SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO

ф 6mm 8mm 3/8" 1/2" 5/8"


TIPOS DE TRASLAPE: Normal 0.40 0.40 0.40 0.50 0.60
Superior 0.40 0.40 0.45 0.60 0.75
Peso (kg/m) 0.22 0.40 0.56 0.99 1.55

ensiones RESULTADOS
ACERO longitud # 6mm 8mm 3/8 1/2 5/8
# de piezas s/emp emp. ML ML ML ML ML

6 1.01 - - - - - -
6 1.01 - - - - - -
- - - - -
- - - - -
8 1.46 - - - - - -
4 0.66 - - - - - -
- - - - - -
- - - - - -
8 1.36 - - - - - -
5 1.36 - - - - - -
- - - - - -
7 1.26 - - - - - -
7 1.16 - - - - - -
- - - - - -
7 1.21 - - - - - -
8 1.51 - - - - - -
- - - - - -
7 1.21 - - - - - -
7 1.31 - - - - - -
- - - - - -
6 1.01 - - - - - -
5 0.91 - - - - - -
- - - - - -
7 1.31 - - - - - -
7 1.21 - - - - - -
- - - - - -
5 0.81 - - - - - -
10 1.76 - - - - - -
- - - - - -
8 1.36 - - - - - -
4 0.61 - - - - - -
- - - - -
- - - - -
- - - - -
630.26

2 9.71 1 - - - - 20.62
1 9.71 1 - - - 10.21 -
2 9.71 - - - - 19.42
1 9.71 - - - 9.71 -
48 1.48 - - - 71.04 - -
- - - - -
2 5.60 - - - - - 11.20
1 5.60 - - - - 5.60 -
2 5.60 - - - - - 11.20
1 5.60 - - - - 5.60 -
24 1.48 - - - 35.52 - -
- - - - -
3 5.59 - - - - - 16.77
3 5.59 - - - - - 16.77
25 1.48 - - - 37.00 - -
- - - - -
3 5.23 - - - - - 15.69
3 5.23 - - - - - 15.69
23 1.48 - - - 34.04 - -
- - - - -
3 5.60 - - - - - 16.80
3 5.60 - - - - - 16.80
25 1.48 - - - 37.00 - -
- - - - -
2 5.23 - - - - - 10.46
1 5.23 - - - - 5.23 -
2 5.23 - - - - - 10.46
1 5.23 - - - - 5.23 -
2 2.57 - - - - 5.14 -
23 1.48 - - - 34.04 - -
- - - - -
2 5.63 - - - - - 11.26
1 5.63 - - - - 5.63 -
2 5.63 - - - - - 11.26
1 5.63 - - - - 5.63 -
2 2.78 - - - - 5.56 -
24 1.48 - - - 35.52 - -
- - - - -
2 13.84 1 - - - - 28.88
1 13.84 1 - - - 14.34 -
2 13.84 1 - - - - 28.88
1 13.84 1 - - - 14.34 -
2 2.78 - - - - 5.56 -
70 1.48 - - - 103.60 - -

- - 387.76 97.78 262.16


- - 44.00 11.00 30.00
- - 216.95 97.20 406.92
721.08
8 6.55 - - - - - -
6 6.55 - - - - - 39.30
39 3.16 - - - 123.24 - -
39 2.76 - - - 107.64 - -

8 10.60 1 - - - - -
2 10.60 - - - - 212.00
62 2.76 - - - 1,711.20 - -
62 2.56 - - - 1,587.20 - -

4 10.60 1 - - - - -
6 10.60 1 - - - - 537.60
62 2.76 - - - 1,368.96 - -
62 1.87 - - - 927.52 - -
- -
6 6.55 - -
4 6.55 - - - - - 52.40
39 3.16 - - - 246.48 - -
39 2.31 - - - 180.18 - -
- - - - - -
- - 6,252.42 - 841.30
- - 695.00 - 94.00
- - 3,498.23 - 1,305.87
7925.78

- - - - -
- - - - - -
2 9.65 1 - - - - 20.50
2 9.65 1 - - - - 20.50
1 6.69 - - - - 6.69 -
54 1.16 - - - 62.64 - -
- - - - - -
2 9.65 1 - - - - -
2 9.65 1 - - - - -
1 6.69 - - - - - 6.69
54 1.16 - - - 62.64 - -
- - - - -
- - - - - -
2 9.65 1 - - - - 20.50
2 9.65 1 - - - - 20.50
1 6.69 - - - - 6.69 -
54 1.16 - - - 62.64 - -
- - - - -
- - - - - -
2 13.77 1 - - - - 28.74
2 13.77 1 - - - - 28.74
1 9.49 1 - - - - 10.09
80 1.16 - - - 92.80 - -
- - - - -
- - - - - -
2 13.77 1 - - - - -
2 13.77 1 - - - - -
1 9.49 1 - - - - 10.09
80 1.16 - - - 92.80 - -
- - - - -
- - - - - -
2 13.77 1 - - - - 28.74
2 13.77 1 - - - - 28.74
1 9.49 1 - - - - 10.09
80 1.16 - - - 92.80 - -
- - - - -
- - - - - -
2 7.54 - - - - - 15.08
2 7.54 - - - - - 15.08
2 5.60 - - - - 11.20 -
45 0.96 - - - 43.20 - -
- - - - -
- - - - - -
2 7.99 - - - - - 15.98
2 7.99 - - - - - 15.98
1 5.60 - - - - 5.60 -
48 0.96 - - - 46.08 - -
- - - - -
- - - - - -
2 7.54 - - - - - 15.08
2 7.54 - - - - - 15.08
2 5.60 - - - - 11.20 -
46 0.96 - - - 44.16 - -
- - - - -
- - - - - -
2 7.99 - - - - - 15.98
2 7.99 - - - - - 15.98
1 3.00 - - - - 3.00 -
1 2.55 - - - - - 2.55
48 0.96 - - - 46.08 - -
- - - - -
- - - - - -
2 7.54 - - - - - 15.08
2 7.54 - - - - - 15.08
2 5.30 - - - - 10.60 -
48 0.96 - - - 46.08 - -
- - - - -
- - - - -
- - - - - -
2 7.99 - - - - - 15.98
2 7.99 - - - - - 15.98
1 3.35 - - - - 3.35 -
49 0.96 - - - 47.04 - -
- - - - -
- - - - - -
2 7.99 - - - - - 15.98
2 7.99 - - - - - 15.98
2 3.35 - - - - 6.70 -
49 0.96 - - - 47.04 - -
- - - - -
- - - - -
- - - - - -
3 7.37 - - - - 22.11 -
3 7.37 - - - - 22.11 -
45 0.96 - - - 43.20 - -
- - - - -
- - - - - -
3 7.81 - - - - 23.43 -
3 7.81 - - - - 23.43 -
48 0.96 - - - 46.08 - -
- - - - -
- - - - - -
3 7.81 - - - - 23.43 -
3 7.81 - - - - 23.43 -
49 0.96 - - - 47.04 - -
- - - - -
- - - - - -
3 7.37 - - - - 22.11 -
3 7.37 - - - - 22.11 -
49 0.96 - - - 47.04 - -
- - - - -
- - - - - -
3 9.66 1 - - - 30.48 -
3 9.66 1 - - - 30.48 -
54 0.96 - - - 51.84 - -
- - - - -
- - - - - -
3 13.60 1 - - - 42.30 -
3 13.60 1 - - - 42.30 -
80 0.96 - - - 76.80 - -
- - - - -
- - - - - -
3 13.60 1 - - - 42.30 -
3 13.60 1 - - - 42.30 -
80 0.96 - - - 76.80 - -

- - 1,174.80 477.35 454.79


- - 131.00 54.00 51.00
- - 657.30 474.53 705.93
2059.67

9 4.92 - - - - 44.28 -
9 1.60 - - - 14.40 - -
9 6.89 - - - - 62.01 -
- - - - -
- - - - -
19 5.22 - - - - 99.18 -
19 1.70 - - - 32.30 - -
19 7.34 - - - - 139.46 -
- - - - -
- - - - -
19 4.92 - - - - 93.48 -
19 1.60 - - - 30.40 - -
19 6.89 - - - - 130.91 -
- - - - -
- - - - -
- - - - -
30 7.45 - 222.01 - - - -
36 9.11 1 346.54 - - - -
- - - - -
- - - - -
28 7.00 - 196.00 - - - -
53 13.23 1 721.30 - - - -
764.55 - 77.10 569.32 -
85.00 - 9.00 64.00 -
168.20 - 43.14 565.96 -
777.30

- - - - - -
4 4.72 - - - 377.60 - -
26 0.58 - 305.66 - - - -
- - - - - -
4 2.35 - - - 28.20 - -
15 0.58 - 25.23 - - - -
- - - - - -
330.89 - 405.80 - -
37.00 - 46.00 - -
72.80 - 227.05 - -
299.84

- - - - -
4 3.00 - - 12.00 - - -
20 0.48 - 9.76 - - - -
4 2.70 - - 10.80 - - -
18 0.48 - 8.80 - - - -
4 3.85 - - 15.40 - - -
26 0.48 - 12.48 - - - -
4 3.30 - - 13.20 - - -
22 0.48 - 10.72 - - - -
4 3.30 - - 13.20 - - -
22 0.48 - 10.72 - - - -
4 2.06 - - 8.24 - - -
14 0.48 - 6.75 - - - -
4 1.41 - - 5.64 - - -
10 0.48 - 4.67 - - - -
4 3.00 - - 12.00 - - -
20 0.48 - 9.76 - - - -
4 2.32 - - 9.28 - - -
16 0.48 - 7.58 - - - -
4 1.90 - - 7.60 - - -
13 0.48 - 6.24 - - - -
4 1.90 - - 7.60 - - -
13 0.48 - 6.24 - - - -
4 2.24 - - 8.96 - - -
15 0.48 - 7.33 - - - -
4 3.17 - - 12.68 - - -
21 0.48 - 10.30 - - - -
4 2.20 - - 8.80 - - -
15 0.48 - 7.20 - - - -
4 3.54 - - 14.16 - - -
24 0.48 - 11.49 - - - -
130.05 159.56 - - -
15.00 18.00 - - -
28.61 63.82 - - -
92.43

18 6.87 - - - - 123.66 -
18 4.59 - - - - 82.62 -
18 2.88 - - - - 51.84 -
30 2.60 - - - 78.00 - -
32 2.60 - - - 83.20 - -
-
18 3.33 - - - - 59.94 -
18 4.92 - - - - 88.56 -
18 7.19 - - - - 129.42 -
32 2.60 - - - 83.20 - -
35 2.60 - - - 91.00 - -
-
18 6.82 - - - - 122.76 -
18 4.83 - - - - 86.94 -
18 2.87 - - - - 51.66 -
31 2.60 - - - 80.60 - -
34 2.60 - - - 88.40 - -
-
18 3.33 - - - - 59.94 -
18 4.92 - - - - 88.56 -
18 7.19 - - - - 129.42 -
32 2.60 - - - 83.20 - -
35 2.60 - - - 91.00 - -
- - - - -
- - - - -
- - 678.60 1,075.32 -
- - 76.00 120.00 -
- - 379.68 1,068.98 -
1448.65
NTO PASCO, REGION PASCO.

3/4" 1" 1 3/8"


0.70 1.15 2.30
0.90 1.45 3.20
2.24 3.99 7.91

3/4 1 1 3/8
ML ML ML

18.18 - -
18.18 - -
- - -
- - -
46.72 - -
10.56 - -
- - -
- - -
32.64 - -
20.40 - -
- - -
17.64 - -
16.24 - -
- - -
8.47 - -
12.08 - -
- - -
8.47 - -
9.17 - -
- - -
6.06 - -
4.55 - -
- - -
9.17 - -
8.47 - -
- - -
4.05 - -
17.60 - -
- - -
10.88 - -
2.44 - -
281.97 - -
32.00 - -
630.26 - -
630.26

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
721.08
52.40 - -
- - -
- - -
- - -

904.00 - -
- - -
- - -
- - -

361.60 - -
- - -
- - -
- - -
-
78.60
- - -
- - -
- - -
- - -
1,396.60 - -
156.00 - -
3,121.68 - -
7925.78

- - -
- - -
- - -
- - -
- - -
- - -
- - -
20.70 - -
20.70 - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
28.94 - -
28.94 - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

99.28 - -
12.00 - -
221.91 - -
2059.67

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
777.30

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
299.84

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
92.43

- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
1448.65
HOJA DE METRADOS / ESTRUCTURAS

OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA,
DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE MANTENIMIENTO (RESIDUOS SOLIDOS Y GRUPO ELECTROGENO)
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
REGION : PASCO PROVINCIA: OXAPAMPA DISTRITO: OXAPAMPA

Nro. METRADO SUMA


PART. DESCRIPCION UND. UBICACIÓN
Elem LARGO ANCHO ALTO PARCIAL TOTAL
09.01.00 ESTRUCTURAS
09.01.01 TRABAJOS PRELIMINARES
09.01.01.01 LIMPIEZA DE TERRENO MANUAL M2 69.00
BLOQUE MANTENIMIENTO
CIMENTACION 1.00 Area= 69.00 69.00

09.01.01.02 TRAZO Y REPLANTEO M2 69.00


BLOQUE MANTENIMIENTO
CIMENTACION 1.00 Area= 69.00 69.00

09.01.01.03 TRAZO Y REPLANTEO DURANTE EL PROCESO M2 207.00


BLOQUE MANTENIMIENTO
CIMENTACION 1.00 Area= 69.00 69.00
1er PISO 1.00 Area= 69.00 69.00
Techo 1.00 Area= 69.00 69.00

09.01.02 MOVIMIENTOS DE TIERRAS


09.01.02.01 CORTES
09.01.02.01.01 CORTE GENERAL CON MAQUINARIA , H=0.40m M3 27.60
BLOQUE MANTENIMIENTO
SUPERFICIE 1.00 Area= 69.00 0.40 27.60

09.01.02.01 EXCAVACION
09.01.02.01.01 EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m M3 7.68
BLOQUE MANTENIMIENTO
Z-1 3.00 0.80 0.80 1.50 2.88
Z-2 5.00 0.80 0.80 1.50 4.80

09.01.02.01.02 EXCAVACION PARA CIMIENTOS CORRIDOS M3 4.27


BLOQUE MANTENIMIENTO EJE C 1.00 6.63 0.40 0.80 2.12
EJE 3 1.00 6.70 0.40 0.80 2.14

09.01.02.02 NIVELACION Y COMPACTACION


09.01.02.02.01 REFINE, COMPACTACION Y NIVELACION DE FONDO DE SUPERFICIE ZAPATA M2 5.12
BLOQUE MANTENIMIENTO Z-1 3.00 0.80 0.80 1.92
Z-2 5.00 0.80 0.80 3.20

09.01.02.02.01 REFINE, COMPACTACION Y NIVELACION DE FONDO DE SUPERFICIE CIMIENTOS CORRIDOS M2 5.33


BLOQUE MANTENIMIENTO EJE C 1.00 6.63 0.40 2.65
EJE 3 1.00 6.70 0.40 2.68

09.01.02.02.03 REFINE, COMPACTACION Y NIVELACION DE SUPERFICIE M2 44.22


BLOQUE MANTENIMIENTO
RESDUOS SOLIDOS 1.00 Area= 12.13 12.13
PASILLO 1.00 Area= 8.13 8.13
GRUPO ELECTROGE 1.00 Area= 21.11 21.11
CUARTO DE LIMPIEZ 1.00 Area= 2.85 2.85

09.01.02.03 RELLENOS CON MATERIAL DE PRESTAMO


09.01.02.03.01 RELLENO Y COMPACTO DE SUPERFICIE M3 17.69
BLOQUE MANTENIMIENTO
RESDUOS SOLIDOS 1.00 Area= 12.13 0.40 4.85
PASILLO 1.00 Area= 8.13 0.40 3.25
GRUPO ELECTROGE 1.00 Area= 21.11 0.40 8.44
CUARTO DE LIMPIEZ 1.00 Area= 2.85 0.40 1.14

09.01.02.03.01 RELLENO Y COMPACTO DE ZAPATAS M3 2.05


BLOQUE MANTENIMIENTO
ZAPATAS Z-1 3.00 0.80 0.80 0.40 0.77
Z-2 5.00 0.80 0.80 0.40 1.28

09.01.02.04 MANEJO DE MATERIAL PROCEDENTE DE EXCAVACIONES


09.01.02.04.01 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES M3 14.93
EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m 1.00 7.68 7.68
EXCAVACION PARA CIMIENTOS CORRIDOS 1.00 4.27 4.27
Sub Total 11.95
+2.5% esponjamiento 14.93

09.01.02.04.02 ELIMINACION DE MATERIAL EXCEDENTE M3 101.18


EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m 1.00 7.68 7.68
EXCAVACION PARA CIMIENTOS CORRIDOS 1.00 4.27 4.27
CORTE GENERAL CON MAQUINARIA , H=0.40m 1.00 69.00 69.00
Sub Total 80.95
+2.5% esponjamiento 101.18

09.01.03 OBRAS DE CONCRETO SIMPLE


09.01.03.01 SUB ZAPATAS
09.01.03.01.01 SUB ZAPATAS F´C=100KG/CM2 +30% PIEDRA GRANDE M3 5.12
BLOQUE MANTENIMIENTO
Z-1 3.00 0.80 0.80 1.00 1.92
Z-2 5.00 0.80 0.80 1.00 3.20
09.01.03.03 CIMIENTOS CORRIDOS
09.01.03.03.01 SOBRE CIMIENTOS CONCRETO F´C=140KG/CM2 + 30% PIEDRA DESPLAZADORA M3 3.47
BLOQUE MANTENIMIENTO EJE C 1.00 6.63 0.40 0.65 1.72
EJE 3 1.00 6.70 0.40 0.65 1.74

09.01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA CIMIENTOS CORRIDOS M2 17.33


BLOQUE MANTENIMIENTO EJE C 2.00 6.63 0.65 8.62
EJE 3 2.00 6.70 0.65 8.71

09.01.03.03 SOBRECIMIENTOS
09.01.03.03.01 SOBRE CIMIENTOS CONCRETO F´C=175KG/CM2 + 25% PIEDRA DESPLAZADORA M3 0.72
BLOQUE MANTENIMIENTO EJE C 1.00 6.63 0.12 0.45 0.36
EJE 3 1.00 6.70 0.12 0.45 0.36

09.01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.30 m M2 12.00


BLOQUE MANTENIMIENTO EJE C 2.00 6.63 0.45 5.97
EJE 3 2.00 6.70 0.45 6.03

09.01.03.04 FALSO PISO


09.01.03.04.01 CONCRETO F´C=80KG/CM2 PARA FALSO PISO E=0.10M M2 44.22
BLOQUE MANTENIMIENTO
PRIMER PISO RESDUOS SOLIDOS 1.00 Area= 12.13 12.13
PASILLO 1.00 Area= 8.13 8.13
GRUPO ELECTROGE 1.00 Area= 21.11 21.11
CUARTO DE LIMPIEZ 1.00 Area= 2.85 2.85

09.01.04 OBRAS DE CONCRETO ARMADO


09.01.04.01 ZAPATAS

09.01.04.01.01 CONCRETO PARA ZAPATA F'C=210 KG/CM2 M3 2.05


BLOQUE MANTENIMIENTO
Z-1 3.00 0.80 0.80 0.40 0.77
Z-2 5.00 0.80 0.80 0.40 1.28

09.01.04.01.02 ACERO PARA ZAPATAS F'y= 4200 Kg/Cm2 KG 55.67


(VER METRADO ACERO 55.67 55.67

09.01.04.04 COLUMNAS
09.01.04.04.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 M3 0.45
BLOQUE MANTENIMIENTO
PRIMER PISO C-1 8.00 0.40 0.35 0.40 0.45

09.01.04.04.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS M2 4.80


BLOQUE MANTENIMIENTO
PRIMER PISO C-1 8.00 Perimetro= 1.50 0.40 4.80

09.01.04.04.03 ACERO PARA COLUMNAS F'y= 4200 Kg/Cm2 KG 110.27


(VER METRADO ACERO 110.27 110.27

09.01.05 VARIOS

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)


09.01.05.01 UND 6.00
EN ZAPATAS (7,14,28 Días) 1.00 3.00 3.00
EN COLUMNAS (7,14,28 Días) 1.00 3.00 3.00

09.01.05 ESTRUCTURAS METALICAS


09.01.05.01 COLUMNAS METALICAS
09.01.05.01 COLUMNA METALICA TUBO RECTANGULAR 100x140X4mm PARA PORTICOS ML 8.00 4.75 38.00 38.00

09.01.05.01 VIGAS METALICAS


09.01.05.01 VIGA METALICA TUBO RECTANGULAR 40X80x3mm PARA PORTICOS ML 52.68
EJE 1, EJE 3 4.00 6.47 25.88
EJE A, EJE C 4.00 6.70 26.80

09.01.05.01 TIJERALES PRINCIPALES


09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 4C UND 3.00
3.00 3.00

09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 4C PZA 3.00


3.00 3.00
09.01.05.01 APOYOS Y FIJACION
09.01.05.01 SISTEMA DE APOYO FIJO EN COLUMNAS METALICAS 100X140mm UND 8.00 8.00 8.00

09.01.05.01 ARRIOSTRES
09.01.05.01 ARRIOSTRE DIAGONAL TUBO CUADRADO 40x2.5mm PARA PORTICOS ML 56.92
EJE 1, EJE 3 4.00 3.63 14.52
4.00 3.63 14.52
EJE A, EJE C 4.00 3.13 12.52
4.00 3.84 15.36

09.01.05.01 TEMPLADORES
09.01.05.01 TENSOR DE 1/2" EN ARRIOSTRE DE TIJERALES ML 44.40
ENTRE 1-2 4.00 5.35 21.40
ENTRE 2-3 4.00 5.75 23.00

09.01.05.01 CORREAS METALICAS


09.01.05.01 CORREA METALICA PERFIL C5X6.7 ML 8.00 7.90 63.20 63.20
HOJA DE M
OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD
FÓRMULA : ESTRUCTURAS
01 -BLOQUE MANTENIMIENTO (RESIDUOS SOLIDOS Y GRUPO ELECTROGENO)
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA

Obs: Traslape Normal: para acero vertical y acero horizontal con H<0.30m
Traslape Superior: para horizontal con H>0.30m
(H=Peralte efectivo)

Datos Dimensiones

item descripción Cantidad Tipo


descripción Ø

09.01.04.01 ZAPATAS
09.01.04.01.02 ACERO PARA ZAPATAS F'y= 4200 Kg/Cm2
BLOQUE MANTENIMIENTO
Z-1 3 Normal Acero Longitudinal 1/2 ''
3 Normal Acero Transversal 1/2 ''
Z-2 5 Normal Acero Longitudinal 1/2 ''
5 Normal Acero Transversal 1/2 ''

Total ml
Total piezas
Kg
Total Kg

05.03.00 COLUMNAS
05.03.01 ACERO PARA COLUMNAS F'y= 4200 Kg/Cm2
BLOQUE MANTENIMIENTO
C-1 8 Normal Acero Longitudinal 1/2 ''
8 Normal Estribos 3/8 ''

Total ml
Total piezas
Kg
Total Kg
HOJA DE METRADOS DE ACERO
S SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO

ф 6mm 8mm 3/8" 1/2" 5/8"


TIPOS DE TRASLAPE: Normal 0.40 0.40 0.40 0.50 0.60
Superior 0.40 0.40 0.45 0.60 0.75
Peso (kg/m) 0.22 0.40 0.56 0.99 1.55

ensiones RESULTADOS
ACERO longitud # 6mm 8mm 3/8 1/2 5/8
# de piezas s/emp emp. ML ML ML ML ML

5 0.70 - - - - 10.50 -
5 0.70 - - - - 10.50 -
5 0.70 - - - - 17.50 -
5 0.70 - - - - 17.50 -

- - 56.00 -
- - 7.00 -
- - 55.67 -
55.67

8 1.10 - - - - 70.40 -
6 1.50 - - - 72.00 - -
- - - - - -
- 72.00 70.40 -
- 8.00 8.00 -
- 40.28 69.98 -
110.27
NTO PASCO, REGION PASCO.

3/4" 1" 1 3/8"


0.70 1.15 2.30
0.90 1.45 3.20
2.24 3.99 7.91

3/4 1 1 3/8
ML ML ML

- - -
- - -
- - -
- - -

- - -
- - -
- - -
55.67

- - -
- - -
- - -
- - -
- - -
- - -
110.27
HOJA DE METRADOS / ESTRUCTURAS
:"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE
OBRA OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA: ESTRUCTURAS01 -TANQUE CISTERNA
CLIENTE: GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
REGION : PASCO PROVINCIA: OXAPAMPA DISTRITO: OXAPAMPA

Nro. METRADO SUMA


PART. DESCRIPCION UND. UBICACIÓN
Elem LARGO ANCHO ALTO PARCIAL TOTAL
09.01.00 ESTRUCTURAS
09.01.01 TRABAJOS PRELIMINARES
09.01.01.01LIMPIEZA DE TERRENO MANUAL M2 46.16
TANQUE CISTERNA
CIMENTACION 1.00 Area= 46.16 46.16

09.01.01.02TRAZO Y REPLANTEO M2 46.16


TANQUE CISTERNA
CIMENTACION 1.00 Area= 46.16 46.16

09.01.01.03TRAZO Y REPLANTEO DURANTE EL PROCESO M2 46.16


TANQUE CISTERNA
CIMENTACION 1.00 Area= 46.16 46.16

09.01.02 MOVIMIENTOS DE TIERRAS


09.01.02.01EXCAVACION
EXCAVACION CON MAQUINARIA PARA CISTERNA, H=1.50m
09.01.02.01.01 M3 132.57
TANQUE CISTERNA
1.00 6.20 7.45 2.87 132.57

09.01.02.02NIVELACION Y COMPACTACION
REFINE, COMPACTACION Y NIVELACION DE SUPERFICIE
09.01.02.02.03 M2 46.19
TANQUE CISTERNA
1.00 6.20 7.45 46.19

09.01.02.04MANEJO DE MATERIAL PROCEDENTE DE EXCAVACIONES


ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES
09.01.02.04.01 M3 165.71
EXCAVACION CON MAQUINARIA PARA CISTERNA, H=1.50m 1.00 132.57 132.57
Sub Total 132.57
+2.5% esponjamiento 165.71

ELIMINACION DE MATERIAL EXCEDENTE


09.01.02.04.02 M3 165.71
EXCAVACION CON MAQUINARIA PARA CISTERNA, H=1.50m 1.00 132.57 132.57
Sub Total 132.57
+2.5% esponjamiento 165.71

09.01.03 OBRAS DE CONCRETO SIMPLE


09.01.03.01SOLADOS
SOLADO F´C=100KG/CM2
09.01.03.01.01 M2 46.19
TANQUE CISTERNA
1.00 6.20 7.45 46.19

09.01.04 OBRAS DE CONCRETO ARMADO


09.01.04.01ZAPATAS Y LOSA DE FONDO

CONCRETO PARA LOSA DE FONDO F'C=245 KG/CM2


09.01.04.01.01 M3 14.11
TANQUE CISTERNA
ZAPATAS 1.00 Secc= 0.28 24.30 6.89
1.00 Secc= 0.78 4.70 3.66
LOSA DE FONDO 1.00 4.70 3.55 0.17 2.84
1.00 4.70 0.90 0.17 0.72

ACERO PARA ZAPATAS Y LOSA DE FONDO F'y= 4200 Kg/Cm2


09.01.04.01.02 KG 774.48
(VER METRADO ACERO 774.48 774.48

09.01.04.04MUROS
CONCRETO EN MUROS f'c=245 kg/cm2
09.01.04.04.01 M3 16.22
TANQUE CISTERNA
SECC A 1.00 27.30 0.20 2.45 13.38
SECC B 1.00 5.80 0.20 2.45 2.84

ENCOFRADO Y DESENCOFRADO PARA MUROS


09.01.04.04.02 M2 162.19
TANQUE CISTERNA
SECC A 2.00 27.30 2.45 133.77
SECC B 2.00 5.80 2.45 28.42

ACERO PARA MUROS F'y= 4200 Kg/Cm2


09.01.04.04.03 KG 2812.07
(VER METRADO ACERO 2812.07 2812.07

09.01.04.04LOSA SUPERIOR
CONCRETO EN LOSA SUPERIOR f'c=245 kg/cm2
09.01.04.04.01 M3 6.75
TANQUE CISTERNA
CONSUMO 1.00 5.80 4.75 0.17 4.68
CONTRA INCENDIO 1.00 5.80 2.10 0.17 2.07

ENCOFRADO Y DESENCOFRADO PARA LOSA SUPERIOR


09.01.04.04.02 M2 39.73
TANQUE CISTERNA
CONSUMO 1.00 5.80 4.75 27.55
CONTRA INCENDIO 1.00 5.80 2.10 12.18

ACERO PARA LOSA SUPERIOR F'y= 4200 Kg/Cm2


09.01.04.04.03 KG 659.89
(VER METRADO ACERO 659.89 659.89

09.01.05 VARIOS

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)


09.01.05.01 UND 15.00
EN ZAPATAS (7,14,28 Días) 1.00 6.00 6.00
EN MUROS (7,14,28 Días) 1.00 6.00 6.00
EN LOSA SUPERIOR (7,14,28 Días) 1.00 3.00 3.00
HOJA DE M
OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALU
FÓRMULA : ESTRUCTURAS
01 -TANQUE CISTERNA
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA

Obs: Traslape Normal: para acero vertical y acero horizontal con H<0.30m
Traslape Superior: para horizontal con H>0.30m
(H=Peralte efectivo)

Datos Dimensiones

item descripción Cantidad Tipo


descripción Ø

09.01.04.01 ZAPATAS Y LOSA DE FONDO


09.01.04.01.02 ACERO PARA ZAPATAS Y LOSA DE FONDO F'y= 4200 Kg/Cm2
TANQUE CISTERNA
ZAPATA (secc A) 1 Normal Acero Longitudinal Superior 1/2 ''
ZAPATA (secc B) 1 Normal Acero Transversal Inferior 1/2 ''
1 Normal Acero Longitudinal Inferior 1/2 ''
LOSA DE FONDO 1 Normal Acero Longitudinal Superior 3/8 ''
1 Normal Acero Transversal Superior 3/8 ''
1 Normal Acero Longitudinal Inferior 3/8 ''
1 Normal Acero Transversal Inferior 3/8 ''

Total ml
Total piezas
Kg
Total Kg

09.01.04.04 MUROS
09.01.04.04.03 ACERO PARA MUROS F'y= 4200 Kg/Cm2
TANQUE CISTERNA
Muro (secc A) 1 Normal Acero Vertical Exterior 5/8 ''
1 Normal Acero Vertical Interior 5/8 ''
1 Normal Acero Horizontal Exterior 1/2 ''
1 Normal Acero Vertical Interior 1/2 ''
Muro (secc B) 1 Normal Acero Vertical Exterior 1/2 ''
1 Normal Acero Vertical Interior 1/2 ''
1 Normal Acero Horizontal Exterior 1/2 ''
1 Normal Acero Vertical Interior 1/2 ''

Total ml
Total piezas
Kg
Total Kg

09.01.04.04 LOSA SUPERIOR


09.01.04.04.03 ACERO PARA LOSA SUPERIOR F'y= 4200 Kg/Cm2
BLOQUE MANTENIMIENTO
LOSA DE FONDO 1 Normal Acero Longitudinal Superior 3/8 ''
1 Normal Acero Transversal Superior 3/8 ''
1 Normal Acero Longitudinal Inferior 1/2 ''
1 Normal Acero Transversal Inferior 1/2 ''

Total ml
Total piezas
Kg
Total Kg
HOJA DE METRADOS DE ACERO
OS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PAS

ф 6mm 8mm 3/8" 1/2" 5/8"


TIPOS DE TRASLAPE: Normal 0.40 0.40 0.40 0.50 0.60
Superior 0.40 0.40 0.45 0.60 0.75
Peso (kg/m) 0.22 0.40 0.56 0.99 1.55

ensiones RESULTADOS
ACERO longitud # 6mm 8mm 3/8 1/2 5/8
# de piezas s/emp emp. ML ML ML ML ML

3 26.10 2 - - - 81.30 -
29 3.13 - - - - 90.63 -
10 6.60 - - - - 66.00 -
31 7.75 - - - 240.25 - -
37 6.50 - - - 240.50 - -
31 7.75 - - - 240.25 - -
37 6.50 - - - 240.50 - -

- - 961.50 237.93 -
- - 107.00 27.00 -
- - 537.96 236.52 -
774.48

137 4.37 - - - - - 598.69


137 3.32 - - - - - 454.84
14 27.30 3 - - - 403.20 -
14 27.30 3 - - - 403.20 -
29 3.32 - - - - 96.28 -
29 3.32 - - - - 96.28 -
14 6.60 - - - - 92.40 -
14 6.60 - - - - 92.40 -
- - - - - -
- - - 1,183.76 1,053.53
- - - 132.00 118.00
- - - 1,176.78 1,635.29
2812.07

21 7.75 - - - 162.75 - -
25 6.50 - - - 162.50 - -
31 7.75 - - - - 240.25 -
37 6.50 - - - - 240.50 -
- - - - - -
- - 325.25 480.75 -
- - 37.00 54.00 -
- - 181.98 477.91 -
659.89
MENTO PASCO, REGION PASCO.

3/4" 1" 1 3/8"


0.70 1.15 2.30
0.90 1.45 3.20
2.24 3.99 7.91

3/4 1 1 3/8
ML ML ML

- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
774.48

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
2812.07

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
659.89
HOJA DE METRADOS / ESTRUCTURAS

OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA,
DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE DIRECCION (TERRENO 2)
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
REGION : PASCO PROVINCIA: OXAPAMPA DISTRITO: OXAPAMPA

Nro. METRADO SUMA


PART. DESCRIPCION UND. UBICACIÓN
Elem LARGO ANCHO ALTO PARCIAL
09.01.00 ESTRUCTURAS
09.01.01 TRABAJOS PRELIMINARES
09.01.01.01 LIMPIEZA DE TERRENO MANUAL M2
BLOQUE ADMINSTRATIVO
CIMENTACION 1.00 Area= 101.64 101.64

09.01.01.02 TRAZO Y REPLANTEO M2


BLOQUE ADMINSTRATIVO
CIMENTACION 1.00 Area= 101.64 101.64

09.01.01.03 TRAZO Y REPLANTEO DURANTE EL PROCESO M2


BLOQUE ADMINSTRATIVO
CIMENTACION 1.00 Area= 101.64 101.64
1er PISO 1.00 Area= 101.64 101.64
2do PISO 1.00 Area= 101.62 101.62
TECHO 1.00 Area= 101.62 101.62

09.01.02 MOVIMIENTOS DE TIERRAS


09.01.02.01 CORTES
09.01.02.01.01 CORTE GENERAL CON MAQUINARIA , H=0.40m M3
BLOQUE ADMINSTRATIVO
SUPERFICIE 1.00 Area= 101.64 0.40 40.66

09.01.02.01 EXCAVACION
09.01.02.01.01 EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m M3
BLOQUE ADMINSTRATIVO
Z-1 1.00 0.85 1.50 1.50 1.91
Z-2 1.00 1.00 1.00 1.50 1.50
Z-3 1.00 1.25 1.25 1.50 2.34
Z-4 1.00 0.85 1.60 1.50 2.04
Z-5 1.00 0.90 1.70 1.50 2.30
Z-6 1.00 1.60 1.40 1.50 3.36
Z-7 1.00 0.95 1.80 1.50 2.57
Z-8 1.00 1.25 1.25 1.50 2.34
Z-9 1.00 1.70 0.90 1.50 2.30
Z-10 1.00 1.20 1.20 1.50 2.16

09.01.02.01.02 EXCAVACION PARA VIGAS DE CONEXIÓN M3


BLOQUE ADMINSTRATIVO
EJE B, ENTRE EJE 5 y 6 1.00 1.27 0.80 0.60 0.61
EJE B, ENTRE EJE 6 y 7 1.00 2.21 0.80 0.60 1.06
EJE B, ENTRE EJE 7 y 8 1.00 3.56 0.80 0.60 1.71
EJE C ENTRE EJE 5 y 6 1.00 4.26 0.80 0.60 2.04
EJE C ENTRE EJE 7 y 8 1.00 3.27 0.80 0.60 1.57
EJE D ENTRE EJE 5 y 7 1.00 3.79 0.80 0.60 1.82
EJE D ENTRE EJE 7 y 8 1.00 3.05 0.80 0.60 1.46
EJE 5 ENTRE EJE B y C 1.00 2.44 0.80 0.60 1.17
EJE 5 ENTRE EJE C y D 1.00 2.20 0.80 0.60 1.06
EJE 7 ENTRE EJE B y C 1.00 2.61 0.80 0.60 1.25
EJE 7 ENTRE EJE C y D 1.00 2.83 0.80 0.60 1.36
EJE 8 ENTRE EJE B y C 1.00 2.34 0.80 0.60 1.12
EJE 8 ENTRE EJE C y D 1.00 2.20 0.80 0.60 1.06

09.01.02.01.02 EXCAVACION PARA CIMIENTOS CORRIDOS M3


BLOQUE MANTENIMIENTO
EJE B, ENTRE EJE 5 y 6 1.00 1.27 0.40 0.75 0.38
EJE B, ENTRE EJE 6 y 7 1.00 2.21 0.40 0.75 0.66
EJE B, ENTRE EJE 7 y 8 1.00 3.56 0.40 0.75 1.07
EJE C ENTRE EJE 5 y 6 1.00 4.26 0.40 0.75 1.28
EJE C ENTRE EJE 7 y 8 1.00 3.27 0.40 0.75 0.98
EJE D ENTRE EJE 5 y 7 1.00 3.79 0.40 0.75 1.14
EJE D ENTRE EJE 7 y 8 1.00 3.05 0.40 0.75 0.92
EJE 5 ENTRE EJE B y C 1.00 2.44 0.40 0.75 0.73
EJE 5 ENTRE EJE C y D 1.00 2.20 0.40 0.75 0.66
EJE 7 ENTRE EJE B y C 1.00 2.61 0.40 0.75 0.78
EJE 7 ENTRE EJE C y D 1.00 2.83 0.40 0.75 0.85
EJE 8 ENTRE EJE B y C 1.00 2.34 0.40 0.75 0.70
EJE 8 ENTRE EJE C y D 1.00 2.20 0.40 0.75 0.66

09.01.02.02 NIVELACION Y COMPACTACION


09.01.02.02.01 REFINE, COMPACTACION Y NIVELACION DE FONDO DE SUPERFICIE ZAPATA M2
BLOQUE ADMINSTRATIVO
Z-1 1.00 0.85 1.50 1.28
Z-2 1.00 1.00 1.00 1.00
Z-3 1.00 1.25 1.25 1.56
Z-4 1.00 0.85 1.60 1.36
Z-5 1.00 0.90 1.70 1.53
Z-6 1.00 1.60 1.40 2.24
Z-7 1.00 0.95 1.80 1.71
Z-8 1.00 1.25 1.25 1.56
Z-9 1.00 1.70 0.90 1.53
Z-10 1.00 1.20 1.20 1.44
09.01.02.02.01 M2
REFINE, COMPACTACION Y NIVELACION DE FONDO DE SUPERFICIE CIMIENTOS CORRIDOS
BLOQUE MANTENIMIENTO
EJE B, ENTRE EJE 5 y 6 1.00 1.27 0.40 0.51
EJE B, ENTRE EJE 6 y 7 1.00 2.21 0.40 0.88
EJE B, ENTRE EJE 7 y 8 1.00 3.56 0.40 1.42
EJE C ENTRE EJE 5 y 6 1.00 4.26 0.40 1.70
EJE C ENTRE EJE 7 y 8 1.00 3.27 0.40 1.31
EJE D ENTRE EJE 5 y 7 1.00 3.79 0.40 1.52
EJE D ENTRE EJE 7 y 8 1.00 3.05 0.40 1.22
EJE 5 ENTRE EJE B y C 1.00 2.44 0.40 0.98
EJE 5 ENTRE EJE C y D 1.00 2.20 0.40 0.88
EJE 7 ENTRE EJE B y C 1.00 2.61 0.40 1.04
EJE 7 ENTRE EJE C y D 1.00 2.83 0.40 1.13
EJE 8 ENTRE EJE B y C 1.00 2.34 0.40 0.94
EJE 8 ENTRE EJE C y D 1.00 2.20 0.40 0.88

09.01.02.02.02 REFINE, COMPACTACION Y NIVELACION DE SUPERFICIE FONDO DE VIGA DE CONEXI M2


BLOQUE ADMINSTRATIVO
EJE B, ENTRE EJE 5 y 6 1.00 1.27 0.80 1.02
EJE B, ENTRE EJE 6 y 7 1.00 2.21 0.80 1.77
EJE B, ENTRE EJE 7 y 8 1.00 3.56 0.80 2.85
EJE C ENTRE EJE 5 y 6 1.00 4.26 0.80 3.41
EJE C ENTRE EJE 7 y 8 1.00 3.27 0.80 2.62
EJE D ENTRE EJE 5 y 7 1.00 3.79 0.80 3.03
EJE D ENTRE EJE 7 y 8 1.00 3.05 0.80 2.44
EJE 5 ENTRE EJE B y C 1.00 2.44 0.80 1.95
EJE 5 ENTRE EJE C y D 1.00 2.20 0.80 1.76
EJE 7 ENTRE EJE B y C 1.00 2.61 0.80 2.09
EJE 7 ENTRE EJE C y D 1.00 2.83 0.80 2.26
EJE 8 ENTRE EJE B y C 1.00 2.34 0.80 1.87
EJE 8 ENTRE EJE C y D 1.00 2.20 0.80 1.76

09.01.02.02.03 REFINE, COMPACTACION Y NIVELACION DE SUPERFICIE M2


BLOQUE ADMINSTRATIVO
ENTREGA DE ROPA LIMPIA 1.00 Area= 11.05 11.05
SS.HH-D 1.00 Area= 3.58 3.58
CUARTO TECNICO ELECT. 1.00 Area= 10.14 10.14
HALL 1.00 Area= 15.99 15.99
CUARTO DE LIMPIEZA 1.00 Area= 1.93 1.93
VIGILANCIA 1.00 Area= 8.68 8.68
ESCALERA 1.00 Area= 14.84 14.84
AREA DE MANTENIMIENTO 1.00 Area= 19.59 19.59
SS.HH 1.00 Area= 3.34 3.34

09.01.02.03 RELLENOS CON MATERIAL DE PRESTAMO


09.01.02.03.01 RELLENO Y COMPACTO DE SUPERFICIE M3
BLOQUE ADMINSTRATIVO
ENTREGA DE ROPA LIMPIA 1.00 Area= 11.05 0.40 4.42
SS.HH-D 1.00 Area= 3.58 0.40 1.43
CUARTO TECNICO ELECT. 1.00 Area= 10.14 0.40 4.05
HALL 1.00 Area= 15.99 0.40 6.40
CUARTO DE LIMPIEZA 1.00 Area= 1.93 0.40 0.77
VIGILANCIA 1.00 Area= 8.68 0.40 3.47
ESCALERA 1.00 Area= 14.84 0.40 5.94
AREA DE MANTENIMIENTO 1.00 Area= 19.59 0.40 7.83
SS.HH 1.00 Area= 3.34 0.40 1.34

09.01.02.03.01 RELLENO Y COMPACTO DE ZAPATAS M3


BLOQUE ADMINSTRATIVO

ZAPATAS Z-1 1.00 Area= 0.98 0.50 0.49


Z-2 1.00 Area= 0.70 0.50 0.35
Z-3 1.00 Area= 1.26 0.50 0.63
Z-4 1.00 Area= 0.98 0.50 0.49
Z-5 1.00 Area= 1.31 0.50 0.66
Z-6 1.00 Area= 1.93 0.50 0.96
Z-7 1.00 Area= 1.25 0.50 0.62
Z-8 1.00 Area= 1.14 0.50 0.57
Z-9 1.00 Area= 1.10 0.50 0.55
Z-10 1.00 Area= 0.89 0.50 0.44

09.01.02.04 MANEJO DE MATERIAL PROCEDENTE DE EXCAVACIONES


09.01.02.04.01 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES M3
EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m 1.00 22.82 22.82
EXCAVACION PARA VIGAS DE CONEXIÓN 1.00 17.29 17.29
EXCAVACION PARA CIMIENTOS CORRIDOS 1.00 10.81 10.81
Sub Total 40.11
+2.5% esponjamiento 50.14

09.01.02.04.02 ELIMINACION DE MATERIAL EXCEDENTE M3


EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m 1.00 22.82 22.82
EXCAVACION PARA VIGAS DE CONEXIÓN 1.00 17.29 17.29
EXCAVACION PARA CIMIENTOS CORRIDOS 1.00 10.81 10.81
CORTE GENERAL CON MAQUINARIA , H=0.40m 1.00 101.64 101.64
Sub Total 152.56
+2.5% esponjamiento 190.70
09.01.03 OBRAS DE CONCRETO SIMPLE
09.01.03.01 SUB ZAPATAS
09.01.03.01.01 SUB ZAPATAS F´C=100KG/CM2 +30% PIEDRA GRANDE M3
BLOQUE ADMINSTRATIVO
Z-1 1.00 0.85 1.50 0.40 0.51
Z-2 1.00 1.00 1.00 0.40 0.40
Z-3 1.00 1.25 1.25 0.40 0.63
Z-4 1.00 0.85 1.60 0.40 0.54
Z-5 1.00 0.90 1.70 0.40 0.61
Z-6 1.00 1.60 1.40 0.40 0.90
Z-7 1.00 0.95 1.80 0.40 0.68
Z-8 1.00 1.25 1.25 0.40 0.63
Z-9 1.00 1.70 0.90 0.40 0.61
Z-10 1.00 1.20 1.20 0.40 0.58

09.01.03.03 SOBRECIMIENTOS
09.01.03.03.01 SOBRE CIMIENTOS CONCRETO F´C=140KG/CM2 + 30% PIEDRA MEDIANA M3
BLOQUE ADMINSTRATIVO
EJE B, ENTRE EJE 5-6 1.00 1.94 0.12 0.45 0.10
EJE B, ENTRE EJE 5-7 1.00 3.77 0.12 0.45 0.20
EJE B, ENTRE EJE 7-8 1.00 2.65 0.13 0.45 0.16
EJE C, ENTRE EJE 7-8 1.00 2.57 0.13 0.45 0.15
EJE C, ENTRE EJE 7-8 1.00 2.92 0.13 0.45 0.17
ENTRE EJE C y D, ENTRE EJE 5-7 1.00 3.94 0.13 0.45 0.23
EJE D, ENTRE EJE 5-7 1.00 1.96 0.13 0.45 0.11
EJE D, ENTRE EJE 7-8 1.00 3.80 0.24 0.45 0.41
ENTRE EJE C y D, ENTRE EJE 7-8 1.00 0.77 0.13 0.45 0.05
EJE 5, ENTRE EJE B-C 1.00 3.70 0.12 0.45 0.20
EJE 5, ENTRE EJE C-D 1.00 1.32 0.13 0.45 0.08
EJE 7, ENTRE EJE B-C 1.00 3.28 0.13 0.45 0.19
EJE 7, ENTRE EJE C-D 1.00 1.27 0.13 0.45 0.07
ENTRE EJE 7 y 8, ENTRE EJE C-D 1.00 1.90 0.24 0.45 0.21
EJE 8, ENTRE EJE B-C 1.00 2.92 0.13 0.45 0.17
EJE 8, ENTRE EJE C-D 1.00 2.90 0.24 0.45 0.31

09.01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.30 m M2


BLOQUE ADMINSTRATIVO
EJE B, ENTRE EJE 5-6 1.00 1.94 0.45 0.87
EJE B, ENTRE EJE 5-7 1.00 3.77 0.45 1.70
EJE B, ENTRE EJE 7-8 1.00 2.65 0.45 1.19
EJE C, ENTRE EJE 7-8 1.00 2.57 0.45 1.16
EJE C, ENTRE EJE 7-8 1.00 2.92 0.45 1.31
ENTRE EJE C y D, ENTRE EJE 5-7 1.00 3.94 0.45 1.77
EJE D, ENTRE EJE 5-7 1.00 1.96 0.45 0.88
EJE D, ENTRE EJE 7-8 1.00 3.80 0.45 1.71
ENTRE EJE C y D, ENTRE EJE 7-8 1.00 0.77 0.45 0.35
EJE 5, ENTRE EJE B-C 1.00 3.70 0.45 1.67
EJE 5, ENTRE EJE C-D 1.00 1.32 0.45 0.59
EJE 7, ENTRE EJE B-C 1.00 3.28 0.45 1.48
EJE 7, ENTRE EJE C-D 1.00 1.27 0.45 0.57
ENTRE EJE 7 y 8, ENTRE EJE C-D 1.00 1.90 0.45 0.86
EJE 8, ENTRE EJE B-C 1.00 2.92 0.45 1.31
EJE 8, ENTRE EJE C-D 1.00 2.90 0.45 1.31

09.01.03.03 CIMIENTOS CORRIDOS


09.01.03.03.01 SOBRE CIMIENTOS CONCRETO F´C=140KG/CM2 + 30% PIEDRA DESPLAZADORA M3
BLOQUE MANTENIMIENTO
EJE B, ENTRE EJE 5 y 6 1.00 1.27 0.40 0.75 0.38
EJE B, ENTRE EJE 6 y 7 1.00 2.21 0.40 0.75 0.66
EJE B, ENTRE EJE 7 y 8 1.00 3.56 0.40 0.75 1.07
EJE C ENTRE EJE 5 y 6 1.00 4.26 0.40 0.75 1.28
EJE C ENTRE EJE 7 y 8 1.00 3.27 0.40 0.75 0.98
EJE D ENTRE EJE 5 y 7 1.00 3.79 0.40 0.75 1.14
EJE D ENTRE EJE 7 y 8 1.00 3.05 0.40 0.75 0.92
EJE 5 ENTRE EJE B y C 1.00 2.44 0.40 0.75 0.73
EJE 5 ENTRE EJE C y D 1.00 2.20 0.40 0.75 0.66
EJE 7 ENTRE EJE B y C 1.00 2.61 0.40 0.75 0.78
EJE 7 ENTRE EJE C y D 1.00 2.83 0.40 0.75 0.85
EJE 8 ENTRE EJE B y C 1.00 2.34 0.40 0.75 0.70
EJE 8 ENTRE EJE C y D 1.00 2.20 0.40 0.75 0.66

09.01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA CIMIENTOS CORRIDOS M2


BLOQUE MANTENIMIENTO
EJE B, ENTRE EJE 5 y 6 1.00 1.27 0.75 0.95
EJE B, ENTRE EJE 6 y 7 1.00 2.21 0.75 1.66
EJE B, ENTRE EJE 7 y 8 1.00 3.56 0.75 2.67
EJE C ENTRE EJE 5 y 6 1.00 4.26 0.75 3.20
EJE C ENTRE EJE 7 y 8 1.00 3.27 0.75 2.45
EJE D ENTRE EJE 5 y 7 1.00 3.79 0.75 2.84
EJE D ENTRE EJE 7 y 8 1.00 3.05 0.75 2.29
EJE 5 ENTRE EJE B y C 1.00 2.44 0.75 1.83
EJE 5 ENTRE EJE C y D 1.00 2.20 0.75 1.65
EJE 7 ENTRE EJE B y C 1.00 2.61 0.75 1.96
EJE 7 ENTRE EJE C y D 1.00 2.83 0.75 2.12
EJE 8 ENTRE EJE B y C 1.00 2.34 0.75 1.76
EJE 8 ENTRE EJE C y D 1.00 2.20 0.75 1.65
09.01.03.04 FALSO PISO
09.01.03.04.01 CONCRETO F´C=80KG/CM2 PARA FALSO PISO E=0.10M M2
BLOQUE ADMINSTRATIVO

PRIMER PISO
ENTREGA DE ROPA LIMPIA 1.00 Area= 11.05 11.05
SS.HH-D 1.00 Area= 3.58 3.58
CUARTO TECNICO ELECT. 1.00 Area= 10.14 10.14
HALL 1.00 Area= 15.99 15.99
CUARTO DE LIMPIEZA 1.00 Area= 1.93 1.93
VIGILANCIA 1.00 Area= 8.68 8.68
ESCALERA 1.00 Area= 14.84 14.84
AREA DE MANTENIMIENTO 1.00 Area= 19.59 19.59
SS.HH 1.00 Area= 3.34 3.34

09.01.04 OBRAS DE CONCRETO ARMADO


09.01.04.01 ZAPATAS

09.01.04.01.01 CONCRETO PARA ZAPATA F'C=210 KG/CM2 M3


BLOQUE ADMINSTRATIVO
Z-1 1.00 0.85 1.50 0.60 0.77
Z-2 1.00 1.00 1.00 0.60 0.60
Z-3 1.00 1.25 1.25 0.60 0.94
Z-4 1.00 0.85 1.60 0.60 0.82
Z-5 1.00 0.90 1.70 0.60 0.92
Z-6 1.00 1.60 1.40 0.60 1.34
Z-7 1.00 0.95 1.80 0.60 1.03
Z-8 1.00 1.25 1.25 0.60 0.94
Z-9 1.00 1.70 0.90 0.60 0.92
Z-10 1.00 1.20 1.20 0.60 0.86

09.01.04.01.02 ACERO PARA ZAPATAS F'y= 4200 Kg/Cm2 KG


(VER METRADO ACERO) 338.34 338.34

09.01.04.02 VIGAS DE CONEXIÓN


09.01.04.02.01 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 M3
BLOQUE ADMINSTRATIVO
EJE B, ENTRE EJE 5 y 6 1.00 1.27 0.30 0.55 0.21
EJE B, ENTRE EJE 6 y 7 1.00 2.21 0.30 0.55 0.36
EJE B, ENTRE EJE 7 y 8 1.00 3.56 0.30 0.55 0.59
EJE C ENTRE EJE 5 y 6 1.00 4.26 0.30 0.55 0.70
EJE C ENTRE EJE 7 y 8 1.00 3.27 0.30 0.55 0.54
EJE D ENTRE EJE 5 y 7 1.00 3.79 0.30 0.55 0.63
EJE D ENTRE EJE 7 y 8 1.00 3.05 0.30 0.55 0.50
EJE 5 ENTRE EJE B y C 1.00 2.44 0.30 0.55 0.40
EJE 5 ENTRE EJE C y D 1.00 2.20 0.30 0.55 0.36
EJE 7 ENTRE EJE B y C 1.00 2.61 0.30 0.55 0.43
EJE 7 ENTRE EJE C y D 1.00 2.83 0.30 0.55 0.47
EJE 8 ENTRE EJE B y C 1.00 2.34 0.30 0.55 0.39
EJE 8 ENTRE EJE C y D 1.00 2.20 0.30 0.55 0.36

09.01.04.02.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CONEXIÓN M2


BLOQUE ADMINSTRATIVO
EJE B, ENTRE EJE 5 y 6 1.00 1.27 0.55 0.70
EJE B, ENTRE EJE 6 y 7 1.00 2.21 0.55 1.22
EJE B, ENTRE EJE 7 y 8 1.00 3.56 0.55 1.96
EJE C ENTRE EJE 5 y 6 1.00 4.26 0.55 2.34
EJE C ENTRE EJE 7 y 8 1.00 3.27 0.55 1.80
EJE D ENTRE EJE 5 y 7 1.00 3.79 0.55 2.08
EJE D ENTRE EJE 7 y 8 1.00 3.05 0.55 1.68
EJE 5 ENTRE EJE B y C 1.00 2.44 0.55 1.34
EJE 5 ENTRE EJE C y D 1.00 2.20 0.55 1.21
EJE 7 ENTRE EJE B y C 1.00 2.61 0.55 1.44
EJE 7 ENTRE EJE C y D 1.00 2.83 0.55 1.56
EJE 8 ENTRE EJE B y C 1.00 2.34 0.55 1.29
EJE 8 ENTRE EJE C y D 1.00 2.20 0.55 1.21

09.01.04.02.03 ACERO PARA VIGAS DE CONEXIÓN F'y= 4200 Kg/Cm2 KG


(VER METRADO ACERO) 691.62 691.62

09.01.04.04 COLUMNAS
09.01.04.04.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 M3
BLOQUE ADMINSTRATIVO
PRIMER PISO C-1 5.00 Secc.= 0.18 4.70 4.23
C-2 2.00 Secc.= 0.23 4.70 2.12
C-3 2.00 Secc.= 0.14 4.70 1.27
C-4 1.00 Secc.= 0.24 4.70 1.13

SEGUNDO PISO C-1 5.00 Secc.= 0.18 3.40 3.06


C-2 2.00 Secc.= 0.23 3.40 1.53
C-3 2.00 Secc.= 0.14 3.40 0.92

09.01.04.04.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS M2


BLOQUE ADMINSTRATIVO
PRIMER PISO
C-1 5.00 Perimetro= 1.80 4.70 42.30
C-2 2.00 Perimetro= 2.10 4.70 19.74
C-3 2.00 Perimetro= 1.50 4.70 14.10
C-4 1.00 Perimetro= 2.20 4.70 10.34

SEGUNDO PISO C-1 5.00 Perimetro= 1.80 3.40 30.60


C-2 2.00 Perimetro= 2.10 3.40 14.28
C-3 2.00 Perimetro= 1.50 3.40 10.20

09.01.04.04.03 ACERO PARA COLUMNAS F'y= 4200 Kg/Cm2 KG


(VER METRADO ACERO) 3214.93 3214.93

09.01.04.05 VIGAS
09.01.04.05.01 CONCRETO EN VIGAS f'c=210 kg/cm2 M3
BLOQUE ADMINSTRATIVO
PRIMER PISO EJE B, ENTRE EJE 5 y 6 1.00 1.94 0.30 0.50 0.29
EJE B, ENTRE EJE 6 y 7 1.00 2.90 0.30 0.50 0.44
EJE B, ENTRE EJE 7 y 8 1.00 4.35 0.30 0.50 0.65
EJE C, ENTRE EJE 5 y 7 1.00 5.28 0.30 0.50 0.79
EJE C, ENTRE EJE 7 y 8 1.00 4.20 0.30 0.50 0.63
VIGA CHATA 1.00 2.90 0.25 0.20 0.15
EJE D, ENTRE EJE 5 y 7 1.00 5.14 0.30 0.50 0.77
EJE D, ENTRE EJE 7 y 8 1.00 4.35 0.30 0.50 0.65
EJE 5, ENTRE EJE B y C 1.00 3.70 0.30 0.40 0.44
EJE 5, ENTRE EJE C y D 1.00 3.70 0.30 0.40 0.44
EJE 6, ENTRE EJE B y C 1.00 3.85 0.25 0.40 0.39
EJE 6, ENTRE EJE C y D 1.00 3.85 0.25 0.40 0.39
EJE 7, ENTRE EJE B y C 1.00 3.50 0.30 0.40 0.42
EJE 7, ENTRE EJE C y D 1.00 3.70 0.30 0.40 0.44
EJE 8, ENTRE EJE B y C 1.00 3.55 0.30 0.40 0.43
EJE 8, ENTRE EJE C y D 1.00 3.55 0.30 0.40 0.43
VOLADO 3.00 0.65 0.30 0.40 0.23
1.00 0.65 0.25 0.20 0.03
VB 1.00 6.94 0.15 0.20 0.21

SEGUNDO PISO EJE B, ENTRE EJE 5 y 6 1.00 1.94 0.30 0.40 0.23
EJE B, ENTRE EJE 6 y 7 1.00 2.90 0.30 0.40 0.35
EJE B, ENTRE EJE 7 y 8 1.00 4.35 0.30 0.40 0.52
EJE D, ENTRE EJE 5 y 7 1.00 5.14 0.30 0.40 0.62
EJE D, ENTRE EJE 7 y 8 1.00 4.35 0.30 0.40 0.52
EJE 5, ENTRE EJE B y C 1.00 3.70 0.30 0.40 0.44
EJE 5, ENTRE EJE C y D 1.00 3.70 0.30 0.40 0.44
EJE 8, ENTRE EJE B y C 1.00 3.55 0.30 0.40 0.43
EJE 8, ENTRE EJE C y D 1.00 3.55 0.30 0.40 0.43

09.01.04.05.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS M2


BLOQUE ADMINSTRATIVO
PRIMER PISO EJE B, ENTRE EJE 5 y 6 1.00 1.94 0.90 1.75
EJE B, ENTRE EJE 6 y 7 1.00 2.90 0.90 2.61
EJE B, ENTRE EJE 7 y 8 1.00 4.35 0.90 3.92
EJE C, ENTRE EJE 5 y 7 1.00 5.28 0.90 4.75
EJE C, ENTRE EJE 7 y 8 1.00 4.20 0.90 3.78
VIGA CHATA 1.00 2.90 0.20 0.58
EJE D, ENTRE EJE 5 y 7 1.00 5.14 0.90 4.63
EJE D, ENTRE EJE 7 y 8 1.00 4.35 0.90 3.92
EJE 5, ENTRE EJE B y C 1.00 3.70 0.70 2.59
EJE 5, ENTRE EJE C y D 1.00 3.70 0.70 2.59
EJE 6, ENTRE EJE B y C 1.00 3.85 0.70 2.70
EJE 6, ENTRE EJE C y D 1.00 3.85 0.70 2.70
EJE 7, ENTRE EJE B y C 1.00 3.50 0.70 2.45
EJE 7, ENTRE EJE C y D 1.00 3.70 0.70 2.59
EJE 8, ENTRE EJE B y C 1.00 3.55 0.70 2.49
EJE 8, ENTRE EJE C y D 1.00 3.55 0.70 2.49
VOLADO 3.00 0.65 0.70 1.37
1.00 0.65 0.20 0.13
VB 1.00 6.94 0.20 1.39

SEGUNDO PISO EJE B, ENTRE EJE 5 y 6 1.00 1.94 0.70 1.36


EJE B, ENTRE EJE 6 y 7 1.00 2.90 0.70 2.03
EJE B, ENTRE EJE 7 y 8 1.00 4.35 0.70 3.05
EJE D, ENTRE EJE 5 y 7 1.00 5.14 0.70 3.60
EJE D, ENTRE EJE 7 y 8 1.00 4.35 0.70 3.05
EJE 5, ENTRE EJE B y C 1.00 3.70 0.70 2.59
EJE 5, ENTRE EJE C y D 1.00 3.70 0.70 2.59
EJE 8, ENTRE EJE B y C 1.00 3.55 0.70 2.49
EJE 8, ENTRE EJE C y D 1.00 3.55 0.70 2.49

09.01.04.05.03 ACERO PARA VIGAS F'y= 4200 Kg/Cm2 KG


(VER METRADO ACERO) 1356.54 1356.54

09.01.04.06 LOSAS ALIGERADAS

09.01.04.06.01 CONCRETO PARA LOSA ALIGERADA F'C=210 KG/CM2 M3


BLOQUE ADMINSTRATIVO f (m3/m2)
PRIMER PISO ENTRE B-C, ENTRE 5-6 1.00 2.29 3.85 0.0875 0.77
ENTRE C-D, ENTRE 5-6 1.00 2.29 3.85 0.0875 0.77
ENTRE C-D, ENTRE 6-7 1.00 2.90 3.85 0.0875 0.98
VOLADO 1.00 2.29 0.50 0.0875 0.10
VOLADO 1.00 4.65 0.50 0.0875 0.20
ENTRE B-C, ENTRE 7-8 1.00 4.65 3.85 0.0875 1.57
ENTRE C-D, ENTRE 7-8 1.00 4.65 3.85 0.0875 1.57

09.01.04.06.02 ENCOFRADO Y DESENCOFRADO PARA LOSAS M2


BLOQUE ADMINSTRATIVO
PRIMER PISO
ENTRE B-C, ENTRE 5-6 1.00 2.29 3.85 8.82
ENTRE C-D, ENTRE 5-6 1.00 2.29 3.85 8.82
ENTRE C-D, ENTRE 6-7 1.00 2.90 3.85 11.17
VOLADO 1.00 2.29 0.50 1.15
VOLADO 1.00 4.65 0.50 2.33
ENTRE B-C, ENTRE 7-8 1.00 4.65 3.85 17.90
ENTRE C-D, ENTRE 7-8 1.00 4.65 3.85 17.90

09.01.04.06.04 LADRILLO HUECO DE ARCILLA 30X30X15 CM PARA TECHO ALIGERADO UND


BLOQUE ADMINSTRATIVO f(und/m2)

UNA DIRECCION ENTRE B-C, ENTRE 5-6 1.00 2.29 3.85 8.33 73.00
ENTRE C-D, ENTRE 5-6 1.00 2.29 3.85 8.33 73.00
ENTRE C-D, ENTRE 6-7 1.00 2.90 3.85 8.33 93.00
VOLADO 1.00 2.29 0.50 8.33 10.00
VOLADO 1.00 4.65 0.50 8.33 19.00
ENTRE B-C, ENTRE 7-8 1.00 4.65 3.85 8.33 149.00
ENTRE C-D, ENTRE 7-8 1.00 4.65 3.85 8.33 149.00

09.01.04.06.05 ACERO PARA LOSAS F'y= 4200 Kg/Cm2 KG


(VER METRADO ACERO) 338.72 338.72

09.01.04.07 COLUMNETAS
09.01.04.07.01 CONCRETO EN COLUMNETAS M3
BLOQUE ADMINSTRATIVO
PRIMER PISO Co-01(X-4) 26.00 0.20 0.15 3.27 2.55
Co-02(X-5) 6.00 0.25 0.15 3.27 0.74
09.01.04.07.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS M2
BLOQUE ADMINSTRATIVO
PRIMER PISO Co-01(X-4) 26.00 Perimetro 0.70 3.27 59.51
Co-02(X-5) 6.00 Perimetro 0.80 3.27 15.70

09.01.04.07.03 ACERO PARA COLUMNETAS F'y= 4200 Kg/Cm2 KG


(VER METRADO ACERO) 497.53 497.53

09.01.04.08 VIGAS DE CONFINAMIENTO


09.01.04.08.01 CONCRETO F´C=175KG/CM2 EN VIGAS DE CONFINAMIENTO M3
PRIMER PISO
EJE B, ENTRE EJE 5-6 1.00 1.94 0.15 0.15 0.04
EJE B, ENTRE EJE 7-8 1.00 2.65 0.15 0.15 0.06
ENTRE EJE B y C, ENTRE EJE 7-8 1.00 2.92 0.15 0.15 0.07
EJE C, ENTRE EJE 7-8 1.00 2.57 0.15 0.15 0.06
EJE D, ENTRE EJE 5-7 1.00 1.96 0.15 0.15 0.04
EJE D, ENTRE EJE 7-8 1.00 3.80 0.15 0.15 0.09
ENTRE EJE C y D, ENTRE EJE 5-6 1.00 3.94 0.15 0.15 0.09
ENTRE EJE C y D, ENTRE EJE 7-8 1.00 0.77 0.15 0.15 0.02
EJE 5, ENTRE EJE B-C 1.00 3.70 0.15 0.15 0.08
EJE 5, ENTRE EJE C-D 1.00 1.32 0.15 0.15 0.03
EJE 7, ENTRE EJE B-C 1.00 3.28 0.15 0.15 0.07
EJE 7, ENTRE EJE C-D 1.00 1.27 0.15 0.15 0.03
ENTRE EJE 7 y 8, ENTRE EJE C-D 1.00 2.10 0.25 0.15 0.08
EJE 8, ENTRE EJE B-C 1.00 2.30 0.15 0.15 0.05
EJE 8, ENTRE EJE C-D 1.00 3.00 0.25 0.15 0.11

09.01.04.08.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CONFINAMIENTO M2


PRIMER PISO
EJE B, ENTRE EJE 5-6 1.00 1.94 P= 0.30 0.58
EJE B, ENTRE EJE 7-8 1.00 2.65 P= 0.30 0.80
ENTRE EJE B y C, ENTRE EJE 7-8 1.00 2.92 P= 0.30 0.88
EJE C, ENTRE EJE 7-8 1.00 2.57 P= 0.30 0.77
EJE D, ENTRE EJE 5-7 1.00 1.96 P= 0.30 0.59
EJE D, ENTRE EJE 7-8 1.00 3.80 P= 0.30 1.14
ENTRE EJE C y D, ENTRE EJE 5-6 1.00 3.94 P= 0.30 1.18
ENTRE EJE C y D, ENTRE EJE 7-8 1.00 0.77 P= 0.30 0.23
EJE 5, ENTRE EJE B-C 1.00 3.70 P= 0.30 1.11
EJE 5, ENTRE EJE C-D 1.00 1.32 P= 0.30 0.40
EJE 7, ENTRE EJE B-C 1.00 3.28 P= 0.30 0.98
EJE 7, ENTRE EJE C-D 1.00 1.27 P= 0.30 0.38
ENTRE EJE 7 y 8, ENTRE EJE C-D 1.00 2.10 P= 0.30 0.63
EJE 8, ENTRE EJE B-C 1.00 2.30 P= 0.30 0.69
EJE 8, ENTRE EJE C-D 1.00 3.00 P= 0.30 0.90

09.01.04.08.03 ACERO EN VIGUETAS F'y= 4200 Kg/Cm2 KG


(VER METRADO ACERO) 142.53 142.53

09.01.05 VARIOS

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)


09.01.05.01 UND
EN ZAPATAS (7,14,28 Días) 1.00 3.00 3.00
EN COLUMNAS (7,14,28 Días) 1.00 6.00 6.00
EN VIGAS (7,14,28 Días) 1.00 6.00 6.00
EN LOSA ALIGERADA (7,14,28 Días) 1.00 3.00 3.00
EN COLUMNETAS (7,14,28 Días) 1.00 3.00 3.00
EN VIGAS DE CONFINAMIENTO (7,14,28 Días) 1.00 3.00 3.00

09.01.05 ESTRUCTURAS METALICAS


09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 7 UND
3.00 3.00

09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 7 PZA


3.00 3.00
09.01.05.01 APOYOS Y FIJACION
09.01.05.01 SISTEMA DE APOYO FIJO EN TIJERAL METALICO UND 3.00 3.00

09.01.05.01 DISPOSITIVO DE APOYO MOVIL EN TIJERAL METALICO UND 3.00 3.00

09.01.05.01 TEMPLADORES
09.01.05.01 TENSOR DE 5/8" EN ARRIOSTRE DE TIJERALES ML
ENTRE B-C 4.00 7.85 31.40
ENTRE C-D 4.00 7.85 31.40
7.85
09.01.05.01 CORREAS METALICAS
09.01.05.01 CORREA METALICA PERFIL C6X8.2 ML 10.00 11.35 113.50
NCIA DE OXAPAMPA,

SUMA
TOTAL

101.64

101.64

406.53

40.66

22.82

17.29

10.81

15.21
14.41

28.82

89.13

35.65

5.76

50.14

190.70

6.08
2.82

18.72

10.81

27.02

89.13
9.13

338.34

5.94

19.82

691.62

14.25

141.56

3214.93

12.20
72.61

1356.54

5.96

68.07

566.00
338.72

3.29

75.21

497.53

0.92

11.26

142.53

24.00

3.00

3.00
3.00

3.00

62.80

113.50
HOJA DE METRADOS DE ACERO
OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE DIRECCION (TERRENO 2)
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
ф 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1" 1 3/8"
Obs: Traslape Normal: para acero vertical y acero horizontal con H<0.30m TIPOS DE TRASLAPE: Normal 0.40 0.40 0.40 0.50 0.60 0.70 1.15 2.30
Traslape Superior: para horizontal con H>0.30m Superior 0.40 0.40 0.45 0.60 0.75 0.90 1.45 3.20
(H=Peralte efectivo) Peso (kg/m) 0.22 0.40 0.56 0.99 1.55 2.24 3.99 7.91

Datos Dimensiones RESULTADOS


ACERO longitud # 6mm 8mm 3/8 1/2 5/8 3/4 1 1 3/8
item descripción Cantidad Tipo
descripción Ø # de piezas s/emp emp. ML ML ML ML ML ML ML ML

09.01.04.01 ZAPATAS
09.01.04.01.02 ACERO PARA ZAPATAS F'y= 4200 Kg/Cm2
BLOQUE ADMINISTRATIVO
Z-1 1 Normal Acero Longitudinal 3/4 '' 4 0.71 - - - - - - 2.84 - -
1 Normal Acero Transversal 3/4 '' 8 1.36 - - - - - - 10.88 - -
- - - - - - - -
- - - - - - - -
Z-2 1 Normal Acero Longitudinal 3/4 '' 5 0.86 - - - - - - 4.30 - -
1 Normal Acero Transversal 3/4 '' 5 0.86 - - - - - - 4.30 - -
- - - - - - - - -
- - - - - - - - -
Z-3 1 Normal Acero Longitudinal 3/4 '' 6 1.11 - - - - - - 6.66 - -
1 Normal Acero Transversal 3/4 '' 6 1.11 - - - - - - 6.66 - -
- - - - - - - - -
Z-4 1 Normal Acero Longitudinal 3/4 '' 4 0.71 - - - - - - 2.84 - -
1 Normal Acero Transversal 3/4 '' 8 1.46 - - - - - - 11.68 - -
- - - - - - - - -
Z-5 1 Normal Acero Longitudinal 3/4 '' 5 0.76 - - - - - - 3.80 - -
1 Normal Acero Transversal 3/4 '' 9 1.56 - - - - - - 14.04 - -
- - - - - - - - -
Z-6 1 Normal Acero Longitudinal 3/4 '' 8 1.46 - - - - - - 11.68 - -
1 Normal Acero Transversal 3/4 '' 7 1.26 - - - - - - 8.82 - -
- - - - - - - - -
Z-7 1 Normal Acero Longitudinal 3/4 '' 5 0.81 - - - - - - 4.05 - -
1 Normal Acero Transversal 3/4 '' 9 1.66 - - - - - - 14.94 - -
- - - - - - - - -
Z-8 1 Normal Acero Longitudinal Inf. 3/4 '' 6 1.11 - - - - - - 6.66 - -
1 Normal Acero Transversal Inf. 3/4 '' 6 1.11 - - - - - - 6.66 - -
- - - - - - - - -
Z-9 1 Normal Acero Longitudinal Inf. 3/4 '' 9 1.56 - - - - - - 14.04 - -
1 Normal Acero Transversal Inf. 3/4 '' 5 0.76 - - - - - - 3.80 - -
- - - - - - - -
Z-10 1 Normal Acero Longitudinal Inf. 3/4 '' 6 1.06 - - - - - - 6.36 - -
1 Normal Acero Transversal Inf. 3/4 '' 6 1.06 - - - - - - 6.36 - -
Total ml - - - - - 151.37 - -
Total piezas - - - - - 17.00 - -
Kg - - - - - 338.34 - -
Total Kg 338.34

05.02.00 VIGAS DE CONEXIÓN


05.02.03 ACERO PARA VIGAS DE CIMENTACION F'y= 4200 Kg/Cm2
BLOQUE ADMINISTRATIVO
EJE B,C y D ENTRE EJE 5 y 8 3 Normal Acero Longitudinal Sup. 5/8 '' 2 11.56 1 - - - - 72.96 - - -
3 Normal Acero Longitudinal Inf. 5/8 '' 2 11.56 1 - - - - 72.96 - - -
3 Normal Acero Refuerzo Sup. 5/8 '' 1 6.30 - - - - - 18.89 - - -
3 Normal Estribos 3/8 '' 53 1.48 - - - 235.32 - - - - -

EJE 5,7 y 8 ENTRE EJE B y D 3 Normal Acero Longitudinal Sup. 1/2 '' 3 9.37 1 - - - 88.83 - - - -
3 Normal Acero Longitudinal Inf. 1/2 '' 3 9.37 1 - - - 88.83 - - - -
3 Normal Acero Refuerzo Sup. 1/2 '' 2 2.64 - - - - 15.84 - - - -
3 Normal Estribos 3/8 '' 45 1.48 - - - 199.80 - - - - -
Total ml - - 435.12 193.50 164.81 - - -
Total piezas - - 49.00 22.00 19.00 - - -
Kg - - 243.45 192.36 255.81 - - -
Total Kg 691.62

05.03.00 COLUMNAS
05.03.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2
BLOQUE ADMINISTRATIVO
C-1 5 Normal Acero Longitudinal 1/2 '' 2 9.15 1 - - - 96.55 - - - -
5 Normal Acero Longitudinal 5/8 '' 8 9.15 1 - - - - 390.19 - - -
5 Normal Estribos 3/8 '' 59 2.60 - - - 767.00 - - - - -
5 Normal Estribos 3/8 '' 59 2.60 - - - 767.00 - - - - -
C-2 2 Normal Acero Longitudinal 1/2 '' 6 9.15 1 - - - 115.86 - - - -
2 Normal Acero Longitudinal 5/8 '' 8 9.15 - - - - 146.48 - - -
2 Normal Estribos 3/8 '' 59 3.16 - - - 372.88 - - - - -
2 Normal Estribos 3/8 '' 59 2.60 - - - 306.80 - - - - -
C-3 2 Normal Acero Longitudinal 1/2 '' 2 9.15 1 - - - 38.62 - - - -
2 Normal Acero Longitudinal 5/8 '' 6 9.15 1 - - - - 117.06 - - -
2 Normal Estribos 3/8 '' 59 2.56 - - - 302.08 - - - - -
2 Normal Estribos 3/8 '' 59 0.84 - - - 99.12 - - - - -
C-4 1 Normal Acero Longitudinal 3/4 '' 8 9.15 1 - - - - - 78.84 - -
1 Normal Acero Longitudinal 5/8 '' 4 9.15 1 - - - - 39.02 - - -
1 Normal Estribos 3/8 '' 59 2.80 - - - 165.20 - - - - -
1 Normal Estribos 3/8 '' 59 3.20 - - - 188.80 - - - - -
1 Normal Estribos 3/8 '' 59 1.60 - - - 94.40 - - - - -
- - - - - - - -
Total ml - - 3,063.28 251.02 692.74 78.84 - -
Total piezas - - 341.00 28.00 77.00 9.00 - -
Kg - - 1,713.91 249.54 1,075.27 176.22 - -
Total Kg 3214.93

05.05.00 VIGAS
05.05.03 ACERO PARA VIGAS F'y= 4200 Kg/Cm2
BLOQUE ADMINISTRATIVO
Primer Piso - - - - - - - -
V- 105,106 y 107(0.30 x 0.50) - - - - - - - - -
EJE B,C y D ENTRE EJE 5 y 8 3 Normal Acero Long. Inferior 3/4 '' 2 11.56 1 - - - - - 73.56 - -
3 Normal Acero Long. Superior 3/4 '' 2 11.56 1 - - - - - 73.56 - -
3 Normal Refuerzo Superior 3/4 '' 1 7.82 - - - - - - 23.45 - -
3 Normal Estribos 3/8 '' 63 1.48 - - - 279.72 - - - - -
V-101,102 y 104 (0.30 x 0.40) - - - - - - - - -
EJE 5,7 y 8 ENTRE B-C 3 Normal Acero Long. Inferior 5/8 '' 2 9.82 1 - - - - 62.51 - - -
3 Normal Acero Long. Superior 5/8 '' 2 9.82 1 - - - - 62.51 - - -
3 Normal Refuerzo Superior 1/2 '' 1 6.86 - - - - 20.58 - - - -
3 Normal Estribos 3/8 '' 56 1.28 - - - 215.04 - - - - -
VB(0.15X0.20)
1 Normal Acero Long. Inferior 1/2 '' 1 8.39 - - - - 8.39 - - - -
1 Normal Acero Long. Superior 1/2 '' 1 8.39 - - - - 8.39 - - - -
Segundo Piso
V- 105 y 107(0.30 x 0.40)
EJE B y D ENTRE EJE 5 y 8 2 Normal Acero Long. Inferior 3/4 '' 2 11.56 1 - - - - - 49.04 - -
2 Normal Acero Long. Superior 3/4 '' 2 11.56 1 - - - - - 49.04 - -
2 Normal Refuerzo Superior 5/8 '' 1 7.82 - - - - - 15.63 - - -
2 Normal Estribos 3/8 '' 63 1.28 - - - 161.28 - - - - -

V-101 y 104 (0.30 x 0.40) - - - - - - - - -


EJE 5 y 8 ENTRE EJE B Y D 2 Normal Acero Long. Inferior 5/8 '' 2 9.16 1 - - - - 39.04 - - -
2 Normal Acero Long. Superior 5/8 '' 2 9.16 1 - - - - 39.04 - - -
2 Normal Refuerzo Superior 1/2 '' 1 6.20 - - - - 12.40 - - - -
2 Normal Estribos 3/8 '' 56 1.28
Total ml - - 656.04 49.76 218.75 268.65 - -
Total piezas - - 73.00 6.00 25.00 30.00 - -
Kg - - 367.05 49.47 339.54 600.48 - -
Total Kg 1356.54

05.06.00 LOSAS ALIGERADAS


05.06.03 ACERO PARA LOSAS F'y= 4200 Kg/Cm2
BLOQUE ADMINISTRATIVO
PRIMER PISO

ENTRE B-D, ENTRE 5-6


Baston Superior 1 Normal 1/2 '' 5 6.48 - - - - 32.41 - - - -
Baston Superior 1 Normal 3/8 '' 5 1.90 - - - 9.50 - - - - -
Baston Inferior 1 Normal 1/2 '' 5 9.04 1 - - - 47.71 - - - -
- - - - - - - -
ENTRE C-D, ENTRE 6-7
Baston Superior 1 Normal 1/2 '' 7 4.68 - - - - 32.73 - - - -
Baston Superior 1 Normal 3/8 '' 7 1.20 - - - 8.40 - - - - -
Baston Inferior 1 Normal 1/2 '' 7 4.26 - - - - 29.82 - - - -

ENTRE B-D, ENTRE 7-8


Baston Superior 1 Normal 1/2 '' 11 6.48 - - - - 71.29 - - - -
Baston Superior 1 Normal 3/8 '' 11 1.90 - - - 20.90 - - - - -
Baston Inferior 1 Normal 1/2 '' 11 9.04 1 - - - 104.95 - - - -
Total ml - - 38.80 318.90 - - - -
Total piezas - - 5.00 36.00 - - - -
Kg - - 21.71 317.02 - - - -
Total Kg 338.72

05.04.00 COLUMNETAS
05.04.03 ACERO PARA COLUMNETAS F'y= 4200 Kg/Cm2
BLOQUE ADMINISTRATIVO
Primer Piso - - - - - - - - -
Co-01(X-4) 26.00 Normal Acero Longitudinal 3/8 '' 4 3.57 - - - 371.28 - - - - -
26.00 Normal Estribos 6mm 20 1.13 - 587.60 - - - - - - -
- - - - - - - - -
Co-02(X-5) 9.00 Normal Acero Longitudinal 3/8 '' 6 3.57 - - - 192.78 - - - - -
9.00 Normal Estribos 6mm 20 1.33 - 239.40 - - - - - - -
- - - - - - - - -
Total ml 827.00 - 564.06 - - - - -
Total piezas 92.00 - 63.00 - - - - -
Kg 181.94 - 315.59 - - - - -
Total Kg 497.53

05.06.00 VIGAS DE CONFINAMIENTO


05.08.03 ACERO EN VIGUETAS F'y= 4200 Kg/Cm2
BLOQUE ADMINISTRATIVO
Primer Piso - - - - - - - -
EJE B, ENTRE EJE 7-8 1 Normal Acero Longitudinal 8mm 4 3.30 - - 13.20 - - - - - -
1 Normal Estribos 6mm 21 1.47 - 31.25 - - - - - - -
EJE D, ENTRE EJE 5-6 1 Normal Acero Longitudinal 8mm 4 2.66 - - 10.64 - - - - - -
1 Normal Estribos 6mm 17 1.47 - 25.00 - - - - - - -
ENTRE EJE 7 y 8, ENTRE EJE B-C 1 Normal Acero Longitudinal 8mm 4 3.22 - - 12.88 - - - - - -
1 Normal Estribos 6mm 21 1.47 - 30.47 - - - - - - -
EJE C, ENTRE EJE 7-8 1 Normal Acero Longitudinal 8mm 4 3.07 - - 12.28 - - - - - -
1 Normal Estribos 6mm 20 1.47 - 29.01 - - - - - - -
EJE D, ENTRE EJE 7-8 1 Normal Acero Longitudinal 8mm 4 4.60 - - 18.40 - - - - - -
1 Normal Estribos 6mm 30 1.23 - 36.90 - - - - - - -
ENTRE EJE C y D, ENTRE EJE 7-8 1 Normal Acero Longitudinal 8mm 4 1.52 - - 6.08 - - - - - -
1 Normal Estribos 6mm 9 1.47 - 13.87 - - - - - - -
EJE 5, ENTRE EJE C-D 1 Normal Acero Longitudinal 8mm 4 1.65 - - 6.60 - - - - - -
1 Normal Estribos 6mm 10 1.47 - 14.85 - - - - - - -
EJE 7, ENTRE EJE B-C 1 Normal Acero Longitudinal 8mm 4 3.75 - - 15.00 - - - - - -
1 Normal Estribos 6mm 22 1.47 - 31.74 - - - - - - -
ENTRE EJE C y D, ENTRE EJE 5-7 1 Normal Acero Longitudinal 8mm 4 4.64 - - 18.56 - - - - - -
1 Normal Estribos 6mm 28 1.47 - 40.43 - - - - - - -
EJE 7, ENTRE EJE C-D 1 Normal Acero Longitudinal 8mm 4 1.97 - - 7.88 - - - - - -
1 Normal Estribos 6mm 10 1.47 - 14.36 - - - - - - -
ENTRE EJE 7 y 8, ENTRE EJE C-D 1 Normal Acero Longitudinal 8mm 4 2.70 - - 10.80 - - - - - -
1 Normal Estribos 6mm 15 1.23 - 18.86 - - - - - - -
EJE 8, ENTRE EJE B-C 1 Normal Acero Longitudinal 8mm 4 3.79 - - 15.16 - - - - - -
1 Normal Estribos 6mm 22 1.47 - 32.13 - - - - - - -
EJE 8, ENTRE EJE C-D 1 Normal Acero Longitudinal 8mm 4 3.80 - - 15.20 - - - - - -
1 Normal Estribos 6mm 23 1.47 - 33.21 - - - - - - -
Total ml 352.08 162.68 - - - - - -
Total piezas 40.00 19.00 - - - - - -
Kg 77.46 65.07 - - - - - -
Total Kg 142.53
HOJA DE METRADOS / ESTRUCTURAS

OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE
OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 -BLOQUE ALMACEN (TERRENO 2)
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
REGION : PASCO PROVINCIA: OXAPAMPA DISTRITO: OXAPAMPA

Nro. METRADO SUMA


PART. DESCRIPCION UND. UBICACIÓN
Elem LARGO ANCHO ALTO PARCIAL TOTAL
09.01.00 ESTRUCTURAS
09.01.01 TRABAJOS PRELIMINARES
09.01.01.01 LIMPIEZA DE TERRENO MANUAL M2 161.95
BLOQUE ALMACEN
CIMENTACION 1.00 Area= 161.95 161.95

09.01.01.02 TRAZO Y REPLANTEO M2 161.95


BLOQUE ALMACEN
CIMENTACION 1.00 Area= 161.95 161.95

09.01.01.03 TRAZO Y REPLANTEO DURANTE EL PROCESO M2 485.85


BLOQUE ALMACEN
CIMENTACION 1.00 Area= 161.95 161.95
1er PISO 1.00 Area= 161.95 161.95
Techo 1.00 Area= 161.95 161.95

09.01.02 MOVIMIENTOS DE TIERRAS


09.01.02.01 CORTES
09.01.02.01.01 CORTE GENERAL CON MAQUINARIA , H=0.40m M3 64.78
BLOQUE ALMACEN
SUPERFICIE 1.00 Area= 161.95 0.40 64.78

09.01.02.01 EXCAVACION
09.01.02.01.01 EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m M3 12.43
BLOQUE ALMACEN
Z-1 1.00 0.70 0.65 1.50 0.68
Z-2 6.00 0.90 0.65 1.50 5.27
Z-3 6.00 0.80 0.80 1.50 5.76
Z-4 1.00 0.60 0.80 1.50 0.72

09.01.02.01.02 EXCAVACION PARA CIMIENTOS CORRIDOS M3 9.49


BLOQUE ALMACEN EJE 1 1.00 15.26 0.40 0.80 4.88
EJE B' 1.00 4.92 0.40 0.80 1.57
EJE I 1.00 9.49 0.40 0.80 3.04

09.01.02.02 NIVELACION Y COMPACTACION


09.01.02.02.01 REFINE, COMPACTACION Y NIVELACION DE FONDO DE SUPERFICIE ZAPATA M2 8.29
BLOQUE ALMACEN
Z-1 1.00 0.70 0.65 0.46
Z-2 6.00 0.90 0.65 3.51
Z-3 6.00 0.80 0.80 3.84
Z-4 1.00 0.60 0.80 0.48

09.01.02.02.01 REFINE, COMPACTACION Y NIVELACION DE FONDO DE SUPERFICIE CIMIENTOS M2 11.87


BLOQUE ALMACEN EJE 1 1.00 15.26 0.40 6.10
EJE B' 1.00 4.92 0.40 1.97
EJE I 1.00 9.49 0.40 3.80

09.01.02.02.03 REFINE, COMPACTACION Y NIVELACION DE SUPERFICIE M2 155.38


BLOQUE ALMACEN
ALMACEN DEPOSITO 1.00 Area= 75.20 75.20
LAVADO DE CARROS 1.00 Area= 9.32 9.32
RECEPCION Y CLASI 1.00 Area= 8.96 8.96
DESCONTAMINACIO 1.00 Area= 9.50 9.50
RESIDUOS SOLIDOS 1.00 Area= 22.46 22.46
SH-M 1.00 Area= 2.30 2.30
SH-H 1.00 Area= 3.67 3.67
HALL 1.00 Area= 23.97 23.97

09.01.02.03 RELLENOS CON MATERIAL DE PRESTAMO


09.01.02.03.01 RELLENO Y COMPACTO DE SUPERFICIE M3 62.15
ALMACEN DEPOSITO 1.00 Area= 75.20 0.40 30.08
LAVADO DE CARROS 1.00 Area= 9.32 0.40 3.73
RECEPCION Y CLASI 1.00 Area= 8.96 0.40 3.58
DESCONTAMINACIO 1.00 Area= 9.50 0.40 3.80
RESIDUOS SOLIDOS 1.00 Area= 22.46 0.40 8.98
SH-M 1.00 Area= 2.30 0.40 0.92
SH-H 1.00 Area= 3.67 0.40 1.47
HALL 1.00 Area= 23.97 0.40 9.59

09.01.02.03.01 RELLENO Y COMPACTO DE ZAPATAS M3 3.31


BLOQUE ALMACEN
Z-1 1.00 0.70 0.65 0.40 0.18
Z-2 6.00 0.90 0.65 0.40 1.40
Z-3 6.00 0.80 0.80 0.40 1.54
Z-4 1.00 0.60 0.80 0.40 0.19

09.01.02.04 MANEJO DE MATERIAL PROCEDENTE DE EXCAVACIONES


09.01.02.04.01 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES M3 108.38
CORTE GENERAL CON MAQUINARIA , H=0.40m 1.00 64.78 64.78
EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m 1.00 12.43 12.43
EXCAVACION PARA CIMIENTOS CORRIDOS 1.00 9.49 9.49
Sub Total 86.70
+2.5% esponjamiento 108.38

09.01.02.04.02 ELIMINACION DE MATERIAL EXCEDENTE M3 108.38


CORTE GENERAL CON MAQUINARIA , H=0.40m 1.00 64.78 64.78
EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m 1.00 12.43 12.43
EXCAVACION PARA CIMIENTOS CORRIDOS 1.00 9.49 9.49
Sub Total 86.70
+2.5% esponjamiento 108.38

09.01.03 OBRAS DE CONCRETO SIMPLE


09.01.03.01 SUB ZAPATAS
09.01.03.01.01 SUB ZAPATAS F´C=100KG/CM2 +30% PIEDRA GRANDE M3 8.29
BLOQUE ALMACEN
Z-1 1.00 0.70 0.65 1.00 0.46
Z-2 6.00 0.90 0.65 1.00 3.51
Z-3 6.00 0.80 0.80 1.00 3.84
Z-4 1.00 0.60 0.80 1.00 0.48

09.01.03.03 CIMIENTOS CORRIDOS


09.01.03.03.01 CIMIENTOS CORRIDO CONCRETO F´C=140KG/CM2 + 30% PIEDRA DESPLAZADO M3 7.71
BLOQUE ALMACEN EJE 1 1.00 15.26 0.40 0.65 3.97
EJE B' 1.00 4.92 0.40 0.65 1.28
EJE I 1.00 9.49 0.40 0.65 2.47

09.01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA CIMIENTOS CORRIDOS M2 38.57


BLOQUE ALMACEN EJE 1 2.00 15.26 0.65 19.84
EJE B' 2.00 4.92 0.65 6.40
EJE I 2.00 9.49 0.65 12.34

09.01.03.03 SOBRECIMIENTOS

09.01.03.03.01 SOBRE CIMIENTOS CONCRETO F´C=175KG/CM2 + 25% PIEDRA DESPLAZADORA M3 1.60


BLOQUE ALMACEN EJE 1 1.00 15.26 0.12 0.45 0.82
EJE B' 1.00 4.92 0.12 0.45 0.27
EJE I 1.00 9.49 0.12 0.45 0.51

09.01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.30 m M2 26.70


BLOQUE ALMACEN EJE 1 2.00 15.26 0.45 13.73
EJE B' 2.00 4.92 0.45 4.43
EJE I 2.00 9.49 0.45 8.54

09.01.03.04 FALSO PISO


09.01.03.04.01 CONCRETO F´C=80KG/CM2 PARA FALSO PISO E=0.10M M2 62.15
ALMACEN DEPOSITO 1.00 Area= 75.20 0.40 30.08
LAVADO DE CARROS 1.00 Area= 9.32 0.40 3.73
RECEPCION Y CLASI 1.00 Area= 8.96 0.40 3.58
DESCONTAMINACIO 1.00 Area= 9.50 0.40 3.80
RESIDUOS SOLIDOS 1.00 Area= 22.46 0.40 8.98
SH-M 1.00 Area= 2.30 0.40 0.92
SH-H 1.00 Area= 3.67 0.40 1.47
HALL 1.00 Area= 23.97 0.40 9.59

09.01.04 OBRAS DE CONCRETO ARMADO


09.01.04.01 ZAPATAS

09.01.04.01.01 CONCRETO PARA ZAPATA F'C=210 KG/CM2 M3 3.31


BLOQUE ALMACEN
Z-1 1.00 0.70 0.65 0.40 0.18
Z-2 6.00 0.90 0.65 0.40 1.40
Z-3 6.00 0.80 0.80 0.40 1.54
Z-4 1.00 0.60 0.80 0.40 0.19

09.01.04.01.02 ACERO PARA ZAPATAS F'y= 4200 Kg/Cm2 KG 86.39


(VER METRADO ACERO 86.39 86.39

09.01.04.04 COLUMNAS
09.01.04.04.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 M3 1.01
BLOQUE ALMACEN
PRIMER PISO C-1 14.00 0.40 0.45 0.40 1.01

09.01.04.04.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS M2 9.52


BLOQUE ALMACEN
PRIMER PISO C-1 14.00 Perimetro= 1.70 0.40 9.52

09.01.04.04.03 ACERO PARA COLUMNAS F'y= 4200 Kg/Cm2 KG 197.67


(VER METRADO ACERO 197.67 197.67

09.01.05 VARIOS

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)


09.01.05.01 UND 6.00
EN ZAPATAS (7,14,28 Días) 1.00 3.00 3.00
EN COLUMNAS (7,14,28 Días) 1.00 3.00 3.00

09.01.05 ESTRUCTURAS METALICAS


09.01.05.01 COLUMNAS METALICAS
09.01.05.01 COLUMNA METALICA TUBO RECTANGULAR 100x250X6mm PARA PORTICOS ML 14.00 4.06 56.84 56.84

09.01.05.01 VIGAS METALICAS


09.01.05.01 VIGA METALICA TUBO RECTANGULAR 80X140x3mm PARA PORTICOS ML 30.94
EJE 1 1.00 15.47 15.47
EJE 4 1.00 15.47 15.47

09.01.05.01 TIJERALES PRINCIPALES


09.01.05.01 TIJERAL METALICO PRINCIPAL TIPO 8 UND 5.00
5.00 5.00

09.01.05.01 MONTAJE DE TIJERAL METALICO PRINCIPAL TIPO 8 PZA 5.00


5.00 5.00

09.01.05.01 APOYOS Y FIJACION


09.01.05.01 SISTEMA DE APOYO FIJO EN COLUMNAS METALICAS 100X250mm UND 14.00 14.00 14.00

09.01.05.01 ARRIOSTRES
09.01.05.01 ARRIOSTRE DIAGONAL TUBO CUADRADO 40x2.5mm PARA PORTICOS ML 73.04
EJE 1 8.00 5.50 44.00
EJE 4 8.00 3.63 29.04

09.01.05.01 TEMPLADORES
09.01.05.01 TENSOR DE 5/8" EN ARRIOSTRE DE TIJERALES ML 100.00
ENTRE B'-C' 4.00 6.70 26.80
ENTRE C'-F 4.00 6.00 24.00
ENTRE F-H 4.00 6.20 24.80
ENTRE H-I 4.00 6.10 24.40

09.01.05.01 CORREAS METALICAS


09.01.05.01 CORREA METALICA PERFIL C6X8.2 ML 10.00 17.27 172.70 172.70
HOJA DE M
OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD
FÓRMULA : ESTRUCTURAS
01 -BLOQUE ALMACEN (TERRENO 2)
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA

Obs: Traslape Normal: para acero vertical y acero horizontal con H<0.30m
Traslape Superior: para horizontal con H>0.30m
(H=Peralte efectivo)

Datos Dimensiones

item descripción Cantidad Tipo


descripción Ø

09.01.04.01 ZAPATAS
09.01.04.01.02 ACERO PARA ZAPATAS F'y= 4200 Kg/Cm2
BLOQUE MANTENIMIENTO
Z-1 1 Normal Acero Longitudinal 1/2 ''
1 Normal Acero Transversal 1/2 ''
Z-2 6 Normal Acero Longitudinal 1/2 ''
6 Normal Acero Transversal 1/2 ''
Z-3 6 Normal Acero Longitudinal 1/2 ''
6 Normal Acero Transversal 1/2 ''
Z-4 1 Normal Acero Longitudinal 1/2 ''
1 Normal Acero Transversal 1/2 ''

Total ml
Total piezas
Kg
Total Kg

05.03.00 COLUMNAS
05.03.01 ACERO PARA COLUMNAS F'y= 4200 Kg/Cm2
BLOQUE MANTENIMIENTO
C-1 14 Normal Acero Longitudinal 1/2 ''
14 Normal Estribos 3/8 ''

Total ml
Total piezas
Kg
Total Kg
HOJA DE METRADOS DE ACERO
S SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO

ф 6mm 8mm 3/8" 1/2" 5/8"


TIPOS DE TRASLAPE: Normal 0.40 0.40 0.40 0.50 0.60
Superior 0.40 0.40 0.45 0.60 0.75
Peso (kg/m) 0.22 0.40 0.56 0.99 1.55

ensiones RESULTADOS
ACERO longitud # 6mm 8mm 3/8 1/2 5/8
# de piezas s/emp emp. ML ML ML ML ML

4 0.60 - - - - 2.40 -
4 0.55 - - - - 2.20 -
4 0.80 - - - - 19.20 -
5 0.55 - - - - 16.50 -
5 0.70 - - - - 21.00 -
5 0.70 - - - - 21.00 -
5 0.50 - - - - 2.50 -
3 0.70 - - - - 2.10 -

- - 86.90 -
- - 10.00 -
- - 86.39 -
86.39

8 1.10 - - - - 123.20 -
6 1.60 - - - 134.40 - -
- - - - - -
- 134.40 123.20 -
- 15.00 14.00 -
- 75.20 122.47 -
197.67
NTO PASCO, REGION PASCO.

3/4" 1" 1 3/8"


0.70 1.15 2.30
0.90 1.45 3.20
2.24 3.99 7.91

3/4 1 1 3/8
ML ML ML

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
86.39

- - -
- - -
- - -
- - -
- - -
- - -
197.67
HOJA DE METRADOS / ESTRUCTURAS
:"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA, DEPARTAMENTO PASCO,
OBRA
REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 - ALMACEN MAYOR (TERRENO 3)
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
REGION : PASCO PROVINCIA: OXAPAMPA DISTRITO: OXAPAMPA

Nro. METRADO SUMA


PART. DESCRIPCION UND. UBICACIÓN
Elem LARGO ANCHO ALTO PARCIAL TOTAL
09.01.00 ESTRUCTURAS
09.01.01 TRABAJOS PRELIMINARES
09.01.01.01 LIMPIEZA DE TERRENO MANUAL M2 86.56
RAMPA
CIMENTACION 1.00 Area= 86.56 86.56

09.01.01.02 TRAZO Y REPLANTEO M2 86.56


RAMPA
CIMENTACION 1.00 Area= 86.56 86.56

09.01.01.03 TRAZO Y REPLANTEO DURANTE EL PROCESO M2 86.56


RAMPA
CIMENTACION 1.00 Area= 86.56 86.56

09.01.02 MOVIMIENTOS DE TIERRAS


09.01.02.01 CORTES
09.01.02.01.01 CORTE GENERAL CON MAQUINARIA , H=0.40m M3 34.62
RAMPA
SUPERFICIE 1.00 Area= 86.56 0.40 34.62

09.01.02.01 EXCAVACION
09.01.02.01.01 EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m M3 82.80
RAMPA
BLOQUE A Z-1 2.00 0.80 1.60 1.50 3.84
Z-2 1.00 1.00 1.60 1.50 2.40
Z-3 1.00 1.60 1.90 1.50 4.56
BLOQUE B Z-4 5.00 1.60 3.00 1.50 36.00
BLOQUE C Z-4 5.00 1.60 3.00 1.50 36.00

09.01.02.02 NIVELACION Y COMPACTACION


09.01.02.02.01 REFINE, COMPACTACION Y NIVELACION DE FONDO DE SUPERFICIE ZAPATA M2 55.20
RAMPA
BLOQUE A Z-1 2.00 0.80 1.60 2.56
Z-2 1.00 1.00 1.60 1.60
Z-3 1.00 1.60 1.90 3.04
BLOQUE B Z-4 5.00 1.60 3.00 24.00
BLOQUE C Z-4 5.00 1.60 3.00 24.00

09.01.02.02.03 REFINE, COMPACTACION Y NIVELACION DE SUPERFICIE M2 86.56


RAMPA
RAMPA 1.00 Area= 86.56 86.56

09.01.02.03 RELLENOS CON MATERIAL DE PRESTAMO


09.01.02.03.01 RELLENO Y COMPACTO DE SUPERFICIE M3 86.56
RAMPA RAMPA 1.00 Area= 86.56 86.56

09.01.02.03.01 RELLENO Y COMPACTO DE ZAPATAS M3 48.00


RAMPA
BLOQUE A Z-1 2.00 0.80 1.60 2.56
Z-2 1.00 1.00 1.60 1.60
Z-3 1.00 1.60 1.90 3.04
BLOQUE B Z-4 5.00 1.60 3.00 24.00
BLOQUE C Z-4 5.00 1.60 3.00 24.00
COLUMNAS -40.00 0.45 0.40 -7.20

09.01.02.04 MANEJO DE MATERIAL PROCEDENTE DE EXCAVACIONES


09.01.02.04.01 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES M3 146.78
CORTE GENERAL CON MAQUINARIA , H=0.40m 1.00 34.62 34.62
EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m 1.00 82.80 82.80
Sub Total 117.42
+2.5% esponjamiento 146.78

09.01.02.04.02 ELIMINACION DE MATERIAL EXCEDENTE M3 146.78


CORTE GENERAL CON MAQUINARIA , H=0.40m 1.00 34.62 34.62
EXCAVACION CON MAQUINARIA PARA ZAPATAS, H=1.50m 1.00 82.80 82.80
Sub Total 117.42
+2.5% esponjamiento 146.78

09.01.03 OBRAS DE CONCRETO SIMPLE


09.01.03.01 SUB ZAPATAS
09.01.03.01.01 SUB ZAPATAS F´C=100KG/CM2 +30% PIEDRA GRANDE M3 38.64
RAMPA
BLOQUE A Z-1 2.00 0.80 1.60 0.70 1.79
Z-2 1.00 1.00 1.60 0.70 1.12
Z-3 1.00 1.60 1.90 0.70 2.13
BLOQUE B Z-4 5.00 1.60 3.00 0.70 16.80
BLOQUE C Z-4 5.00 1.60 3.00 0.70 16.80

09.01.03.04 FALSO PISO


09.01.03.04.01 CONCRETO F´C=80KG/CM2 PARA FALSO PISO E=0.10M M2 86.56
RAMPA 1.00 Area= 86.56 86.56

09.01.04 OBRAS DE CONCRETO ARMADO


09.01.04.01 ZAPATAS

09.01.04.01.01 CONCRETO PARA ZAPATA F'C=210 KG/CM2 M3 22.08


RAMPA
BLOQUE A Z-1 2.00 0.80 1.60 0.40 1.02
Z-2 1.00 1.00 1.60 0.40 0.64
Z-3 1.00 1.60 1.90 0.40 1.22
BLOQUE B Z-4 5.00 1.60 3.00 0.40 9.60
BLOQUE C Z-4 5.00 1.60 3.00 0.40 9.60

09.01.04.01.02 ACERO PARA ZAPATAS F'y= 4200 Kg/Cm2 KG 644.41


(VER METRADO ACERO) 644.41 644.41

09.01.04.04 COLUMNAS
09.01.04.04.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 M3 5.76
RAMPA
BLOQUE A, B Y C COLUMNA 40.00 0.40 0.45 0.80 5.76

09.01.04.04.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS M2 54.40


RAMPA
BLOQUE A, B Y C C-1 40.00 Perimetro= 1.70 0.80 54.40

09.01.04.04.03 ACERO PARA COLUMNAS F'y= 4200 Kg/Cm2 KG 197.67


(VER METRADO ACERO) 197.67 197.67

09.01.05 VARIOS

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)


09.01.05.01 UND 54.00
EN ZAPATAS (7,14,28 Días) 1.00 14.00 14.00
EN COLUMNAS (7,14,28 Días) 1.00 40.00 40.00

09.01.05 ESTRUCTURAS METALICAS


09.01.05.01 COLUMNAS METALICAS
09.01.05.01 COLUMNA METALICA TUBO CUADRADO 100X6mm PARA PORTICOS ML 16.60
RAMPA
BLOQUE A (EJE 1 Y 2) 4.00 4.15 16.60

09.01.05.01 COLUMNA METALICA TUBO RECTANGULAR 100x200X6mm PARA PORTICOS ML 113.79


RAMPA
BLOQUE A (TRAMO 1 Y 6 ) EJE 3 2.00 4.28 8.56
EJE 4 2.00 4.54 9.08
EJE 5 2.00 4.80 9.60

BLOQUE B (TRAMO 2 Y 5) ENTRE EJE 1 Y A 1.00 4.15 4.15


ENTRE EJE 1 Y B 1.00 3.91 3.91
ENTRE EJE 1 Y C 1.00 3.66 3.66
ENTRE EJE 1 Y D 1.00 3.42 3.42
ENTRE EJE 1 Y E 1.00 3.41 3.41
ENTRE EJE 2 Y A 1.00 4.15 4.15
ENTRE EJE 2 Y B 1.00 3.91 3.91
ENTRE EJE 2 Y C 1.00 3.66 3.66
ENTRE EJE 2 Y D 1.00 3.42 3.42
ENTRE EJE 2 Y E 1.00 3.41 3.41
ENTRE EJE 3 Y A 1.00 1.17 1.17
ENTRE EJE 3 Y B 1.00 1.42 1.42
ENTRE EJE 3 Y C 1.00 1.67 1.67
ENTRE EJE 3 Y D 1.00 1.91 1.91
ENTRE EJE 3 Y E 1.00 1.91 1.91

BLOQUE C (TRAMO 3 Y 4) ENTRE EJE 1 Y F 1.00 3.40 3.40


ENTRE EJE 1 Y G 1.00 3.15 3.15
ENTRE EJE 1 Y H 1.00 2.90 2.90
ENTRE EJE 1 Y I 1.00 2.66 2.66
ENTRE EJE 1 Y J 1.00 2.66 2.66
ENTRE EJE 2 Y F 1.00 3.40 3.40
ENTRE EJE 2Y G 1.00 3.15 3.15
ENTRE EJE 2 Y H 1.00 2.90 2.90
ENTRE EJE 2 Y I 1.00 2.66 2.66
ENTRE EJE 2 Y J 1.00 2.66 2.66
ENTRE EJE 3 Y F 1.00 1.92 1.92
ENTRE EJE 3 Y G 1.00 2.17 2.17
ENTRE EJE 3 Y H 1.00 2.42 2.42
ENTRE EJE 3 Y I 1.00 2.66 2.66
ENTRE EJE 3 Y J 1.00 2.66 2.66

09.01.05.01 VIGAS METALICAS


09.01.05.01 VIGA METALICA TUBO RECTANGULAR 100X200x6mm PARA PORTICOS ML 118.84
RAMPA
BLOQUE A (TRAMO 1 ) EJE A Y B (ENTRE EJE 1 Y 2) 2.00 1.30 2.60
EJE A Y B (ENTRE EJE 2 Y 3) 2.00 1.40 2.80
EJE A Y B(ENTRE EJE 3 Y 4) 2.00 2.84 5.68
EJE A Y B (ENTRE EJE 4 Y 5) 2.00 2.80 5.60
EJE A Y B (ENTRE EJE 5) 2.00 4.18 8.36
0.00
BLOQUE A (TRAMO 6 ) EJE A Y B (ENTRE EJE 1 Y 2) 2.00 1.30 2.60
EJE A Y B (ENTRE EJE 2 Y 3) 2.00 1.40 2.80
EJE A Y B(ENTRE EJE 3 Y 4) 2.00 2.84 5.68
EJE A Y B (ENTRE EJE 4 Y 5) 2.00 2.80 5.60
0.00
BLOQUE B (TRAMO 2 ) EJE 3 Y 2 (ENTRE EJE A Y B) 2.00 2.76 5.52
EJE 3 Y 2 (ENTRE EJE B Y C) 2.00 2.76 5.52
EJE 3 Y 2 (ENTRE EJE C Y D) 2.00 2.76 5.52
EJE 3 Y 2(ENTRE EJE D Y E) 2.00 1.30 2.60
0.00
BLOQUE B (TRAMO 5 ) EJE 1 Y 2 (ENTRE EJE A Y B) 2.00 2.76 5.52
EJE 1 Y 2 (ENTRE EJE B Y C) 2.00 2.76 5.52
EJE 1 Y 2 (ENTRE EJE C Y D) 2.00 2.76 5.52
EJE 1 Y 2 (ENTRE EJE D Y E) 2.00 1.30 2.60
0.00
BLOQUE C (TRAMO 3 ) EJE 3 Y 2 (ENTRE EJE F Y G) 2.00 2.75 5.50
EJE 3 Y 2 (ENTRE EJE G Y H) 2.00 2.75 5.50
EJE 3 Y 2 (ENTRE EJE H Y I) 2.00 2.75 5.50
EJE 3 Y 2(ENTRE EJE I Y J) 2.00 1.45 2.90
0.00
BLOQUE C (TRAMO 4 ) EJE 1 Y 2 (ENTRE EJE F Y G) 2.00 2.75 5.50
EJE 1 Y 2 (ENTRE EJE G Y H) 2.00 2.75 5.50
EJE 1 Y 2 (ENTRE EJE H Y I) 2.00 2.75 5.50
EJE 1 Y 2 (ENTRE EJE I Y J) 2.00 1.45 2.90

09.01.05.02 VIGA METALICA TUBO RECTANGULAR 80X140x3mm PARA PORTICOS ML 71.50


RAMPA
BLOQUE A (TRAMO 1 ) EJE 1, 2 , 3, 4, 5 10.00 1.30 13.00
BLOQUE A (TRAMO 6 ) EJE 1, 2 , 3, 4, 5 7.00 1.30 9.10
INTERMEDIO EJE 1, 4 Y 5 3.00 1.30 3.90

BLOQUE B (TRAMO 2 ) EJE A ,B ,C ,D Y E (ENTRE 2 Y 3) 8.00 1.30 10.40


BLOQUE B (TRAMO 5 ) EJE A ,B ,C ,D Y E (ENTRE 1 Y 2) 8.00 1.30 10.40
INTERMEDIO EJE A 1.00 1.30 1.30

BLOQUE C (TRAMO 3 ) EJE F ,G ,H ,I, J (ENTRE 2 Y 3) 8.00 1.30 10.40


BLOQUE C (TRAMO 4 ) EJE F ,G ,H ,I, J (ENTRE 1 Y 2) 8.00 1.30 10.40
INTERMEDIO EJE J 2.00 1.30 2.60

09.01.05.01 APOYOS Y FIJACION


09.01.05.01 SISTEMA DE APOYO FIJO EN COLUMNAS METALICAS 100X100mm UND 4.00
4.00 4.00

SISTEMA DE APOYO FIJO EN COLUMNAS METALICAS 100X200mm UND 36.00


36.00 36.00

09.01.05.01 ARRIOSTRES
09.01.05.01 ARRIOSTRE DIAGONAL TUBO CUADRADO 40x2.0mm PARA PORTICOS ML 231.72
RAMPA
BLOQUE A (TRAMO 1 ) ENTRE EJE 1 Y 2 2.00 1.86 3.72
ENTRE EJE 2 Y 3 2.00 1.96 3.92
ENTRE EJE 3 Y 4 4.00 1.94 7.76
ENTRE EJE 4 Y 5 4.00 1.94 7.76
EJE 5 2.00 1.94 3.88
2.00 1.98 3.96
2.00 1.60 3.20

BLOQUE A (TRAMO 6 ) ENTRE EJE 1 Y 2 2.00 1.85 3.70


ENTRE EJE 2 Y 3 2.00 1.92 3.84
ENTRE EJE 3 Y 4 4.00 1.94 7.76
ENTRE EJE 4 Y 5 4.00 1.98 7.92

BLOQUE A (TRAMO 1 Y 6 ) EJE 1 2.00 1.93 3.86


2.00 1.79 3.58
EJE 4 2.00 1.73 3.46
EJE 5 2.00 2.14 4.28
0.00
BLOQUE B (TRAMO 2 ) ENTRE EJE A Y B 2.00 1.95 3.90
2.00 1.91 3.82
ENTRE EJE B Y C 2.00 1.85 3.70
2.00 1.97 3.94
ENTRE EJE C Y D 4.00 1.91 7.64
ENTRE EJE D Y E 2.00 1.97 3.94

BLOQUE B (TRAMO 5 ) ENTRE EJE A Y B 4.00 1.91 7.64


ENTRE EJE B Y C 2.00 1.85 3.70
2.00 1.97 3.94
ENTRE EJE C Y D 4.00 1.91 7.64
ENTRE EJE D Y E 2.00 2.00 4.00
EJE A 4.00 1.60 6.40
2.00 1.51 3.02
2.00 1.64 3.28
EJE E 4.00 2.14 8.56
2.00 1.88 3.76

BLOQUE C (TRAMO 3 ) ENTRE EJE F Y G 2.00 1.95 3.90


2.00 1.90 3.80
ENTRE EJE G Y H 2.00 1.90 3.80
2.00 1.90 3.80
ENTRE EJE H Y I 4.00 1.91 7.64
ENTRE EJE I Y J 2.00 2.08 4.16

BLOQUE C (TRAMO 4 ) ENTRE EJE F Y G 2.00 1.95 3.90


2.00 1.90 3.80
ENTRE EJE G Y H 2.00 1.90 3.80
2.00 1.90 3.80
ENTRE EJE H Y I 4.00 1.91 7.64
ENTRE EJE I Y J 2.00 2.08 4.16
EJE F 4.00 2.14 8.56
2.00 1.86 3.72
EJE J 4.00 1.80 7.20
4.00 1.64 6.56
CARTELAS DE FIJACION
CARTELAS DE FIJACION DE 150X12 MM UND 164.00
RAMPA
BLOQUE A 68.00 68.00
BLOQUE B 48.00 48.00
BLOQUE C 48.00 48.00

LOSA COLABORANTE
LOSA COLABORANTE CALIBRE 22, E= 0.75MM M2 70.07
RAMPA
BLOQUE A TRAMO 1 1.00 13.33 1.50 20.00
TRAMO 6 1.00 9.16 1.50 13.74
BLOQUE B TRAMO 2 1.00 10.55 1.50 15.83
TRAMO 5 1.00 1.55 1.40 2.17
BLOQUE C TRAMO 3 1.00 10.67 1.50 16.01
TRAMO 4 1.00 1.67 1.40 2.34
HOJA DE METRADOS DE ACERO
OBRA :"PLAN DE CONTINGENCIA DEL PROYECTO: MEJORAMIENTO DE LA COBERTURA DE LOS SERVICIOS DE SALUD DEL HOSPITAL ERNESTO GUZMAN GONZALES, PROVINCIA DE OXAPAMPA, DEPARTAMENTO PASCO, REGION PASCO.
FÓRMULA : ESTRUCTURAS
01 - ALMACEN MAYOR (TERRENO 3)
CLIENTE : GOBIERNO REGIONAL DE PASCO
LUGAR : OXAPAMPA
ф 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1" 1 3/8"
Obs: Traslape Normal: para acero vertical y acero horizontal con H<0.30m TIPOS DE TRASLAPE: Normal 0.40 0.40 0.40 0.50 0.60 0.70 1.15 2.30
Traslape Superior: para horizontal con H>0.30m Superior 0.40 0.40 0.45 0.60 0.75 0.90 1.45 3.20
(H=Peralte efectivo) Peso (kg/m) 0.22 0.40 0.56 0.99 1.55 2.24 3.99 7.91

Datos Dimensiones RESULTADOS


ACERO longitud # 6mm 8mm 3/8 1/2 5/8 3/4 1 1 3/8
item descripción Cantidad Tipo
descripción Ø # de piezas s/emp emp. ML ML ML ML ML ML ML ML

09.01.04.01 ZAPATAS
09.01.04.01.02 ACERO PARA ZAPATAS F'y= 4200 Kg/Cm2
RAMPA
Z-1 2 Normal Acero Longitudinal 3/4 '' 4 1.50 - - - - - - 12.00 - -
2 Normal Acero Transversal 3/4 '' 8 0.70 - - - - - - 11.20 - -
Z-2 1 Normal Acero Longitudinal 3/4 '' 5 1.50 - - - - - - 7.50 - -
1 Normal Acero Transversal 3/4 '' 8 0.90 - - - - - - 7.20 - -
Z-3 1 Normal Acero Longitudinal 3/4 '' 8 1.80 - - - - - - 14.40 - -
1 Normal Acero Transversal 3/4 '' 10 1.50 - - - - - - 15.00 - -
Z-4 10 Normal Acero Longitudinal 3/4 '' 4 2.90 - - - - - - 116.00 - -
10 Normal Acero Transversal 3/4 '' 15 0.70 - - - - - - 105.00 - -

Total ml - - - - 288.30 - -
Total piezas - - - - 33.00 - -
Kg - - - - 644.41 - -
Total Kg 644.41

05.03.00 COLUMNAS
05.03.01 ACERO PARA COLUMNAS F'y= 4200 Kg/Cm2
RAMPA
C-1 40 Normal Acero Longitudinal 5/8 '' 8 1.60 - - - - - 512.00 - - -
40 Normal Estribos 3/8 '' 10 1.60 - - - 640.00 - - - - -
- - - - - - - - -
Total ml - 640.00 - 512.00 - - -
Total piezas - 72.00 - 57.00 - - -
Kg - 358.08 - 794.73 - - -
Total Kg 1152.81