BUILDER'S WORK CATALOGUE
2/38
Lux MAIN
FAA29100H_BWC Version : a-e Date: 07-04-15
This catalogue summarizes useful information for installation of the Otis Gen2 TM Machine above
2,5m/s 800 kg–1600 kg range in buildings.
- The building interfaces and dimensions for a single lift in the hoistway (doors are
installed in the hoistway)
- The mechanical reactions exerted by the lift on the building for a single lift in the
hoistway.
Bank
Bank Dupl
Duplex
ex Trip
Triple
lex
x Quad
Quadru
rupl
plex
ex Quin
Quintu
tupl
plex
ex Sext
Sextup
uple
lex
x Octo
Octopl
plex
ex
Number of
lifts in the 2 3 4 5 6 8
bank
BUILDER'S WORK CATALOGUE
2/38
Lux MAIN
FAA29100H_BWC Version : a-e Date: 07-04-15
This catalogue summarizes useful information for installation of the Otis Gen2 TM Machine above
2,5m/s 800 kg–1600 kg range in buildings.
- The building interfaces and dimensions for a single lift in the hoistway (doors are
installed in the hoistway)
- The mechanical reactions exerted by the lift on the building for a single lift in the
hoistway.
Bank
Bank Dupl
Duplex
ex Trip
Triple
lex
x Quad
Quadru
rupl
plex
ex Quin
Quintu
tupl
plex
ex Sext
Sextup
uple
lex
x Octo
Octopl
plex
ex
Number of
lifts in the 2 3 4 5 6 8
bank
BUILDER'S WORK CATALOGUE
3/38
Lux INDEX
FAA29100H_BWC Version : a-e Date: 07-04-15
1.2. DIMENSIONS 5
1.3. REQUIREMENTS
REQUIREMENTS FOR THE WELL – GENERAL WELL TOLERANCES 8
3.2. RECOMMENDED
RECOMMENDED HOISTWAY DIMENSIONS (ELEVATION) 38
1.1. DEFINITIONS
CONCEPT
This range of lifts is designed with machine room above the well , one entrance car with center
door opening (CLD) , and rear counterweight .
BUILDING DIMENSIONS
SYMBOLS
SF: door panels only are visible. Return walls are compulsory ( SMALL FRAME ),
NF: door panels only are visible. Return walls are compulsory ( NO FRAME )
Landing doors are installed in the hoistway or on the landing.
BUILDER'S WORK CATALOGUE
5/38
Lux PART 1: GENERAL INFORMATION
FAA29100H_BWC Version : a-e Date: 07-04-15
The main COP is located on the car right side panel when entering in the car by the entrance.
The option with a second auxiliary COP at the car opposite side is available.
In case of single lift, the hall buttons are mounted on the return walls adjacent to the landing
doors. The minimum lateral distance between the centre line of the button and any corner of
adjacent walls shall be 500 mm.
1.2. DIMENSIONS
OP
RW1 RW2
HW/2 HW/2
HOISTWAY WIDTH (HW)
FRONT ENTRANCE
BUILDER'S WORK CATALOGUE
6/38
Lux PART 1: GENERAL INFORMATION
FAA29100H_BWC Version : a-e Date: 07-04-15
TYFAC : NF
2300 - - - 2500
1.3.1 HOISTWAY DEPTH AND WIDTH TOLERANCES HOISTWAY TOLERANCES FOR SIMPLEX -
R 80M
5
2 5
2
H
T
P
H E H
T D T
P Y P
E A E
D W D
Y T Y
A S
I A
W O W
T H T
S
I L S
I
O A
I O
H C H
I I
X R N
A E I
M M M
M
O
C
5
5 2
2
FRONT OPENING
The actual hoistway walls are included between the two perfect vertical parallelepipeds
Maximum out of plumb of each hoistway wall = 50 mm
Commercial HW + 50
5 0 0
+
D - 5 25mm 25mm
l H
a
D
H
i
c l
e r i a
c Commercial HW
m e r request to the builder
o m m
C o m
C
Commercial HW - 50 Actual
Minimum authorized
location
location for the wall
of the
hoistway
walls
Maximum authorized
location for the wall
Effective
constructed wall
BUILDER'S WORK CATALOGUE
9/38
Lux PART 1: GENERAL INFORMATION
FAA29100H_BWC Version : a-e Date: 07-04-15
1.3.2 HOISTWAY DEPTH AND WIDTH TOLERANCES HOISTWAY TOLERANCES FOR SIMPLEX -
R > 80M
0
5 0
5
H
T
P
H E H
T D T
P Y P
E A E
D W D
Y T Y
A S
I A
W O W
T H T
S
I L S
I
O A
I O
H C H
I I
X R N
A E I
M M M
M
O
C
0
0 5
5
FRONT OPENING
Commercial HW + 100
0
1 0 0 0
+
D - 1 50mm 50mm
H
l D
i a
c l H
a
r
e i
c
Commercial HW
m e r request to the builder
m
o m
C o m
Commercial HW - 100 C Actual
location Minimum authorized
of the location for the wall
hoistway
walls Maximum authorized
location for the wall
Effective
constructed wall
BUILDER'S WORK CATALOGUE
10/38
Lux PART 1: GENERAL INFORMATION
FAA29100H_BWC Version : a-e Date: 07-04-15
The commercial dimensions HW; HD used to order the lift must be included between the
maximum and minimum values (hoistway, commercial dimensions maximum, minimum : see
part 2 ).
The maximum out of plumb of each hoistway wall is ± 25 mm for rise R 80m and ± 50 mm for
rise R> 80m
Consequently, the equipment supplied is manufactured for installation in a well, the walls of
which are inscribed in two perfect rectangular parallelepipeds defined in the sketches (dotted
line : chapter 1-3-1 & 1-3-2 ).
ELEVATION - TOLERANCES
For the safe operation of the lift, the walls shall have a mechanical strength such that when
a force of 300 N, being evenly distributed over an area of 5 cm² in round or square, section,
is applied at right angles to the wall at any point on either face they shall:
- Resist without permanent deformation,
- Resist without elastic deformation greater than 15 mm.
The mechanical reactions exerted by the lift on the building are given in the drawings part 2.
The building walls thickness must be in accordance with the fire regulation.
The hoistway and the machine room shall be suitable ventilated. It shall not be used to
provide ventilation of rooms other than those belonging to the lift.
Note: in the absence of relevant regulations or standards, it is recommended to provide
ventilation openings at the top of the well, with a minimum area of 1% of the horizontal
section of the well.
The ambient temperature in hoistway and in the machine room shall be maintained
between 0 °C and + 45 °C, taking into account the heat dissipated by the lift. See Para:
Heat dissipation.
In order to facilitate the handling of the lift material it is requested do not construct before
material installation at the level determined for material introduction.
Both the return walls will be constructed at this floor after the material installation inside the
hoistway.
BUILDER'S WORK CATALOGUE
12/38
Lux PART 1: GENERAL INFORMATION
FAA29100H_BWC Version : a-e Date: 07-04-15
List of the lift components with structural interfaces with the well :
- Guide rail bracket
- Landing door fixations
- Hooks for handling the equipment.
CONCRETE WELL
Minimum compression strength of 30 MPa is required for the concrete.
Two fixation methods are available:
- Steel anchorages: Otis installs the steel dowels after drilling of the concrete.
- The constructor installs suitable rail inserts. The bolts are delivered and installed by Otis.
Contact otis for precise definition.
The maximum vertical distance between guide rails fixation is 3 m.
CONCRETE BEAMS AND CONCRETE SLABS WITH BRICKS OR BLOCK WORKS WALL
The structural Lift components interface on the concrete parts with the same requirements
as for concrete walls.
The maximum distance between slabs is 3 m. One additive concrete beam is required at
the level of the highest guide rails fixations (see part 2).
Consult Otis for detailed information.
STEEL STRUCTURE
The structural lift components are interfaced at the level of the floor beams with a maximum
distance between beams of 3 m. Additive beams are required at the level of the highest
guide rails (side walls). Consult Otis for detailed information.
The natural frequency of the steel structure, which supported the lift, shall be above 5 Hz.
The building beams on which the guide rails brackets are fixed shall have a maximum
deflexion on 2 mm in the local area where the efforts are applied by the lift. Consult Otis for
the value and the location of these efforts.
BLOCK WORKS
(Block works, cellular concrete, full body bricks)
Specific anchorages (chemical dowels...) must be selected by the constructor and Otis,
regarding the max load applied on interfaces components: (guide rails and landing doors).
The maximum vertical distance between guide rails fixation is 3 m.
Consult Otis for detailed information.
See sketches in the following sheets.
BUILDER'S WORK CATALOGUE
13/38
Lux PART 1: GENERAL INFORMATION
FAA29100H_BWC Version : a-e Date: 07-04-15
CONCRETE HOISTWAY
Sketch 1
Hoistway roof
level
Top of hoistway
CONCRETE BEAMS AND CONCRETE SLABS WITH BRICKS OR BLOCK WORKS WALL
0
0
4
i
x
a
M
0
0
l 0
e 3
v
e
l
p
o
T
BUILDER'S WORK CATALOGUE
14/38
Lux PART 1: GENERAL INFORMATION
FAA29100H_BWC Version : a-e Date: 07-04-15
0
0
4
i
x
a
m
0
0
l 0
e 3
v
e
l
p
o
T
BLOCK WORKS
Sketch 4
Hoistway roof
level
Top of hoistway
BUILDER'S WORK CATALOGUE
15/38
Lux PART 1: GENERAL INFORMATION
FAA29100H_BWC Version : a-e Date: 07-04-15
1.4.2 MAIN POWER SUPPLY (WITHOUT POWER SUPPLY FOR LIGHTING, SEE 1.4.3)
For each lift, the power supply lines (3 phases + neutral + earth) shall be routed to the
machine room.
Definition in line with (IEC 364-4-63):
IB = Useful current (current for which the circuit is designed)
IZ = Continuous current-carrying capacity of the cable
In = Nominal current of the protective device
Operating characteristic of a device protecting a cable against overload shall satisfy, at
least:
IB In IZ
Table for electrical power supply (DATA NOT CONTRACTUAL)
All the following data are given for a 400 V AC power supply
For information
Rated Power
Starting Useful Line Main
Number of Speed Copper cross Calibration of
Current Current
Passengers (m/s) Power Line Section Protection
IS (A) IB (A)
S (kVA) P (kW) (mm ) Device ( A )
10 (800kg ) 2.50 32 26 18 18 10 50
13 (1000kg) 2.50 37 31 21.5 21.5 10 50
17 (1275kg) 2.50 38 31 21.5 21.5 10 50
21 (1600kg) 2.50 47 39 37 37 10 50
Additional information :
It is strongly recommended to separate neutral and protective conductor according to a
TN-S system (5-wire net: 3 phases + neutral + earth).
Rated voltage available: 380 or 400 or 415 V, tolerance: + 10%.
Frequency: 50 or 60 Hz
If an earth leakage circuit breaker is used at the starting point of the power line, the
required rating is 500 mA or more.
Copper cross section of the cable between building and controller in the machine room
has to be calculated following the local code (i.e. IEC 364), considering the rated voltage,
the currents determined with the here-above table and the external influences which can
exist.
BUILDER'S WORK CATALOGUE
16/38
Lux PART 1: GENERAL INFORMATION
FAA29100H_BWC Version : a-e Date: 07-04-15
This line shall be protected at the starting point according local code (IEC 364).
Machinery location
Starting Current Useful Current
RISE (meter))
IS (A) IB (A Protection device for car FUSE (A) for Lighting In
and socket machinery Hoistway (LIH)
< 50 35 25 16 (∆: 10mA) 6 or 10
Note: This power supply for lighting could be connected to the main power line, on the
supply side of the main switch.
In this case the value of the current for the lighting must be added to the value of the current
of the main power supply defined in the 1.4.2
In case of interruption of the normal lighting supply, there shall be an automatically
rechargeable emergency supply which is capable of feading a lamp installed in the top of
the hoistway (not supplied by Otis).
10
2.50 3,51
13
2.50 3,67
17
2.50 4,30
21
2.50 5,93
According to IEC 60364 part 5 international standard - Electrical installation of buildings, low
voltage electrical installation.
Degree of protection:
IP21: IP code according to EN 50 102 standard.
IK = 5: IK code according to EN 60 529 standard.
Ambient temperature:
The ambient temperature in the machine room is assumed to be maintained between 0 °C
and + 45 °C.
1.6.4 EARTHQUAKE
Option: earthquake (Consult OTIS for detailed information)
3 Hooks
Location
TOP LEVEL
FRONT ENTRANCE
CEILING
DIMENSIONS TABLE
HOISTWAY DEPTH (HD) AND FRONT TO REAR WALL DIMENSIONS (WTW)
WTW=HD
P8 P2
P1
1
M s
i P7
I x
D a
r
a
C D
1 Car axis 2 H
3 4
P3 P4
335 335
HW
ENTRANCE
Number of passenger
21 pass. 21 pass.
10 pass. 13 pass. 17 pass.
CW 2000 x CD 1700 CW 2100 x CD 1600
DIM1 (mm) 863 863 863 1013 963
P1 (N) 21000 22500 29800 37000 37000
P2 (N) 23000 24000 31000 38000 38000
P3 (N) 23000 25500 33600 42000 42000
P4 (N) 23500 25500 33700 42500 42500
P7 (N) 2300 2300 2300 2300 2300
P8 (N) 2300 2300 2300 2300 2300
BUILDER'S WORK CATALOGUE
21/38
Lux PART 3: INFORMATION CONCERNING BANKS OF
LIFTS
FAA29100H_BWC Version : a-e Date: 07-04-15
HW
1
Number of passenger
10 pass. 13 pass. 17 pass. 21 pass.
P11 (N) 62000 68300 77000 84000
P12 (N) 100000 115000 138000 165000
P13 (N) 85000 94000 1110000 131000
P17 (N) 41000 46000 52000 58100
CWT axis
T4 T6 T5
150
5 C
3 T
1 C
Car DBG/2+90 Car DBG/2+90
T1 T2
T3 0
2
2
HW1 HW2
HW
ENTRANCE
RW1 RW2
0
2
± OP + 100 ± 20
0
5
+
H
P
O
SILL "0"
FINISHED FLOOR
i
n
i HW
m
0
8
WTW = HD
DOORS ON LANDING
RW1 RW2
0
2
±
0 0
2 7
± 2 OP + 100 ± 20
0 +
5 H
+ P
H O
P
O
100 for CLD
SILL "0"
FINISHED FLOOR
i
n
i HW
m
0
6
WTW
HD
BUILDER'S WORK CATALOGUE
24/38
Lux PART 3: INFORMATION CONCERNING BANKS OF
LIFTS
FAA29100H_BWC Version : a-e Date: 07-04-15
RW1 RW2
0
2
± OP + 60 ± 20
0
5
+
H
P
O
SILL "0"
FINISHED FLOOR
i
n
i HW
m
0
8
WTW = HD
DOORS ON LANDING
RW1 RW2
0
2
±
0 0
2 7
± 2 OP + 60 ± 20
0 +
5 H
+ P
H O
P
O
100 for CLD
SILL "0"
FINISHED FLOOR
i
n
i HW
m
0
6
WTW
HD
BUILDER'S WORK CATALOGUE
25/38
Lux PART 3: INFORMATION CONCERNING BANKS OF
LIFTS
FAA29100H_BWC Version : a-e Date: 07-04-15
DUPLEX
FRONT OPENING
0 H
5 T 0
P 5
H E H S
T D T M
P Y P
E A E
A
D W D E
Y T Y
B
A I S A R
W O W O
T H T
S L S
UNIT A T UNIT B
I I A
O A
H I
O R
I C H
I A
X R N
E I
P
A E
M M M S
M 0 160
0 O 5
5 C
FRONT OPENING
BUILDER'S WORK CATALOGUE
27/38
Lux PART 3: INFORMATION CONCERNING BANKS OF
LIFTS
FAA29100H_BWC Version : a-e Date: 07-04-15
TRIPLEX
FRONT OPENING
FRONT OPENING
BUILDER'S WORK CATALOGUE
28/38
Lux PART 3: INFORMATION CONCERNING BANKS OF
LIFTS
FAA29100H_BWC Version : a-e Date: 07-04-15
QUADRUPLEX
FRONT OPENING
FRONT OPENING
BUILDER'S WORK CATALOGUE
29/38
Lux PART 3: INFORMATION CONCERNING BANKS OF
LIFTS
FAA29100H_BWC Version : a-e Date: 07-04-15
QUINTUPLEX
FRONT OPENING
FRONT OPENING
BUILDER'S WORK CATALOGUE
32/38
Lux PART 3: INFORMATION CONCERNING BANKS OF
LIFTS
FAA29100H_BWC Version : a-e Date: 07-04-15
R 80m
Number of
CW CD DOOR OP THW MINI THW MAXI
passenger
R 80m
Number of
CW CD DOOR OP THW MINI THW MAXI
passenger
TRIPLEX
Lifts in line in the same hoistway
R 80m
Number of
CW CD DOOR OP THW MINI THW MAXI
passenger
R 80m
Number of
CW CD DOOR OP THW MINI THW MAXI
passenger
QUADRUPLEX
Lifts in line in the same hoistway
R 80m
Number of
CW CD DOOR OP THW MINI THW MAXI
passenger
R 80m
Number of
CW CD DOOR OP THW MINI THW MAXI
passenger
QUINTUPLEX
Lifts in line in the same hoistway
R 80m
Number of
CW CD DOOR OP THW MINI THW MAXI
passenger
R 80m
Number of
CW CD DOOR OP THW MINI THW MAXI
passenger
SEXTUPLEX
Dimensions for a single hoistway for 3 Lifts
R 80m
Number of
CW CD DOOR OP THW MINI THW MAXI
passenger
R 80m
Number of
CW CD DOOR OP THW MINI THW MAXI
passenger
OCTOPLEX
Dimensions for a single hoistway for 4 Lifts
R 80m
Number of
CW CD DOOR OP THW MINI THW MAXI
passenger
R 80m
Number of
CW CD DOOR OP THW MINI THW MAXI
passenger