Anda di halaman 1dari 7

DESIGN OF RAFT FOOTING

SN DESCRIPTION QUANTITY UNIT REMARKS


1 size of column (a) = 0.45 m
2 Safe Bearing Cpacity = 141.8625 kN/m2
3 Grade of concrete = 20 M20
4 Grade of steel = 500 Fe500
5 X-direction total grid to grid distance 2 m
6 Y-direction total grid to grid distance 2.56 m
projection (x) 0.5 Ixx
projection(y) 0.5 Iyy
x-dir total 3 Mx
y-dir total 3.56 My
p
A
P/A

SN
1
2
3
4
5

Total

ex

SN
1
2
3
4
5
6
CG

Depth calculation
overall depth 425 mm
Dia. Of bar used 12 mm
Clear cover 50 mm
Effective depth 369 mm

Check for punching shear


Shear strength of concrete(tc) 1.12

1) For a corner column


Load (P) 190.0933333 kN
column size: a 450 mm
D 369 mm
perimeter (b0) 3357 mm
tv 0.23 N/mm2 OK

2) For an edge column


Load (P) 242.6266667 kN
column size: a 450 mm
D 369 mm
perimeter (b0) 3276 mm
tv 0.30 N/mm2 OK

3) Intermedaiate column
Load (P) 50.9 kN
column size: b 450 mm
D 369 mm
perimeter (b0) 3114 mm
tv 0.07 N/mm2 OK
Ast. Calculation
Maxm. Moment along x-direction = wl2/10
w = 137.96 kN/m
l = 2 m
Mu = 55.18 kNm/m
Maxm. Moment along y-direction = wl2/8
w = 137.96 kN/m
l = 2.56 m
Mu = 113.01 kNm/m
R = 0.83
Ast. = 741.35 mm2
Spacing required = 152.5555712
150
12mm dia. @150mm c/c on both sides
Eccentricity calculation

11.279504 m4
8.01 m4
-281.04 kNm
-408.446 kNm
588.17 kN
10.68 m2
55.07172285 kN/m2

point load(P) distance(dx) CRx pxdx Distance (dy) CRy Pxdy x


1 190.1 0 0.30555999 0 0 0.8021742161 0 -1.00
2 242.62 0 0 0.6 145.572 -1.00
3 65.586 0 0 2.6 170.5236 -1.00
4 38.96 2 77.92 0.6 23.376 1.00
5 50.9 2 101.8 2.6 132.34 1.00

Total 588.17 179.72 471.8116


 1.00  1.28
ex -0.69 ey -0.48

GRID DISTANCE SN GRID


1
2
3
CG

CG
y stress check
-1.28 137.96 OK
-0.68 123.01 OK
1.32 73.17 OK
-0.68 21.02 OK
1.32 28.81 OK