Precision Drilling International

TASK RISK ASSESSMENT WORKSHEET


Facility: Rig 174 Original Issue Date: Date: Page 1 of TRA # : 63 1 Rev:0
Supervisor:
Work Group Preparing TRA:
(Name & Position) Rig Manager
Description of work activities: Working on Mud Pumps SOP Ref # (If Applicable):
List unusual physical or operational factors, existing or expected during this tour, which will cause a departure from or changes to the content below within this TRA:

List the measures to be taken in recognition of the points mentioned above:

L - LIKELIHOOD S - SEVERITY R - RATING RESULT

SEVERITY
CATEGORY DEFINITION CATEGORY DEFINITIONS L 1 2 3 Acceptable
LOW (1) Remote LOW (1) Minor Injury No Damage No Pollution M 2 4 6 Tolerable
MEDIUM (2) Possible MEDIUM (2) Serious Injury Minor Damage Minor Pollution H 3 6 9 Unacceptable
HIGH (3) Probable HIGH (3) Major Injury Major Damage Major Pollution L M H TRA Policy Reference
IS THERE A SAFER WAY TO COMPLETE THE JOB? ARE THERE ALTERNATIVES WITH LESS RISK? LIKELIHOOD 03-31-PRO
Residual Acceptable?
Risk Reduction
Step Task Hazard Risk Tolerable ?
Measure
L S R L S R Unacceptable?

Prior to work, open


the bleed line &
confirm there is no
trapped pressure,
Raise the necessary
work permit, Use
proper hand tools,
Expose to high pressure, Avoid pinch point,
Struck by, Hand injury, Caught Use proper hand
1 Working on mud pump between, Back injury 3 3 9 manual technique 2 2 4 Tolerable
0 0
0 0
0 0
0 0