Precision Drilling International

TASK RISK ASSESSMENT WORKSHEET


Facility: Rig 174 Original Issue Date: JAN-20-06 Date: 20/01/06 Page 1 of TRA # : 65 1 Rev:0
Supervisor:
Work Group Preparing TRA:
(Name & Position) Rig Manager
Description of work activities: CHANGE OIL SEAL FOR TD OIL PUMP SOP Ref # (If Applicable):
List unusual physical or operational factors, existing or expected during this tour, which will cause a departure from or changes to the content below within this TRA:

List the measures to be taken in recognition of the points mentioned above:

L - LIKELIHOOD S - SEVERITY R - RATING RESULT

SEVERITY
CATEGORY DEFINITION CATEGORY DEFINITIONS L 1 2 3 Acceptable
LOW (1) Remote LOW (1) Minor Injury No Damage No Pollution M 2 4 6 Tolerable
MEDIUM (2) Possible MEDIUM (2) Serious Injury Minor Damage Minor Pollution H 3 6 9 Unacceptable
HIGH (3) Probable HIGH (3) Major Injury Major Damage Major Pollution L M H TRA Policy Reference
IS THERE A SAFER WAY TO COMPLETE THE JOB? ARE THERE ALTERNATIVES WITH LESS RISK? LIKELIHOOD 03-31-PRO
Residual Acceptable?
Risk Reduction
Step Task Hazard Risk Tolerable ?
Measure
L S R L S R Unacceptable?

RAISE MAN RIDING


WORK PERMIT,
NOMINATE
EXPERIENCE
HAND INJURY, AIR MAN OPERATOR UNDER
REMOVE OIL LINE AND BOLT TO REMOVE RIDER OPERATION TOO THE SUPERVISION
1 FLANGE FAST 2 2 4 OF A SENIOR 2 2 4 Tolerable

2 REMOVE THE UNIT FALLING OBJECT 2 2 4 TIED PROPERLY 2 1 2 Acceptable

PROPER TOOLS
AND PROPER
POSITION TO
3 INSTALL BACK HAND INJURY 2 1 2 WORK 1 1 1 Acceptable
Residual Acceptable?
Risk Reduction
Step Task Hazard Risk Tolerable ?
Measure
L S R L S R Unacceptable?

PROPER PUMP
AND HOSES,
AFTER CLEAN THE
AREA , TWO
DRIPPING OIL CAUSING WORKERS TO
4 FILL UP OIL SLIPPING 2 2 4 PERFORM THE JOB 1 1 1 Acceptable