JUMLAH
SUB JUMLAH
NO URAIAN PEKERJAAN TOTAL
( Rp. ) ( RP. )
JUMLAH Rp 85,407,156.05
DIBULATKAN Rp 93,947,000.00
( ………………………………………... )
Team Leader
RINCIAN
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : PEMBANGUNAN BANGUNAN PENGOLAHAN HASIL KOPI
LOKASI : Kabupaten Bandung Barat
TAHUN ANGGARAN : 2018
JUMLAH
HARGA SATUAN
N0 URAIAN PEKERJAAN VOLUME SAT HARGA
(RP.) (RP.)
1 2 3 4 5 6=5x3
A. Pekerjaan Persiapan
1 Pek. Pengukuran dan Pasangan bouwplank 33.00 m' 64,100.00 2,115,300.00
2 Pek. Administrasi, Pelaporan Dan Dokumentasi 1.00 Ls 1,000,000.00 1,000,000.00
Sub Jumlah A 3,115,300.00
B. Pekerjaan Tanah dan Pondasi
1 Pek. Galian tanah pondasi 26.53 m3 65,100.00 1,727,233.20
2 Pek. Urugan pasir t=5 cm 1.32 m3 144,800.00 191,136.00
3 Pek. Pasang Aanstamping 3.96 m3 326,700.00 1,293,732.00
4 Pek. Pasang Pondasi batu kali camp 1:5 8.42 m3 703,500.00 5,919,952.50
5 Pek. Urugan tanah kembali 8.84 m3 18,300.00 161,845.20
Sub Jumlah B 9,293,898.90
C. Pekerjaan Pembetonan
1 Pek. Sloof beton 15/20 cm 0.99 m3 4,840,000.00 4,791,600.00
2 Pek. Kolom Praktis 12x12 cm 0.39 m3 6,671,000.00 2,593,684.80
3 Pek. Ringbalk 12x15 cm 0.59 m3 5,509,000.00 3,272,346.00
Sub Jumlah C 10,657,630.80
D. Pekerjaan Dinding
1 Pek. Pasangan dinding 1/2 bata camp. 1:5 62.40 m2 112,500.00 7,019,673.75
2 Pek. Pasangan dinding trasraam 1/2 bata camp. 1:3 10.49 m2 118,400.00 1,241,424.00
3 Pek. Plesteran 124.79 m2 58,500.00 7,300,460.70
4 Pek. Acian 124.79 m2 29,400.00 3,668,949.48
Sub Jumlah D 19,230,507.93
E. Pekerjaan Atap
1 Pek. Rangka Atap Baja Ringan 41.44 m2 141,800.00 5,875,837.50
2 Pek. Penutup Atap Metal Roof 41.44 m2 85,200.00 3,530,475.00
3 Pek. Bubungan 9.75 m' 87,900.00 857,025.00
4 Pek. Listplank GRC 2/20 cm 36.50 m' 57,100.00 2,084,150.00
Sub Jumlah E 12,347,487.50
F. Pekerjaan Kusen
1 Pek. Pasang Kusen Type PJ1 1.00 unit 3,280,500.00 3,280,500.00
2 Pek. Pasang Kusen Type P1 2.00 unit 2,357,700.00 4,715,400.00
3 Pek. Pasang Kusen Type P2 1.00 unit 4,554,300.00 4,554,300.00
4 Pek. Pasang Kusen Type J1 2.00 unit 960,200.00 1,920,400.00
5 Pek. Pasang Kusen Type BV1 2.00 unit 522,400.00 1,044,800.00
6 Pek. Pasang Kusen Type BV2 1.00 unit 563,900.00 563,900.00
7 Pek. Pasang Kusen Type BV3 1.00 unit 764,100.00 764,100.00
Sub Jumlah F 16,843,400.00
G. Pekerjaan Plafond
1 Pek. Rangka kayu 40x60 mm 15.00 m2 66,300.00 994,500.00
2 Pek. Pasang Plafond Gypsum t=9mm 15.00 m2 42,100.00 631,500.00
Sub Jumlah G 1,626,000.00
H. Pekerjaan Lantai
1 Pek. Urugan Pasir T.5cm 3.29 m3 144,800.00 476,392.00
2 Pek. Pasang lantai Keramik 40x40 cm Polished 15.00 m2 201,500.00 3,022,500.00
3 Pek. Lantai Floor Fin. Acian kasar 1.57 m2 840,700.00 1,319,899.00
Sub Jumlah H 4,818,791.00
I. Pekerjaan Pengecatan
1 Pek. Pengecatan Dinding Dalam 67.96 m2 29,900.00 2,032,066.79
2 Pek. Pengecatan Dinding Luar 56.83 m2 35,300.00 2,006,173.13
3 Pek. Pengecatan Plafond 15.00 m2 31,100.00 466,500.00
Sub Jumlah I 4,504,739.92
JUMLAH
HARGA SATUAN
N0 URAIAN PEKERJAAN VOLUME SAT HARGA
(RP.) (RP.)
1 2 3 4 5 6=5x3
J. Pekerjaan Elektrikal
1 Pek. Instalasi Titik Lampu 5.00 titik 211,000.00 1,055,000.00
2 Pek. Instaslasi Titik Stop Kontak 5.00 titik 241,000.00 1,205,000.00
3 Pek. Pasang Lampu SL-9 Watt 5.00 bh 66,600.00 333,000.00
4 Pek. Pasang Saklar Tunggal 1.00 bh 48,200.00 48,200.00
5 Pek. Pasang Saklar Ganda 2.00 bh 55,100.00 110,200.00
6 Pek. Pasang Stop Kontak 5.00 bh 43,600.00 218,000.00
Sub Jumlah J 2,969,400.00
Jumlah Total 85,407,156.05
REKAP DAFTAR INDEK HARGA SATUAN PEKERJAAN
Harga
NO. Jenis Pekerjaan Satuan
Pekerjaan
HARGA SAT
NO. JENIS BAHAN BANGUNAN SAT.
Rp.
H. BAHAN KACA
1 Kaca Es 5 mm ( ASAHI ) m2 123,480.00
2 Kaca Polos 5 mm ( ASAHI ) m2 78,624.00
3 Kaca Warna Biru 5 mm ( ASAHI ) m2 327,600.00
4 Kaca Rayben 5 mm ( ASAHI ) m2 109,494.00
5 Kaca Patri Lokal Terpasang ( ASAHI ) m2 1,722,672.00
6 Kaca Float Tempered 12 mm Terpasang ( ASAHI ) m2 719,586.00
7 Kaca Polos 8 mm ( ASAHI ) m2 220,500.00
8 Kaca Tempered 8 mm ( ASAHI ) m2 437,850.00
9 Glass Block DN 20 x 20 ( Kedawung ) bh 28,854.00
10 List Karet (Assesoris Kusen/Pintu Alumunium) m1 8,190.00
11 Sticker Sanblass m2 107,100.00
K. BAHAN ELEKTRIKAL
1 Kabel NYM 3 x 2,5 mm2 m 8,400.00
2 SL 18 Watt, philips bh 44,100.00
3 Stop Kontak 1 Phasa 10/ 16 A bh 25,200.00
4 Saklar Tunggal bh 31,500.00
5 Saklar Ganda bh 37,800.00
6 Pipa Conduit bh 7,875.00
7 Socket Pipa bh 1,260.00
8 Tee Doos bh 7,560.00
9 Klem Pipa bh 1,260.00
10 Fhiser bh 1,260.00
11 Las Doop bh 1,260.00
12 Isolasi ban ls 12,600.00
DAFTAR HARGA SATUAN UPAH KERJA
HARGA SAT
NO JENIS PEKERJA BANGUNAN SATUAN WAKTU
Rp.
BERAT/6m BERAT/6m
UKURAN UKURAN
kg kg
50.36.5 mm 33.50 60.30.10.1,2 7.44
65.42.5,5 mm 42.50 60.30.10.2,3
75.40.5 mm 41.50 75.35.10.1,6 13.90
80.45.5 mm 47.00 75.45.15.2,3 19.50
100.50.5 mm 56.20 100.50.20.2,3 24.40
120.55.6 mm 75.00 100.50.20.3,2 33.00
125.55.6 mm 80.40 125.50.20.2,3 27.10
140.60.7 mm 96.00 125.50.20.3,2 36.80
150.75.6,5 mm 112.00 150.50.20.2,3 30.00
160.66.7 mm 115.50 150.50.20.3,2 40.60
180.75.7 mm 132.00 150.65.20.2,3 33.00
200.80.7,5 mm 152.00 150.65.20.3,2 45.10
220.80.9 mm 187.50 200.75.20.3,2 56.00
240.85.9,5 mm 205.00
250.80.7,1 mm 182.50
250.90.9 mm 208.00
260.90.10 mm 114.00
300.90.9 mm 229.00
300.100.10 mm 278.00
380.100.10,5 mm 337.50
PIPA PERSEGI
BERAT/6m
UKURAN ( mm ) TEBAL ( mm )
kg
12,5 X 12,5 0.90 0.3320
15 X 15 0.90 0.4030
20 X 20 0.90 0.5440
25 X 25 1.00 0.7590
30 X 30 1.00 0.9150
40 X 40 1.20 1.4680
10 X 20 0.90 0.4030
12,5 X 27,5 0.90 0.5440
15 X 30 0.90 0.6150
20 X 40 1.00 0.9150
25 X 50 1.40 1.5970
20 X 60 1.40 1.9260
LEBAR PANJANG BERAT/lbr
mm mm kg
16 6000 2.3
19 6000 2.7
25 6000 3.53
32 6000 4.52
38 6000 5.37
19 6000 4.03
25 6000 5.4
32 6000 6.8
38 6000 8.3
50 6000 10.6
19 6000 5.4
25 6000 7.1
32 6000 9.2
38 6000 10.7
50 6000 14.5
65 6000 18.5
75 6000 21.5
85 6000 25.5
100 6000 28.5
150 6000 44.5
25 6000 10.6
32 6000 14
38 6000 16.1
50 6000 21.2
65 6000 27.5
75 6000 32
85 6000 38.3
100 6000 42.5
150 6000 64
25 6000 14.2
38 6000 21.5
50 6000 28.5
65 6000 37
75 6000 42.5
100 6000 56.5
150 6000 85
38 6000 29
50 6000 38
100 6000 76
150 6000 113
38 6000 34
50 6000 45
65 6000 58.5
75 6000 67.5
100 6000 89.5
125 6000 112
150 6000 134
BESI W.F
BESI I.N.P
terbilang =
Sembilan Puluh Tiga Juta Sembilan Ratus Empat Puluh Tujuh Ribu Rupiah
BASIC => satu dua tiga empat lima enam tujuh @@@@
ribu juta milyar triliyun @@@@
000093947000 @@@@
@ @@@@@@@@ @@@@ @@@@ @@@@ @@@@@@@@@@
basic @ 000 1 @@@@
perhitungan @ 0 @@@@
angka @ sepuluh @@@@
@ 0 @@@@
@ 0 @@@@
@ @@@@
@ @@@@
@ @@@@
@ @@@@
@ 947 2 @@@@
@ 9 empat puluh @@@@
@ sembilan ratus tujuh belas @@@@
@ 4 tujuh @@@@
@ 7 empat puluh tujuh @@@@
@ empat puluh tujuh empat puluh tujuh @@@@
@ sembilan ratus empat puluh tujuh ribu @@@@
@ @@@@
@ @@@@
@ 093 3 @@@@
@ 0 sembilan puluh @@@@
@ tiga belas @@@@
@ 9 tiga @@@@
@ 3 sembilan puluh tiga @@@@
@ sembilan puluh tiga sembilan puluh tiga @@@@
@ sembilan puluh tiga juta @@@@
@ @@@@
@ @@@@
@ 000 4 @@@@
@ 0 @@@@
@ sepuluh @@@@
@ 0 @@@@
@ 0 @@@@
@ @@@@
@ @@@@
@ @@@@
@ 000 1 @@@@
@ 0 @@@@
@ sepuluh @@@@
@ 0 @@@@@@@@@@
@ 0 @@@@
@ @@@@
@ @@@@
@ ***
@
@ 69 00
@ sembilan puluh tiga j sembilan puluh tiga juta sembilan ratus empat puluh tujuh ribu rupiah
@ sembilan puluh tiga juta sembilan ratus empat puluh tujuh ribu rupiah
@ Sembilan puluh tiga juta sembilan ratus empat puluh tujuh ribu rupiah