ORDER

WORK

Ref: BMMIUPROJ-CONTRACTS/GNPIIWEBCfCIV/12-13MO'0001
Dale:27.10.2012

To,
PCRTRANSPORT,
KHBColony,Opp.HT Mining
Office,
SANDUR. 583119
Dist,
Bellary
N0,9M4236106
C;ell

Elear
Sirs,

Weigh
bf100MT
forCivilConstruction
of workorder
Siub:Award Bridge Outsidepertaining
Store
atNewProject to
Project
General Phase-l
II
onyouhadwithus.

of 100MT
workorderforCivilConstruction Weigh at
Bridge
)hase-lll
at BMMIL site(Dianapur)
with terms
following and
conditions.

1.Work Date
Order 27t10t2012

Period
ll.Contract 26.11'20n2
1 Monthfromthedateofworkorderi,e,from27'10'2012to

ofWork
i|. Scope AsperAnnexure

z[.WorkOrderValue Fourlakhsthirtyninethousand six$ only)


twohundred

Tax
li.Servrce Asapplicable 12.36%
Presentlv
extra actual. ST+ z"okEd.
(12% + 1%,Higher
Cess Ed
12%)
CessofST
6.Warranty
: 6 months fordefect andquality construction.
Further foranvdefeci inqualityisfoundthesameshallbemadegoodatyourowncost
failingwhichBMM sources
getit donebyalternative thesameinyouraccount.
charrging

Terms
Z.Pavment : PaymentAfter of worksbelow;
andcertification
1.90%against byBMMIL
submi of billdulycertified siteIncharge//Engineer
2.Balance10% amountwillberetainedassecurity andsame
deposit willbe
releasedafter6 (Six) fromthedateofcompletion ofJob,withdueclearancebyBMM
siteIncharge/E
MEBC/Clv/l1'13/WO'0001
BMMIUPROJ-CONTRACT{ilGNPl

8. Deduction : TDSasperrule

9. Annexure : Terms& Conditions

Project
Group,
: To be submifted to Planning Site,Danapur'
1stFloor,BMMIL
Office,
10,Bills
Hospet

ofacceptance,
asa token
copyofthisWorkOrder wi[h
along
tosignandreturnthe
Youarerequested
annexure.

You,
Thanking

faithfully,
Yours
FORBMMISPAT LIMITED

SIGNATORY
AUTHORISED

&AccePted
Received
ForContractor

SIGNATORY
AUTHORISED
I tz-t3lw o
CIC|V
BMMfr/PROJ-CONTRACTS/GNPl/WEB

NEXURE

ransportation withina
Leadof 2 to 3 KmDisposal
PCC1:4:8usi
SSMMasonryFoundation
CopingConcreteM15

g l e F i x i n g( 7 5 X 7 5 X 8 m m )

B. SCOPEOFCONTMCTOR:
. AllStatutory Insurance,& Labour
requirements, asperBMMIL
License R'equirement'

. PPE(Personal Equipment)theworkers.
Protective

o AllMachineries,Hydra,Consumables, inthescopeof Contractor'


ools& Tackles

statement
reconciliation and
alongwiththe RA Billsfor dhecking
a monthlY
r Youhaveto submit
Certification.

out of the at one placeearmarked


Steelare to be collected by the user
r TheScraosGenerated
Inabsence
statement.
reconciliation yourbills
of thesestatemqnts
weighed
department, and inthe
reported
forthe
willnotbecertified payment'

,w
BMMIUPROJ.CON
TRACTS/GNPlMEEC/CIV/1
2.13/WO.OOO1

. Cement willbesupplied byBMMIL pertherequirement of thecontractor. However Cement is to be


receivedfromourMainStores / Proiect bythecontractor.
Based onthemonthly reconciliation
reportthe
balancecement is to be returned backto stores
anddocuments intothateffectis to beattached,Empty
Cement bagsareto bereturned backto Stores
/ Project
Stores. lf thecement bagsarenotreturned orthe
returned
cement bagscondition is notin thena penalty
andreusable ofRs.6/.(Rupees Sixonly)perbagwill
bededucted inyourbills.A cement ionstatement
tothiseffectisto beattached alongwithRABillsfor
certification.

. RABills:Forthecertification
ofRABills tobesubmitted withsupporting likemeasurement
clocuments
sheets,
PourCards,Reconciliation / jointrecords.
statementcement Billswithout
thesupporting
documents
will
forpayment.
notbecertified

r Thecontractor
shallkeeptheworksite storage
areausedbythem,isfrer:fromaccumulation
ofwaste
material
ordebris.
Housekeeping
istobe aftercompletion properly
ofwork.lf Scrapisnotcollected &
Housekeeping
isnotdoneproperly
a penalty Rs.500/-
(Rupees
Fivehundred
only)PerMTwillbededucted
in
yourRABills.

. Billstobesubmitted
onlyto Planning Project
Office,
1stFloor, lSite,
BMMIL Danapur,
Hospet

FORBMMISPAT
LIMITED
w
SEDSIGNATORY