BILL OF MATERIAL
PART TOTAL
PART NAME OF PART QTY DESCRIPTION MATERIAL
WEGHT (Kg) WEIGHT (Kg)
NOTES :
1. All dimension are in mm unless otherwise noted
7 7
2. Surface preparation shall be conducted by sweep blast
3. All part shall be finish painted by steel paint
4. All filed weld 100% visual
5. All lifting lug joint 100 % PT/MPI
6. Document to be completed as MDR as follows
a. Receiving inspection of material
b. Dimension report
c. Visusal inspection report
d. NDT report (PT/MT)
6 6
e. C.O.C (certificate of compliance)
5 5
4 4
3 REV 3
DATE DESCRIPTION DRAWN BY ENG. BY APPR. BY
NO.
REVISIONS
ALL RIGHT RESERVED
THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND PROPERTY BP BERAU LTD. AND COPYRIGHT THEREIN IS VESTED BP BERAU LTD. NO PART OF THIS DOCUMENT, DATA,
INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF BP BERAU LTD.
2
2
A B C D E F G H I J K