PACKING LIST
6 6
5 5
4 4
3 REV 3
DATE DESCRIPTION DRAWN BY ENG. BY APPR. BY
NO.
REVISIONS
ALL RIGHT RESERVED
THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND PROPERTY BP BERAU LTD. AND COPYRIGHT THEREIN IS VESTED BP BERAU LTD. NO PART OF THIS DOCUMENT, DATA,
INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF BP BERAU LTD.
ISOMETRIC VIEW
Scale 1 : 40
2
2
A B C D E F G H I J K
A B C D E F G H I J K
BILL OF MATERIAL
PART TOTAL
PART NAME OF PART QTY DESCRIPTION MATERIAL
WEGHT (Kg) WEIGHT (Kg)
TOTAL 1982
NOTES :
1. All dimension are in mm unless otherwise noted
7 7
2. Surface preparation shall be conducted by sweep blast
3. All part shall be finish painted by steel paint
A A 4. All filed weld 100% visual
5. All lifting lug joint 100 % PT/MPI
6. Document to be completed as MDR as follows
a. Receiving inspection of material
b. Dimension report
c. Visusal inspection report
d. NDT report (PT/MT)
e. C.O.C (certificate of compliance)
6 6
B
TOP VIEW B
Scale 1 :50
5 5
SEC. A-A
Scale : 1 :50
4 C 4
C
SEC. B-B 4 10/10/2018 As per as Enginering's coment ASN ER Erwin P
Scale : 1 :50 3 3/10/2018 As per as Enginering's coment HTY/BE ER Erwin P
2 24/9/2018 As per as Enginering's coment HTY/BE ER Erwin P
1 28/8/2018 ISSUED FOR REVIEW HTY/BE ER Erwin P
0 8/8/2018 ISSUED FOR REVIEW IS ER DLG
3 REV 3
DATE DESCRIPTION DRAWN BY ENG. BY APPR. BY
NO.
2
2
PL 10 mm
DETAIL 5
Scale : 1 :25
A B C D E F G H I J K
A B C D E F G H I J K
BILL OF MATERIAL
PART TOTAL
PART NAME OF PART QTY DESCRIPTION MATERIAL
WEGHT (Kg) WEIGHT (Kg)
C TOTAL 301.54
7 7
6 6
C
SEC. C-C
Scale 1 :50
TOP VIEW
Scale 1 :50
D D
5 5
F E E
4 4
F
SEC. D-D
Scale 1 :10
SEC. E-E
Scale 1 :10 4 10/10/2018 As per as Enginering's coment ASN ER Erwin P
SEC. F-F
Scale 1 :10 3 3/10/2018 As per as Enginering's coment HTY/BE ER Erwin P
2 24/9/2018 As per as Enginering's coment HTY/BE ER Erwin P
1 28/8/2018 ISSUED FOR REVIEW HTY/BE ER Erwin P
0 8/8/2018 ISSUED FOR REVIEW IS ER DLG
3 REV 3
DATE DESCRIPTION DRAWN BY ENG. BY APPR. BY
NO.
REVISIONS
ALL RIGHT RESERVED
THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND PROPERTY BP BERAU LTD. AND COPYRIGHT THEREIN IS VESTED BP BERAU LTD. NO PART OF THIS DOCUMENT, DATA,
PL 22 mm
INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF BP BERAU LTD.
DETAIL 3 DETAIL 4
Scale 1 :10 Scale 1 :10
DETAIL 2 2
2 Scale 1 :10
DETAIL 1
Scale 1 :10
NOTES :
1. All dimension are in mm unless otherwise noted
2. Surface preparation shall be conducted by sweep blast
3. All part shall be finish painted by steel paint
STEEL PACKING SKID BASE
PL 22 mm FOR ALL TANKS
4. All filed weld 100% visual
(164-TK-31001)
PL 22 mm 5. All lifting lug joint 100 % PT/MPI
PL 22 mm PURCHASE ORDER NO. c BP p.l.c SCALE
6. Document to be completed as MDR as follows SECURITY CLASSIFICATION
a. Receiving inspection of material 1211866 AS SHOWN
1 BP INTERNAL 1
b. Dimension report COMPANY DRAWING NO. CORE SIZE REV.
c. Visusal inspection report
DETAIL 5 DETAIL 6 d. NDT report (PT/MT) TEP-1211866-B01-0005-002 NON CORE A3 4
Scale 1 :10 Scale 1 :10 DETAIL 7 e. C.O.C (certificate of compliance) SUPPLIER NUMBER CSTS NUMBER
Scale 1 :10
SP-GA-007-01
A B C D E F G H I J K