ANALISA HARGA SATUAN BAHAN

PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP


LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.
I PEKERJAAN STRUKTUR BAWAH BASEMENT-2

A PileCap SNI 6.28


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.120 24,200.00 27,104.00
Total Beton Rp. 774,504.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
Sub Total 929.38
- Index % Lantai ..... x upah kerja % 1.120 929.38 1,040.90
Total Besi Rp. 8,656.95

3 Bekisting / m2 SNI 6.28


a. Bahan
- Kayu terentang m³ 0.04 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.30 10,320.00 3,096.00
- Minyak bekisting Lt 0.10 4,000.00 400.00
Sub Total Rp. 127,081.00
b. Tenaga
- Pekerja Oh 0.300 55,798.00 16,739.40
- Tukang kayu Oh 0.260 65,734.00 17,090.84
- Kepala Tukang Oh 0.0260 75,671.00 1,967.45
- Mandor Oh 0.0050 85,607.00 428.04
Sub Total 36,225.72
- Index % Lantai ..... x upah kerja % 1.120 36,225.72 40,572.81
Total Bekisting Rp. 83,826.91

Lt. Bmt-2 --- 1 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.
B TIE BEAM SNI 6.29
1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.120 24,200.00 27,104.00
Total Beton Rp. 774,504.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.120 929.38 1,040.90
Total Besi Rp. 8,656.95

3 Bekisting / m2 SNI 6.29


a. Bahan
- Kayu terentang m³ 0.045 3,089,625.00 139,033.13
- Paku Biasa 2' - 5" Kg 0.300 10,320.00 3,096.00
- Minyak bekisting Lt 0.100 4,000.00 400.00
Sub Total Rp. 142,529.13
b. Tenaga
- Pekerja Oh 0.300 55,798.00 16,739.40
- Tukang kayu Oh 0.260 65,734.00 17,090.84
- Kepala Tukang Oh 0.0260 75,671.00 1,967.45
- Mandor Oh 0.0050 85,607.00 428.04
36,225.72
- Index % Lantai ..... x upah kerja % 1.120 36,225.72 40,572.81
Total Bekisting Rp. 91,550.97

Lt. Bmt-2 --- 2 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.
C KOLOM SNI 6.30
1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.120 24,200.00 27,104.00
Total Beton Rp. 774,504.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.120 929.38 1,040.90
Total Besi Rp. 8,656.95

3 Bekisting / m2 SNI 6.30.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 291,771.38
b. Tenaga SNI 6.30.2
- Pekerja Oh 0.300 55,798.00 16,739.40
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
Sub Total 41,442.41
- Index % Lantai ..... x upah kerja % 1.120 41,442.41 46,415.49
Total Bekisting Rp. 169,093.44

Lt. Bmt-2 --- 3 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.
D BALOK LANTAI SNI 6.31
1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.120 24,200.00 27,104.00
Total Beton Rp. 774,504.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.120 929.38 1,040.90
Total Besi Rp. 8,656.95

3 Bekisting / m2 SNI 6.31.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.018 4,887,225.00 87,970.05
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 306,433.05
b. Tenaga SNI 6.31.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
Sub Total 42,558.37
- Index % Lantai ..... x upah kerja % 1.120 42,558.37 47,665.37
Total Bekisting Rp. 177,049.21

Lt. Bmt-2 --- 4 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.
E PLAT LANTAI SNI 6.32
1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.120 24,200.00 27,104.00
Total Beton Rp. 774,504.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.120 929.38 1,040.90
Total Besi Rp. 8,656.95

3 Bekisting / m2 SNI 6.32.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 6.000 17,850.00 107,100.00
Sub Total Rp. 363,171.38
b. Tenaga SNI 6.32.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
Sub Total 42,558.37
- Index % Lantai ..... x upah kerja % 1.120 42,558.37 47,665.37
Total Bekisting Rp. 205,418.38

Lt. Bmt-2 --- 5 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.
F TANGGA SNI 6.34
1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.120 24,200.00 27,104.00
Total Beton Rp. 774,504.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.120 929.38 1,040.90
Total Besi Rp. 8,656.95

3 Bekisting / m2 SNI 6.34.1


a. Bahan
- Kayu terentang m³ 0.030 3,089,625.00 92,688.75
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.150 4,000.00 600.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 260,675.13
b. Tenaga SNI 6.34.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
Sub Total 42,558.37
- Index % Lantai ..... x upah kerja % 1.120 42,558.37 47,665.37
Total Bekisting Rp. 154,170.25

Lt. Bmt-2 --- 6 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.
E DINDING BETON SNI 6.34
1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.120 24,200.00 27,104.00
Total Beton Rp. 774,504.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
Sub Total 929.38
- Index % Lantai ..... x upah kerja % 1.120 929.38 1,040.90
Total Besi Rp. 8,656.95

3 Bekisting / m2 SNI 6.34.1


a. Bahan
- Kayu terentang m³ 0.030 3,089,625.00 92,688.75
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 3.000 17,850.00 53,550.00
- Formtie / penjaga jarak Bh 4.000 7,500.00 30,000.00
Sub Total Rp. 308,725.13
b. Tenaga SNI 6.34.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
Sub Total 42,558.37
- Index % Lantai ..... x upah kerja % 1.120 42,558.37 47,665.37
Total Bekisting Rp. 178,195.25

Lt. Bmt-2 --- 7 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

I PEKERJAAN STRUKTUR BAWAH BASEMENT-1

A KOLOM SNI 6.30


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.090 24,200.00 26,378.00
Total Beton Rp. 773,778.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
Sub Total 929.38
- Index % Lantai ..... x upah kerja % 1.090 929.38 1,013.02
Total Besi Rp. 8,629.07

3 Bekisting / m2 SNI 6.30.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 291,771.38
b. Tenaga SNI 6.30.2
- Pekerja Oh 0.300 55,798.00 16,739.40
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
Sub Total 41,442.41
- Index % Lantai ..... x upah kerja % 1.090 41,442.41 45,172.22
Total Bekisting Rp. 168,471.80

Lt. Bmt-1 --- 8 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

B BALOK LANTAI SNI 6.31


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.090 24,200.00 26,378.00
Total Beton Rp. 773,778.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
Sub Total 929.38
- Index % Lantai ..... x upah kerja % 1.090 929.38 1,013.02
Total Besi Rp. 8,629.07

3 Bekisting / m2 SNI 6.31.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.018 4,887,225.00 87,970.05
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 306,433.05
b. Tenaga SNI 6.31.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
Sub Total 42,558.37
- Index % Lantai ..... x upah kerja % 1.090 42,558.37 46,388.62
Total Bekisting Rp. 176,410.84

Lt. Bmt-1 --- 9 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

C PLAT LANTAI SNI 6.32


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.090 24,200.00 26,378.00
Total Beton Rp. 773,778.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
Sub Total 929.38
- Index % Lantai ..... x upah kerja % 1.090 929.38 1,013.02
Total Besi Rp. 8,629.07

3 Bekisting / m2 SNI 6.32.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 6.000 17,850.00 107,100.00
Sub Total Rp. 363,171.38
b. Tenaga SNI 6.32.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
Sub Total 42,558.37
- Index % Lantai ..... x upah kerja % 1.090 42,558.37 46,388.62
Total Bekisting Rp. 226,059.18

Lt. Bmt-1 --- 10 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

D TANGGA SNI 6.34


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.090 24,200.00 26,378.00
Total Beton Rp. 773,778.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
Sub Total 929.38
- Index % Lantai ..... x upah kerja % 1.090 929.38 1,013.02
Total Besi Rp. 8,629.07

3 Bekisting / m2 SNI 6.34.1


a. Bahan
- Kayu terentang m³ 0.030 3,089,625.00 92,688.75
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.150 4,000.00 600.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 260,675.13
b. Tenaga SNI 6.34.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
Sub Total 42,558.37
- Index % Lantai ..... x upah kerja % 1.090 42,558.37 46,388.62
Total Bekisting Rp. 153,531.88

Lt. Bmt-1 --- 11 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

I PEKERJAAN STRUKTUR ATAS LT. 2

A KOLOM SNI 6.30


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.000 24,200.00 24,200.00
Total Beton Rp. 771,600.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.000 929.38 929.38
Total Besi Rp. 8,545.43

3 Bekisting / m2 SNI 6.30.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 291,771.38
b. Tenaga SNI 6.30.2
- Pekerja Oh 0.300 55,798.00 16,739.40
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
Sub Total 41,442.41
- Index % Lantai ..... x upah kerja % 1.000 41,442.41 41,442.41
Total Bekisting Rp. 166,606.90

Lt. Dasar --- 12 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

B BALOK LANTAI SNI 6.31


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.000 24,200.00 24,200.00
Total Beton Rp. 771,600.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.000 929.38 929.38
Total Besi Rp. 8,545.43

3 Bekisting / m2 SNI 6.31.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.018 4,887,225.00 87,970.05
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 306,433.05
b. Tenaga SNI 6.31.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.000 42,558.37 42,558.37
Total Bekisting Rp. 174,495.71

Lt. Dasar --- 13 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

C PLAT LANTAI SNI 6.32


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.000 24,200.00 24,200.00
Total Beton Rp. 771,600.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.000 929.38 929.38
Total Besi Rp. 8,545.43

3 Bekisting / m2 SNI 6.32.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 6.000 17,850.00 107,100.00
Sub Total Rp. 363,171.38
b. Tenaga SNI 6.32.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.000 42,558.37 42,558.37
Total Bekisting Rp. 202,864.88

Lt. Dasar --- 14 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

D TANGGA SNI 6.34


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.000 24,200.00 24,200.00
Total Beton Rp. 771,600.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.000 929.38 929.38
Total Besi Rp. 8,545.43

3 Bekisting / m2 SNI 6.34.1


a. Bahan
- Kayu terentang m³ 0.030 3,089,625.00 92,688.75
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.150 4,000.00 600.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 260,675.13
b. Tenaga SNI 6.34.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.000 42,558.37 42,558.37
Total Bekisting Rp. 151,616.75

Lt. Dasar --- 15 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

I PEKERJAAN STRUKTUR ATAS LT. 3

A KOLOM SNI 6.30


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.090 24,200.00 26,378.00
Total Beton Rp. 773,778.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.090 929.38 1,013.02
Total Besi Rp. 8,629.07

3 Bekisting / m2 SNI 6.30.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 291,771.38
b. Tenaga SNI 6.30.2
- Pekerja Oh 0.300 55,798.00 16,739.40
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
Sub Total 41,442.41
- Index % Lantai ..... x upah kerja % 1.090 41,442.41 45,172.22
Total Bekisting Rp. 168,471.80

Lt. Dua --- 16 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

B BALOK LANTAI SNI 6.31


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.090 24,200.00 26,378.00
Total Beton Rp. 773,778.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.090 929.38 1,013.02
Total Besi Rp. 8,629.07

3 Bekisting / m2 SNI 6.31.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.018 4,887,225.00 87,970.05
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 306,433.05
b. Tenaga SNI 6.31.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.090 42,558.37 46,388.62
Total Bekisting Rp. 176,410.84

Lt. Dua --- 17 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

C PLAT LANTAI SNI 6.32


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.090 24,200.00 26,378.00
Total Beton Rp. 773,778.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.090 929.38 1,013.02
Total Besi Rp. 8,629.07

3 Bekisting / m2 SNI 6.32.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 6.000 17,850.00 107,100.00
Sub Total Rp. 363,171.38
b. Tenaga SNI 6.32.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.090 42,558.37 46,388.62
Total Bekisting Rp. 204,780.00

Lt. Dua --- 18 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

D TANGGA SNI 6.34


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.090 24,200.00 26,378.00
Total Beton Rp. 773,778.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.090 929.38 1,013.02
Total Besi Rp. 8,629.07

3 Bekisting / m2 SNI 6.34.1


a. Bahan
- Kayu terentang m³ 0.030 3,089,625.00 92,688.75
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.150 4,000.00 600.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 260,675.13
b. Tenaga SNI 6.34.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.090 42,558.37 46,388.62
Total Bekisting Rp. 153,531.88

Lt. Dua --- 19 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

I PEKERJAAN STRUKTUR ATAS LT. 3

A KOLOM SNI 6.30


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.120 24,200.00 27,104.00
Total Beton Rp. 774,504.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.120 929.38 1,040.90
Total Besi Rp. 8,656.95

3 Bekisting / m2 SNI 6.30.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 291,771.38
b. Tenaga SNI 6.30.2
- Pekerja Oh 0.300 55,798.00 16,739.40
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
Sub Total 41,442.41
- Index % Lantai ..... x upah kerja % 1.120 41,442.41 46,415.49
Total Bekisting Rp. 169,093.44

Lt. Tiga --- 20 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

B BALOK LANTAI SNI 6.31


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.120 24,200.00 27,104.00
Total Beton Rp. 774,504.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.120 929.38 1,040.90
Total Besi Rp. 8,656.95

3 Bekisting / m2 SNI 6.31.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.018 4,887,225.00 87,970.05
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 306,433.05
b. Tenaga SNI 6.31.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.120 42,558.37 47,665.37
Total Bekisting Rp. 177,049.21

Lt. Tiga --- 21 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

C PLAT LANTAI SNI 6.32


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.120 24,200.00 27,104.00
Total Beton Rp. 774,504.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.120 929.38 1,040.90
Total Besi Rp. 8,656.95

3 Bekisting / m2 SNI 6.32.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 6.000 17,850.00 107,100.00
Sub Total Rp. 363,171.38
b. Tenaga SNI 6.32.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.120 42,558.37 47,665.37
Total Bekisting Rp. 205,418.38

Lt. Tiga --- 22 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

D TANGGA SNI 6.34


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.120 24,200.00 27,104.00
Total Beton Rp. 774,504.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.120 929.38 1,040.90
Total Besi Rp. 8,656.95

3 Bekisting / m2 SNI 6.34.1


a. Bahan
- Kayu terentang m³ 0.030 3,089,625.00 92,688.75
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.150 4,000.00 600.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 260,675.13
b. Tenaga SNI 6.34.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.120 42,558.37 47,665.37
Total Bekisting Rp. 154,170.25

Lt. Tiga --- 23 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

I PEKERJAAN STRUKTUR ATAS LT. 4

A KOLOM SNI 6.30


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.135 24,200.00 27,467.00
Total Beton Rp. 774,867.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.135 929.38 1,054.84
Total Besi Rp. 8,670.89

3 Bekisting / m2 SNI 6.30.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 291,771.38
b. Tenaga SNI 6.30.2
- Pekerja Oh 0.300 55,798.00 16,739.40
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
Sub Total 41,442.41
- Index % Lantai ..... x upah kerja % 1.135 41,442.41 47,037.13
Total Bekisting Rp. 169,404.26

Lt. Empat --- 24 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

B BALOK LANTAI SNI 6.31


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.135 24,200.00 27,467.00
Total Beton Rp. 774,867.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.135 929.38 1,054.84
Total Besi Rp. 8,670.89

3 Bekisting / m2 SNI 6.31.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.018 4,887,225.00 87,970.05
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 306,433.05
b. Tenaga SNI 6.31.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.135 42,558.37 48,303.74
Total Bekisting Rp. 177,368.40

Lt. Empat --- 25 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

C PLAT LANTAI SNI 6.32


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.135 24,200.00 27,467.00
Total Beton Rp. 774,867.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.135 929.38 1,054.84
Total Besi Rp. 8,670.89

3 Bekisting / m2 SNI 6.32.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 6.000 17,850.00 107,100.00
Sub Total Rp. 363,171.38
b. Tenaga SNI 6.32.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.135 42,558.37 48,303.74
Total Bekisting Rp. 205,737.56

Lt. Empat --- 26 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

D TANGGA SNI 6.34


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.135 24,200.00 27,467.00
Total Beton Rp. 774,867.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.135 929.38 1,054.84
Total Besi Rp. 8,670.89

3 Bekisting / m2 SNI 6.34.1


a. Bahan
- Kayu terentang m³ 0.030 3,089,625.00 92,688.75
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.150 4,000.00 600.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 260,675.13
b. Tenaga SNI 6.34.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.135 42,558.37 48,303.74
Total Bekisting Rp. 154,489.44

Lt. Empat --- 27 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

I PEKERJAAN STRUKTUR ATAS LT. 5

A KOLOM SNI 6.30


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.1620 24,200.00 28,120.40
Total Beton Rp. 775,520.40

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.1620 929.38 1,079.93
Total Besi Rp. 8,695.98

3 Bekisting / m2 SNI 6.30.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 291,771.38
b. Tenaga SNI 6.30.2
- Pekerja Oh 0.300 55,798.00 16,739.40
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
Sub Total 41,442.41
- Index % Lantai ..... x upah kerja % 1.1620 41,442.41 48,156.07
Total Bekisting Rp. 169,963.73

Lt. Lima --- 28 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

B BALOK LANTAI SNI 6.31


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.1620 24,200.00 28,120.40
Total Beton Rp. 775,520.40

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.1620 929.38 1,079.93
Total Besi Rp. 8,695.98

3 Bekisting / m2 SNI 6.31.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.018 4,887,225.00 87,970.05
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 306,433.05
b. Tenaga SNI 6.31.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.1620 42,558.37 49,452.82
Total Bekisting Rp. 177,942.94

Lt. Lima --- 29 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

C PLAT LANTAI SNI 6.32


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.1620 24,200.00 28,120.40
Total Beton Rp. 775,520.40

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.1620 929.38 1,079.93
Total Besi Rp. 8,695.98

3 Bekisting / m2 SNI 6.32.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 6.000 17,850.00 107,100.00
Sub Total Rp. 363,171.38
b. Tenaga SNI 6.32.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.1620 42,558.37 49,452.82
Total Bekisting Rp. 206,312.10

Lt. Lima --- 30 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

D TANGGA SNI 6.34


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.1620 24,200.00 28,120.40
Total Beton Rp. 775,520.40

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.1620 929.38 1,079.93
Total Besi Rp. 8,695.98

3 Bekisting / m2 SNI 6.34.1


a. Bahan
- Kayu terentang m³ 0.030 3,089,625.00 92,688.75
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.150 4,000.00 600.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 260,675.13
b. Tenaga SNI 6.34.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.1620 42,558.37 49,452.82
Total Bekisting Rp. 155,063.98

Lt. Lima --- 31 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

I PEKERJAAN STRUKTUR ATAS LT. 6

A KOLOM SNI 6.30


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.1970 24,200.00 28,967.40
Total Beton Rp. 776,367.40

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.1970 929.38 1,112.46
Total Besi Rp. 8,728.51

3 Bekisting / m2 SNI 6.30.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 291,771.38
b. Tenaga SNI 6.30.2
- Pekerja Oh 0.300 55,798.00 16,739.40
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
Sub Total 41,442.41
- Index % Lantai ..... x upah kerja % 1.1970 41,442.41 49,606.56
Total Bekisting Rp. 170,688.97

Lt. Enam --- 32 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

B BALOK LANTAI SNI 6.31


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.1970 24,200.00 28,967.40
Total Beton Rp. 776,367.40

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.1970 929.38 1,112.46
Total Besi Rp. 8,728.51

3 Bekisting / m2 SNI 6.31.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.018 4,887,225.00 87,970.05
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 306,433.05
b. Tenaga SNI 6.31.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.1970 42,558.37 50,942.36
Total Bekisting Rp. 178,687.71

Lt. Enam --- 33 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

C PLAT LANTAI SNI 6.32


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.1970 24,200.00 28,967.40
Total Beton Rp. 776,367.40

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.1970 929.38 1,112.46
Total Besi Rp. 8,728.51

3 Bekisting / m2 SNI 6.32.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 6.000 17,850.00 107,100.00
Sub Total Rp. 363,171.38
b. Tenaga SNI 6.32.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.1970 42,558.37 50,942.36
Total Bekisting Rp. 207,056.87

Lt. Enam --- 34 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

D TANGGA SNI 6.34


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.1970 24,200.00 28,967.40
Total Beton Rp. 776,367.40

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.1970 929.38 1,112.46
Total Besi Rp. 8,728.51

3 Bekisting / m2 SNI 6.34.1


a. Bahan
- Kayu terentang m³ 0.030 3,089,625.00 92,688.75
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.150 4,000.00 600.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 260,675.13
b. Tenaga SNI 6.34.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.1970 42,558.37 50,942.36
Total Bekisting Rp. 155,808.75

Lt. Enam --- 35 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

I PEKERJAAN STRUKTUR ATAS LT. 7

A KOLOM SNI 6.30


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.2360 24,200.00 29,911.20
Total Beton Rp. 777,311.20

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.2360 929.38 1,148.71
Total Besi Rp. 8,764.76

3 Bekisting / m2 SNI 6.30.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 291,771.38
b. Tenaga SNI 6.30.2
- Pekerja Oh 0.300 55,798.00 16,739.40
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
Sub Total 41,442.41
- Index % Lantai ..... x upah kerja % 1.2360 41,442.41 51,222.81
Total Bekisting Rp. 171,497.10

Lt. Tujuh --- 36 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

B BALOK LANTAI SNI 6.31


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.2360 24,200.00 29,911.20
Total Beton Rp. 777,311.20

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.2360 929.38 1,148.71
Total Besi Rp. 8,764.76

3 Bekisting / m2 SNI 6.31.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.018 4,887,225.00 87,970.05
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 306,433.05
b. Tenaga SNI 6.31.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.2360 42,558.37 52,602.14
Total Bekisting Rp. 179,517.60

Lt. Tujuh --- 37 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

C PLAT LANTAI SNI 6.32


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.2360 24,200.00 29,911.20
Total Beton Rp. 777,311.20

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.2360 929.38 1,148.71
Total Besi Rp. 8,764.76

3 Bekisting / m2 SNI 6.32.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 6.000 17,850.00 107,100.00
Sub Total Rp. 363,171.38
b. Tenaga SNI 6.32.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.2360 42,558.37 52,602.14
Total Bekisting Rp. 207,886.76

Lt. Tujuh --- 38 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

D TANGGA SNI 6.34


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.2360 24,200.00 29,911.20
Total Beton Rp. 777,311.20

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.2360 929.38 1,148.71
Total Besi Rp. 8,764.76

3 Bekisting / m2 SNI 6.34.1


a. Bahan
- Kayu terentang m³ 0.030 3,089,625.00 92,688.75
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.150 4,000.00 600.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 260,675.13
b. Tenaga SNI 6.34.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.2360 42,558.37 52,602.14
Total Bekisting Rp. 156,638.64

Lt. Tujuh --- 39 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

I PEKERJAAN STRUKTUR ATAS LT. ATAP

A KOLOM SNI 6.30


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.2650 24,200.00 30,613.00
Total Beton Rp. 778,013.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.2650 929.38 1,175.66
Total Besi Rp. 8,791.71

3 Bekisting / m2 SNI 6.30.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 291,771.38
b. Tenaga SNI 6.30.2
- Pekerja Oh 0.300 55,798.00 16,739.40
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
Sub Total 41,442.41
- Index % Lantai ..... x upah kerja % 1.2650 41,442.41 52,424.64
Total Bekisting Rp. 172,098.01

Lt. ATAP --- 40 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

B BALOK LANTAI SNI 6.31


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.2650 24,200.00 30,613.00
Total Beton Rp. 778,013.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.2650 929.38 1,175.66
Total Besi Rp. 8,791.71

3 Bekisting / m2 SNI 6.31.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.018 4,887,225.00 87,970.05
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 306,433.05
b. Tenaga SNI 6.31.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.2650 42,558.37 53,836.33
Total Bekisting Rp. 180,134.69

Lt. ATAP --- 41 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

C PLAT LANTAI SNI 6.32


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.2650 24,200.00 30,613.00
Total Beton Rp. 778,013.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.2650 929.38 1,175.66
Total Besi Rp. 8,791.71

3 Bekisting / m2 SNI 6.32.1


a. Bahan
- Kayu terentang m³ 0.040 3,089,625.00 123,585.00
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.200 4,000.00 800.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 6.000 17,850.00 107,100.00
Sub Total Rp. 363,171.38
b. Tenaga SNI 6.32.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.2650 42,558.37 53,836.33
Total Bekisting Rp. 208,503.86

Lt. ATAP --- 42 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK: PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOLUME SATUAN HARGA
Rp. Rp.

D TANGGA SNI 6.34


1 Beton Redy mix / m3
- Beton Readymix K.350 m³ 1.05 668,000.00 701,400.00
- Concrete Pump ls 1.00 25,000.00 25,000.00
- Alat Bantu : - Vibrator dll. ls 1.00 21,000.00 21,000.00
Total Beton Rp. 747,400.00
- Upah penegcoran m³ 1.00 24,200.00
- Index % Lantai ..... x upah kerja % 1.2650 24,200.00 30,613.00
Total Beton Rp. 778,013.00

2 Besi beton / Kg SNI 6.25


a. Bahan
- Pembesian (Polos /Ulir) kg 1.050 7,081.95 7,436.05
- Kawat Beton Kg 0.015 12,000.00 180.00
Sub Total Rp. 7,616.05
b. Tenaga
- Pekerja Oh 0.007 55,798.00 390.59
- Tukang besi Oh 0.007 65,734.00 460.14
- Kepala Tukang Oh 0.0007 75,671.00 52.97
- Mandor Oh 0.0003 85,607.00 25.68
929.38
- Index % Lantai ..... x upah kerja % 1.2650 929.38 1,175.66
Total Besi Rp. 8,791.71

3 Bekisting / m2 SNI 6.34.1


a. Bahan
- Kayu terentang m³ 0.030 3,089,625.00 92,688.75
- Paku Biasa 2' - 5" Kg 0.400 10,320.00 4,128.00
- Minyak bekisting Lt 0.150 4,000.00 600.00
- Balok Kayu Borneo m³ 0.015 4,887,225.00 73,308.38
- Plywood Tebal 9 mm Lbr 0.350 155,000.00 54,250.00
- Dolken kayu galam Ø 8 ~10/4 Btg 2.000 17,850.00 35,700.00
Sub Total Rp. 260,675.13
b. Tenaga SNI 6.34.2
- Pekerja Oh 0.320 55,798.00 17,855.36
- Tukang kayu Oh 0.330 65,734.00 21,692.22
- Kepala Tukang Oh 0.0330 75,671.00 2,497.14
- Mandor Oh 0.0060 85,607.00 513.64
42,558.37
- Index % Lantai ..... x upah kerja % 1.2650 42,558.37 53,836.33
Total Bekisting Rp. 157,255.73

Lt. ATAP --- 43 / 46


ANALISA HARGA SATUAN BAHAN
PROYEK : PEMBANGUNAN GEDUNG KANTOR YKPP
LOKASI : JL.KWITANG RAYA - JAKARTA PUSAT

HARGA JUMLAH HARGA DKI JANUARI 2008


No. KOEFISIENSAT. ITEM PEKERJAAN SATUAN HARGA GRUP URUT HALAMAN
Rp. Rp.
a a

II. PEKERJAAN STRUKTUR BAJA

1 Kuda-kuda Baja WF - H-Beam / kg : 14,500.00


1.000 kg Baja CNP 14,500.00 14,500.00 XIV.A.KY70 9
Jumlah 14,500.00
Pembulatan 14,500.00

2 Base plate, plat penyambung & sttifner / kg : 13,500.00


1.000 kg Baja plat 13,500.00 13,500.00 XIV.A.KY70 9
Jumlah 13,500.00
Pembulatan 13,500.00

3 Penutup Metal deck t= 0,45 mm / m2 : 136,473.00


1.000 m2 Zincalum 136,473.00 136,473.00 XVI.PA19 15
Jumlah 136,473.00
Pembulatan 136,473.00

4 Siku L 50x50x5 / kg : 14,500.00


1.000 kg Baja Siku 14,500.00 14,500.00 XIV.A.KY71 10
Jumlah 14,500.00
Pembulatan 14,500.00

5 Rangka pipa / kg : 22,500.00


1.000 kg Rangka pipa 22,500.00 22,500.00
Jumlah 22,500.00
Pembulatan 22,500.00

6 Angkur baut ø 19 ( L = 700 mm ) / bh : 60,000.00


1.000 bh Angkur baut ø 19 ( L = 700 mm ) 60,000.00 60,000.00
Jumlah 60,000.00
Pembulatan 60,000.00

7 Meni zingkromate / M2 35,000.00


1.000 kg Meni zingkromate 35,000.00 35,000.00
Jumlah 35,000.00
Pembulatan 35,000.00

8 Listplank aluminium + rangka L 50x50x5 225,000.00


1.000 m' Listplank aluminium + rangka L 50x50x5 225,000.00 225,000.00
Jumlah 225,000.00
Pembulatan 225,000.00

9 Pasang glass wool + aluminium foil & roof mesh bawah atap / m2 : 75,000.00
1.000 m2 Pasang glass wool + aluminium foil & roo 75,000.00 75,000.00
Jumlah 75,000.00
Pembulatan 75,000.00

10 Talang datar / m' : 250,000.00


1.000 m' Talang datar 250,000.00 250,000.00
Jumlah 250,000.00
Pembulatan 250,000.00

20 Bekisting Pile Cap & Tie Beam


1.000 m2 Pasang Bekisting dari Batako 1:5 80,000.00 80,000.00
Jumlah 80,000.00
Pembulatan 80,000.00

Baja --- 44 / 46
HARGA BAHAN PEKERJAAN BETON BERTULANG
Patokan Harga Satuan Bahan dan Upah Propinsi DKI Jakarta
Periode Januari 2009

PEMBESIAN 562,500.00 HS DKI Hal. 8 koef upah


1
Bahan Upah Bahan Upah Lt. 1
NO ITEM PEKERJAAN sat Rp. Rp. Rp. Rp. hg sat
(m3) (m3) (Kg) (Kg) Rp.
1 Pembesian Ulir 75 - 99 kg/m3 Kg 502,500.00 75,867.00 6,700.00 1,011.56 7,711.56
2 Pembesian Ulir 100 - 124 kg/m3 Kg 670,000.00 100,493.00 6,700.00 1,004.93 7,704.93
3 Pembesian Ulir 125 -149 kg/m3 Kg 837,500.00 125,556.00 6,700.00 1,004.45 7,704.45
4 Pembesian Ulir 150 - 174 kg/m3 Kg 1,005,000.00 151,818.00 6,700.00 1,012.12 7,712.12
5 Pembesian Ulir 175 - 199 kg/m3 Kg 1,333,300.00 177,125.00 7,618.86 1,012.14 8,631.00
6 Pembesian Ulir 200 - 224 kg/m3 Kg 1,500,800.00 202,424.00 7,504.00 1,012.12 8,516.12
7 Pembesian Ulir 225 - 249 kg/m3 Kg 1,668,300.00 227,732.00 7,414.67 1,012.14 8,426.81
8 Pembesian Ulir 250 - 274 kg/m3 Kg 1,835,800.00 253,031.00 7,343.20 1,012.12 8,355.32
9 Pembesian Ulir 275 - 299 kg/m3 Kg 2,003,300.00 275,419.00 7,284.73 1,001.52 8,286.25
10 Pembesian Ulir 300 - 324 kg/m3 Kg 2,170,800.00 303,636.00 7,236.00 1,012.12 8,248.12
11 Pembesian Ulir 325 > kg/m3 Kg 2,177,500.00 328,981.00 6,700.00 1,012.25 7,712.25
Rata-rata per Kg 7,081.95 1,009.77 8,091.72

BETON READY MIX (Jenis NFA) HS DKI Hal 34

NO ITEM PEKERJAAN Sat Bahan Upah JUMLAH


1 Beton BO m³ 489,000.00 24,200.00 513,200.00
2 Beton Ready Mix K-175 NFA Slump 12 m³ 586,000.00 24,200.00 610,200.00
3 Beton Ready Mix K-225 NFA slump 12 m³ 588,000.00 24,200.00 612,200.00
4 Beton Ready Mix K-300 NFA slump 12 m³ 646,000.00 24,200.00 670,200.00
5 Beton Ready Mix K-350 NFA slump 12 m³ 668,000.00 24,200.00 692,200.00
6 Beton Ready Mix K-350 NFA slump 16 m³ 683,000.00 24,200.00 707,200.00

CONCRETE PUMP + ALAT BANTU

NO ITEM PEKERJAAN sat concrete pump vibrator TOTAL Rp

1 Lantai Basement s/d Lantai 4 m³ 25,000.00 21,000.00 46,000.00


2 Lantai 5 s/d Lantai 8 m³ 27,500.00 21,000.00 48,500.00
3 Lantai 9 s/d Lantai 12 m³ 30,000.00 21,000.00 51,000.00

BEKISTING HS DKI Hal. 8

NO ITEM PEKERJAAN Sat Bahan Upah JUMLAH


1 Bekisting ringan u/ duiker m³ 329,316.00 352,810.00 682,126.00
2 Bekisting ringan expose m³ 270,937.00 352,810.00 623,747.00
3 Bekisting plat m³ 1,433,284.00 578,012.00 2,011,296.00
4 Bekisting plat / dinding expose m³ 1,667,749.00 647,033.00 2,314,782.00
5 Bekisting jepit, sloof, ring balok m³ 504,517.00 352,810.00 857,327.00
6 Bekisting balok m³ 1,518,451.00 647,033.00 2,165,484.00
7 Bekisting balok / kolom expose m³ 1,078,561.00 647,033.00 1,725,594.00
8 Bekisting balok beton expose (jembatan) m³ 1,211,898.00 519,424.00 1,731,322.00

Bahan --- 45 / 46
DAFTAR HARGA SATUAN UPAH

NO JENIS BAHAN HARGA SAT SAT


A TENAGA KERJA
1 Mandor Gali Rp. 85,607.00 Hari
2 Mandor Besi Rp. 85,607.00 Hari
3 Mandor Batu Rp. 85,607.00 Hari
4 Mandor Kayu Rp. 85,607.00 Hari
5 Kepala Tukang, Batu, Kayu, Besi, Cat Rp. 75,671.00 Hari
6 Tukang Kayu Rp. 65,734.00 Hari
7 Tukang Batu Rp. 65,734.00 Hari
8 Tukang Besi Rp. 65,734.00 Hari
9 Tukang Cat Rp. 65,734.00 Hari
10 Tukang Gali Rp. 65,734.00 Hari
11 Tukang Las Rp. 65,734.00 Hari
12 Pekerja Rp. 55,798.00 Hari

B MATERIAL BATA & BESI BETON


1 Batako uk 9x19x39 Rp. 1,650.00 Bh
2 Batu belah /Kali 15-20 Cm Rp. 189,000.00 M3
3 Batu Split 2-3 Cm Rp. 189,000.00 M3
4 Batu Koral beton Rp. 210,600.00 M3
9 Besi Baja Siku Rp. 10,925.00 Kg
10 Besi Baja WF Rp. 11,700.00 Kg
11 Besi Baja H Beam Rp. 11,700.00 Kg
12 Besi Baja Plat hitam (Segala Ukuran) Rp. 10,604.00 Kg
13 Kawat bendrat beton Rp. 12,000.00 Kg
14 Paku biasa 2" - 5" Rp. 10,320.00 Kg
15 Formtie / penjaga jarak Rp. 7,500.00 Bh
C KAYU
1 Kayu Kamper Samarinda (Oven) Uk. 8/12 Rp. 4,788,250.00 M3
2 Kayu Kamper Samarinda (Oven) Uk. 6/12 Rp. 3,887,310.00 M3
3 Kayu Kamper Samarinda (Oven) Uk. 5/7 Rp. 3,089,625.00 M3
4 Kayu Kamper Samarinda (Oven) Uk. 2/3 Rp. 2,921,100.00 M3
5 Kayu Kamper Samarinda (Oven) Uk. 2/20 Rp. 5,595,030.00 M3
6 Kayu Kamper Samarinda (Oven) Uk. 3/30 Rp. 5,583,795.00 M3
7 Kayu Borneo Basah Bekisting 6/12-8/12 Rp. 4,887,225.00 M3
8 Plywood Tebal 9mm Rp. 155,000.00 M¹
9 Kayu terentang Bekisting Rp. 3,089,625.00 M³
10 Dolken Ø 8~10 pjg 400 Cm Rp. 17,850.00 Btg
11 Minyak Bekisting Rp. 4,000.00 Ltr

D PASIR & SEMEN


1 Pasir urug Rp. 135,000.00 M3
2 Pasir beton Rp. 177,000.00 M3
3 Pasir pasang Rp. 185,000.00 Kg
4 Sirtu Rp. 133,800.00 M2
5 Semen PC Tiga Roda / 50 Kg, (Rp. 55,000/Zak) Rp. 1,100.00 Kg

Bahan --- 46 / 46