Anda di halaman 1dari 1

Kupasan = 0.

00 m2

Timbunan = m2

Galian = m2

Geb Rumput = 0.00 m

bidang persamaan
reference level
91.00

94.415

94.124

94.195

95.224

96.909

97.146

96.936

96.186

95.686

95.689

95.723

96.954

97.263

97.370

97.289

97.357

94.187

94.162

94.141

93.092

92.717
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

JARAK (m)

0.94

0.86

0.88

0.81

0.71
5.02 9.52 2.59 1.07 2.43 1.27 1.79 2.32 1.43 2.48 1.48 4.88 1.49 2.56 5.50
DISTANCE (m)

Kupasan = 0.00 m2

Timbunan = 3.80 m2

Galian = 19.43m2

Geb Rumput = 0.00 m

bidang persamaan
reference level
91.00
95.851

95.195

95.193

96.716
97.122
97.179

96.993

95.767

95.769
95.776

96.983

97.431
97.451

97.331

97.427

93.007
93.005
92.894

92.630
96.478

ELEVASI TANAH ASLI


ORIGINAL GROUND LEVEL

JARAK (m)
0.10

0.23
0.22

0.18

0.15

0.22
0.28
5.05 9.35 2.31 3.83 2.54 2.20 2.63 2.21 2.05 3.56 2.08 6.95 4.01
DISTANCE (m)

Kupasan = 0.00 m2

Timbunan = 3.80 m2

Galian = 19.00m2

Geb Rumput = 0.00 m

bidang persamaan
reference level
91.00
96.907

96.104

95.618

95.651

96.696

96.402

97.176

96.983

95.751

95.746

96.954

97.385

97.295

97.373

93.738

93.714
93.380

93.364

92.831

92.614
97.022

ELEVASI TANAH ASLI


ORIGINAL GROUND LEVEL

JARAK (m)
0.87

3.08 6.48 2.92 2.87


DISTANCE (m)

Anda mungkin juga menyukai