CSG ONE-STOP-SHOP BUILDING

IT CEILING LINE
FAN COIL UN
TE D
WALL MOUN
IT
FAN COIL UN
T E D
WALL MOUN
DRAIN TO NEAREST TAPPING POINT AS
SHOWN ON PLUMBING DRAIN DETAIL
GENERAL NOTES:
DRAIN TO NEAREST TAPPING POINT AS
SHOWN ON PLUMBING DRAIN DETAIL
1. AIR CONDITIONED SHALL BE INVERTER TYPE & AREAS SHALL BE
MAINTAINED AT 22° C ±1°C;

2. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR


REFRIGERANT PIPING
ALL BALANCING, TESTING AND COMMISSIONING OF THE WHOLE AIR
CONDITIONING AND VENTILATION SYSTEM; 15.88/9.52 MM Ø (GAS/LIQUID) NOTE:
& FIELD WIRINGS WRAPPED IN INCASE OF VERTICAL INSTALLATION
3. WORKMANSHIP: THE WORK THROUGHOUT SHALL BE EXECUTED IN POLYETHYLENE TAPE OF TWO OR MORE SETS OF ACCU,
THE BEST AND THOROUGH MANNER KNOWN TO TRACE AND TO THE W 34" RUBBER INSULATION THE HIGHER TONNAGE SHOULD BE
SATISFACTION OF THE ARCHITECT AND THE ENGINEER IN CHARGE; MOUNTED AT THE LOWER PORTION
AS SHOWN. CHB WALL
AIR COOLED CONDENSING UNIT
4. THE MECHANICAL CONTRACTOR SHALL SUBMIT SHOP DRAWINGS
CONNECTIONS TO
SHOWING ALL THE DETAILS FOR APPROVAL BY THE ENGINEER OR
TO SERVICE VALVES
OWNERS REPRESENTATIVES PRIOR TO THE CONSTRUCTION ANDOR
INSTALLATION SCHEDULE;

THE MECHANICAL CONTRACTOR SHALL INSPECT AND ASCERTAIN

SERVING COUNTER
THE QUANTITY AND QUALITY OF MATERIALS PRIOR TO THE SECTION
RUBBER INSULATION
DELIVERY AT SITE, ANY DEFECTS, DAMAGES ANDOR DEFFICIENCIES 25MM THK W POLYETHELENE
ON THE MATERIALS PRIOR TO THE CCEPTANCE SHALL BE BORNE, OUTER WRAPPER W VAPOR BURNER
REPLACED ANDOR COMPLETE BY THE MECHANICAL CONTRACTOR; FLOOR SLAB
ISOMETRIC DIAGRAM ACCU & MULTI-FCU WALL MOUNTED
AIR COOLED CONDENSING UNIT
6. CONDENSATE DRAIN RECEPTACLE SHALL BE PROVIDED BY THE NTS HITACHI
SUCTION LINE
(ACCU)
PLUMBING CONTRACTOR WITHIN A MAXIMUM DISTANCE OF 10 FEET
FROM ANY AIR CONDITIONING UNITS, DRAINS SHALL HAVE A 2 LIQUID LINE
PROVIDE RUBBER PAD
SLOPE;
FLEXIBLE CONDUIT ACCU STEEL FLAT FORM
7. THIS DRAWING IS NOT INTENDED TO SHOW EVERY DETAIL OF 32x32x3MM THK ANGLE BAR
CHB WALL
INSTALLATION, FITTINGS AND ACCESSORIES REQUIRED TO
COMPLETE THE JOB.
CARRIER AIR COOLED CONDENSING UNIT
(ACCU)
MCB

ACU CIRCUIT BREAKER PROVIDE RAILING 1" DIA. G.I. PIPE


IN NEMA 3R ENCLOSURES
MCB

SPECIFICATIONS: FLEXIBLE CONDUIT


PROVIDE RUBBER PAD

LEGEND ACCU STEEL FLAT FORM


32x32x3MM THK ANGLE BAR
F2A REFRIGERANT PIPES
1. CONDENSATE DRAINS: 1HP
F-INDOOR AC UNIT, 2-AC UNIT NUMBER, A-INDOOR UNIT QUANTITY, 1HP-RATING PROVIDE WORKING SPACE
A. MATERIAL : 12" PVC PIPE & ELECTRICAL WIRES FOR MAINTENANCE
AC2 WRAPPED W WHITE FILM
B. INSULATION : 11" FLEXIBLE UNICELLULAR INSULATION 3TR AC-OUTDOOR AC UNIT, 2-AC UNIT NUMBER, 3TR-RATING

2. REFRIGERANTS PIPING: AIR COOLED CONDENSING UNIT (AC OUTDOOR UNIT) SIDE VIEW
A. MATERIAL : TYPE L COPPER WIRE
FRONT VIEW
B. INSULATION : 34" THK FLEXIBLE UNICELLULAR INSULATION FAN COIL UNIT (AC INDOOR UNIT)
C. CLADDING : POLYETHYLENE TAPE VAPOR BARRIER FOR INSIDE ACCU WALL HANGED MOUNTING DETAIL
METAL FOR OUTSIDE.
NTS

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
M-1
LOCATION: CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
2.00 54.00

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

AC1 AC2 AC3 AC4 AC5 AC6 AC7 AC8 AC9 AC10 AC11
1.5TR 2.5TR 3.0TR 3.0TR 3.0TR 3.0TR 2.5TR 3.0TR 4.0TR 4.0TR 4.0TR

F1 F2A F3A F7B F7A F9A F11A NBI STO


2HP 1.5HP 2HP 1.5HP 1.5HP 2.5HP 2.5HP

MULTI PURPOSE RM
LANDBANK DI AND NBI DI STO

STO

6.00
F8A MALE CR

STORAGE RM
F3B

CABINET

CABINET
EXAMINATION RM - 2 2HP EXAMINATION RM - 1 2HP
F10A
TRANSACTION WINDOWS
2.5HP

F2B F8B
F4A 1.5HP F5A F4B F6A
2HP
FE

1HP 2HP 2HP 2HP


H A L L W A Y F11B
F9B
2.5HP CLIENTS LOUNGE CLIENTS LOUNGE 2.5HP
F4C NP SECTION
1HP
RECEPTION AREA FEMALE CR
OFFICE

6.00
F6B
F5B
INTERVIEW RM INTERVIEW RM 2HP
2HP
CHIEF
PANEL LANDBANK
INTERVIEW DI & NBI CLEARANCE

CHASE
PIPE
F10B
LOCKER COUNTER TABLE 2.5HP COUNTER TABLE STORAGE

24.00
RM EXIT

H A L L W A Y
H A L L W A Y
UP
WASH F17B
CR F12A F13A
AREA

6.00
2.0HP 1.5HP 2HP ELECTRICAL RM
EXIT
FEMALE MALE F16A
CR CR 2.5HP

32.70
COMPUTER TABLE
CLIENTS LOUNGE
SERVER
CCTV RM
F14 F15 F13B
F12B
1.5HP 1.5HP CLIENTS WAITING AREA 2HP
CRIME LAB DRUG TESTING 1.5HP
F17A
2.0HP

AC14 AC15 AC16 AC17


ENTEXIT
SENIOR CITIZENS & PWD LOUNGE
1.0TR 1.0TR 4.0TR 3.0TR
F16B 4 RAMP UP
AC18 2.5HP 3
1.5TR WASH AREA INFORMATION 2
F18 1
TRANSACTION WINDOWS 2.0HP
AC19 STORAGE UP

6.00
EXAM RM F19
1.5TR 2.0HP
MALE FEMALE
PWD CR

EXIT LOBBY UP
CHIEF
URINE COLLECTION
STO

RAMP UP
ENTRANCE

TRANSFORMATION
ENTRANCE FROM
MAIN ENTRY

OVAL
PORCH

ACU LAYOUT
4
3
2 RAMP UP
1
UP

GROUND FLOOR PLAN CANOPY LINE


SCALE 1 : 100MTS

P E D E S T R I A N L A N E

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
M-2
LOCATION: CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
54.00

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

AC25 AC20 AC21 AC22 AC23 AC24 AC26 AC27


2.5TR 1.5TR 3.0TR 4.0TR 4.0TR 4.0TR 4.0TR 4.0TR
PULL DOWN STAIR
UP

F20 F22A F23A F23B F24A F24B FIRE EXIT F26B F26B
2.0HP 2.5HP 2.5HP 2.5HP 2.5HP 2.5HP 2.5HP 2.5HP

FEO RECORDS RM
F25A F21A
1HP 2.0HP

FEO STAFF
CHIEF

6.00
MALE CR
F27A
2.5HP
F22B
2.5HP

FEO TRANSACTION WINDOWS


F25B
2.0HP

F21B
CONFERENCE RM FEO STAFF 2.0HP
F27B
2.5HP
FEMALE CR

6.00
CLIENTS LOUNGE
F30B
2.5HP

CHASE
PIPE
STORAGE

24.00
MALE CR

FEMALE CR AC28 AC12 AC13


4.0TR 2.5TR 3.0TR

UP DN
F30A
2.5HP

6.00
F19
2.0HP F28A
2.5HP

SOSIA TRANSACTION WINDOWS


RECORDS RM

SOSIA STAFF

F31A
AC29 AC30 2.5HP
1.5TR 4.0TR ROOF LINE
F28B
2.5HP
AC31
4.0TR
F32A
F32B COUNTER TABLE
AC32 2.0HP
2.0HP

6.00
DN
INFORMATION
3.0TR
CHIEF
AC33
4.0TR F31B

UP
2.5HP

AC34
4.0TR

F34A F34B F33A F33B


2.5HP 2.5HP 2.5HP 2.5HP

ACU LAYOUT
SECOND FLOOR PLAN CANOPY LINE
SCALE 1 : 100MTS

PERIMETER LINE

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
M-3
LOCATION: CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE

Anda mungkin juga menyukai