Scope of Work for Metal Straps Installation on Old Deltas and Huawei TPs Installed with LIBs

ATC Site Portfolio Site Cat HYBRID TYPE Latitude


SN ID Name

### Manduru BTS 2014 C Delta BBS 3.4390805556

###Kitgum Matidi Legacy BTS C Delta BBS 3.2685472222

###Nyamatunga BTS 2013 C Delta BBS -0.0368305556


###Nyamatunga BTS 2013 C Delta BBS -0.0368305556

### Anai BTS 2014 C Delta BBS 2.2194888889

### Ibuje BTS 2013 C Delta BBS 1.9028194444


### Kupoth BTS 2013 C Delta BBS 3.3068111111

### Kankoole BTS 2014 C Delta BBS 0.9169888889

### Kasswa BTS 2014 C Delta BBS 0.9562305556


### Kasswa BTS 2014 C Delta BBS 0.9562305556

### Kigo Lunya BTS 2014 C Delta BBS 0.2158305556

### Indridri BTS 2013 C Delta BBS 3.5704


### Kyassuma BTS 2014 C Delta BBS -0.3819416667

### Nabiswera BTS 2014 C Delta BBS 1.4704583333


###Bubeke Island BTS 2014 C Delta BBS -0.3241694444

### Cheminy BTS 2013 C Delta BBS 1.4142083333

### Bubuubi BTS 2014 C Delta BBS 0.7595666667


### Bubuubi BTS 2014 C Delta BBS 0.7595666667

### Namasale Legacy BTS C Delta BBS 1.508853

### Laibi_Cap BTS 2013 C Delta BBS 2.7600138889


###Katikamu C. BTS 2013 C Delta BBS 0.7277638889

###
Buseruka Road BTS 2013 C Delta BBS 1.5

### Nkanja BTS 2014 C Delta BBS 0.3776777778


### Nkanja BTS 2014 C Delta BBS 0.3776777778

### Patongo BTS 2013 C Delta BBS 2.7526694444

### Byebega BTS 2014 C Delta BBS 1.4963194444


### Mpoma BTS 2014 C Delta BBS 0.4472

### Komuria Legacy BTS A Delta BBS 3.5349694444

### Patuda BTS 2014 C Delta BBS 2.7468805556


### Patuda BTS 2014 C Delta BBS 2.7468805556

### Lwemiyaga Legacy BTS C Legacy Hybrid 0.1273361111

### Biharwe Legacy BTS C Legacy Hybrid -0.5236638889

###Mpanga Falls Legacy BTS C Legacy Hybrid 0.0802638889


###Mpanga Falls Legacy BTS C Legacy Hybrid 0.0802638889

### Kihura Legacy BTS C Legacy Hybrid 0.5811138889

###
Kalangala Bidco Legacy BTS C Legacy Hybrid -0.5262305556
### Nyakasura Legacy BTS C Legacy Hybrid 0.6786944444

### Bukuya Legacy BTS C Legacy Hybrid 0.6643305556

### Kisoga Legacy BTS C Delta BBS 0.2363777778


### Kasubi Legacy BTS C Delta BBS 0.3291888889

### Bukurungu Legacy BTS C Delta BBS -0.6433583333

### Buyaga Legacy BTS C Delta BBS 1.27009


### Buyaga Legacy BTS C Delta BBS 1.27009

### Kitampene Legacy BTS C Delta BBS -0.8282055556

###Kiziranfumbi Legacy BTS C Delta BBS 1.33575

### Mpambire Legacy BTS C Delta BBS 0.1936111111


### Mpambire Legacy BTS C Delta BBS 0.1936111111

### Mugalike Legacy BTS C Delta BBS 0.9971166667

### Nangunga 2013 C Delta BBS 0.2495916667


### Ovujjo 2013 C Delta BBS 3.2288138889

### Sanje Legacy BTS C Delta BBS -0.7897333333

### Mbalwa 2013 C Delta BBS 0.3725611111


### Sigulu East 2013 C Delta BBS 0.0977222222

### Kawaala Legacy BTS C Huawei TP 0.3333111111

###Lower Konge Legacy BTS C Huawei TP 0.2748416667


###
Kirinya_Bukasa Legacy BTS C Huawei TP 0.3164083333

###Mbalwa1800 Legacy BTS C Huawei TP 0.3772777778

### Bakuli Legacy BTS C Huawei TP 0.3180833333


### Bakuli Legacy BTS C Huawei TP 0.3180833333

### Lawsam Legacy BTS C Huawei TP 0.3148888889

###Nakawa_CMC Legacy BTS C Huawei TP 0.3311083333

###Mackay_Road Legacy BTS C Huawei TP 0.3151361111


###Mackay_Road Legacy BTS C Huawei TP 0.3151361111

###
Mukono_Ggulu Legacy BTS C Huawei TP 0.3545638889

### Kigungu Legacy BTS C Huawei TP 0.0361777778


###Kinawataka Legacy BTS C Huawei TP 0.3309805556

###
Busega Kibumbiro Legacy BTS C Huawei TP 0.3148805556

### Kakoba Legacy BTS C Huawei TP -0.6068861111


### Seguku C Huawei TP 0.2372555556

### Gangu Legacy BTS C Huawei TP 0.2418527778

### Namere Legacy BTS C Huawei TP 0.3905472222


### Namere Legacy BTS C Huawei TP 0.3905472222

### Kkulumba Legacy BTS C Huawei TP 0.3598305556

### Bwondha BTS 2013 C Huawei Powercube 0.1826333333

### Bukoli BTS 2013 C Huawei Powercube 0.4046111111

### Bussi Island BTS 2012 C Huawei Powercube 0.043275

### Buyende BTS 2013 C Huawei Powercube 1.1701444444

###Bangaladeshi BTS 2013 C Powercube 1000 1.5200722222


###Bangaladeshi BTS 2013 C Powercube 1000 1.5200722222

### Kifunfu BTS 2013 C Huawei Powercube -0.6004861111

### Kabanyonyi BTS 2013 C Huawei Powercube -1.3178611111

###Nyamwirima BTS 2013 C Huawei Powercube -0.362525

### Kinuka BTS 2013 C Huawei Powercube -0.3103305556

### Maanyi BTS 2013 C Huawei Powercube 0.2559166667

### Dyango BTS 2013 C Huawei Powercube -0.7746777778

Total

Picture 01
Desired out look of straps installation , however nature of cabinet is different
Note: The metal straps and cabinet door guards will be provided by ATC Uganda while the scaflex is to procured by the installation
Longitiude Grid status Bundwall

31.1824 No-Grid Yes

33.0494833333 No-Grid No

29.8346416667 No-Grid YES


29.8346416667 No-Grid YES

32.8450638889 No-Grid Yes

32.38235 No-Grid No
34.1282611111 No-Grid No

32.6274388889 No-Grid Yes

32.6810388889 No-Grid yes


32.6810388889 No-Grid yes

32.5942888889 No-Grid Yes

31.9241305556 No-Grid No
31.7534694444 No-Grid Yes

32.2699194444 No-Grid Yes


32.5912611111 No-Grid No

34.5970083333 No-Grid No

32.6711361111 No-Grid yes


32.6711361111 No-Grid yes

32.615575 No-Grid Yes

32.2965361111 No-Grid
32.5183166667 No-Grid No

31.2677333333 No-Grid No

31.0687388889 No-Grid Yes


31.0687388889 No-Grid Yes

33.3070611111 No-Grid Yes

31.6405972222 No-Grid Yes


32.7532694444 No-Grid Yes

34.1231972222 No-Grid No

32.2687111111 No-Grid Yes


32.2687111111 No-Grid Yes

31.1114833333 No-Grid No

30.71715 No-Grid No

30.3538138889 No-Grid No
30.3538138889 No-Grid No

30.7129583333 No-Grid No

32.1593194444 No-Grid No
30.1993611111 No-Grid No

31.8258611111 No-Grid No

32.813775 No-Grid No
32.5507694444 No-Grid No

29.8430972222 No-Grid No

34.28576 No-Grid No
34.28576 No-Grid No

30.1431333333 No-Grid No

31.2048611111 No-Grid No

32.3011666667 No-Grid No
32.3011666667 No-Grid No

30.8499388889 No-Grid No

33.0134944444 No-Grid No
30.9104888889 No-Grid No

31.4906916667 No-Grid No

32.6553 No-Grid No
33.7913444444 No-Grid No

32.5556555556 Grid No

32.6063638889 Grid No
32.676175 Grid No

32.6639611111 Grid No

32.5622722222 Grid No
32.5622722222 Grid No

32.6081777778 Grid No

32.6129083333 Grid No

32.5722861111 Grid No
32.5722861111 Grid No

32.7574111111 Grid No

32.4256194444 Grid No
32.63225 Grid No

32.5261277778 Grid No

30.6660527778 Grid No
32.5515444444 Grid No

32.5989055556 Grid No

32.5627555556 Grid No
32.5627555556 Grid No

32.5690305556 Grid No

33.5642916667 No-Grid No

33.7929 No-Grid

No

32.3209222222 No-Grid No

33.1595388889 No-Grid No

32.7031583333 Non-Grid No
32.7031583333 Non-Grid No

30.5406388889 Non-Grid No

30.0714166667 Non-Grid No

30.6707472222 Non-Grid No

31.1421388889 Non-Grid No

31.9730111111 Non-Grid No

31.1832638889 Non-Grid No

Picture 02
Huawei Power cubes cabinet door guards
s to procured by the installation vendor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps (See picture 01 for desired outlook after installation of st
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has no DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has no DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has no DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has no DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has no DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has no DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has no DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has no DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has no DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has no DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has no DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has no DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has no DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has no DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has no DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has no DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
If site has no DG, connect a 10kVA mobile DG and switch off grid. If site has DG, put DG in manual mode and disconnect grid power
Carefully isolate ethernet connection from the battery, maintaining the connection on the K2 side. Remove the COM cables between batte
Switch off all battery breakers
Disconnect battery cables and remove the installed LIB batteries.
Clean cabinet ventilator/door filter, rectifier and battery cabinet using an air blower.
Clean and ensure functionality of the air suction fans (Located on top of the rectifier cabinet) – this applies to Delta cabinets
Undertake minor repairs on the doors e.g. panel beating the door in case found bent or broken
Very carefully drill holes into the cabinet, through which the strap bolts are fixed and fastened onto cabinet with nuts from inside the cabin
Install and fasten the steel metal straps firmly onto cabinet using nuts and bolts (steel metal straps and accessories to be provided by ATC U
Seal up all the holes fabricated into the cabinet with scaflex -11 FC sealant, using a silicon gun and also ensure that the upper joining surfac
sealant required are attached.
Replace the LIB batteries and reinstall battery cables firmly
Reinstall connection between battery and the RMS.
If site has no DG, switch on grid power and disconnect mobile DG. If site has DG, put DG back in auto.
Check with ATC NOC to ensure that there are no alarms on the batteries and that all batteries are visible on Galooli.
Lock cabinet with the outside security straps and deploy Acsys padlocks on straps
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
Cut the concrete directly infront of the cabinet door,creating a hole where the base plate of the cabinet door guard is anchored, anchor the
Replace the smooth concete screed finish
Install the door guard and have it locked with Acsys padlocks (see picture 2)
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
Cut the concrete directly infront of the cabinet door,creating a hole where the base plate of the cabinet door guard is anchored, anchor the
Replace the smooth concete screed finish
Install the door guard and have it locked with Acsys padlocks (see picture 2)
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
Cut the concrete directly infront of the cabinet door,creating a hole where the base plate of the cabinet door guard is anchored, anchor the
Replace the smooth concete screed finish
Install the door guard and have it locked with Acsys padlocks (see picture 2)
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
Cut the concrete directly infront of the cabinet door,creating a hole where the base plate of the cabinet door guard is anchored, anchor the
Replace the smooth concete screed finish
Install the door guard and have it locked with Acsys padlocks (see picture 2)
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
Cut the concrete directly infront of the cabinet door,creating a hole where the base plate of the cabinet door guard is anchored, anchor the
Replace the smooth concete screed finish
Install the door guard and have it locked with Acsys padlocks (see picture 2)
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
Cut the concrete directly infront of the cabinet door,creating a hole where the base plate of the cabinet door guard is anchored, anchor the
Replace the smooth concete screed finish
Install the door guard and have it locked with Acsys padlocks (see picture 2)
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
Cut the concrete directly infront of the cabinet door,creating a hole where the base plate of the cabinet door guard is anchored, anchor the
Replace the smooth concete screed finish
Install the door guard and have it locked with Acsys padlocks (see picture 2)
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
Cut the concrete directly infront of the cabinet door,creating a hole where the base plate of the cabinet door guard is anchored, anchor the
Replace the smooth concete screed finish
Install the door guard and have it locked with Acsys padlocks (see picture 2)
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
Cut the concrete directly infront of the cabinet door,creating a hole where the base plate of the cabinet door guard is anchored, anchor the
Replace the smooth concete screed finish
Install the door guard and have it locked with Acsys padlocks (see picture 2)
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
Cut the concrete directly infront of the cabinet door,creating a hole where the base plate of the cabinet door guard is anchored, anchor the
Replace the smooth concete screed finish
Install the door guard and have it locked with Acsys padlocks (see picture 2)
Get sign-off from ATC O&M site supervisor
Log in with the ATC NOC
Take pictures of the batteries inside the cabinet (ensure pictures are date and time stamped and pictures should be taken at every stage )
Cut the concrete directly infront of the cabinet door,creating a hole where the base plate of the cabinet door guard is anchored, anchor the
Replace the smooth concete screed finish
Install the door guard and have it locked with Acsys padlocks (see picture 2)
Get sign-off from ATC O&M site supervisor

Picture 4
Contact of supplier of scaflex
PROJECT BUDGET

ITEMS QUANTITY COST


TRANSPORT 1* double cabin 120,000 (per day)
welding rods 2.5mm and 3.5mm
Archoring bolts M12/M16
Galvor spray
mobilie Generator 1 80,000 (per day)
Welder labour 120,000 (per day)
Denis labour 150,000 (per day)
Causal labourer 50,000 (per day)
OTHER REQUIREMENTS:
1. ATC KEYS
2. SMART PHONE WITH OFFICE TRACK INSTALLED.
3. ACCESS REFERENCE FROM ATC NOC.
PROJECT BUDGET