p Geologist
g
Jakarta, 26 November 2016
Mohammad Syaiful
Petroleum System
STUDYING
PREVIOUS DATA
GEOPHYSICAL
OPERATION
(SEISMIC, ETC)
OPERATOR
GOV’MEN
EXPLOR. DRILLING and
MANAGER SUPERIN‐ PARTNERS
TENDENT
OPERATION
MARINE CREW
GEOLOGIST (OFFSHORE)
‘COMPANY
WELLSITE MAN’ TOOL
GEOLOGIST
PUSHER
MUD
MUD
ENGINEERING
CEMENT
CASING DRILLERS
ELECTRIC
ELECTRIC
LOGGING
WELL TESTING DERRICKMEN
L W D
SAFETY FLOORMEN
CORING
DEVIATION ROUSTABOUTS
Mudlogging Unit
DRILLING OPERATIONS
» Drillingg
» Wireline Logging (optional)
» Casing
»CCementing i
Operation Geology Exploration Well Drilling
Well prognosis
0 ft
1000
ft
2000
ft
3000
ft
4000
ft
5000
5000
ft
6000
ft
• Wells drilled from
Conductor top‐down, but (usually)
Casing designed from
g
Surface bottom‐up
Casing
• Tubing size selected
Intermediate
Casing
• Casing strings telescope
out from tubing size
Tubing • Setting depths depend on
geologic features and
Production reservoir pressures
reservoir pressures
Casing
Conductor Conductor
Casing Casing
Surface
Surface
Casing
Casing
IIntermediate
t di t Intermediate
Casing Casing
Drilling Drilling
Liner Liner
Tubing Production
Tieback Tubing
Production
Production
Liner
Casing
Weak, unstable formation
isolated by conductor casing
pore Solid rock supports
pressure surface casing
High
Hi h
verticall
depth
pressure, fracture
unstable gradient
hole isolated mud
by protective weight
casing
Production casing extends
Production casing extends
into high pressure pay‐zones
Action:
• Drill from surface going
down
• Cutting going up with
Cutting going up with
mud
mud
Action:
• Drill deeper depth
• Increasing mud weight as
necessary
OPEN HOLE
CASED HOLE
CASED HOLE
Action:
• Drill new formation for few
D ill f i f f
CASED HOLE feet / meters
• Stop
• Do LOT (leak off test) / FIT
Do LOT (leak off test) / FIT
(formation integrity test)
OPEN HOLE
CASED HOLE
OPEN HOLE
Operation Geology Exploration Well Drilling
Operations constraints or risks may occur
• Well Kicks
• Pipe Stuck
• Broken/Twisted Pipe
• Lost Return
• Gumbo
• Reactive Clay
• Ab
Abnormal Pressure
lP
• Stable hole and normal
pore pressures
permitted well to be
Conductor Casing drilled with few casing
g
strings
Surface Casing
• N
No need to vary mud
dt d
weight or stabilize loose
Stable Hole
formation
Normal Pressure
P d ti C i
Production Casing
• High pressure
zone balanced
Conductor Casing with heavy mud
behind
intermediate
Surface Casing casing
High Pressure
• Production
Intermediate Casing
Intermediate Casing casingg hole
drilled with
Normal Pressure lighter weight /
Production Casing
Production Casing lower cost mud
• IIntermediate
t di t casing
i
to isolate high
Conductor Casing pressure zone