Lampiran 2.

Layout PKS Kebun Rambutan

25
Lampiran 3. Aliran Proses CPO Dan Kernel

26
Lampiran 4. Dokumentasi Kegiatan PKL

(1) Jembatan Timbang (2) Sortasi

(3) Loading ramp (4) Lori

(5) Capstand dan Rail Track (6) Sterilizer

(7) Hoisting crane dan thresher (8) Hopper

27
(9) Digester (10) Screw Press

(11) Sand Trap Tank (12) Vibro Separator

(13) Crude Oil Tank (14) Vertical Clarifier Tank (VCT)

(15) Oil Tank (16) Oil Purifier

28
(17) Vacum Dryer (18) Storage Tank

(19) Fat Pit (20) Cake Braker Conveyor

(21) Defricarfer (22) Nut Polishig Drum

(23) Nut Silo (24) Ripple Mill

29
(25) LTDS (26) Hydrocyclone

(27) Kernel Silo (28) Kernel Storage

(29) Stasiun Boiler (30) Turbin

(31) Diesel Genset (32) BPV

30
(33) Cooling Tower