Anda di halaman 1dari 11

Project:

ETAP Page: 1
12.6.0H
Location: Date: 08-11-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: TUGAS 4 Config.: Normal

Electrical Transient Analyzer Program

Short-Circuit Analysis

ANSI Standard
3-Phase, LG, LL, & LLG Fault Currents
1/2 Cycle Network

Swing V-Control Load Total


Number of Buses: 2 0 17 19

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 7 0 0 10 0 1 18

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total
Number of Machines: 0 2 0 7 0 9

System Frequency: 50.00 Hz

Unit System: Metric

Project Filename: TUGAS 4

Output Filename: C:\ETAP 1260\Tugas 4\uji 4.SA2


Project:
ETAP Page: 2
12.6.0H
Location: Date: 08-11-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: TUGAS 4 Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project:
ETAP Page: 3
12.6.0H
Location: Date: 08-11-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: TUGAS 4 Config.: Normal

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

Bus1 SWNG 20.000 20.000 1 100.00 0.00

Bus2 SWNG 20.000 20.000 1 100.00 0.00

Bus3 Load 5.500 5.500 1 100.00 -30.00

Bus4 Load 5.500 5.500 1 100.00 -30.00

Bus5 Load 5.500 5.500 1 100.00 -30.00

Bus6 Load 5.500 5.500 1 100.00 -30.00

Bus7 Load 0.380 0.380 1 100.00 -60.00

Bus8 Load 5.500 5.500 1 100.00 -30.00

Bus10 Load 5.500 5.500 1 100.00 -30.00

Bus11 Load 0.380 0.380 1 100.00 -60.00

Bus12 Load 5.500 5.500 1 100.00 -30.00

Bus13 Load 5.500 5.500 1 100.00 -30.00

Bus14 Load 0.380 0.380 1 100.00 -60.00

Bus15 Load 5.500 5.500 1 100.00 -30.00

Bus16 Load 5.500 5.500 1 100.00 -30.00

Bus17 Load 0.380 0.380 1 100.00 -60.00

Bus18 Load 5.500 5.500 1 100.00 -30.00

Bus19 Load 5.500 5.500 1 100.00 -30.00

Bus20 Load 0.380 0.380 1 100.00 -60.00

19 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP .
Project:
ETAP Page: 4
12.6.0H
Location: Date: 08-11-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: TUGAS 4 Config.: Normal

Line/Cable Input Data

Ohms or Siemens per 1000 m per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R1 X1 Y1 R0 X0 Y0


Cable1 0,6MCUN3 10 10000.0 0.0 3 75 2.1670000 0.1096000 6.8260500 0.2696200

Cable2 0,6MCUN3 10 5000.0 0.0 3 75 2.1670000 0.1096000 6.8260500 0.2696200

Cable3 0,6MCUN3 10 10000.0 0.0 3 75 2.1670000 0.1096000 6.8260500 0.2696200

Cable4 0,6MCUN3 10 5000.0 0.0 3 75 2.1670000 0.1096000 6.8260500 0.2696200

Cable5 0,6MCUN3 10 10000.0 0.0 3 75 2.1670000 0.1096000 6.8260500 0.2696200

Cable6 0,6MCUN3 10 5000.0 0.0 3 75 2.1670000 0.1096000 6.8260500 0.2696200

Cable7 0,6MCUN3 10 10000.0 0.0 3 75 2.1670000 0.1096000 6.8260500 0.2696200

Cable8 0,6MCUN3 10 5000.0 0.0 3 75 2.1670000 0.1096000 6.8260500 0.2696200

Cable9 0,6MCUN3 10 10000.0 0.0 3 75 2.1670000 0.1096000 6.8260500 0.2696200

Cable10 0,6MCUN3 10 5000.0 0.0 3 75 2.1670000 0.1096000 6.8260500 0.2696200

Line / Cable resistances are listed at the specified temperatures.


Project:
ETAP Page: 5
12.6.0H
Location: Date: 08-11-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: TUGAS 4 Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T1 5.000 20.000 5.500 7.15 8.50 0 0 0 0 0 7.1500 Dyn 30.000

T2 5.000 20.000 5.500 7.15 8.50 0 0 0 0 0 7.1500 Dyn 30.000

T3 0.400 5.500 0.380 4.00 1.50 0 0 0 0 0 4.0000 Dyn 30.000

T4 0.400 5.500 0.380 4.00 1.50 0 0 0 0 0 4.0000 Dyn 30.000

T5 0.400 5.500 0.380 4.00 1.50 0 0 0 0 0 4.0000 Dyn 30.000

T6 0.400 5.500 0.380 4.00 1.50 0 0 0 0 0 4.0000 Dyn 30.000

T7 0.400 5.500 0.380 4.00 1.50 0 0 0 0 0 4.0000 Dyn 30.000

2-Winding Transformer Grounding Input Data

Grounding

Transformer Rating Conn. Primary Secondary


ID MVA Prim. kV Sec. kV Type Type kV Amp Ohm Type kV Amp Ohm

T1 5.000 20.000 5.500 D/Y Solid

T2 5.000 20.000 5.500 D/Y Solid

T3 0.400 5.500 0.380 D/Y Solid

T4 0.400 5.500 0.380 D/Y Solid

T5 0.400 5.500 0.380 D/Y Solid

T6 0.400 5.500 0.380 D/Y Solid

T7 0.400 5.500 0.380 D/Y Solid


Project:
ETAP Page: 6
12.6.0H
Location: Date: 08-11-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: TUGAS 4 Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

T1 2W XFMR Bus1 Bus3 16.71 142.02 143.00

T2 2W XFMR Bus2 Bus4 16.71 142.02 143.00

T3 2W XFMR Bus6 Bus7 554.70 832.05 1000.00

T4 2W XFMR Bus10 Bus11 554.70 832.05 1000.00

T5 2W XFMR Bus13 Bus14 554.70 832.05 1000.00

T6 2W XFMR Bus16 Bus17 554.70 832.05 1000.00

T7 2W XFMR Bus19 Bus20 554.70 832.05 1000.00

Cable1 Cable Bus3 Bus5 2387.88 120.77 2390.93

Cable2 Cable Bus5 Bus6 1193.94 60.39 1195.47

Cable3 Cable Bus3 Bus8 2387.88 120.77 2390.93

Cable4 Cable Bus8 Bus10 1193.94 60.39 1195.47

Cable5 Cable Bus4 Bus12 2387.88 120.77 2390.93

Cable6 Cable Bus12 Bus13 1193.94 60.39 1195.47

Cable7 Cable Bus4 Bus15 2387.88 120.77 2390.93

Cable8 Cable Bus15 Bus16 1193.94 60.39 1195.47

Cable9 Cable Bus4 Bus18 2387.88 120.77 2390.93

Cable10 Cable Bus18 Bus19 1193.94 60.39 1195.47

SW2 Tie Switch Bus11 Bus14


Project:
ETAP Page: 7
12.6.0H
Location: Date: 08-11-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: TUGAS 4 Config.: Normal

Power Grid Input Data

% Positive Seq. Impedance % Zero Seq. Impedance


Power Grid Connected Bus Rating 100 MVA Base Grounding 100 MVA Base
ID ID MVASC kV X/R R X Type X/R R0 X0

GRID 1 Bus1 200.000 20.000 10.00 4.97519 49.75186 Wye - Solid 10.00 4.975186 49.75186

GRID 2 Bus2 200.000 20.000 10.00 4.97519 49.75186 Wye - Solid 10.00 4.975186 49.75186

Total Power Grids (= 2 ) 400.000 MVA


Project:
ETAP Page: 8
12.6.0H
Location: Date: 08-11-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: TUGAS 4 Config.: Normal

Induction Machine Input Data

Induction Machine Rating (Base) Positive Seq. Imp. Grounding Zero Seq. Imp.
ID Type Qty kVA kV RPM X"/R %R % X" % X' Conn. Type Amp X/R % R0 % X0

Mtr1 Motor 1 157.75 5.500 1500 10.00 1.845 18.46 46.15 Wye Open 10.00 1.845 18.46

Mtr2 Motor 1 391.31 5.500 1500 16.52 1.117 18.46 46.15 Wye Open 16.52 1.117 18.46

Mtr3 Motor 1 157.75 5.500 1500 10.00 1.845 18.46 46.15 Wye Open 10.00 1.845 18.46

Mtr4 Motor 1 391.31 5.500 1500 16.52 1.117 18.46 46.15 Wye Open 16.52 1.117 18.46

Mtr5 Motor 1 157.75 5.500 1500 10.00 1.845 18.46 46.15 Wye Open 10.00 1.845 18.46

Mtr6 Motor 1 157.75 5.500 1500 10.00 1.845 18.46 46.15 Wye Open 10.00 1.845 18.46

Mtr7 Motor 1 157.75 5.500 1500 10.00 1.845 18.46 46.15 Wye Open 10.00 1.845 18.46

Total Connected Induction Machines ( = 7 ): 1571.4 kVA


Project:
ETAP Page: 9
12.6.0H
Location: Date: 08-11-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: TUGAS 4 Config.: Normal

SHORT- CIRCUIT REPORT

Fault at bus: Bus3

Prefault voltage = 5.500 kV = 100.00 % of nominal bus kV ( 5.500 kV)


= 100.00 % of base kV ( 5.500 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus3 Total 0.00 5.696 0.00 97.10 95.33 6.156 6.156 2.75E+001 1.82E+002 1.67E+001 1.42E+002

Bus5 Bus3 19.36 0.085 13.95 92.27 102.26 0.061 0.000 3.56E+003 1.18E+004
Bus8 Bus3 58.93 0.259 42.47 97.08 113.89 0.186 0.000 3.35E+003 2.29E+003
Bus1 Bus3 74.10 5.439 86.34 100.00 86.41 5.970 6.156 * 2.17E+001 1.92E+002 1.67E+001 1.42E+002

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 10
12.6.0H
Location: Date: 08-11-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: TUGAS 4 Config.: Normal

Short-Circuit Summary Report

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

Bus3 5.50 0.849 -5.632 5.696 0.863 -6.095 6.156 4.877 0.736 4.933 4.444 4.056 6.016

All fault currents are symmetrical momentary (1/2 Cycle network) values in rms kA

* LLG fault current is the larger of the two faulted line currents
Project:
ETAP Page: 11
12.6.0H
Location: Date: 08-11-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: TUGAS 4 Config.: Normal

Short-Circuit Summary Report

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

Bus3 5.500 0.08314 0.55129 0.55752 0.08314 0.55129 0.55752 0.05054 0.42961 0.43258