DAFTAR BAYAR RENOVASI RUMAH

No. Personil Tanggal


4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov
Tukang 1 65000 125000 125000 125000 125000 125000 125000 250000
Tukang 2 65000 125000 125000 125000 125000 125000 125000 250000
Tukang 3 65000 125000 125000 125000 125000 125000 125000 250000
Laden 1 50000 100000 100000 100000 100000 100000 100000 200000
Laden 2 50000 100000 100000 100000 100000 100000 100000 200000
Laden 3 50000 100000 100000 100000 100000 100000 100000 200000

Tukang 1 1065000
Tukang 2 1065000 Kasbon 11/11/2018 1000000
Tukang 3 1065000
Laden 1 850000
Laden 2 850000
Laden 3 850000
Total 5745000
Saldo 18,800,000.00

Pintu & Jendela 4,000,000.00


Teralis Tangga 2,475,000.00
Semen 1,080,000.00
Pasir 1,500,000.00
Keramik
1. Utama 2,210,000.00
2. Dapur Plus Bawah Tangga 1,326,000.00
3. Keramik Sikat dlm rumah 156,000.00
4. Garasi 636,000.00
5. Teras 438,000.00
6. Tangga 288,000.00
Cat 2,000,000.00
Mamah 1,000,000.00
Torren 1,200,000.00
Paralon, stop kontak 1,000,000.00
19,309,000.00