240 CEMENTITIOUS TOPPINGS
[240 CEMENTITIOUS TOPPINGS
240.1 GENERAL
240.11 CROSS REFERENCES
Cross reference
Refer to General Requirement work section
Associated worksections
Conform to associated worksections as follows: Granite Flooring
Tiling
Waterproofing
‘Adhesives Sealants and Fasteners
Extemal Paving
Concrete finishes
240.1.2 INTERPRETATION
‘Cementitious toppings
‘A cementitious material applied to @ base slab for the purposes of achieving a flat floor
finish. Refers to a stand-alone finish or base to take an applied finish, 6. ting
Bonded Topping
‘Toppings that are fully bonded to their substrate
240.1.3 EQUIPOTENTIAL BONDING REQUIREMENTS (EPB)
‘Comply with the requirements of Section 13.3 of the Authority's Design Criteria Volume 2 of
2, whrere metals ere proposed within the station protection zone.
Cross Refer: section 20.2.7 ‘Design’ of the General Requirements.
240.1.4 DESIGN
Drawings
Contract drawings show generic design principles and design intent only.
2402 QUALITY
240.2.4 INSPECTION
Witness points
Give sufficient notice so that inspection may be made at the following stages:
= Completion of preparatory work to the base stab
= Completion of applied waterproofing on the base slab
Hold points
= Completion ofall prototypes.
Corrosion
Cross refer: General Requirements clause 20.4.1
240.22 TESTS
Carty out all tests in accordance with section 20.3.2, ‘Tests’ of the General Requirements
‘Achitectral M&W 1 Contract 7228
240 - Rov 00 ‘T20MRB Staton240 (CEMENTITIOUS TOPPINGS
All Toppings
BRE Impact test to BS 8204
Sand and aggregates
Toss73
240.23 SAMPLES
Submit samples of each ofthe following in accordance with section 20.3.
General Requirements.
= Sand: Submit a 2 kg sample of sana
= _ Divider strip: A 300mm length of each type of section proposed.
= Movernent oints: A 200mm length ofthe proposed joint ir.
‘Samples’, of the
Composite stone topping
‘Submit samples showing range of colour and texture,
'240.2.4 PROTOTYPES:
General
Provide prototypes in accordance with section 20.34 ‘Prototypes’ of the General
Requirements
Design prototype
Provide Design prototypes of all toppings
Type ‘As agreed with the Engineer
Location: ‘As agreed with the Engineer
Minimum size (mm): 3.0m x 3.0m or as directed
Mix ‘As agreed with the Engineer
Incorporating = Daywork and expansion joints
= Edge details as directed
= Interfaces as directed
Confirmation prototype
Provide confirmation prototypes of all cementitious toppings.
Location: ‘As agreed with the Engineer
Minimum size (mm): * 3.0m x3.0m or as directed
Incorporating = Daywork and expansion joints
= Edge details as directed
= Interfaces as directed
- movement joints as directed
Retain at prototypes until the completion of the works or as directed by the Engineer.
Incorporate accepted prototypes into the work as directed by the Engineer.
240.2.5 SUBMISSIONS
General
Make all submissions in accordance with the requirements of section 20.8.5, ‘Submissions’
of the General Requirements.
‘Subcontractors
‘Submit name and contact details of proposed specialist topping subcontractor(s).
Avcbitectural MAW 2 Contract T226
240 -Rev 00 ‘TOMAS Station240 (CEMENTITIOUS TOPPINGS
‘Shop drawings
General: Submit shop drawings in accordance with section 20.3.
General Requirements
Shop drawings shall show, but not limited to, the folowing information:
= Plans and sections showing the location and type of all cementitious toppings.
= Arnumbering system enabiing all panels to be identfied.
~ Details ofall required joints and interfaces.
= Allowances for movernent.
No of copies to be submitted: 3,
"Submissions of the
Manufacturers’ information
Technical Literature: Submit the manufacturer's technical iiterature for all proprietary
materials used together with certification that materials comply with the required standards in
accordance with section 20.3.6, ‘Submissions’ of the General Requirements.
Instructions: Submit copies of relevant manufacturers’ instructions including standard
drawings and details.
Materiel safety data sheets (MSDS): Submit MSDS.
No of copies to be submitted: 7
Tests
‘Submit reports of all tests in accordance with section 20.3.2, ‘Tests’ of the General
Requirements
Mothod Statement
General: Submit method statements in accordance with section 20.3.6 ‘Submissions’ of the
General Requirements
240.3_ FINISHES GENERAL
"Toxic materials: Use materials which are certified free of asbestos and lead, or any other
known toxin, and free of, nor requiring the use of, toxic solvents.
Do not use products which give off toxic emissions in the event of a fre.
Do not use materials which contain known carcinogenics.
Confirm that materials used in conjunction are compatible with one another, the substrates
con which they are used, and all adjacent materials in the completed building
240.3.1 TOLERANCES:
Flatness
Conform to the Flatness class table for the maximum deviation of the finished surface
under a straight edge laid in any direction on an area of uniform grade.
Flatness class table
Crass ‘Straight edge length Maximum deviation (mm)
x om 3
cy om 6
c ‘BOO Tr o
‘Deviation shall not occur suddenly with the rate of departure rot greater than 1.5mm for
each 800mm in distance from any point of contact along the straight edge.