Anda di halaman 1dari 9
240 CEMENTITIOUS TOPPINGS [240 CEMENTITIOUS TOPPINGS 240.1 GENERAL 240.11 CROSS REFERENCES Cross reference Refer to General Requirement work section Associated worksections Conform to associated worksections as follows: Granite Flooring Tiling Waterproofing ‘Adhesives Sealants and Fasteners Extemal Paving Concrete finishes 240.1.2 INTERPRETATION ‘Cementitious toppings ‘A cementitious material applied to @ base slab for the purposes of achieving a flat floor finish. Refers to a stand-alone finish or base to take an applied finish, 6. ting Bonded Topping ‘Toppings that are fully bonded to their substrate 240.1.3 EQUIPOTENTIAL BONDING REQUIREMENTS (EPB) ‘Comply with the requirements of Section 13.3 of the Authority's Design Criteria Volume 2 of 2, whrere metals ere proposed within the station protection zone. Cross Refer: section 20.2.7 ‘Design’ of the General Requirements. 240.1.4 DESIGN Drawings Contract drawings show generic design principles and design intent only. 2402 QUALITY 240.2.4 INSPECTION Witness points Give sufficient notice so that inspection may be made at the following stages: = Completion of preparatory work to the base stab = Completion of applied waterproofing on the base slab Hold points = Completion ofall prototypes. Corrosion Cross refer: General Requirements clause 20.4.1 240.22 TESTS Carty out all tests in accordance with section 20.3.2, ‘Tests’ of the General Requirements ‘Achitectral M&W 1 Contract 7228 240 - Rov 00 ‘T20MRB Staton 240 (CEMENTITIOUS TOPPINGS All Toppings BRE Impact test to BS 8204 Sand and aggregates Toss73 240.23 SAMPLES Submit samples of each ofthe following in accordance with section 20.3. General Requirements. = Sand: Submit a 2 kg sample of sana = _ Divider strip: A 300mm length of each type of section proposed. = Movernent oints: A 200mm length ofthe proposed joint ir. ‘Samples’, of the Composite stone topping ‘Submit samples showing range of colour and texture, '240.2.4 PROTOTYPES: General Provide prototypes in accordance with section 20.34 ‘Prototypes’ of the General Requirements Design prototype Provide Design prototypes of all toppings Type ‘As agreed with the Engineer Location: ‘As agreed with the Engineer Minimum size (mm): 3.0m x 3.0m or as directed Mix ‘As agreed with the Engineer Incorporating = Daywork and expansion joints = Edge details as directed = Interfaces as directed Confirmation prototype Provide confirmation prototypes of all cementitious toppings. Location: ‘As agreed with the Engineer Minimum size (mm): * 3.0m x3.0m or as directed Incorporating = Daywork and expansion joints = Edge details as directed = Interfaces as directed - movement joints as directed Retain at prototypes until the completion of the works or as directed by the Engineer. Incorporate accepted prototypes into the work as directed by the Engineer. 240.2.5 SUBMISSIONS General Make all submissions in accordance with the requirements of section 20.8.5, ‘Submissions’ of the General Requirements. ‘Subcontractors ‘Submit name and contact details of proposed specialist topping subcontractor(s). Avcbitectural MAW 2 Contract T226 240 -Rev 00 ‘TOMAS Station 240 (CEMENTITIOUS TOPPINGS ‘Shop drawings General: Submit shop drawings in accordance with section 20.3. General Requirements Shop drawings shall show, but not limited to, the folowing information: = Plans and sections showing the location and type of all cementitious toppings. = Arnumbering system enabiing all panels to be identfied. ~ Details ofall required joints and interfaces. = Allowances for movernent. No of copies to be submitted: 3, "Submissions of the Manufacturers’ information Technical Literature: Submit the manufacturer's technical iiterature for all proprietary materials used together with certification that materials comply with the required standards in accordance with section 20.3.6, ‘Submissions’ of the General Requirements. Instructions: Submit copies of relevant manufacturers’ instructions including standard drawings and details. Materiel safety data sheets (MSDS): Submit MSDS. No of copies to be submitted: 7 Tests ‘Submit reports of all tests in accordance with section 20.3.2, ‘Tests’ of the General Requirements Mothod Statement General: Submit method statements in accordance with section 20.3.6 ‘Submissions’ of the General Requirements 240.3_ FINISHES GENERAL "Toxic materials: Use materials which are certified free of asbestos and lead, or any other known toxin, and free of, nor requiring the use of, toxic solvents. Do not use products which give off toxic emissions in the event of a fre. Do not use materials which contain known carcinogenics. Confirm that materials used in conjunction are compatible with one another, the substrates con which they are used, and all adjacent materials in the completed building 240.3.1 TOLERANCES: Flatness Conform to the Flatness class table for the maximum deviation of the finished surface under a straight edge laid in any direction on an area of uniform grade. Flatness class table Crass ‘Straight edge length Maximum deviation (mm) x om 3 cy om 6 c ‘BOO Tr o ‘Deviation shall not occur suddenly with the rate of departure rot greater than 1.5mm for each 800mm in distance from any point of contact along the straight edge. ZAAedas\Latest Searches\Search Results 5(2}3(2}2013 4{3}28 PMACZ105 T20{3} Final ‘Architectural Design Drawings - LTA Comments (ID 50820) ‘Architectural MSW 3 Contact 1226 240-Rev 00 ‘720 MR Staton

Anda mungkin juga menyukai