Anda di halaman 1dari 9

Test Report of 66 KV Incoming Line CTs

1
Page

Name of Substation: 66 KV 25 MW ASTRA


SOLRAN
Date of Testing: 24/03/2017
Tested By: Sanjay Thakor
Approved By: Naresh Soni
Name Plate Details:

Description Make Sr No Year


R Phase Pragati Ele. 16/M-56837 2016
Y Phase Pragati Ele. 16/M-56838 2016
B Phase Pragati Ele. 16/M-56839 2016

Secondary Ratio Knee Point


Core Class
Terminal Pri. Sec. Voltage
1 0.25 1S1-1S2-1S3 300/600 1 -
2 5P 2S1-2S2-2S3 300/600 1 -
3 PS 3S1-3S2-3S3 300/600 1 650

2
Page

Name of Substation: 66 KV 25 MW ASTRA


SOLRAN
Date of Testing: 24/03/2017
Tested By: Sanjay Thakor
Approved By: Naresh Soni
1) Test Report of Capacitance & Tan δ Measurement

Factory Test Site Test Report


Descriptio Test Amb .Tem. U
Report(10 KV)
n Mode (°C) (kV)
%TanD
C (pF)
C (pF) %TanD (Amb. Tem.)
33 2 333.2 0.217
R Phase UST
33 10 333.2 0.219
33 2 337.9 0.254
Y Phase UST
33 10 337.9 0.254
33 2 338.2 0.246
B Phase UST
33 10 338.3 0.245

3
Page

Name of Substation: 66 KV 25 MW ASTRA


SOLRAN
Date of Testing: 24/03/2017
Tested By: Sanjay Thakor
Approved By: Naresh Soni
2) Polarity Test of CTs:

Core Between R Y B
Phase Phase Phase

1S1(+VE) 1S2(-VE) OK OK OK
Core-1 1S1(+VE) 1S3(-VE) OK OK OK
2S1(+VE) 2S2(-VE) OK OK OK
Core-2 2S1(+VE) 2S3(-VE) OK OK OK
3S1(+VE) 3S2(-VE) OK OK OK
Core-3 3S1(+VE) 3S3(-VE) OK OK OK

3) Secondary Winding Resistance Test of CTs:

Core Terminal R Y B
Phase Phase Phase
(Ω) (Ω) (Ω)
1S1-1S2 2.7 2.4 2.3
Core-1 1S1-1S3 4.9 5.0 4.8
2S1-2S2 2.9 2.7 2.9
Core-2 2S1-2S3 5.9 5.8 5.7
3S1-3S2 3.9 3.5 2.9
Core-3 3S1-3S3 7.7 7.7 7.8
4
Page

Name of Substation: 66 KV 25 MW ASTRA


SOLRAN
Date of Testing: 24/03/2017
Tested By: Sanjay Thakor
Approved By: Naresh Soni
4) Insulation Resistance Test of CTs:

Test Connection Test R Y B


Voltege. Phase (GΩ) Phase (GΩ) Phase(GΩ)
Pri to Earth 5 KV 372 251 254
Pri to Core-1 5 KV 235 270 231
Pri to Core-2 5 KV 438 306 282
Pri to Core-3 5 KV 463 356 262
Core-1 to Core-2 0.5 KV 3.59 5.50 3.82
Core-1 to Core-2 0.5 KV 3.17 2.87 2.97
Core-1 to Core-2 0.5 KV 3.90 3.69 3.43
Core-1 to Earth 0.5 KV 2.84 3.73 2.60
Core-2 to Earth 0.5 KV 2.12 2.96 2.23
Core-3 to Earth 0.5 KV 2.60 0.142 1.19
Tan Delta Point to 1 KV 6.54 7.06 5.86
Earth

5
Page

Name of Substation: 66 KV 25 MW ASTRA


SOLRAN
Date of Testing: 24/03/2017
Tested By: Sanjay Thakor
Approved By: Naresh Soni
5) Knee Point Voltage Test:
R Phase: (Knee Point Voltage:650 V )
Test Applied Measured Current in mAmp
Voltage Voltage (Volt) 3S1-3S3
0.25X KVP 162 3.52
0.50X KVP 325 5.25
0.75X KVP 490 6.82
1.00X KVP 650 8.44
1.10X KVP 715 9.22

Y Phase: (Knee Point Voltage:650 V )


Test Applied Measured Current in mAmp
Voltage Voltage (Volt) 3S1-3S3
0.25X KVP 162 3.93
0.50X KVP 325 5.62
0.75X KVP 490 7.02
1.00X KVP 650 8.69
1.10X KVP 715 9.55

B Phase: (Knee Point Voltage:650 V )


Test Applied Measured Current in mAmp
Voltage Voltage (Volt) 3S1-3S3
0.25X KVP 4.00 4.06
0.50X KVP 5.70 5.521
0.75X KVP 7.30 6.88
1.00X KVP 8.50 8.53
1.10X KVP 9.20 9.54 6
Page

Name of Substation: 66 KV 25 MW ASTRA


SOLRAN
Date of Testing: 24/03/2017
Tested By: Sanjay Thakor
Approved By: Naresh Soni
6) Current Ratio Test:
R Phase
Primary Current
ACTUAL Theoretical Measured
CORE Terminal % (Apply Current) Ratio(Amp.) Current(Amp.)
20 60 0.20 0.19
1S1-1S2 40 120 0.40 0.38
80 240 0.80 0.77
100 300 1.00 0.98
1
20 120 0.20 0.18
1S1-1S3 40 240 0.40 0.37
80 480 0.80 0.78
85 510 0.85 0.82
20 60 0.20 0.18
2S1-2S2 40 120 0.40 0.38
80 240 0.80 0.78
100 300 1.00 0.98
2
20 120 0.20 0.18
2S1-2S3 40 240 0.40 0.37
80 480 0.80 0.78
85 510 0.85 0.82
20 60 0.20 0.19
3S1-3S2 40 120 0.40 0.38
80 240 0.80 0.77
100 300 1.00 0.98
3
20 120 0.20 0.17
3S1-3S3 40 240 0.40 0.37
80 480 0.80 0.78
85 510 0.85 0.82
7
Page

Name of Substation: 66 KV 25 MW ASTRA


SOLRAN
Date of Testing: 24/03/2017
Tested By: Sanjay Thakor
Approved By: Naresh Soni
Y Phase
Primary Current
ACTUAL Theoretical Measured
CORE Terminal % (Apply Current) Ratio(Amp.) Current(Amp.)
20 60 0.20 0.19
1S1-1S2 40 120 0.40 0.38
80 240 0.80 0.78
100 300 1.00 0.98
1
20 120 0.20 0.18
1S1-1S3 40 240 0.40 0.38
80 480 0.80 0.78
85 510 0.85 0.82
20 60 0.20 0.18
2S1-2S2 40 120 0.40 0.38
80 240 0.80 0.78
100 300 1.00 0.98
2
20 120 0.20 0.18
2S1-2S3 40 240 0.40 0.38
80 480 0.80 0.77
85 510 0.85 0.82
20 60 0.20 0.19
3S1-3S2 40 120 0.40 0.38
80 240 0.80 0.78
100 300 1.00 0.98
3
20 120 0.20 0.18
3S1-3S3 40 240 0.40 0.38
80 480 0.80 0.77
85 510 0.85 0.82

8
Page

Name of Substation: 66 KV 25 MW ASTRA


SOLRAN
Date of Testing: 24/03/2017
Tested By: Sanjay Thakor
Approved By: Naresh Soni
B Phase
Primary Current
ACTUAL Theoretical Measured
CORE Terminal % (Apply Current) Ratio(Amp.) Current(Amp.)
20 60 0.20 0.19
1S1-1S2 40 120 0.40 0.38
80 240 0.80 0.78
100 300 1.00 0.98
1
20 120 0.20 0.18
1S1-1S3 40 240 0.40 0.38
80 480 0.80 0.78
85 510 0.85 0.81
20 60 0.20 0.18
2S1-2S2 40 120 0.40 0.37
80 240 0.80 0.78
100 300 1.00 0.98
2
20 120 0.20 0.18
2S1-2S3 40 240 0.40 0.39
80 480 0.80 0.78
85 510 0.85 0.81
20 60 0.20 0.18
3S1-3S2 40 120 0.40 0.37
80 240 0.80 0.78
100 300 1.00 0.98
3
20 120 0.20 0.18
3S1-3S3 40 240 0.40 0.39
80 480 0.80 0.78
85 510 0.85 0.82

9
Page

Name of Substation: 66 KV 25 MW ASTRA


SOLRAN
Date of Testing: 24/03/2017
Tested By: Sanjay Thakor
Approved By: Naresh Soni