YEAR 3
CT-323 ADVANCED QUANTITY SURVEYING
TOTAL CONTACT HOURS: 224 T P C
Theory: 32 1 6 3
Practical: 192
AIM:
To understand :
1. Estimation of multi-storied buildings, R. C. C. bridges, water tanks including bar
scheduling, etc
2. Estimation of building services and wells
3. Application of software in estimation (MS EXCEL, Eagle Point, Prima Vera)
COURSE CONTENTS
1 Estimation of Framed Structure Buildings.
1.1 Enlist different works for RCC Framed Structure Building.
1.2 Instructions on calculation of quantities of different items of work.
1.3 Instructions on preparation of quantity of structural steel work, beams and
columns of different shape (I, L, H, etc) and truss of 60’ span (60x100 shed)
1.4 Instructions on Preparation of Abstract of Cost & Bar Bending Schedule
6 Hours
2 Estimation of Bridge and Water Tanks
2.1 Enlist different items of work for RCC Over Head Deck Bridge and single span
masonry arch culvert.
2.2 Instructions on calculation of quantities of different items of work.
2.3 Instructions on preparation of Abstract of Cost.
2.4 Enlist different works for RCC Over Head and Under Ground Water (Circular)
2.5 Instructions on calculation of quantities of different items of work.
2.6 Estimation of single span plate girder steel bridge 40’ span
4 Hours
3 Methods of Execution of Works.
3.1 Departmental execution of works - daily labour, day work and piece work
3.2 Contract:-
3.2.1 Definitions-contract, tender.
3.2.2 Types of contracts-Lumpsum contract, item rate contract, cost plus fee
3 Hours