Mano de Obra
OFICIAL ALBAÑIL 18 OFICIAL ALBAÑIL 2018 (CNSM#1) JOR 0.02500 $510.96 $12.77
AYUDANTE GRAL 18 AYUDANTE GENERAL 2018 (1.10 VSMG) JOR 0.02500 $418.42 $10.46
Total de Mano de Obra $23.23
Herramienta
HE HERRAMIENTA MENOR (%)mo 0.03000 $23.23 $0.70
MI MANO INTERMEDIO (%)mo 0.10000 $23.23 $2.32
ES EQUIPO DE SEGURIDAD (%)mo 0.01000 $23.23 $0.23
Total de Herramienta $3.25
Mano de Obra
OFICIAL ALBAÑIL 18 OFICIAL ALBAÑIL 2018 (CNSM#1) JOR 0.02500 $510.96 $12.77
AYUDANTE GRAL 18 AYUDANTE GENERAL 2018 (1.10 VSMG) JOR 0.02500 $418.42 $10.46
PEON 18 PEON 2018 (1.0 VSMG) JOR 0.02500 $382.06 $9.55
Total de Mano de Obra $32.78
Herramienta
HE HERRAMIENTA MENOR (%)mo 0.03000 $32.78 $0.98
MI MANO INTERMEDIO (%)mo 0.10000 $32.78 $3.28
ES EQUIPO DE SEGURIDAD (%)mo 0.01000 $32.78 $0.33
Total de Herramienta $4.59
Mano de Obra
OFICIAL ALBAÑIL 18 OFICIAL ALBAÑIL 2018 (CNSM#1) JOR 0.06250 $510.96 $31.94
AYUDANTE GRAL 18 AYUDANTE GENERAL 2018 (1.10 VSMG) JOR 0.06250 $418.42 $26.15
Total de Mano de Obra $58.09
Herramienta
HE HERRAMIENTA MENOR (%)mo 0.03000 $58.09 $1.74
ES EQUIPO DE SEGURIDAD (%)mo 0.01000 $58.09 $0.58
MI MANO INTERMEDIO (%)mo 0.10000 $58.09 $5.81
Total de Herramienta $8.13
Mano de Obra
OFICIAL ALBAÑIL 18 OFICIAL ALBAÑIL 2018 (CNSM#1) JOR 0.25000 $510.96 $127.74
AYUDANTE GRAL 18 AYUDANTE GENERAL 2018 (1.10 VSMG) JOR 0.25000 $418.42 $104.61
PEON 18 PEON 2018 (1.0 VSMG) JOR 0.25000 $382.06 $95.52
Total de Mano de Obra $327.87
Herramienta
HE HERRAMIENTA MENOR (%)mo 0.03000 $327.87 $9.84
MI MANO INTERMEDIO (%)mo 0.10000 $327.87 $32.79
ES EQUIPO DE SEGURIDAD (%)mo 0.01000 $327.87 $3.28
Total de Herramienta $45.91
Equipo
H PULIDORA MAKITA PULIDORA DE MANO CON DISCO DE CORTE DE 4" PARA ACERO O hora 0.12500 $10.43 $1.30
CONCRETO
Total de Equipo $1.30
Mano de Obra
OFICIAL ALBAÑIL 18 OFICIAL ALBAÑIL 2018 (CNSM#1) JOR 0.05000 $510.96 $25.55
AYUDANTE GRAL 18 AYUDANTE GENERAL 2018 (1.10 VSMG) JOR 0.05000 $418.42 $20.92
Total de Mano de Obra $46.47
Herramienta
HE HERRAMIENTA MENOR (%)mo 0.03000 $46.47 $1.39
MI MANO INTERMEDIO (%)mo 0.10000 $46.47 $4.65
ES EQUIPO DE SEGURIDAD (%)mo 0.01000 $46.47 $0.46
Total de Herramienta $6.50
Auxiliares
+ PLANTILLA FC=100 PLANTILLA DE CONCRETO F'c= 100 Kg/cm2, TMA 19 mm TRITURADA, M3
HECHO EN OBRA, DE ESPESOR VARIABLE.
+ CONC.H.O.100-19 R.N. CONCRETO F'C=100 KG/CM2 GRAVA TRITURADA 3/4",R.N.REV.10+/-2 ( M3 1.00000 $1,346.07 $1,346.07
SOLO MATERIALES).
+ ELAB.CONC.REV.1 SACO ELABORACION DE CONCRETOS EN OBRA CON REVOLVEDORA DE 1 M3 1.00000 $58.52 $58.52
SACO
+ VAC.EXT.VIB.CONCRETO VACIADO, EXTENDIDO, VIBRADO Y ACOMODO DE CONCRETO HECHO M3 1.00000 $212.19 $212.19
EN OBRA Y PREMEZCLADO.
HE HERRAMIENTA MENOR (%)mo 0.03000 $0.00 $0.00
MI MANO INTERMEDIO (%)mo 0.10000 $0.00 $0.00
ES EQUIPO DE SEGURIDAD (%)mo 0.01000 $0.00 $0.00
Suma $1,616.78
Cantidad : 0.05000 Total $80.84
Total de Auxiliares $80.84
Auxiliares
+ EXC. A MANO TIPO B EXCAVACIÓN A MANO EN MATERIAL TIPO B DE 0.00 A 2.00 M DE M3
PROFUNDIDAD, INCLUYE: TRASPALEO VERTICAL, AFINE DE TALUDES
CONSERVACIÓN DE LA EXCAVACIÓN Y ACARREO DE MATERIAL AL
LUGAR DE ACOPIO PARA SU POSTERIOR CARGA Y ACARREO FUERA
DE LA OBRA.
PEON 18 PEON 2018 (1.0 VSMG) JOR 0.28571 $382.06 $109.16
+ ACA EN CARR A 20MTS ACARREOS INTERNOS EN CARRETILLA, HASTA LA 1RA ESTACIÓN A M3 1.00000 $12.45 $12.45
20 METROS DE DISTANCIA, INCLUYE CARGA MANUAL, ACARREO Y
VACIADO.
HE HERRAMIENTA MENOR (%)mo 0.03000 $109.16 $3.27
MI MANO INTERMEDIO (%)mo 0.10000 $109.16 $10.92
ES EQUIPO DE SEGURIDAD (%)mo 0.01000 $109.16 $1.09
Suma $136.89
Cantidad : 1.00000 Total $136.89
Total de Auxiliares $136.89
Auxiliares
+ DEM. PLANTILLA DEMOLICION DE PLANTILLA CON ROTOMARTILLO M2
OFICIAL ALBAÑIL 18 OFICIAL ALBAÑIL 2018 (CNSM#1) JOR 0.05000 $510.96 $25.55
AYUDANTE GRAL 18 AYUDANTE GENERAL 2018 (1.10 VSMG) JOR 0.05000 $418.42 $20.92
HE HERRAMIENTA MENOR (%)mo 0.03000 $46.47 $1.39
MI MANO INTERMEDIO (%)mo 0.10000 $46.47 $4.65
ES EQUIPO DE SEGURIDAD (%)mo 0.01000 $46.47 $0.46
H ROTOMARTILLO 18KG ROTOMARTILLO DE 18 KG hora 0.12500 $21.01 $2.63
Suma $55.60
Cantidad : 1.00000 Total $55.60
Total de Auxiliares $55.60
Auxiliares
+ DEM-CORTE AZULEJO DEMOLICIÓN, CORTE Y/O RETIRO MANUAL DE PIEZAS DE AZULEJO. ML
PEON 18 PEON 2018 (1.0 VSMG) JOR 0.05882 $382.06 $22.47
AYUDANTE GRAL 18 AYUDANTE GENERAL 2018 (1.10 VSMG) JOR 0.05882 $418.42 $24.61
HE HERRAMIENTA MENOR (%)mo 0.03000 $47.08 $1.41
MI MANO INTERMEDIO (%)mo 0.10000 $47.08 $4.71
ES EQUIPO DE SEGURIDAD (%)mo 0.01000 $47.08 $0.47
Suma $53.67
Cantidad : 1.00000 Total $53.67
Total de Auxiliares $53.67
Auxiliares
+ EXC. RETROEXC EXCAVACION CON RETRO EXCCAVADORA M3
PEON 18 PEON 2018 (1.0 VSMG) JOR 0.04000 $382.06 $15.28
H RETRO CARGADOR 18 RETROEXCAVADORA CON CARGADOR CAT-416-E, DE 74 H.P.,MOTOR HR 0.12500 $461.46 $57.68
DIESEL. CON OPERADOR PARA SU USO.
HE HERRAMIENTA MENOR (%)mo 0.03000 $15.28 $0.46
MI MANO INTERMEDIO (%)mo 0.10000 $15.28 $1.53
ES EQUIPO DE SEGURIDAD (%)mo 0.01000 $15.28 $0.15
Suma $75.10
Cantidad : 1.00000 Total $75.10
Total de Auxiliares $75.10
Auxiliares
+ EXC.CEPA II 0-2M. EXCAVACION EN MATERIAL TIPO "I I" C/MAQUINA DE 0.00 A 2.00 MTS. M3
EN SECO Y/O PRESENCIA DE AGUA INCLUYE: AFLOJE Y
EXTRACCIÓN DEL MATERIAL PRODUCTO DE LOS TRABAJOS DE
EXCAVACIÓN, AFINE, TRASPALEO VERTICAL, P/SU EXTRACCIÓN,
CONSERVACIÓN DE LA EXCAVACIÓN.
H RETRO CARGADOR 18 RETROEXCAVADORA CON CARGADOR CAT-416-E, DE 74 H.P.,MOTOR HR 0.04762 $461.46 $21.97
DIESEL. CON OPERADOR PARA SU USO.
+ ACA EN CARR A 20MTS ACARREOS INTERNOS EN CARRETILLA, HASTA LA 1RA ESTACIÓN A M3 1.00000 $12.45 $12.45
20 METROS DE DISTANCIA, INCLUYE CARGA MANUAL, ACARREO Y
VACIADO.
PEON 18 PEON 2018 (1.0 VSMG) JOR 0.02381 $382.06 $9.10
HE HERRAMIENTA MENOR (%)mo 0.03000 $9.10 $0.27
MI MANO INTERMEDIO (%)mo 0.10000 $9.10 $0.91
ES EQUIPO DE SEGURIDAD (%)mo 0.01000 $9.10 $0.09
Suma $44.79
Cantidad : 1.00000 Total $44.79
Total de Auxiliares $44.79
Mano de Obra
OFICIAL ALBAÑIL 18 OFICIAL ALBAÑIL 2018 (CNSM#1) JOR 0.09091 $510.96 $46.45
AYUDANTE GRAL 18 AYUDANTE GENERAL 2018 (1.10 VSMG) JOR 0.09091 $418.42 $38.04
Total de Mano de Obra $84.49
Herramienta
HE HERRAMIENTA MENOR (%)mo 0.03000 $84.49 $2.53
MI MANO INTERMEDIO (%)mo 0.10000 $84.49 $8.45
ES EQUIPO DE SEGURIDAD (%)mo 0.01000 $84.49 $0.84
Total de Herramienta $11.82
Auxiliares
+ RELL/COMP TEP AL 95% RELLENO Y COMPACTACIÓN AL 95% ( PRUEBA PROCTOR ) CON M3
MATERIAL DE BANCO ( TEPETATE ) EN ZANJA CENTRAL, SE DEBERÁ
DE CONSIDERAR LAS PRUEBAS DE LABORATORIO PARA SU
CORRECTA EJECUCIÓN, SE CONSIDERARÁ BAILARINA PARA LOGRAR
LA COMPACTACIÓN INDICADA, LAS CAPAS MÁXIMAS A COMPACTAR
SERÁN DE 0.20 MTS. DE ESPESOR Y MANO DE OBRA.
PEON 18 PEON 2018 (1.0 VSMG) JOR 0.14286 $382.06 $54.58
TEPETATE P.O. TEPETATE PUESTO EN OBRA M3 1.30000 $70.00 $91.00
+ ACA EN CARR A 20MTS ACARREOS INTERNOS EN CARRETILLA, HASTA LA 1RA ESTACIÓN A M3 1.30000 $12.45 $16.19
20 METROS DE DISTANCIA, INCLUYE CARGA MANUAL, ACARREO Y
VACIADO.
+ AGUA AGUA ACARREADA EN PIPA Y PUESTA EN EL LUGAR DE LOS M3 0.19000 $55.15 $10.48
TRABAJOS
H COMPAC BAILARINA 17 COMPACTADOR MANUAL TIPO BAILARINA CON MOTOR 8 H.P. CON HR 0.16667 $121.51 $20.25
OPERADOR PARA SU USO.
HE HERRAMIENTA MENOR (%)mo 0.03000 $54.58 $1.64
MI MANO INTERMEDIO (%)mo 0.10000 $54.58 $5.46
ES EQUIPO DE SEGURIDAD (%)mo 0.01000 $54.58 $0.55
Suma $200.15
Cantidad : 1.00000 Total $200.15
Total de Auxiliares $200.15