Cladire Birouri Ana Tower / Ana Tower Office Building

Grafic de lucrari / Time schedule

ID Task Name % Duration Start Finish 2019


Complete November December January February March April May June July August September October November
29/10
05/11
12/11
19/11
26/11
03/12
10/12
17/12
24/12
31/12
07/01
14/01
21/01
28/01
04/02
11/02
18/02
25/02
04/03
11/03
18/03
25/03
01/04
08/0415/04
22/04
29/04
06/05
13/05
20/05
27/05
03/06
10/06
17/06
24/06
01/07
08/07
15/07
22/07
29/07
05/08
12/08
19/08
26/08
02/09
09/09
16/09
23/09
30/09
07/10
14/10
21/10
28/10
04/11
11/11
18/11
1 Cladire Birouri Ana Tower / Office Building Ana Tower 7% 518 dys 19/02/2018 08/11/2019
2 Date Contractuale / Contractual Milestones 0% 518 dys 19/02/2018 08/11/2019
3 Semnare Contract / Signing of the contract 100% 0 dys 19/02/2018 19/02/2018
4 Ordin de incepere a lucrarilor / Commencement date 100% 0 dys 22/02/2018 22/02/2018
5 Predare amplasamanet / Handing over of the site 100% 0 dys 22/02/2018 22/02/2018
6 Confirmare Beneficiarului pentru executia tavanelor casetate si a pardoselii 0% 0 dys 01/01/2019 01/01/2019 01/01
supra-inaltate / Employer's confirmation for execution of coffered ceilings and
raised floor by 01.01.2019
7 Confirmare Beneficiarului pentru executia Lucrarilor din Anexa 3.1 / Employer's 0% 0 dys 28/02/2019 28/02/2019 28/02
confirmation for execution of the Works from Appendix 3.1 by 28.02.2019
8 Finalizare structura / Complete structure 0% 0 dys 02/05/2019 02/05/2019 02/05
9 Finalizarea lucrarilor / Completion date 0% 0 dys 08/11/2019 08/11/2019 08/11
10 Lucrari generale / General works 100% 1 dy 01/03/2018 01/03/2018
12 Organizare de santier / Site organization 2% 427 dys 05/03/2018 08/11/2019
13 Livrare si montare containere birouri / Delivery and mounting office containers 100% 8 dys 07/03/2018 16/03/2018
14 Podina acces / Acces platform 100% 5 dys 05/03/2018 09/03/2018
15 Mentenanta Orgaizare de santier / Site organisation maintenance 0% 256 dys 01/11/2018 08/11/2019
16 Ordine de Variatie / Variation Orders 0% 100 dys 04/02/2019 26/06/2019
17 Materiale de rezerva / Spare materials 0% 10 dys 21/10/2019 01/11/2019
18 Discount 3% / 3% Discount 0% 256 dys 01/11/2018 08/11/2019
19 Infrastructura / Infrastructure 100% 141.5 dys 28/02/2018 17/09/2018
337 Suprastructura / Suprastructure 19% 204.25 dys05/09/2018 16/05/2019
338 Parter / Ground floor 100% 21.25 dys 05/09/2018 24/09/2018
355 Etaj 1 / 1st Floor 100% 12.4 dys 20/09/2018 05/10/2018
372 Etaj 2 / 2nd Floor 100% 12.5 dys 29/09/2018 13/10/2018
389 Etaj 3 / 3rd Level 100% 14 dys 10/10/2018 25/10/2018
414 Etaj 4 / 4th Level 96% 12 dys 18/10/2018 01/11/2018
415 Plot 1 / Plot 1 100% 8.75 dys 18/10/2018 29/10/2018
423 Plot 2 / Plot 2 94% 9.5 dys 19/10/2018 31/10/2018
424 Armare Elemente verticale / Reinforcement Vertical elements 100% 3 dys 19/10/2018 23/10/2018
425 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
100% 3 dys 20/10/2018 23/10/2018
426 Cofrare grinzi si placa / Formwork beams and slab 100% 3 dys 22/10/2018 25/10/2018
427 Armare grinzi si placa / Reinforcement beams and slab 100% 4 dys 24/10/2018 27/10/2018
428 Introducere sistem posttensionare placa / Mounting Post-stressing system of100%
slab 2 dys 26/10/2018 27/10/2018
429 Betonare grinzi si placa / Casting beams and slab 100% 1 dy 29/10/2018 29/10/2018
430 Posttensionare placa / Post-stressing slab 0% 1 dy 30/10/2018 31/10/2018
431 Plot 3 / Plot 3 94% 8 dys 25/10/2018 01/11/2018
432 Armare Elemente verticale / Reinforcement Vertical elements 100% 3 dys 25/10/2018 27/10/2018
433 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
100% 3 dys 26/10/2018 29/10/2018
434 Cofrare grinzi si placa / Formwork beams and slab 100% 3 dys 27/10/2018 30/10/2018
435 Armare grinzi si placa / Reinforcement beams and slab 100% 3 dys 27/10/2018 30/10/2018
436 Introducere sistem posttensionare placa / Mounting Post-stressing system of100%
slab 2 dys 29/10/2018 30/10/2018
437 Betonare grinzi si placa / Casting beams and slab 100% 1 dy 30/10/2018 31/10/2018
438 Posttensionare placa / Post-stressing slab 0% 1 dy 01/11/2018 01/11/2018
439 Etaj 5 / 5th Level 9% 14 dys 27/10/2018 12/11/2018
440 Plot 1 / Plot 1 28% 12.75 dys 27/10/2018 08/11/2018
441 Armare Elemente verticale / Reinforcement Vertical elements 75% 3 dys 27/10/2018 01/11/2018
442 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
75% 3 dys 27/10/2018 02/11/2018
443 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 31/10/2018 03/11/2018
444 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 02/11/2018 05/11/2018
445 Introducere sistem posttensionare placa / Mounting Post-stressing system of0%slab 2 dys 03/11/2018 05/11/2018
446 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 05/11/2018 06/11/2018
447 Posttensionare placa / Post-stressing slab 0% 1 dy 07/11/2018 08/11/2018
448 Plot 2 / Plot 2 0% 10 dys 01/11/2018 09/11/2018
449 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 01/11/2018 03/11/2018
450 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 01/11/2018 05/11/2018
451 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 03/11/2018 06/11/2018
452 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 05/11/2018 07/11/2018
453 Introducere sistem posttensionare placa / Mounting Post-stressing system of0%slab 2 dys 06/11/2018 07/11/2018
454 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 07/11/2018 08/11/2018
455 Posttensionare placa / Post-stressing slab 0% 1 dy 09/11/2018 09/11/2018
456 Plot 3 / Plot 3 0% 11 dys 02/11/2018 12/11/2018
457 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 02/11/2018 05/11/2018
458 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 02/11/2018 06/11/2018
459 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 05/11/2018 07/11/2018
460 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 07/11/2018 09/11/2018
461 Introducere sistem posttensionare placa / Mounting Post-stressing system of0%slab 2 dys 07/11/2018 09/11/2018
462 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 09/11/2018 10/11/2018
463 Posttensionare placa / Post-stressing slab 0% 1 dy 12/11/2018 12/11/2018
464 Etaj 6 / 6th Level 0% 11.5 dys 07/11/2018 20/11/2018
465 Plot 1 / Plot 1 0% 10 dys 07/11/2018 16/11/2018
466 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 07/11/2018 09/11/2018
467 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 08/11/2018 10/11/2018
468 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 09/11/2018 12/11/2018
469 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 10/11/2018 13/11/2018
470 Introducere sistem posttensionare placa / Mounting Post-stressing system of0%slab 2 dys 12/11/2018 13/11/2018
471 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 14/11/2018 14/11/2018
472 Posttensionare placa / Post-stressing slab 0% 1 dy 15/11/2018 16/11/2018
473 Plot 2 / Plot 2 0% 10 dys 09/11/2018 19/11/2018
474 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 09/11/2018 12/11/2018
475 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 10/11/2018 13/11/2018
476 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 10/11/2018 14/11/2018
477 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 13/11/2018 15/11/2018
478 Introducere sistem posttensionare placa / Mounting Post-stressing system of0%slab 2 dys 14/11/2018 15/11/2018
479 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 15/11/2018 16/11/2018
480 Posttensionare placa / Post-stressing slab 0% 1 dy 17/11/2018 19/11/2018
481 Plot 3 / Plot 3 0% 10 dys 12/11/2018 20/11/2018
482 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 12/11/2018 14/11/2018
483 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 12/11/2018 15/11/2018
484 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 13/11/2018 15/11/2018
485 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 15/11/2018 17/11/2018
486 Introducere sistem posttensionare placa / Mounting Post-stressing system of0%slab 2 dys 16/11/2018 17/11/2018
487 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 17/11/2018 19/11/2018
488 Posttensionare placa / Post-stressing slab 0% 1 dy 20/11/2018 20/11/2018
489 Etaj 7 / 7th Level 0% 11.5 dys 15/11/2018 29/11/2018
490 Plot 1 / Plot 1 0% 10 dys 15/11/2018 24/11/2018
491 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 15/11/2018 17/11/2018
492 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 16/11/2018 19/11/2018
493 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 17/11/2018 20/11/2018
494 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 19/11/2018 22/11/2018
495 Introducere sistem posttensionare placa / Mounting Post-stressing system of0%slab 2 dys 20/11/2018 22/11/2018
496 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 22/11/2018 22/11/2018
497 Posttensionare placa / Post-stressing slab 0% 1 dy 23/11/2018 24/11/2018
498 Plot 2 / Plot 2 0% 10 dys 17/11/2018 27/11/2018
499 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 17/11/2018 20/11/2018
500 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 19/11/2018 21/11/2018
501 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 20/11/2018 22/11/2018
502 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 21/11/2018 23/11/2018
503 Introducere sistem posttensionare placa / Mounting Post-stressing system of0%slab 2 dys 22/11/2018 23/11/2018
504 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 24/11/2018 24/11/2018
505 Posttensionare placa / Post-stressing slab 0% 1 dy 26/11/2018 27/11/2018
506 Plot 3 / Plot 3 0% 10 dys 20/11/2018 29/11/2018
507 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 20/11/2018 22/11/2018
508 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 21/11/2018 23/11/2018
509 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 21/11/2018 24/11/2018
510 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 23/11/2018 26/11/2018
511 Introducere sistem posttensionare placa / Mounting Post-stressing system of0%slab 2 dys 24/11/2018 26/11/2018
512 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 26/11/2018 27/11/2018
513 Posttensionare placa / Post-stressing slab 0% 1 dy 28/11/2018 29/11/2018
514 Etaj 8 / 8th Level 0% 11.5 dys 23/11/2018 10/12/2018
515 Plot 1 / Plot 1 0% 10 dys 23/11/2018 05/12/2018
516 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 23/11/2018 27/11/2018
517 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 24/11/2018 27/11/2018
518 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 26/11/2018 28/11/2018
519 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 28/11/2018 03/12/2018
520 Introducere sistem posttensionare placa / Mounting Post-stressing system of0%slab 2 dys 28/11/2018 03/12/2018
521 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 03/12/2018 04/12/2018
522 Posttensionare placa / Post-stressing slab 0% 1 dy 05/12/2018 05/12/2018
523 Plot 2 / Plot 2 0% 10 dys 26/11/2018 07/12/2018
524 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 26/11/2018 28/11/2018

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline Manual Progress
Split External Tasks Inactive Summary Manual Summary Critical
Milestone External Milestone Manual Task Start-only Critical Split
Summary Inactive Task Duration-only Finish-only Progress

Data de referinta 31.10.2018


Cladire Birouri Ana Tower / Ana Tower Office Building
Grafic de lucrari / Time schedule

ID Task Name % Duration Start Finish 2019


Complete November December January February March April May June July August September October November
29/10
05/11
12/11
19/11
26/11
03/12
10/12
17/12
24/12
31/12
07/01
14/01
21/01
28/01
04/02
11/02
18/02
25/02
04/03
11/03
18/03
25/03
01/04
08/0415/04
22/04
29/04
06/05
13/05
20/05
27/05
03/06
10/06
17/06
24/06
01/07
08/07
15/07
22/07
29/07
05/08
12/08
19/08
26/08
02/09
09/09
16/09
23/09
30/09
07/10
14/10
21/10
28/10
04/11
11/11
18/11
525 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 27/11/2018 29/11/2018
526 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 28/11/2018 03/12/2018
527 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 29/11/2018 05/12/2018
528 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 03/12/2018 05/12/2018
529 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 05/12/2018 05/12/2018
530 Posttensionare placa / Post-stressing slab 0% 1 dy 06/12/2018 07/12/2018
531 Plot 3 / Plot 3 0% 10 dys 28/11/2018 10/12/2018
532 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 28/11/2018 03/12/2018
533 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 29/11/2018 04/12/2018
534 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 03/12/2018 05/12/2018
535 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 04/12/2018 06/12/2018
536 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 05/12/2018 06/12/2018
537 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 07/12/2018 07/12/2018
538 Posttensionare placa / Post-stressing slab 0% 1 dy 08/12/2018 10/12/2018
539 Etaj 9 / 9th Level 0% 11.75 dys 05/12/2018 18/12/2018
540 Plot 1 / Plot 1 0% 10 dys 05/12/2018 13/12/2018
541 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 05/12/2018 07/12/2018
542 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 05/12/2018 08/12/2018
543 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 06/12/2018 08/12/2018
544 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 08/12/2018 11/12/2018
545 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 10/12/2018 11/12/2018
546 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 11/12/2018 12/12/2018
547 Posttensionare placa / Post-stressing slab 0% 1 dy 13/12/2018 13/12/2018
548 Plot 2 / Plot 2 0% 10 dys 06/12/2018 15/12/2018
549 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 06/12/2018 10/12/2018
550 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 07/12/2018 10/12/2018
551 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 08/12/2018 11/12/2018
552 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 11/12/2018 13/12/2018
553 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 11/12/2018 13/12/2018
554 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 13/12/2018 14/12/2018
555 Posttensionare placa / Post-stressing slab 0% 1 dy 15/12/2018 15/12/2018
556 Plot 3 / Plot 3 0% 10 dys 08/12/2018 18/12/2018
557 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 08/12/2018 11/12/2018
558 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 10/12/2018 12/12/2018
559 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 11/12/2018 13/12/2018
560 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 12/12/2018 15/12/2018
561 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 13/12/2018 15/12/2018
562 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 15/12/2018 15/12/2018
563 Posttensionare placa / Post-stressing slab 0% 1 dy 17/12/2018 18/12/2018
564 Etaj 10 /10th Level 0% 11.75 dys 13/12/2018 04/01/2019
565 Plot 1 / Plot 1 0% 10 dys 13/12/2018 22/12/2018
566 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 13/12/2018 15/12/2018
567 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 14/12/2018 17/12/2018
568 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 14/12/2018 18/12/2018
569 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 17/12/2018 19/12/2018
570 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 18/12/2018 19/12/2018
571 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 19/12/2018 20/12/2018
572 Posttensionare placa / Post-stressing slab 0% 1 dy 21/12/2018 22/12/2018
573 Plot 2 / Plot 2 0% 10 dys 15/12/2018 24/12/2018
574 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 15/12/2018 18/12/2018
575 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 15/12/2018 19/12/2018
576 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 17/12/2018 19/12/2018
577 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 19/12/2018 21/12/2018
578 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 20/12/2018 21/12/2018
579 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 21/12/2018 22/12/2018
580 Posttensionare placa / Post-stressing slab 0% 1 dy 24/12/2018 24/12/2018
581 Plot 3 / Plot 3 0% 10 dys 17/12/2018 04/01/2019
582 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 17/12/2018 20/12/2018
583 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 18/12/2018 20/12/2018
584 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 19/12/2018 21/12/2018
585 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 21/12/2018 24/12/2018
586 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 21/12/2018 24/12/2018
587 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 24/12/2018 03/01/2019
588 Posttensionare placa / Post-stressing slab 0% 1 dy 04/01/2019 04/01/2019
589 Etaj 11 / 11th Level 0% 11.5 dys 21/12/2018 12/01/2019
590 Plot 1 / Plot 1 0% 10 dys 21/12/2018 09/01/2019
591 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 21/12/2018 24/12/2018
592 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 22/12/2018 03/01/2019
593 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 24/12/2018 04/01/2019
594 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 03/01/2019 05/01/2019
595 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 04/01/2019 05/01/2019
596 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 07/01/2019 07/01/2019
597 Posttensionare placa / Post-stressing slab 0% 1 dy 08/01/2019 09/01/2019
598 Plot 2 / Plot 2 0% 10 dys 24/12/2018 11/01/2019
599 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 24/12/2018 04/01/2019
600 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 03/01/2019 05/01/2019
601 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 03/01/2019 07/01/2019
602 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 05/01/2019 08/01/2019
603 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 07/01/2019 08/01/2019
604 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 08/01/2019 09/01/2019
605 Posttensionare placa / Post-stressing slab 0% 1 dy 10/01/2019 11/01/2019
606 Plot 3 / Plot 3 0% 10 dys 04/01/2019 12/01/2019
607 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 04/01/2019 07/01/2019
608 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 04/01/2019 08/01/2019
609 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 05/01/2019 08/01/2019
610 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 08/01/2019 10/01/2019
611 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 09/01/2019 10/01/2019
612 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 10/01/2019 11/01/2019
613 Posttensionare placa / Post-stressing slab 0% 1 dy 12/01/2019 12/01/2019
614 Etaj 12 / 12th Level 0% 11.5 dys 08/01/2019 22/01/2019
615 Plot 1 / Plot 1 0% 10 dys 08/01/2019 17/01/2019
616 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 08/01/2019 10/01/2019
617 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 09/01/2019 11/01/2019
618 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 10/01/2019 12/01/2019
619 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 11/01/2019 15/01/2019
620 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 12/01/2019 15/01/2019
621 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 15/01/2019 15/01/2019
622 Posttensionare placa / Post-stressing slab 0% 1 dy 16/01/2019 17/01/2019
623 Plot 2 / Plot 2 0% 10 dys 10/01/2019 19/01/2019
624 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 10/01/2019 12/01/2019
625 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 11/01/2019 14/01/2019
626 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 12/01/2019 15/01/2019
627 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 14/01/2019 16/01/2019
628 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 15/01/2019 16/01/2019
629 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 17/01/2019 17/01/2019
630 Posttensionare placa / Post-stressing slab 0% 1 dy 18/01/2019 19/01/2019
631 Plot 3 / Plot 3 0% 10 dys 12/01/2019 22/01/2019
632 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 12/01/2019 15/01/2019
633 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 14/01/2019 16/01/2019
634 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 14/01/2019 17/01/2019
635 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 16/01/2019 18/01/2019
636 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 17/01/2019 18/01/2019
637 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 18/01/2019 19/01/2019
638 Posttensionare placa / Post-stressing slab 0% 1 dy 21/01/2019 22/01/2019
639 Etaj 13 /13th Level 0% 11.5 dys 16/01/2019 31/01/2019
640 Plot 1 / Plot 1 0% 10 dys 16/01/2019 26/01/2019
641 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 16/01/2019 19/01/2019
642 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 17/01/2019 19/01/2019
643 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 18/01/2019 21/01/2019
644 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 21/01/2019 23/01/2019
645 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 21/01/2019 23/01/2019
646 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 23/01/2019 25/01/2019
647 Posttensionare placa / Post-stressing slab 0% 1 dy 26/01/2019 26/01/2019
648 Plot 2 / Plot 2 0% 10 dys 18/01/2019 29/01/2019
649 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 18/01/2019 21/01/2019
650 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 19/01/2019 22/01/2019
651 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 21/01/2019 23/01/2019
652 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 22/01/2019 26/01/2019
653 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 23/01/2019 26/01/2019
654 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 26/01/2019 26/01/2019

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline Manual Progress
Split External Tasks Inactive Summary Manual Summary Critical
Milestone External Milestone Manual Task Start-only Critical Split
Summary Inactive Task Duration-only Finish-only Progress

Data de referinta 31.10.2018


Cladire Birouri Ana Tower / Ana Tower Office Building
Grafic de lucrari / Time schedule

ID Task Name % Duration Start Finish 2019


Complete November December January February March April May June July August September October November
29/10
05/11
12/11
19/11
26/11
03/12
10/12
17/12
24/12
31/12
07/01
14/01
21/01
28/01
04/02
11/02
18/02
25/02
04/03
11/03
18/03
25/03
01/04
08/0415/04
22/04
29/04
06/05
13/05
20/05
27/05
03/06
10/06
17/06
24/06
01/07
08/07
15/07
22/07
29/07
05/08
12/08
19/08
26/08
02/09
09/09
16/09
23/09
30/09
07/10
14/10
21/10
28/10
04/11
11/11
18/11
655 Posttensionare placa / Post-stressing slab 0% 1 dy 28/01/2019 29/01/2019
656 Plot 3 / Plot 3 0% 10 dys 21/01/2019 31/01/2019
657 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 21/01/2019 23/01/2019
658 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 22/01/2019 25/01/2019
659 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 23/01/2019 26/01/2019
660 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 25/01/2019 28/01/2019
661 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 26/01/2019 28/01/2019
662 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 29/01/2019 29/01/2019
663 Posttensionare placa / Post-stressing slab 0% 1 dy 30/01/2019 31/01/2019
664 Etaj 14 / 14th Level 0% 11.75 dys 26/01/2019 08/02/2019
665 Plot 1 / Plot 1 0% 10 dys 26/01/2019 04/02/2019
666 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 26/01/2019 29/01/2019
667 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 26/01/2019 30/01/2019
668 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 28/01/2019 30/01/2019
669 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 30/01/2019 01/02/2019
670 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 31/01/2019 01/02/2019
671 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 01/02/2019 02/02/2019
672 Posttensionare placa / Post-stressing slab 0% 1 dy 04/02/2019 04/02/2019
673 Plot 2 / Plot 2 0% 9 dys 28/01/2019 05/02/2019
674 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 28/01/2019 31/01/2019
675 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 29/01/2019 31/01/2019
676 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 30/01/2019 01/02/2019
677 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 31/01/2019 02/02/2019
678 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 01/02/2019 02/02/2019
679 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 02/02/2019 04/02/2019
680 Posttensionare placa / Post-stressing slab 0% 1 dy 05/02/2019 05/02/2019
681 Plot 3 / Plot 3 0% 10 dys 30/01/2019 08/02/2019
682 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 30/01/2019 01/02/2019
683 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 31/01/2019 02/02/2019
684 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 01/02/2019 04/02/2019
685 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 02/02/2019 06/02/2019
686 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 04/02/2019 06/02/2019
687 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 06/02/2019 06/02/2019
688 Posttensionare placa / Post-stressing slab 0% 1 dy 07/02/2019 08/02/2019
689 Etaj 15 / 15th Level 0% 11.75 dys 04/02/2019 16/02/2019
690 Plot 1 / Plot 1 0% 10 dys 04/02/2019 13/02/2019
691 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 04/02/2019 06/02/2019
692 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 05/02/2019 07/02/2019
693 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 05/02/2019 08/02/2019
694 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 07/02/2019 09/02/2019
695 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 08/02/2019 09/02/2019
696 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 09/02/2019 11/02/2019
697 Posttensionare placa / Post-stressing slab 0% 1 dy 12/02/2019 13/02/2019
698 Plot 2 / Plot 2 0% 10 dys 05/02/2019 14/02/2019
699 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 05/02/2019 07/02/2019
700 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 06/02/2019 08/02/2019
701 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 06/02/2019 09/02/2019
702 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 08/02/2019 11/02/2019
703 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 09/02/2019 11/02/2019
704 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 11/02/2019 12/02/2019
705 Posttensionare placa / Post-stressing slab 0% 1 dy 13/02/2019 14/02/2019
706 Plot 3 / Plot 3 0% 10 dys 07/02/2019 16/02/2019
707 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 07/02/2019 11/02/2019
708 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 08/02/2019 11/02/2019
709 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 09/02/2019 12/02/2019
710 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 12/02/2019 14/02/2019
711 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 12/02/2019 14/02/2019
712 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 14/02/2019 15/02/2019
713 Posttensionare placa / Post-stressing slab 0% 1 dy 16/02/2019 16/02/2019
714 Etaj 16 / 16th Level 0% 11.5 dys 12/02/2019 25/02/2019
715 Plot 1 / Plot 1 0% 10 dys 12/02/2019 21/02/2019
716 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 12/02/2019 14/02/2019
717 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 13/02/2019 15/02/2019
718 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 14/02/2019 16/02/2019
719 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 15/02/2019 18/02/2019
720 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 16/02/2019 18/02/2019
721 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 19/02/2019 19/02/2019
722 Posttensionare placa / Post-stressing slab 0% 1 dy 20/02/2019 21/02/2019
723 Plot 2 / Plot 2 0% 10 dys 13/02/2019 22/02/2019
724 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 13/02/2019 15/02/2019
725 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 14/02/2019 16/02/2019
726 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 15/02/2019 18/02/2019
727 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 16/02/2019 19/02/2019
728 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 18/02/2019 19/02/2019
729 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 20/02/2019 20/02/2019
730 Posttensionare placa / Post-stressing slab 0% 1 dy 21/02/2019 22/02/2019
731 Plot 3 / Plot 3 0% 10 dys 16/02/2019 25/02/2019
732 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 16/02/2019 19/02/2019
733 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 16/02/2019 20/02/2019
734 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 18/02/2019 20/02/2019
735 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 20/02/2019 22/02/2019
736 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 21/02/2019 22/02/2019
737 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 22/02/2019 23/02/2019
738 Posttensionare placa / Post-stressing slab 0% 1 dy 25/02/2019 25/02/2019
739 Etaj 17 / 17th Level 0% 11.5 dys 20/02/2019 06/03/2019
740 Plot 1 / Plot 1 0% 10 dys 20/02/2019 01/03/2019
741 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 20/02/2019 22/02/2019
742 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 21/02/2019 23/02/2019
743 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 22/02/2019 25/02/2019
744 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 23/02/2019 27/02/2019
745 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 25/02/2019 27/02/2019
746 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 27/02/2019 27/02/2019
747 Posttensionare placa / Post-stressing slab 0% 1 dy 28/02/2019 01/03/2019
748 Plot 2 / Plot 2 0% 10 dys 21/02/2019 02/03/2019
749 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 21/02/2019 23/02/2019
750 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 22/02/2019 25/02/2019
751 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 23/02/2019 26/02/2019
752 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 25/02/2019 28/02/2019
753 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 26/02/2019 28/02/2019
754 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 28/02/2019 28/02/2019
755 Posttensionare placa / Post-stressing slab 0% 1 dy 01/03/2019 02/03/2019
756 Plot 3 / Plot 3 0% 10 dys 25/02/2019 06/03/2019
757 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 25/02/2019 27/02/2019
758 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 26/02/2019 28/02/2019
759 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 26/02/2019 01/03/2019
760 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 28/02/2019 02/03/2019
761 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 01/03/2019 02/03/2019
762 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 02/03/2019 04/03/2019
763 Posttensionare placa / Post-stressing slab 0% 1 dy 05/03/2019 06/03/2019
764 Etaj 18 / 18th Level 0% 11.5 dys 28/02/2019 14/03/2019
765 Plot 1 / Plot 1 0% 10 dys 28/02/2019 09/03/2019
766 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 28/02/2019 04/03/2019
767 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 01/03/2019 04/03/2019
768 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 02/03/2019 05/03/2019
769 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 05/03/2019 07/03/2019
770 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 05/03/2019 07/03/2019
771 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 07/03/2019 08/03/2019
772 Posttensionare placa / Post-stressing slab 0% 1 dy 09/03/2019 09/03/2019
773 Plot 2 / Plot 2 0% 10 dys 01/03/2019 11/03/2019
774 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 01/03/2019 05/03/2019
775 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 02/03/2019 05/03/2019
776 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 04/03/2019 06/03/2019
777 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 06/03/2019 08/03/2019
778 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 06/03/2019 08/03/2019
779 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 08/03/2019 09/03/2019
780 Posttensionare placa / Post-stressing slab 0% 1 dy 11/03/2019 11/03/2019
781 Plot 3 / Plot 3 0% 10 dys 05/03/2019 14/03/2019
782 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 05/03/2019 07/03/2019
783 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 06/03/2019 08/03/2019
784 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 07/03/2019 09/03/2019

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline Manual Progress
Split External Tasks Inactive Summary Manual Summary Critical
Milestone External Milestone Manual Task Start-only Critical Split
Summary Inactive Task Duration-only Finish-only Progress

Data de referinta 31.10.2018


Cladire Birouri Ana Tower / Ana Tower Office Building
Grafic de lucrari / Time schedule

ID Task Name % Duration Start Finish 2019


Complete November December January February March April May June July August September October November
29/10
05/11
12/11
19/11
26/11
03/12
10/12
17/12
24/12
31/12
07/01
14/01
21/01
28/01
04/02
11/02
18/02
25/02
04/03
11/03
18/03
25/03
01/04
08/0415/04
22/04
29/04
06/05
13/05
20/05
27/05
03/06
10/06
17/06
24/06
01/07
08/07
15/07
22/07
29/07
05/08
12/08
19/08
26/08
02/09
09/09
16/09
23/09
30/09
07/10
14/10
21/10
28/10
04/11
11/11
18/11
785 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 08/03/2019 11/03/2019
786 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 09/03/2019 11/03/2019
787 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 12/03/2019 12/03/2019
788 Posttensionare placa / Post-stressing slab 0% 1 dy 13/03/2019 14/03/2019
789 Etaj 19 / 19th Level 0% 11.75 dys 09/03/2019 22/03/2019
790 Plot 1 / Plot 1 0% 10 dys 09/03/2019 18/03/2019
791 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 09/03/2019 12/03/2019
792 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 09/03/2019 13/03/2019
793 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 11/03/2019 13/03/2019
794 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 13/03/2019 15/03/2019
795 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 14/03/2019 15/03/2019
796 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 15/03/2019 16/03/2019
797 Posttensionare placa / Post-stressing slab 0% 1 dy 18/03/2019 18/03/2019
798 Plot 2 / Plot 2 0% 10 dys 11/03/2019 19/03/2019
799 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 11/03/2019 13/03/2019
800 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 11/03/2019 14/03/2019
801 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 12/03/2019 14/03/2019
802 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 14/03/2019 16/03/2019
803 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 15/03/2019 16/03/2019
804 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 16/03/2019 18/03/2019
805 Posttensionare placa / Post-stressing slab 0% 1 dy 19/03/2019 19/03/2019
806 Plot 3 / Plot 3 0% 10 dys 13/03/2019 22/03/2019
807 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 13/03/2019 15/03/2019
808 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 14/03/2019 16/03/2019
809 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 15/03/2019 18/03/2019
810 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 16/03/2019 20/03/2019
811 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 18/03/2019 20/03/2019
812 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 20/03/2019 20/03/2019
813 Posttensionare placa / Post-stressing slab 0% 1 dy 21/03/2019 22/03/2019
814 Etaj 20 / 20th Level 0% 11.75 dys 18/03/2019 30/03/2019
815 Plot 1 / Plot 1 0% 10 dys 18/03/2019 27/03/2019
816 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 18/03/2019 20/03/2019
817 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 19/03/2019 21/03/2019
818 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 19/03/2019 22/03/2019
819 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 21/03/2019 23/03/2019
820 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 22/03/2019 23/03/2019
821 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 23/03/2019 25/03/2019
822 Posttensionare placa / Post-stressing slab 0% 1 dy 26/03/2019 27/03/2019
823 Plot 2 / Plot 2 0% 10 dys 19/03/2019 28/03/2019
824 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 19/03/2019 21/03/2019
825 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 20/03/2019 22/03/2019
826 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 20/03/2019 23/03/2019
827 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 22/03/2019 25/03/2019
828 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 23/03/2019 25/03/2019
829 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 25/03/2019 26/03/2019
830 Posttensionare placa / Post-stressing slab 0% 1 dy 27/03/2019 28/03/2019
831 Plot 3 / Plot 3 0% 10 dys 21/03/2019 30/03/2019
832 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 21/03/2019 25/03/2019
833 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 22/03/2019 25/03/2019
834 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 23/03/2019 26/03/2019
835 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 26/03/2019 28/03/2019
836 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 26/03/2019 28/03/2019
837 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 28/03/2019 29/03/2019
838 Posttensionare placa / Post-stressing slab 0% 1 dy 30/03/2019 30/03/2019
839 Etaj 21 / 21th Level 0% 11.5 dys 26/03/2019 08/04/2019
840 Plot 1 / Plot 1 0% 10 dys 26/03/2019 04/04/2019
841 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 26/03/2019 28/03/2019
842 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 27/03/2019 29/03/2019
843 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 28/03/2019 30/03/2019
844 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 29/03/2019 01/04/2019
845 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 30/03/2019 01/04/2019
846 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 02/04/2019 02/04/2019
847 Posttensionare placa / Post-stressing slab 0% 1 dy 03/04/2019 04/04/2019
848 Plot 2 / Plot 2 0% 10 dys 27/03/2019 05/04/2019
849 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 27/03/2019 29/03/2019
850 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 28/03/2019 30/03/2019
851 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 29/03/2019 01/04/2019
852 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 30/03/2019 02/04/2019
853 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 01/04/2019 02/04/2019
854 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 03/04/2019 03/04/2019
855 Posttensionare placa / Post-stressing slab 0% 1 dy 04/04/2019 05/04/2019
856 Plot 3 / Plot 3 0% 10 dys 30/03/2019 08/04/2019
857 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 30/03/2019 02/04/2019
858 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 30/03/2019 03/04/2019
859 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 01/04/2019 03/04/2019
860 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 03/04/2019 05/04/2019
861 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 04/04/2019 05/04/2019
862 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 05/04/2019 06/04/2019
863 Posttensionare placa / Post-stressing slab 0% 1 dy 08/04/2019 08/04/2019
864 Etaj 22 /22th Level 0% 11.5 dys 03/04/2019 17/04/2019
865 Plot 1 / Plot 1 0% 10 dys 03/04/2019 12/04/2019
866 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 03/04/2019 05/04/2019
867 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 04/04/2019 06/04/2019
868 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 05/04/2019 08/04/2019
869 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 06/04/2019 10/04/2019
870 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 08/04/2019 10/04/2019
871 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 10/04/2019 10/04/2019
872 Posttensionare placa / Post-stressing slab 0% 1 dy 11/04/2019 12/04/2019
873 Plot 2 / Plot 2 0% 10 dys 04/04/2019 13/04/2019
874 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 04/04/2019 06/04/2019
875 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 05/04/2019 08/04/2019
876 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 06/04/2019 09/04/2019
877 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 08/04/2019 11/04/2019
878 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 09/04/2019 11/04/2019
879 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 11/04/2019 11/04/2019
880 Posttensionare placa / Post-stressing slab 0% 1 dy 12/04/2019 13/04/2019
881 Plot 3 / Plot 3 0% 10 dys 08/04/2019 17/04/2019
882 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 08/04/2019 10/04/2019
883 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 09/04/2019 11/04/2019
884 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 09/04/2019 12/04/2019
885 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 11/04/2019 13/04/2019
886 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 12/04/2019 13/04/2019
887 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 13/04/2019 15/04/2019
888 Posttensionare placa / Post-stressing slab 0% 1 dy 16/04/2019 17/04/2019
889 Etaj 23 / 23th Level 0% 10.75 dys 11/04/2019 24/04/2019
890 Plot 1 / Plot 1 0% 10 dys 11/04/2019 20/04/2019
891 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 11/04/2019 15/04/2019
892 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 12/04/2019 15/04/2019
893 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 13/04/2019 16/04/2019
894 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 16/04/2019 18/04/2019
895 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 16/04/2019 18/04/2019
896 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 18/04/2019 19/04/2019
897 Posttensionare placa / Post-stressing slab 0% 1 dy 20/04/2019 20/04/2019
898 Plot 2 / Plot 2 0% 10 dys 12/04/2019 22/04/2019
899 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 12/04/2019 16/04/2019
900 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 13/04/2019 16/04/2019
901 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 15/04/2019 17/04/2019
902 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 17/04/2019 19/04/2019
903 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 17/04/2019 19/04/2019
904 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 19/04/2019 20/04/2019
905 Posttensionare placa / Post-stressing slab 0% 1 dy 22/04/2019 22/04/2019
906 Plot 3 / Plot 3 0% 9 dys 16/04/2019 24/04/2019
907 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 16/04/2019 18/04/2019
908 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 17/04/2019 19/04/2019
909 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 18/04/2019 20/04/2019
910 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 18/04/2019 22/04/2019
911 Introducere sistem posttensionare placa / Mounting Post-stressing system of
0%slab 2 dys 19/04/2019 22/04/2019
912 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 22/04/2019 22/04/2019
913 Posttensionare placa / Post-stressing slab 0% 1 dy 23/04/2019 24/04/2019
914 Etaj 24 / 24th Level 0% 10.75 dys 19/04/2019 03/05/2019

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline Manual Progress
Split External Tasks Inactive Summary Manual Summary Critical
Milestone External Milestone Manual Task Start-only Critical Split
Summary Inactive Task Duration-only Finish-only Progress

Data de referinta 31.10.2018


Cladire Birouri Ana Tower / Ana Tower Office Building
Grafic de lucrari / Time schedule

ID Task Name % Duration Start Finish 2019


Complete November December January February March April May June July August September October November
29/10
05/11
12/11
19/11
26/11
03/12
10/12
17/12
24/12
31/12
07/01
14/01
21/01
28/01
04/02
11/02
18/02
25/02
04/03
11/03
18/03
25/03
01/04
08/0415/04
22/04
29/04
06/05
13/05
20/05
27/05
03/06
10/06
17/06
24/06
01/07
08/07
15/07
22/07
29/07
05/08
12/08
19/08
26/08
02/09
09/09
16/09
23/09
30/09
07/10
14/10
21/10
28/10
04/11
11/11
18/11
915 Plot 1 / Plot 1 0% 10 dys 19/04/2019 30/04/2019
916 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 19/04/2019 22/04/2019
917 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 20/04/2019 23/04/2019
918 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 20/04/2019 24/04/2019
919 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 23/04/2019 25/04/2019
920 Introducere sistem posttensionare placa / Mounting Post-stressing system of 0%slab 2 dys 24/04/2019 25/04/2019
921 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 25/04/2019 26/04/2019
922 Posttensionare placa / Post-stressing slab 0% 1 dy 27/04/2019 30/04/2019
923 Plot 2 / Plot 2 0% 10 dys 22/04/2019 02/05/2019
924 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 22/04/2019 24/04/2019
925 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 23/04/2019 25/04/2019
926 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 24/04/2019 26/04/2019
927 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 25/04/2019 27/04/2019
928 Introducere sistem posttensionare placa / Mounting Post-stressing system of 0%slab 2 dys 26/04/2019 27/04/2019
929 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 27/04/2019 30/04/2019
930 Posttensionare placa / Post-stressing slab 0% 1 dy 02/05/2019 02/05/2019
931 Plot 3 / Plot 3 0% 9 dys 23/04/2019 03/05/2019
932 Armare Elemente verticale / Reinforcement Vertical elements 0% 3 dys 23/04/2019 26/04/2019
933 Cofrare si betonare Elemente verticale / Formwork and casting Vertical elements
0% 3 dys 24/04/2019 26/04/2019
934 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 25/04/2019 27/04/2019
935 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 26/04/2019 30/04/2019
936 Introducere sistem posttensionare placa / Mounting Post-stressing system of 0%slab 2 dys 27/04/2019 30/04/2019
937 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 30/04/2019 02/05/2019
938 Posttensionare placa / Post-stressing slab 0% 1 dy 03/05/2019 03/05/2019
939 Etaj tehnic / Technical floor 0% 11.25 dys 03/05/2019 16/05/2019
940 Elemente verticale / Vertical elements 0% 6 dys 03/05/2019 08/05/2019
941 Armare elemente verticale / Reinforcement vertical elements 0% 4 dys 03/05/2019 07/05/2019
942 Cofrare elemente verticale / Formwork vertical elements 0% 4 dys 03/05/2019 07/05/2019
943 Betonare elemente verticale / Casting vertical elements 0% 2 dys 07/05/2019 08/05/2019
944 Placa peste etaj tehnic / Slab over technical floor 0% 8 dys 08/05/2019 16/05/2019
945 Cofrare grinzi si placa / Formwork beams and slab 0% 3 dys 08/05/2019 11/05/2019
946 Armare grinzi si placa / Reinforcement beams and slab 0% 3 dys 10/05/2019 13/05/2019
947 Introducere sistem posttensionare placa / Mounting Post-stressing system of 0%slab 2 dys 11/05/2019 13/05/2019
948 Betonare grinzi si placa / Casting beams and slab 0% 1 dy 13/05/2019 14/05/2019
949 Posttensionare placa / Post-stressing slab 0% 1 dy 15/05/2019 16/05/2019
950 Fatade si terase / Roofing and Façades 0% 243 dys 08/10/2018 26/09/2019
951 Terasa peste etaj 24 inclusiv testare / Roofing over 24 th floor including testing0% 40 dys 06/05/2019 01/07/2019
952 Hidroizolatie (inclusiv testare) / Waterproofing (including tests) 0% 8 dys 06/05/2019 15/05/2019
953 Termoizolatie / Thermoinsulation 0% 12 dys 16/05/2019 31/05/2019
954 Finisaje terasa / Roofing finishes 0% 20 dys 03/06/2019 01/07/2019
955 Terasa peste etaj tehnic inclusiv testare / Roofing over technical floor 0% 41 dys 24/05/2019 22/07/2019
including testing
956 Hidroizolatie (inclusiv testare) / Waterproofing (including tests) 0% 6 dys 24/05/2019 31/05/2019
957 Termoizolatie / Thermoinsulation 0% 10 dys 03/06/2019 14/06/2019
958 Finisaje terasa / Roofing finishes 0% 15 dys 02/07/2019 22/07/2019
959 Fatade / Façades 0% 243 dys 08/10/2018 26/09/2019
960 Concept Proiect / Concept design 0% 7 dys 08/10/2018 16/10/2018
961 Aprobare materiale / Material approval 0% 15 dys 17/10/2018 06/11/2018
962 Mostre , Aprobare mostre / Mock-up and testing 0% 63 dys 07/11/2018 13/02/2019
963 Proiectare mostre / Mock-up design 0% 5 dys 07/11/2018 13/11/2018
964 Mostre materiale / Mock-up materials 0% 27 dys 07/12/2018 23/01/2019
965 Mostre aluminiu / Mock-up aluminium 0% 17 dys 07/12/2018 09/01/2019
966 Mostre sticla / Mock-up glass 0% 22 dys 07/12/2018 16/01/2019
967 Mostre Bond / Mock-up cladding sheet 0% 18 dys 07/12/2018 10/01/2019
968 Productie mostre / Mock-up production 0% 5 dys 17/01/2019 23/01/2019
969 Testare mostre / Mock-up testing 0% 14 dys 25/01/2019 13/02/2019
970 Proiectare / Design 0% 102 dys 14/11/2018 16/04/2019
971 Parti scrise / Written part 0% 38 dys 14/11/2018 15/01/2019
972 Subsol / Basement 0% 15 dys 14/11/2018 04/12/2018
973 Parter / Ground floor 0% 14 dys 05/12/2018 24/12/2018
974 Etaj 1 / 1st floor 0% 9 dys 03/01/2019 15/01/2019
975 Etajele 2-8 / 2nd - 8th floor 0% 14 dys 16/01/2019 05/02/2019
976 Etaj 9 / 9th Floor 0% 10 dys 06/02/2019 19/02/2019
977 Etaj 10 / 10th Floor 0% 10 dys 20/02/2019 05/03/2019
978 Etajele 11-23 / 11th - 23th floor 0% 15 dys 06/03/2019 26/03/2019
979 Etaj 24 / 24th Floor 0% 15 dys 27/03/2019 16/04/2019
980 Aprovizionare materiale / Material supply 0% 165 dys 15/11/2018 18/07/2019
981 Aluminiu /Aluminium 0% 150 dys 15/11/2018 27/06/2019
982 Subsol / Basement level 0% 5 dys 15/11/2018 21/11/2018
983 Parter / Ground floor Level 0% 5 dys 22/11/2018 28/11/2018
984 Etaj 1 / 1st Level 0% 5 dys 29/11/2018 05/12/2018
985 Etaj 2 / 2nd Level 0% 29 dys 06/12/2018 25/01/2019
986 Etaje 3 - Etaj 12 / 3rd Level - 12th Level 0% 50 dys 25/01/2019 04/04/2019
987 Etaje 13 - Etaj 24 /13th Level - 24th Level 0% 57 dys 05/04/2019 27/06/2019
988 Glass /Sticla 0% 150 dys 06/12/2018 18/07/2019
989 Subsol / Basement level 0% 5 dys 06/12/2018 12/12/2018
990 Parter / Ground floor Level 0% 5 dys 13/12/2018 19/12/2018
991 Etaj 1 / 1st Level 0% 5 dys 20/12/2018 04/01/2019
992 Etaj 2 / 2nd Level 0% 5 dys 25/01/2019 31/01/2019
993 Etaje 3 - Etaj 12 / 3rd Level - 12th Level 0% 55 dys 01/02/2019 18/04/2019
994 Etaje 13 - Etaj 24 /13th Level - 24th Level 0% 62 dys 19/04/2019 18/07/2019
995 Bond / Cladding sheets 0% 155 dys 22/11/2018 11/07/2019
996 Subsol / Basement level 0% 5 dys 22/11/2018 28/11/2018
997 Parter / Ground floor Level 0% 5 dys 29/11/2018 05/12/2018
998 Etaj 1 / 1st Level 0% 5 dys 06/12/2018 12/12/2018
999 Etaj 2 / 2nd Level 0% 5 dys 25/01/2019 31/01/2019
1000 Etaje 3 - Etaj 12 / 3rd Level - 12th Level 0% 55 dys 01/02/2019 18/04/2019
1001 Etaje 13 - Etaj 24 /13th Level - 24th Level 0% 62 dys 12/04/2019 11/07/2019
1002 Productie / Production 0% 156 dys 22/11/2018 12/07/2019
1003 Subsol / Basement level 0% 5 dys 22/11/2018 28/11/2018
1004 Parter / Ground floor Level 0% 5 dys 29/11/2018 05/12/2018
1005 Etaj 1 / 1st Level 0% 5 dys 06/12/2018 12/12/2018
1006 Etaj 2 / 2nd Level 0% 7 dys 01/02/2019 11/02/2019
1007 Etaje 3 - Etaj 12 / 3rd Level - 12th Level 0% 68 dys 12/02/2019 20/05/2019
1008 Etaje 13 - Etaj 24 /13th Level - 24th Level 0% 54 dys 25/04/2019 12/07/2019
1009 Montare fatade / Installation façade (watertight) 0% 205 dys 29/11/2018 26/09/2019
1010 Subsol / Basement level 0% 20 dys 29/11/2018 04/01/2019
1011 Parter / Ground floor Level 0% 18 dys 04/01/2019 30/01/2019
1012 Etaj 1 / 1st Level 0% 15 dys 31/01/2019 20/02/2019
1013 Etaj 2 / 2nd Level 0% 15 dys 12/02/2019 04/03/2019
1014 Etaje 3 - Etaj 12 / 3rd Level - 12th Level 0% 71 dys 21/02/2019 03/06/2019
1015 Etaje 13 - Etaj 24 /13th Level - 24th Level 0% 74 dys 08/05/2019 20/08/2019
1016 Atic / Attic 0% 7 dys 18/09/2019 26/09/2019
1017 Finisaje-Lucrari de Arhitectura / Finishes-Architectural Works 0% 202 dys 19/11/2018 11/09/2019
1018 Subsoluri / Basements 0% 152 dys 19/11/2018 29/05/2019
1019 Subsol 3 / Basement 3 0% 91 dys 19/11/2018 16/03/2019
1020 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, GK)0% 20 dys 19/11/2018 13/12/2018
1021 Tencuieli / Plastering 0% 25 dys 27/11/2018 05/01/2019
1022 Finisaje pereti / Walls finishing 0% 25 dys 11/12/2018 17/01/2019
1023 Confectii metalice / Metallic structures 0% 10 dys 18/01/2019 30/01/2019
1024 Montare usi / Door sheets mounting 0% 5 dys 11/02/2019 15/02/2019
1025 Vopsitorie pereti / Walls painting 0% 10 dys 16/02/2019 27/02/2019
1026 Finisaje pardoseli / Floor Finishings 0% 15 dys 28/02/2019 16/03/2019
1027 Subsol 2 / Basement 2 0% 102 dys 14/12/2018 22/04/2019
1028 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, GK)0% 20 dys 14/12/2018 15/01/2019
1029 Tencuieli / Plastering 0% 25 dys 07/01/2019 05/02/2019
1030 Finisaje pereti / Walls finishing 0% 25 dys 18/01/2019 16/02/2019
1031 Confectii metalice / Metallic structures 0% 15 dys 18/02/2019 06/03/2019
1032 Montare usi / Door sheets mounting 0% 5 dys 07/03/2019 12/03/2019
1033 Vopsitorie pereti / Walls painting 0% 10 dys 13/03/2019 23/03/2019
1034 Finisaje toalete- vestiare / Wet area Finishes 0% 15 dys 19/03/2019 04/04/2019
1035 Finisaje pardoseli / Floor Finishings 0% 15 dys 05/04/2019 22/04/2019
1036 Subsol 1 / .Basement 1 0% 112 dys 16/01/2019 29/05/2019
1037 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, GK)0% 20 dys 16/01/2019 08/02/2019
1038 Tencuieli / Plastering 0% 25 dys 06/02/2019 06/03/2019
1039 Finisaje pereti / Walls finishing 0% 25 dys 18/02/2019 18/03/2019
1040 Confectii metalice / Metallic structures 0% 15 dys 19/03/2019 04/04/2019
1041 Montare usi / Door sheets mounting 0% 5 dys 05/04/2019 10/04/2019
1042 Vopsitorie pereti / Walls painting 0% 10 dys 11/04/2019 22/04/2019
1043 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 15 dys 17/04/2019 06/05/2019

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline Manual Progress
Split External Tasks Inactive Summary Manual Summary Critical
Milestone External Milestone Manual Task Start-only Critical Split
Summary Inactive Task Duration-only Finish-only Progress

Data de referinta 31.10.2018


Cladire Birouri Ana Tower / Ana Tower Office Building
Grafic de lucrari / Time schedule

ID Task Name % Duration Start Finish 2019


Complete November December January February March April May June July August September October November
29/10
05/11
12/11
19/11
26/11
03/12
10/12
17/12
24/12
31/12
07/01
14/01
21/01
28/01
04/02
11/02
18/02
25/02
04/03
11/03
18/03
25/03
01/04
08/0415/04
22/04
29/04
06/05
13/05
20/05
27/05
03/06
10/06
17/06
24/06
01/07
08/07
15/07
22/07
29/07
05/08
12/08
19/08
26/08
02/09
09/09
16/09
23/09
30/09
07/10
14/10
21/10
28/10
04/11
11/11
18/11
1044 Finisaje toalete- vestiare / Wet area Finishes 0% 15 dys 23/04/2019 11/05/2019
1045 Finisaje pardoseli / Floor Finishings 0% 15 dys 13/05/2019 29/05/2019
1046 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 28.02.2019
0% 10 dys 18/05/2019 29/05/2019
1047 Suprastructura / Suprastructure 0% 194 dys 22/01/2019 11/09/2019
1048 Parter / Ground Floor 0% 64 dys 28/06/2019 11/09/2019
1049 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, GK)0% 10 dys 28/06/2019 09/07/2019
1050 Tencuieli / Plastering 0% 20 dys 04/07/2019 26/07/2019
1051 Finisaje pereti / Walls finishing 0% 15 dys 19/07/2019 05/08/2019
1052 Montare usi / Door sheets mounting 0% 4 dys 05/08/2019 08/08/2019
1053 Vopsitorie pereti / Walls painting 0% 10 dys 09/08/2019 21/08/2019
1054 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 16/08/2019 29/08/2019
1055 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 23/08/2019 03/09/2019
1056 Finisaje pardoseli / Floor Finishings 0% 7 dys 04/09/2019 11/09/2019
1057 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 04/09/2019 11/09/2019
28.02.2019
1058 Etaj 1 / 1st Floor 0% 98 dys 22/01/2019 18/05/2019
1059 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, GK)0% 10 dys 22/01/2019 02/02/2019
1060 Tencuieli / Plastering 0% 15 dys 29/01/2019 14/02/2019
1061 Finisaje pereti / Walls finishing 0% 15 dys 09/02/2019 26/02/2019
1062 Montare usi / Door sheets mounting 0% 4 dys 10/04/2019 13/04/2019
1063 Vopsitorie pereti / Walls painting 0% 10 dys 15/04/2019 25/04/2019
1064 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 20/04/2019 06/05/2019
1065 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 27/04/2019 10/05/2019
1066 Finisaje pardoseli / Floor Finishings 0% 7 dys 11/05/2019 18/05/2019
1067 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 11/05/2019 18/05/2019
28.02.2019
1068 Etaj 2 / 2nd Floor 0% 96 dys 29/01/2019 22/05/2019
1069 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, GK)0% 10 dys 29/01/2019 08/02/2019
1070 Tencuieli / Plastering 0% 15 dys 04/02/2019 20/02/2019
1071 Finisaje pereti / Walls finishing 0% 15 dys 13/02/2019 01/03/2019
1072 Montare usi / Door sheets mounting 0% 4 dys 13/04/2019 17/04/2019
1073 Vopsitorie pereti / Walls painting 0% 10 dys 18/04/2019 30/04/2019
1074 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 24/04/2019 09/05/2019
1075 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 03/05/2019 14/05/2019
1076 Finisaje pardoseli / Floor Finishings 0% 7 dys 15/05/2019 22/05/2019
1077 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 15/05/2019 22/05/2019
28.02.2019
1078 Etaj 3 / 3rd Floor 0% 94 dys 04/02/2019 25/05/2019
1079 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, GK)0% 10 dys 04/02/2019 14/02/2019
1080 Tencuieli / Plastering 0% 15 dys 09/02/2019 26/02/2019
1081 Finisaje pereti / Walls finishing 0% 15 dys 19/02/2019 07/03/2019
1082 Montare usi / Door sheets mounting 0% 4 dys 17/04/2019 20/04/2019
1083 Vopsitorie pereti / Walls painting 0% 10 dys 22/04/2019 04/05/2019
1084 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 27/04/2019 13/05/2019
1085 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 07/05/2019 17/05/2019
1086 Finisaje pardoseli / Floor Finishings 0% 7 dys 18/05/2019 25/05/2019
1087 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 18/05/2019 25/05/2019
28.02.2019
1088 Etaj 4 / 4th Floor 0% 91 dys 11/02/2019 29/05/2019
1089 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, 0% 10 dys 11/02/2019 21/02/2019
GK)
1090 Tencuieli / Plastering 0% 15 dys 16/02/2019 05/03/2019
1091 Finisaje pereti / Walls finishing 0% 15 dys 26/02/2019 14/03/2019
1092 Montare usi / Door sheets mounting 0% 4 dys 20/04/2019 24/04/2019
1093 Vopsitorie pereti / Walls painting 0% 10 dys 25/04/2019 08/05/2019
1094 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 03/05/2019 16/05/2019
1095 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 10/05/2019 21/05/2019
1096 Finisaje pardoseli / Floor Finishings 0% 7 dys 22/05/2019 29/05/2019
1097 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 22/05/2019 29/05/2019
28.02.2019
1098 Etaj 5 / 5th Floor 0% 90 dys 15/02/2019 03/06/2019
1099 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, 0% 10 dys 15/02/2019 26/02/2019
GK)
1100 Tencuieli / Plastering 0% 15 dys 21/02/2019 09/03/2019
1101 Finisaje pereti / Walls finishing 0% 15 dys 02/03/2019 19/03/2019
1102 Montare usi / Door sheets mounting 0% 4 dys 24/04/2019 27/04/2019
1103 Vopsitorie pereti / Walls painting 0% 10 dys 30/04/2019 11/05/2019
1104 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 07/05/2019 20/05/2019
1105 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 14/05/2019 24/05/2019
1106 Finisaje pardoseli / Floor Finishings 0% 7 dys 25/05/2019 03/06/2019
1107 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 25/05/2019 03/06/2019
28.02.2019
1108 Etaj 6 / 6th Floor 0% 89 dys 21/02/2019 07/06/2019
1109 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, GK)0% 10 dys 21/02/2019 04/03/2019
1110 Tencuieli / Plastering 0% 15 dys 27/02/2019 15/03/2019
1111 Finisaje pereti / Walls finishing 0% 15 dys 08/03/2019 25/03/2019
1112 Montare usi / Door sheets mounting 0% 4 dys 30/04/2019 04/05/2019
1113 Vopsitorie pereti / Walls painting 0% 10 dys 06/05/2019 16/05/2019
1114 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 11/05/2019 24/05/2019
1115 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 18/05/2019 29/05/2019
1116 Finisaje pardoseli / Floor Finishings 0% 7 dys 30/05/2019 07/06/2019
1117 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 30/05/2019 07/06/2019
28.02.2019
1118 Etaj 7 / 7th Floor 0% 88 dys 27/02/2019 12/06/2019
1119 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, GK)0% 10 dys 27/02/2019 09/03/2019
1120 Tencuieli / Plastering 0% 15 dys 05/03/2019 21/03/2019
1121 Finisaje pereti / Walls finishing 0% 15 dys 14/03/2019 30/03/2019
1122 Montare usi / Door sheets mounting 0% 4 dys 06/05/2019 09/05/2019
1123 Vopsitorie pereti / Walls painting 0% 10 dys 10/05/2019 21/05/2019
1124 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 16/05/2019 29/05/2019
1125 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 23/05/2019 04/06/2019
1126 Finisaje pardoseli / Floor Finishings 0% 7 dys 05/06/2019 12/06/2019
1127 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 05/06/2019 12/06/2019
28.02.2019
1128 Etaj 8 / 8th Floor 0% 87 dys 05/03/2019 18/06/2019
1129 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, 0% 10 dys 05/03/2019 15/03/2019
GK)
1130 Tencuieli / Plastering 0% 15 dys 11/03/2019 27/03/2019
1131 Finisaje pereti / Walls finishing 0% 15 dys 20/03/2019 05/04/2019
1132 Montare usi / Door sheets mounting 0% 4 dys 10/05/2019 14/05/2019
1133 Vopsitorie pereti / Walls painting 0% 10 dys 15/05/2019 25/05/2019
1134 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 21/05/2019 04/06/2019
1135 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 28/05/2019 08/06/2019
1136 Finisaje pardoseli / Floor Finishings 0% 7 dys 10/06/2019 18/06/2019
1137 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 10/06/2019 18/06/2019
28.02.2019
1138 Etaj 9 / 9th Floor 0% 86 dys 11/03/2019 22/06/2019
1139 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, 0% 10 dys 11/03/2019 21/03/2019
GK)
1140 Tencuieli / Plastering 0% 15 dys 16/03/2019 02/04/2019
1141 Finisaje pereti / Walls finishing 0% 15 dys 26/03/2019 11/04/2019
1142 Montare usi / Door sheets mounting 0% 4 dys 15/05/2019 18/05/2019
1143 Vopsitorie pereti / Walls painting 0% 10 dys 20/05/2019 30/05/2019
1144 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 25/05/2019 08/06/2019
1145 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 03/06/2019 13/06/2019
1146 Finisaje pardoseli / Floor Finishings 0% 7 dys 14/06/2019 22/06/2019
1147 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 14/06/2019 22/06/2019
28.02.2019
1148 Etaj 10 / 10th Floor 0% 84 dys 18/03/2019 27/06/2019
1149 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, 0% 10 dys 18/03/2019 28/03/2019
GK)
1150 Tencuieli / Plastering 0% 15 dys 23/03/2019 09/04/2019
1151 Finisaje pereti / Walls finishing 0% 15 dys 02/04/2019 18/04/2019
1152 Montare usi / Door sheets mounting 0% 4 dys 20/05/2019 23/05/2019
1153 Vopsitorie pereti / Walls painting 0% 10 dys 24/05/2019 05/06/2019
1154 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 30/05/2019 13/06/2019
1155 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 07/06/2019 19/06/2019
1156 Finisaje pardoseli / Floor Finishings 0% 7 dys 20/06/2019 27/06/2019
1157 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 20/06/2019 27/06/2019
28.02.2019
1158 Etaj 11 / 11th Floor 0% 84 dys 22/03/2019 02/07/2019

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline Manual Progress
Split External Tasks Inactive Summary Manual Summary Critical
Milestone External Milestone Manual Task Start-only Critical Split
Summary Inactive Task Duration-only Finish-only Progress

Data de referinta 31.10.2018


Cladire Birouri Ana Tower / Ana Tower Office Building
Grafic de lucrari / Time schedule

ID Task Name % Duration Start Finish 2019


Complete November December January February March April May June July August September October November
29/10
05/11
12/11
19/11
26/11
03/12
10/12
17/12
24/12
31/12
07/01
14/01
21/01
28/01
04/02
11/02
18/02
25/02
04/03
11/03
18/03
25/03
01/04
08/0415/04
22/04
29/04
06/05
13/05
20/05
27/05
03/06
10/06
17/06
24/06
01/07
08/07
15/07
22/07
29/07
05/08
12/08
19/08
26/08
02/09
09/09
16/09
23/09
30/09
07/10
14/10
21/10
28/10
04/11
11/11
18/11
1159 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, GK)0% 10 dys 22/03/2019 02/04/2019
1160 Tencuieli / Plastering 0% 15 dys 28/03/2019 13/04/2019
1161 Finisaje pereti / Walls finishing 0% 15 dys 06/04/2019 23/04/2019
1162 Montare usi / Door sheets mounting 0% 4 dys 24/05/2019 28/05/2019
1163 Vopsitorie pereti / Walls painting 0% 10 dys 29/05/2019 10/06/2019
1164 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 05/06/2019 19/06/2019
1165 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 12/06/2019 24/06/2019
1166 Finisaje pardoseli / Floor Finishings 0% 7 dys 25/06/2019 02/07/2019
1167 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 25/06/2019 02/07/2019
28.02.2019
1168 Etaj 12 / 12th Floor 0% 83 dys 28/03/2019 06/07/2019
1169 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, 0% 10 dys 28/03/2019 08/04/2019
GK)
1170 Tencuieli / Plastering 0% 15 dys 03/04/2019 19/04/2019
1171 Finisaje pereti / Walls finishing 0% 15 dys 12/04/2019 30/04/2019
1172 Montare usi / Door sheets mounting 0% 4 dys 29/05/2019 03/06/2019
1173 Vopsitorie pereti / Walls painting 0% 10 dys 04/06/2019 14/06/2019
1174 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 10/06/2019 24/06/2019
1175 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 18/06/2019 28/06/2019
1176 Finisaje pardoseli / Floor Finishings 0% 7 dys 29/06/2019 06/07/2019
1177 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 29/06/2019 06/07/2019
28.02.2019
1178 Etaj 13 / 13th Floor 0% 82 dys 03/04/2019 11/07/2019
1179 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, 0% 10 dys 03/04/2019 13/04/2019
GK)
1180 Tencuieli / Plastering 0% 15 dys 09/04/2019 25/04/2019
1181 Finisaje pereti / Walls finishing 0% 15 dys 18/04/2019 07/05/2019
1182 Montare usi / Door sheets mounting 0% 4 dys 04/06/2019 07/06/2019
1183 Vopsitorie pereti / Walls painting 0% 10 dys 08/06/2019 20/06/2019
1184 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 14/06/2019 28/06/2019
1185 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 22/06/2019 03/07/2019
1186 Finisaje pardoseli / Floor Finishings 0% 7 dys 04/07/2019 11/07/2019
1187 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 04/07/2019 11/07/2019
28.02.2019
1188 Etaj 14 / 14th Floor 0% 80 dys 09/04/2019 15/07/2019
1189 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, 0% 10 dys 09/04/2019 19/04/2019
GK)
1190 Tencuieli / Plastering 0% 15 dys 15/04/2019 03/05/2019
1191 Finisaje pereti / Walls finishing 0% 15 dys 24/04/2019 13/05/2019
1192 Montare usi / Door sheets mounting 0% 4 dys 08/06/2019 12/06/2019
1193 Vopsitorie pereti / Walls painting 0% 10 dys 13/06/2019 25/06/2019
1194 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 20/06/2019 03/07/2019
1195 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 26/06/2019 06/07/2019
1196 Finisaje pardoseli / Floor Finishings 0% 7 dys 08/07/2019 15/07/2019
1197 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 08/07/2019 15/07/2019
28.02.2019
1198 Etaj 15 / 15th Floor 0% 80 dys 15/04/2019 20/07/2019
1199 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, 0% 10 dys 15/04/2019 25/04/2019
GK)
1200 Tencuieli / Plastering 0% 15 dys 20/04/2019 09/05/2019
1201 Finisaje pereti / Walls finishing 0% 15 dys 02/05/2019 18/05/2019
1202 Montare usi / Door sheets mounting 0% 4 dys 13/06/2019 18/06/2019
1203 Vopsitorie pereti / Walls painting 0% 10 dys 19/06/2019 29/06/2019
1204 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 25/06/2019 08/07/2019
1205 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 02/07/2019 12/07/2019
1206 Finisaje pardoseli / Floor Finishings 0% 7 dys 13/07/2019 20/07/2019
1207 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 13/07/2019 20/07/2019
28.02.2019
1208 Etaj 16 / 16th Floor 0% 78 dys 22/04/2019 25/07/2019
1209 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, GK)0% 10 dys 22/04/2019 04/05/2019
1210 Tencuieli / Plastering 0% 15 dys 27/04/2019 16/05/2019
1211 Finisaje pereti / Walls finishing 0% 15 dys 09/05/2019 25/05/2019
1212 Montare usi / Door sheets mounting 0% 4 dys 19/06/2019 22/06/2019
1213 Vopsitorie pereti / Walls painting 0% 10 dys 24/06/2019 04/07/2019
1214 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 29/06/2019 12/07/2019
1215 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 06/07/2019 17/07/2019
1216 Finisaje pardoseli / Floor Finishings 0% 7 dys 18/07/2019 25/07/2019
1217 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 18/07/2019 25/07/2019
28.02.2019
1218 Etaj 17 / 17th Floor 0% 77 dys 26/04/2019 29/07/2019
1219 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, GK)0% 10 dys 26/04/2019 09/05/2019
1220 Tencuieli / Plastering 0% 15 dys 04/05/2019 21/05/2019
1221 Finisaje pereti / Walls finishing 0% 15 dys 14/05/2019 30/05/2019
1222 Montare usi / Door sheets mounting 0% 4 dys 24/06/2019 27/06/2019
1223 Vopsitorie pereti / Walls painting 0% 10 dys 28/06/2019 09/07/2019
1224 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 04/07/2019 17/07/2019
1225 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 10/07/2019 20/07/2019
1226 Finisaje pardoseli / Floor Finishings 0% 7 dys 22/07/2019 29/07/2019
1227 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 22/07/2019 29/07/2019
28.02.2019
1228 Etaj 18 / 18th Floor 0% 76 dys 06/05/2019 03/08/2019
1229 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, GK)0% 10 dys 06/05/2019 16/05/2019
1230 Tencuieli / Plastering 0% 15 dys 11/05/2019 28/05/2019
1231 Finisaje pereti / Walls finishing 0% 15 dys 21/05/2019 07/06/2019
1232 Montare usi / Door sheets mounting 0% 4 dys 28/06/2019 02/07/2019
1233 Vopsitorie pereti / Walls painting 0% 10 dys 03/07/2019 13/07/2019
1234 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 09/07/2019 22/07/2019
1235 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 16/07/2019 26/07/2019
1236 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 27/07/2019 03/08/2019
28.02.2019
1237 Finisaje pardoseli-nucleu / Floor Finishings -core 0% 7 dys 27/07/2019 03/08/2019
1238 Etaj 19 / 19th Floor 0% 76 dys 10/05/2019 08/08/2019
1239 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, 0% 10 dys 10/05/2019 21/05/2019
GK)
1240 Tencuieli / Plastering 0% 15 dys 16/05/2019 03/06/2019
1241 Finisaje pereti / Walls finishing 0% 15 dys 25/05/2019 12/06/2019
1242 Montare usi / Door sheets mounting 0% 4 dys 03/07/2019 06/07/2019
1243 Vopsitorie pereti / Walls painting 0% 10 dys 08/07/2019 18/07/2019
1244 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 13/07/2019 26/07/2019
1245 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 20/07/2019 31/07/2019
1246 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 01/08/2019 08/08/2019
28.02.2019
1247 Finisaje pardoseli-nucleu / Floor Finishings -core 0% 7 dys 01/08/2019 08/08/2019
1248 Etaj 20 / 20th Floor 0% 75 dys 16/05/2019 13/08/2019
1249 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, 0% 10 dys 16/05/2019 27/05/2019
GK)
1250 Tencuieli / Plastering 0% 15 dys 22/05/2019 08/06/2019
1251 Finisaje pereti / Walls finishing 0% 15 dys 31/05/2019 19/06/2019
1252 Montare usi / Door sheets mounting 0% 4 dys 08/07/2019 11/07/2019
1253 Vopsitorie pereti / Walls painting 0% 10 dys 12/07/2019 23/07/2019
1254 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 18/07/2019 31/07/2019
1255 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 25/07/2019 05/08/2019
1256 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 06/08/2019 13/08/2019
28.02.2019
1257 Finisaje pardoseli-nucleu / Floor Finishings -core 0% 7 dys 06/08/2019 13/08/2019
1258 Etaj 21 / 21th Floor 0% 74 dys 22/05/2019 19/08/2019
1259 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, 0% 10 dys 22/05/2019 03/06/2019
GK)
1260 Tencuieli / Plastering 0% 15 dys 28/05/2019 14/06/2019
1261 Finisaje pereti / Walls finishing 0% 15 dys 07/06/2019 25/06/2019
1262 Montare usi / Door sheets mounting 0% 4 dys 12/07/2019 16/07/2019
1263 Vopsitorie pereti / Walls painting 0% 10 dys 17/07/2019 27/07/2019
1264 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 23/07/2019 05/08/2019
1265 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 30/07/2019 09/08/2019
1266 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 10/08/2019 19/08/2019
28.02.2019
1267 Finisaje pardoseli-nucleu / Floor Finishings -core 0% 7 dys 10/08/2019 19/08/2019
1268 Etaj 22 / 22th Floor 0% 73 dys 28/05/2019 23/08/2019
1269 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, 0% 10 dys 28/05/2019 08/06/2019
GK)
1270 Tencuieli / Plastering 0% 15 dys 04/06/2019 21/06/2019

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline Manual Progress
Split External Tasks Inactive Summary Manual Summary Critical
Milestone External Milestone Manual Task Start-only Critical Split
Summary Inactive Task Duration-only Finish-only Progress

Data de referinta 31.10.2018


Cladire Birouri Ana Tower / Ana Tower Office Building
Grafic de lucrari / Time schedule

ID Task Name % Duration Start Finish 2019


Complete November December January February March April May June July August September October November
29/10
05/11
12/11
19/11
26/11
03/12
10/12
17/12
24/12
31/12
07/01
14/01
21/01
28/01
04/02
11/02
18/02
25/02
04/03
11/03
18/03
25/03
01/04
08/0415/04
22/04
29/04
06/05
13/05
20/05
27/05
03/06
10/06
17/06
24/06
01/07
08/07
15/07
22/07
29/07
05/08
12/08
19/08
26/08
02/09
09/09
16/09
23/09
30/09
07/10
14/10
21/10
28/10
04/11
11/11
18/11
1271 Finisaje pereti / Walls finishing 0% 15 dys 13/06/2019 01/07/2019
1272 Montare usi / Door sheets mounting 0% 4 dys 17/07/2019 20/07/2019
1273 Vopsitorie pereti / Walls painting 0% 10 dys 22/07/2019 01/08/2019
1274 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 27/07/2019 09/08/2019
1275 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 03/08/2019 14/08/2019
1276 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 16/08/2019 23/08/2019
28.02.2019
1277 Finisaje pardoseli-nucleu / Floor Finishings -core 0% 7 dys 16/08/2019 23/08/2019
1278 Etaj 23 / 23th Floor 0% 72 dys 04/06/2019 28/08/2019
1279 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, 0% 10 dys 04/06/2019 14/06/2019
GK)
1280 Tencuieli / Plastering 0% 15 dys 10/06/2019 27/06/2019
1281 Finisaje pereti / Walls finishing 0% 15 dys 20/06/2019 06/07/2019
1282 Montare usi / Door sheets mounting 0% 4 dys 22/07/2019 25/07/2019
1283 Vopsitorie pereti / Walls painting 0% 10 dys 26/07/2019 06/08/2019
1284 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 01/08/2019 14/08/2019
1285 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 08/08/2019 20/08/2019
1286 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 21/08/2019 28/08/2019
28.02.2019
1287 Finisaje pardoseli-nucleu / Floor Finishings -core 0% 7 dys 21/08/2019 28/08/2019
1288 Etaj 24 / 24th Floor 0% 71 dys 10/06/2019 02/09/2019
1289 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, 0% 10 dys 10/06/2019 21/06/2019
GK)
1290 Tencuieli / Plastering 0% 15 dys 15/06/2019 03/07/2019
1291 Finisaje pereti / Walls finishing 0% 15 dys 26/06/2019 12/07/2019
1292 Montare usi / Door sheets mounting 0% 4 dys 26/07/2019 30/07/2019
1293 Vopsitorie pereti / Walls painting 0% 10 dys 31/07/2019 10/08/2019
1294 Tavane / Ceilings-Subject for Employer's confirmation by 31.12.2018 0% 12 dys 06/08/2019 20/08/2019
1295 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 13/08/2019 24/08/2019
1296 Pardoseala flotanta/Raised floor-Subject for Employer's confirmation by 0% 7 dys 26/08/2019 02/09/2019
28.02.2019
1297 Finisaje pardoseli-nucleu / Floor Finishings -core 0% 7 dys 26/08/2019 02/09/2019
1298 Etaj tehnic si terasa / Technical floor and terace 0% 66 dys 13/06/2019 30/08/2019
1299 Compartimentari interioare ( zidarie, GK) / Internal partitions (Masonry, GK)0% 10 dys 13/06/2019 25/06/2019
1300 Tencuieli / Plastering 0% 15 dys 20/06/2019 06/07/2019
1301 Finisaje pereti, tavane / Walls and ceilings finishing 0% 15 dys 29/06/2019 16/07/2019

1302 Montare usi / Door sheets mounting 0% 4 dys 31/07/2019 03/08/2019


1303 Vopsitorie pereti / Walls painting 0% 10 dys 05/08/2019 16/08/2019
1304 Finisaje toalete- vestiare / Wet area Finishes 0% 10 dys 10/08/2019 22/08/2019
1305 Finisaje pardoseli-nucleu / Floor Finishings -core 0% 7 dys 23/08/2019 30/08/2019
1306 Lucrari de Instalatii/MEP Works 0% 408 dys 14/05/2018 23/09/2019
1307 Risers 0% 150 dys 16/01/2019 15/07/2019
1308 Ductwork 0% 100 dys 16/01/2019 15/05/2019
1309 HVAC Piping 0% 100 dys 16/01/2019 15/05/2019
1310 Natural gas Piping 0% 100 dys 16/01/2019 15/05/2019
1311 Water supply 0% 80 dys 29/01/2019 03/05/2019
1312 Sewage 0% 70 dys 29/01/2019 19/04/2019
1313 Rain water drainage 0% 70 dys 29/01/2019 19/04/2019
1314 Cable trays 0% 100 dys 09/02/2019 08/06/2019
1315 LV and ELV cabling 0% 100 dys 16/03/2019 15/07/2019
1316 Basement 3 10% 209 dys 14/05/2018 28/01/2019
1317 HVAC 0% 27 dys 19/11/2018 21/12/2018
1318 Piping distribution, including insulation, valves and accessories 0% 15 dys 19/11/2018 07/12/2018
1319 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 19/11/2018 13/12/2018
1320 Equipment 0% 15 dys 03/12/2018 19/12/2018
1321 Last fix: grilles 0% 7 dys 14/12/2018 21/12/2018
1322 Sanitary and fire fighting 21% 194 dys 14/05/2018 09/01/2019
1323 Piping in the raft foundation 100% 15 dys 14/05/2018 04/06/2018
1324 Water and sewage piping distribution, including valves and accessories 0% 15 dys 24/11/2018 13/12/2018
1325 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 24/11/2018 19/12/2018
1326 Last fix: sprinkler heads, hydrant boxes, sanitary fixtures and floor drains0% 20 dys 08/12/2018 09/01/2019
1327 Low Voltage 18% 209 dys 14/05/2018 28/01/2019
1328 Grounding 100% 15 dys 14/05/2018 04/06/2018
1329 Cable trays and empty tubes 0% 20 dys 03/12/2018 03/01/2019
1330 Electrical pannels, electrical equipment and connections 0% 20 dys 14/12/2018 15/01/2019
1331 0% 15 dys 04/01/2019 21/01/2019
1332 Last fix: lighting fixtures and motion detectors 0% 15 dys 10/01/2019 28/01/2019
1333 Extra low voltage (Low currents) and BMS 0% 40 dys 03/12/2018 28/01/2019
1334 Cable trays and empty tubes 0% 20 dys 03/12/2018 03/01/2019
1335 Cabling 0% 20 dys 14/12/2018 15/01/2019
1336 Field equipment 0% 20 dys 04/01/2019 28/01/2019
1337 Automation panels/local automation stations and programming 0% 15 dys 20/12/2018 15/01/2019
1338 Last fix: sensors and equipment apparently mounted 0% 15 dys 10/01/2019 28/01/2019
1339 Basement 2 0% 50 dys 26/11/2018 04/02/2019
1340 HVAC 0% 27 dys 26/11/2018 07/01/2019
1341 Piping distribution, including insulation, valves and accessories 0% 15 dys 26/11/2018 14/12/2018
1342 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 26/11/2018 20/12/2018
1343 Equipment 0% 15 dys 10/12/2018 04/01/2019
1344 Last fix: grilles 0% 7 dys 21/12/2018 07/01/2019
1345 Sanitary and fire fighting 0% 30 dys 04/12/2018 16/01/2019
1346 Water and sewage piping distribution, including valves and accessories 0% 15 dys 04/12/2018 20/12/2018
1347 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 04/12/2018 04/01/2019
1348 Last fix: sprinkler heads, hydrant boxes, sanitary fixtures and floor drains 0% 20 dys 15/12/2018 16/01/2019
1349 Low Voltage 0% 40 dys 10/12/2018 04/02/2019
1350 Cable trays and empty tubes 0% 20 dys 10/12/2018 10/01/2019

1351 Cabling 0% 20 dys 21/12/2018 22/01/2019


1352 Electrical pannels, electrical equipment and connections 0% 15 dys 11/01/2019 29/01/2019
1353 Last fix: lighting fixtures and motion detectors 0% 15 dys 17/01/2019 04/02/2019
1354 Extra low voltage (Low currents) and BMS 0% 40 dys 10/12/2018 04/02/2019
1355 Cable trays and empty tubes 0% 20 dys 10/12/2018 10/01/2019
1356 Cabling 0% 20 dys 21/12/2018 22/01/2019

1357 Field equipment 0% 20 dys 11/01/2019 04/02/2019


1358 Automation panels/local automation stations and programming 0% 15 dys 05/01/2019 22/01/2019
1359 Last fix: sensors and equipment apparently mounted 0% 15 dys 17/01/2019 04/02/2019
1360 Basement 1 0% 172 dys 07/11/2018 11/06/2019
1361 HVAC 0% 147 dys 07/11/2018 11/05/2019
1362 Piping distribution, including insulation, valves and accessories 0% 20 dys 07/11/2018 29/11/2018
1363 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 07/11/2018 29/11/2018
1364 Equipment 0% 20 dys 19/11/2018 13/12/2018
1365 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 30/04/2019 11/05/2019
1366 Sanitary and fire fighting 0% 149 dys 13/11/2018 20/05/2019
1367 Water and sewage piping distribution, including valves and accessories 0% 15 dys 13/11/2018 29/11/2018
1368 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 13/11/2018 07/12/2018
1369 Last fix: sanitary fixtures 0% 7 dys 13/05/2019 20/05/2019
1370 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 30/04/2019 11/05/2019
1371 Last fix: hydrant boxes 0% 10 dys 29/01/2019 08/02/2019
1372 Low Voltage 0% 162 dys 19/11/2018 11/06/2019
1373 Cable trays and empty tubes 0% 20 dys 19/11/2018 13/12/2018

1374 Cabling 0% 20 dys 03/12/2018 03/01/2019


1375 Electrical pannels, electrical equipment and connections 0% 15 dys 14/12/2018 09/01/2019
1376 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 30/04/2019 11/05/2019
Employer's confirmation for Ceilings
1377 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 30/05/2019 11/06/2019
1378 Extra low voltage (Low currents) and BMS 0% 137 dys 19/11/2018 11/05/2019
1379 Cable trays and empty tubes 0% 20 dys 19/11/2018 13/12/2018
1380 Cabling 0% 20 dys 03/12/2018 03/01/2019

1381 Field equipment 0% 20 dys 14/12/2018 15/01/2019


1382 Automation panels/local automation stations and programming 0% 15 dys 08/12/2018 03/01/2019
1383 Last fix: sensors and equipment installed on walls 0% 15 dys 07/03/2019 23/03/2019
1384 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 30/04/2019 11/05/2019
confirmation for ceilings
1385 Ground Floor 0% 74 dys 28/06/2019 23/09/2019
1386 HVAC 0% 51 dys 10/07/2019 07/09/2019
1387 Piping distribution, including insulation, valves and accessories 0% 20 dys 10/07/2019 01/08/2019

1388 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 10/07/2019 01/08/2019
Task Project Summary Inactive Milestone Manual Summary Rollup Deadline Manual Progress
Split External Tasks Inactive Summary Manual Summary Critical
Milestone External Milestone Manual Task Start-only Critical Split
Summary Inactive Task Duration-only Finish-only Progress

Data de referinta 31.10.2018


Cladire Birouri Ana Tower / Ana Tower Office Building
Grafic de lucrari / Time schedule

ID Task Name % Duration Start Finish 2019


Complete November December January February March April May June July August September October November
29/10
05/11
12/11
19/11
26/11
03/12
10/12
17/12
24/12
31/12
07/01
14/01
21/01
28/01
04/02
11/02
18/02
25/02
04/03
11/03
18/03
25/03
01/04
08/0415/04
22/04
29/04
06/05
13/05
20/05
27/05
03/06
10/06
17/06
24/06
01/07
08/07
15/07
22/07
29/07
05/08
12/08
19/08
26/08
02/09
09/09
16/09
23/09
30/09
07/10
14/10
21/10
28/10
04/11
11/11
18/11
1389 Equipment 0% 20 dys 22/07/2019 13/08/2019
1390 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 28/08/2019 07/09/2019
1391 Sanitary and fire fighting 0% 64 dys 28/06/2019 11/09/2019
1392 Water and sewage piping distribution, including valves and accessories 0% 15 dys 16/07/2019 01/08/2019
1393 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 16/07/2019 07/08/2019
1394 Last fix: sanitary fixtures 0% 7 dys 04/09/2019 11/09/2019
1395 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 28/08/2019 07/09/2019
1396 Last fix: hydrant boxes 0% 10 dys 28/06/2019 09/07/2019
1397 Low Voltage 0% 54 dys 22/07/2019 23/09/2019
1398 Cable trays and empty tubes 0% 20 dys 22/07/2019 13/08/2019

1399 Cabling 0% 20 dys 02/08/2019 26/08/2019


1400 Electrical pannels, electrical equipment and connections 0% 15 dys 14/08/2019 31/08/2019
1401 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 28/08/2019 07/09/2019
Employer's confirmation for Ceilings
1402 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 12/09/2019 23/09/2019
1403 Extra low voltage (Low currents) and BMS 0% 41 dys 22/07/2019 07/09/2019
1404 Cable trays and empty tubes 0% 20 dys 22/07/2019 13/08/2019
1405 Cabling 0% 20 dys 02/08/2019 26/08/2019

1406 Field equipment 0% 20 dys 14/08/2019 06/09/2019


1407 Automation panels/local automation stations and programming 0% 15 dys 08/08/2019 26/08/2019
1408 Last fix: sensors and equipment installed on walls 0% 15 dys 09/08/2019 27/08/2019
1409 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 28/08/2019 07/09/2019
confirmation for ceilings
1410 1st Floor 0% 153 dys 19/11/2018 30/05/2019
1411 HVAC 0% 140 dys 19/11/2018 15/05/2019
1412 Piping distribution, including insulation, valves and accessories 0% 20 dys 19/11/2018 13/12/2018
1413 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 19/11/2018 13/12/2018
1414 Equipment 0% 20 dys 03/12/2018 03/01/2019
1415 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 04/05/2019 15/05/2019
1416 Sanitary and fire fighting 0% 138 dys 24/11/2018 18/05/2019
1417 Water and sewage piping distribution, including valves and accessories 0% 15 dys 24/11/2018 13/12/2018
1418 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 24/11/2018 19/12/2018
1419 Last fix: sanitary fixtures 0% 7 dys 11/05/2019 18/05/2019
1420 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 04/05/2019 15/05/2019
1421 Last fix: hydrant boxes 0% 10 dys 22/01/2019 02/02/2019
1422 Low Voltage 0% 143 dys 03/12/2018 30/05/2019
1423 Cable trays and empty tubes 0% 20 dys 03/12/2018 03/01/2019

1424 Cabling 0% 20 dys 14/12/2018 15/01/2019


1425 Electrical pannels, electrical equipment and connections 0% 15 dys 04/01/2019 21/01/2019
1426 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 04/05/2019 15/05/2019
Employer's confirmation for Ceilings
1427 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 20/05/2019 30/05/2019
1428 Extra low voltage (Low currents) and BMS 0% 130 dys 03/12/2018 15/05/2019
1429 Cable trays and empty tubes 0% 20 dys 03/12/2018 03/01/2019
1430 Cabling 0% 20 dys 14/12/2018 15/01/2019

1431 Field equipment 0% 20 dys 04/01/2019 28/01/2019


1432 Automation panels/local automation stations and programming 0% 15 dys 20/12/2018 15/01/2019
1433 Last fix: sensors and equipment installed on walls 0% 15 dys 15/04/2019 03/05/2019
1434 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 04/05/2019 15/05/2019
confirmation for ceilings
1435 2nd Floor 0% 156 dys 19/11/2018 04/06/2019
1436 HVAC 0% 143 dys 19/11/2018 18/05/2019
1437 Piping distribution, including insulation, valves and accessories 0% 20 dys 19/11/2018 13/12/2018
1438 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 19/11/2018 13/12/2018
1439 Equipment 0% 20 dys 03/12/2018 03/01/2019
1440 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 08/05/2019 18/05/2019
1441 Sanitary and fire fighting 0% 141 dys 24/11/2018 22/05/2019
1442 Water and sewage piping distribution, including valves and accessories 0% 15 dys 24/11/2018 13/12/2018
1443 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 24/11/2018 19/12/2018
1444 Last fix: sanitary fixtures 0% 7 dys 15/05/2019 22/05/2019
1445 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 08/05/2019 18/05/2019
1446 Last fix: hydrant boxes 0% 10 dys 29/01/2019 08/02/2019
1447 Low Voltage 0% 146 dys 03/12/2018 04/06/2019
1448 Cable trays and empty tubes 0% 20 dys 03/12/2018 03/01/2019

1449 Cabling 0% 20 dys 14/12/2018 15/01/2019


1450 Electrical pannels, electrical equipment and connections 0% 15 dys 04/01/2019 21/01/2019
1451 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 08/05/2019 18/05/2019
Employer's confirmation for Ceilings
1452 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 23/05/2019 04/06/2019
1453 Extra low voltage (Low currents) and BMS 0% 133 dys 03/12/2018 18/05/2019
1454 Cable trays and empty tubes 0% 20 dys 03/12/2018 03/01/2019
1455 Cabling 0% 20 dys 14/12/2018 15/01/2019

1456 Field equipment 0% 20 dys 04/01/2019 28/01/2019


1457 Automation panels/local automation stations and programming 0% 15 dys 20/12/2018 15/01/2019
1458 Last fix: sensors and equipment installed on walls 0% 15 dys 18/04/2019 07/05/2019
1459 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 08/05/2019 18/05/2019
confirmation for ceilings
1460 3rd Floor 0% 149 dys 03/12/2018 07/06/2019
1461 HVAC 0% 136 dys 03/12/2018 22/05/2019
1462 Piping distribution, including insulation, valves and accessories 0% 20 dys 03/12/2018 03/01/2019
1463 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 03/12/2018 03/01/2019
1464 Equipment 0% 20 dys 14/12/2018 15/01/2019
1465 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 11/05/2019 22/05/2019
1466 Sanitary and fire fighting 0% 134 dys 08/12/2018 25/05/2019
1467 Water and sewage piping distribution, including valves and accessories 0% 15 dys 08/12/2018 03/01/2019
1468 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 08/12/2018 09/01/2019
1469 Last fix: sanitary fixtures 0% 7 dys 18/05/2019 25/05/2019
1470 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 11/05/2019 22/05/2019
1471 Last fix: hydrant boxes 0% 10 dys 04/02/2019 14/02/2019
1472 Low Voltage 0% 139 dys 14/12/2018 07/06/2019
1473 Cable trays and empty tubes 0% 20 dys 14/12/2018 15/01/2019

1474 Cabling 0% 20 dys 04/01/2019 28/01/2019


1475 Electrical pannels, electrical equipment and connections 0% 15 dys 16/01/2019 02/02/2019
1476 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 11/05/2019 22/05/2019
Employer's confirmation for Ceilings
1477 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 27/05/2019 07/06/2019
1478 Extra low voltage (Low currents) and BMS 0% 126 dys 14/12/2018 22/05/2019
1479 Cable trays and empty tubes 0% 20 dys 14/12/2018 15/01/2019
1480 Cabling 0% 20 dys 04/01/2019 28/01/2019

1481 Field equipment 0% 20 dys 16/01/2019 08/02/2019


1482 Automation panels/local automation stations and programming 0% 15 dys 10/01/2019 28/01/2019
1483 Last fix: sensors and equipment installed on walls 0% 15 dys 22/04/2019 10/05/2019
1484 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 11/05/2019 22/05/2019
confirmation for ceilings
1485 4th Floor 0% 152 dys 03/12/2018 11/06/2019
1486 HVAC 0% 139 dys 03/12/2018 25/05/2019
1487 Piping distribution, including insulation, valves and accessories 0% 20 dys 03/12/2018 03/01/2019

1488 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 03/12/2018 03/01/2019
1489 Equipment 0% 20 dys 14/12/2018 15/01/2019
1490 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 15/05/2019 25/05/2019
1491 Sanitary and fire fighting 0% 137 dys 08/12/2018 29/05/2019
1492 Water and sewage piping distribution, including valves and accessories 0% 15 dys 08/12/2018 03/01/2019
1493 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 08/12/2018 09/01/2019
1494 Last fix: sanitary fixtures 0% 7 dys 22/05/2019 29/05/2019
1495 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 15/05/2019 25/05/2019
1496 Last fix: hydrant boxes 0% 10 dys 11/02/2019 21/02/2019
1497 Low Voltage 0% 142 dys 14/12/2018 11/06/2019
1498 Cable trays and empty tubes 0% 20 dys 14/12/2018 15/01/2019

1499 Cabling 0% 20 dys 04/01/2019 28/01/2019


1500 Electrical pannels, electrical equipment and connections 0% 15 dys 16/01/2019 02/02/2019

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline Manual Progress
Split External Tasks Inactive Summary Manual Summary Critical
Milestone External Milestone Manual Task Start-only Critical Split
Summary Inactive Task Duration-only Finish-only Progress

Data de referinta 31.10.2018


Cladire Birouri Ana Tower / Ana Tower Office Building
Grafic de lucrari / Time schedule

ID Task Name % Duration Start Finish 2019


Complete November December January February March April May June July August September October November
29/10
05/11
12/11
19/11
26/11
03/12
10/12
17/12
24/12
31/12
07/01
14/01
21/01
28/01
04/02
11/02
18/02
25/02
04/03
11/03
18/03
25/03
01/04
08/0415/04
22/04
29/04
06/05
13/05
20/05
27/05
03/06
10/06
17/06
24/06
01/07
08/07
15/07
22/07
29/07
05/08
12/08
19/08
26/08
02/09
09/09
16/09
23/09
30/09
07/10
14/10
21/10
28/10
04/11
11/11
18/11
1501 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 15/05/2019 25/05/2019
Employer's confirmation for Ceilings
1502 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 30/05/2019 11/06/2019
1503 Extra low voltage (Low currents) and BMS 0% 129 dys 14/12/2018 25/05/2019
1504 Cable trays and empty tubes 0% 20 dys 14/12/2018 15/01/2019
1505 Cabling 0% 20 dys 04/01/2019 28/01/2019

1506 Field equipment 0% 20 dys 16/01/2019 08/02/2019


1507 Automation panels/local automation stations and programming 0% 15 dys 10/01/2019 28/01/2019
1508 Last fix: sensors and equipment installed on walls 0% 15 dys 25/04/2019 14/05/2019
1509 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 15/05/2019 25/05/2019
confirmation for ceilings
1510 5th Floor 0% 145 dys 14/12/2018 14/06/2019
1511 HVAC 0% 132 dys 14/12/2018 29/05/2019
1512 Piping distribution, including insulation, valves and accessories 0% 20 dys 14/12/2018 15/01/2019
1513 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 14/12/2018 15/01/2019
1514 Equipment 0% 20 dys 04/01/2019 28/01/2019
1515 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 18/05/2019 29/05/2019
1516 Sanitary and fire fighting 0% 130 dys 20/12/2018 03/06/2019
1517 Water and sewage piping distribution, including valves and accessories 0% 15 dys 20/12/2018 15/01/2019
1518 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 20/12/2018 21/01/2019
1519 Last fix: sanitary fixtures 0% 7 dys 25/05/2019 03/06/2019
1520 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 18/05/2019 29/05/2019
1521 Last fix: hydrant boxes 0% 10 dys 15/02/2019 26/02/2019
1522 Low Voltage 0% 135 dys 04/01/2019 14/06/2019
1523 Cable trays and empty tubes 0% 20 dys 04/01/2019 28/01/2019

1524 Cabling 0% 20 dys 16/01/2019 08/02/2019


1525 Electrical pannels, electrical equipment and connections 0% 15 dys 29/01/2019 14/02/2019
1526 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 18/05/2019 29/05/2019
Employer's confirmation for Ceilings
1527 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 04/06/2019 14/06/2019
1528 Extra low voltage (Low currents) and BMS 0% 122 dys 04/01/2019 29/05/2019
1529 Cable trays and empty tubes 0% 20 dys 04/01/2019 28/01/2019
1530 Cabling 0% 20 dys 16/01/2019 08/02/2019

1531 Field equipment 0% 20 dys 29/01/2019 20/02/2019


1532 Automation panels/local automation stations and programming 0% 15 dys 22/01/2019 08/02/2019
1533 Last fix: sensors and equipment installed on walls 0% 15 dys 30/04/2019 17/05/2019
1534 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 18/05/2019 29/05/2019
confirmation for ceilings
1535 6th Floor 0% 149 dys 14/12/2018 20/06/2019
1536 HVAC 0% 136 dys 14/12/2018 04/06/2019
1537 Piping distribution, including insulation, valves and accessories 0% 20 dys 14/12/2018 15/01/2019
1538 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 14/12/2018 15/01/2019
1539 Equipment 0% 20 dys 04/01/2019 28/01/2019
1540 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 23/05/2019 04/06/2019
1541 Sanitary and fire fighting 0% 134 dys 20/12/2018 07/06/2019
1542 Water and sewage piping distribution, including valves and accessories 0% 15 dys 20/12/2018 15/01/2019
1543 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 20/12/2018 21/01/2019
1544 Last fix: sanitary fixtures 0% 7 dys 30/05/2019 07/06/2019
1545 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 23/05/2019 04/06/2019
1546 Last fix: hydrant boxes 0% 10 dys 21/02/2019 04/03/2019
1547 Low Voltage 0% 139 dys 04/01/2019 20/06/2019
1548 Cable trays and empty tubes 0% 20 dys 04/01/2019 28/01/2019

1549 Cabling 0% 20 dys 16/01/2019 08/02/2019


1550 Electrical pannels, electrical equipment and connections 0% 15 dys 29/01/2019 14/02/2019
1551 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 23/05/2019 04/06/2019
Employer's confirmation for Ceilings
1552 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 08/06/2019 20/06/2019
1553 Extra low voltage (Low currents) and BMS 0% 126 dys 04/01/2019 04/06/2019
1554 Cable trays and empty tubes 0% 20 dys 04/01/2019 28/01/2019
1555 Cabling 0% 20 dys 16/01/2019 08/02/2019

1556 Field equipment 0% 20 dys 29/01/2019 20/02/2019


1557 Automation panels/local automation stations and programming 0% 15 dys 22/01/2019 08/02/2019
1558 Last fix: sensors and equipment installed on walls 0% 15 dys 06/05/2019 22/05/2019
1559 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 23/05/2019 04/06/2019
confirmation for ceilings
1560 7th Floor 0% 143 dys 04/01/2019 25/06/2019
1561 HVAC 0% 130 dys 04/01/2019 08/06/2019
1562 Piping distribution, including insulation, valves and accessories 0% 20 dys 04/01/2019 28/01/2019
1563 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 04/01/2019 28/01/2019
1564 Equipment 0% 20 dys 16/01/2019 08/02/2019
1565 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 28/05/2019 08/06/2019
1566 Sanitary and fire fighting 0% 128 dys 10/01/2019 12/06/2019
1567 Water and sewage piping distribution, including valves and accessories 0% 15 dys 10/01/2019 28/01/2019
1568 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 10/01/2019 02/02/2019
1569 Last fix: sanitary fixtures 0% 7 dys 05/06/2019 12/06/2019
1570 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 28/05/2019 08/06/2019
1571 Last fix: hydrant boxes 0% 10 dys 27/02/2019 09/03/2019
1572 Low Voltage 0% 133 dys 16/01/2019 25/06/2019
1573 Cable trays and empty tubes 0% 20 dys 16/01/2019 08/02/2019

1574 Cabling 0% 20 dys 29/01/2019 20/02/2019


1575 Electrical pannels, electrical equipment and connections 0% 15 dys 09/02/2019 26/02/2019
1576 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 28/05/2019 08/06/2019
Employer's confirmation for Ceilings
1577 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 13/06/2019 25/06/2019
1578 Extra low voltage (Low currents) and BMS 0% 120 dys 16/01/2019 08/06/2019
1579 Cable trays and empty tubes 0% 20 dys 16/01/2019 08/02/2019
1580 Cabling 0% 20 dys 29/01/2019 20/02/2019

1581 Field equipment 0% 20 dys 09/02/2019 04/03/2019


1582 Automation panels/local automation stations and programming 0% 15 dys 04/02/2019 20/02/2019
1583 Last fix: sensors and equipment installed on walls 0% 15 dys 10/05/2019 27/05/2019
1584 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 28/05/2019 08/06/2019
confirmation for ceilings
1585 8th Floor 0% 147 dys 04/01/2019 29/06/2019
1586 HVAC 0% 134 dys 04/01/2019 13/06/2019
1587 Piping distribution, including insulation, valves and accessories 0% 20 dys 04/01/2019 28/01/2019
1588 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 04/01/2019 28/01/2019
1589 Equipment 0% 20 dys 16/01/2019 08/02/2019
1590 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 03/06/2019 13/06/2019
1591 Sanitary and fire fighting 0% 132 dys 10/01/2019 18/06/2019
1592 Water and sewage piping distribution, including valves and accessories 0% 15 dys 10/01/2019 28/01/2019
1593 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 10/01/2019 02/02/2019
1594 Last fix: sanitary fixtures 0% 7 dys 10/06/2019 18/06/2019
1595 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 03/06/2019 13/06/2019
1596 Last fix: hydrant boxes 0% 10 dys 05/03/2019 15/03/2019
1597 Low Voltage 0% 137 dys 16/01/2019 29/06/2019
1598 Cable trays and empty tubes 0% 20 dys 16/01/2019 08/02/2019

1599 Cabling 0% 20 dys 29/01/2019 20/02/2019


1600 Electrical pannels, electrical equipment and connections 0% 15 dys 09/02/2019 26/02/2019
1601 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 03/06/2019 13/06/2019
Employer's confirmation for Ceilings
1602 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 19/06/2019 29/06/2019
1603 Extra low voltage (Low currents) and BMS 0% 124 dys 16/01/2019 13/06/2019
1604 Cable trays and empty tubes 0% 20 dys 16/01/2019 08/02/2019
1605 Cabling 0% 20 dys 29/01/2019 20/02/2019

1606 Field equipment 0% 20 dys 09/02/2019 04/03/2019


1607 Automation panels/local automation stations and programming 0% 15 dys 04/02/2019 20/02/2019
1608 Last fix: sensors and equipment installed on walls 0% 15 dys 15/05/2019 31/05/2019
1609 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 03/06/2019 13/06/2019
confirmation for ceilings
1610 9th Floor 0% 141 dys 16/01/2019 04/07/2019
1611 HVAC 0% 128 dys 16/01/2019 19/06/2019
1612 Piping distribution, including insulation, valves and accessories 0% 20 dys 16/01/2019 08/02/2019

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline Manual Progress
Split External Tasks Inactive Summary Manual Summary Critical
Milestone External Milestone Manual Task Start-only Critical Split
Summary Inactive Task Duration-only Finish-only Progress

Data de referinta 31.10.2018


Cladire Birouri Ana Tower / Ana Tower Office Building
Grafic de lucrari / Time schedule

ID Task Name % Duration Start Finish 2019


Complete November December January February March April May June July August September October November
29/10
05/11
12/11
19/11
26/11
03/12
10/12
17/12
24/12
31/12
07/01
14/01
21/01
28/01
04/02
11/02
18/02
25/02
04/03
11/03
18/03
25/03
01/04
08/0415/04
22/04
29/04
06/05
13/05
20/05
27/05
03/06
10/06
17/06
24/06
01/07
08/07
15/07
22/07
29/07
05/08
12/08
19/08
26/08
02/09
09/09
16/09
23/09
30/09
07/10
14/10
21/10
28/10
04/11
11/11
18/11
1613 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 16/01/2019 08/02/2019
1614 Equipment 0% 20 dys 29/01/2019 20/02/2019
1615 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 07/06/2019 19/06/2019
1616 Sanitary and fire fighting 0% 126 dys 22/01/2019 22/06/2019
1617 Water and sewage piping distribution, including valves and accessories 0% 15 dys 22/01/2019 08/02/2019
1618 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 22/01/2019 14/02/2019
1619 Last fix: sanitary fixtures 0% 7 dys 14/06/2019 22/06/2019
1620 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 07/06/2019 19/06/2019
1621 Last fix: hydrant boxes 0% 10 dys 11/03/2019 21/03/2019
1622 Low Voltage 0% 131 dys 29/01/2019 04/07/2019
1623 Cable trays and empty tubes 0% 20 dys 29/01/2019 20/02/2019

1624 Cabling 0% 20 dys 09/02/2019 04/03/2019


1625 Electrical pannels, electrical equipment and connections 0% 15 dys 21/02/2019 09/03/2019
1626 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 07/06/2019 19/06/2019
Employer's confirmation for Ceilings
1627 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 24/06/2019 04/07/2019
1628 Extra low voltage (Low currents) and BMS 0% 118 dys 29/01/2019 19/06/2019
1629 Cable trays and empty tubes 0% 20 dys 29/01/2019 20/02/2019
1630 Cabling 0% 20 dys 09/02/2019 04/03/2019

1631 Field equipment 0% 20 dys 21/02/2019 15/03/2019


1632 Automation panels/local automation stations and programming 0% 15 dys 15/02/2019 04/03/2019
1633 Last fix: sensors and equipment installed on walls 0% 15 dys 20/05/2019 06/06/2019
1634 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 07/06/2019 19/06/2019
confirmation for ceilings
1635 10th Floor 0% 145 dys 16/01/2019 09/07/2019
1636 HVAC 0% 132 dys 16/01/2019 24/06/2019
1637 Piping distribution, including insulation, valves and accessories 0% 20 dys 16/01/2019 08/02/2019
1638 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 16/01/2019 08/02/2019
1639 Equipment 0% 20 dys 29/01/2019 20/02/2019
1640 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 12/06/2019 24/06/2019
1641 Sanitary and fire fighting 0% 130 dys 22/01/2019 27/06/2019
1642 Water and sewage piping distribution, including valves and accessories 0% 15 dys 22/01/2019 08/02/2019
1643 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 22/01/2019 14/02/2019
1644 Last fix: sanitary fixtures 0% 7 dys 20/06/2019 27/06/2019
1645 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 12/06/2019 24/06/2019
1646 Last fix: hydrant boxes 0% 10 dys 18/03/2019 28/03/2019
1647 Low Voltage 0% 135 dys 29/01/2019 09/07/2019
1648 Cable trays and empty tubes 0% 20 dys 29/01/2019 20/02/2019

1649 Cabling 0% 20 dys 09/02/2019 04/03/2019


1650 Electrical pannels, electrical equipment and connections 0% 15 dys 21/02/2019 09/03/2019
1651 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 12/06/2019 24/06/2019
Employer's confirmation for Ceilings
1652 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 28/06/2019 09/07/2019
1653 Extra low voltage (Low currents) and BMS 0% 122 dys 29/01/2019 24/06/2019
1654 Cable trays and empty tubes 0% 20 dys 29/01/2019 20/02/2019
1655 Cabling 0% 20 dys 09/02/2019 04/03/2019

1656 Field equipment 0% 20 dys 21/02/2019 15/03/2019


1657 Automation panels/local automation stations and programming 0% 15 dys 15/02/2019 04/03/2019
1658 Last fix: sensors and equipment installed on walls 0% 15 dys 24/05/2019 11/06/2019
1659 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 12/06/2019 24/06/2019
confirmation for ceilings
1660 11th Floor 0% 139 dys 29/01/2019 13/07/2019
1661 HVAC 0% 126 dys 29/01/2019 28/06/2019
1662 Piping distribution, including insulation, valves and accessories 0% 20 dys 29/01/2019 20/02/2019
1663 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 29/01/2019 20/02/2019
1664 Equipment 0% 20 dys 09/02/2019 04/03/2019
1665 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 18/06/2019 28/06/2019
1666 Sanitary and fire fighting 0% 124 dys 04/02/2019 02/07/2019
1667 Water and sewage piping distribution, including valves and accessories 0% 15 dys 04/02/2019 20/02/2019
1668 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 04/02/2019 26/02/2019
1669 Last fix: sanitary fixtures 0% 7 dys 25/06/2019 02/07/2019
1670 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 18/06/2019 28/06/2019
1671 Last fix: hydrant boxes 0% 10 dys 22/03/2019 02/04/2019
1672 Low Voltage 0% 129 dys 09/02/2019 13/07/2019
1673 Cable trays and empty tubes 0% 20 dys 09/02/2019 04/03/2019

1674 Cabling 0% 20 dys 21/02/2019 15/03/2019


1675 Electrical pannels, electrical equipment and connections 0% 15 dys 05/03/2019 21/03/2019
1676 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 18/06/2019 28/06/2019
Employer's confirmation for Ceilings
1677 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 03/07/2019 13/07/2019
1678 Extra low voltage (Low currents) and BMS 0% 116 dys 09/02/2019 28/06/2019
1679 Cable trays and empty tubes 0% 20 dys 09/02/2019 04/03/2019
1680 Cabling 0% 20 dys 21/02/2019 15/03/2019
1681 Field equipment 0% 20 dys 05/03/2019 27/03/2019
1682 Last fix: sensors and equipment installed on walls 0% 15 dys 29/05/2019 15/06/2019
1683 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 18/06/2019 28/06/2019
confirmation for ceilings
1684 12th Floor 0% 143 dys 29/01/2019 18/07/2019
1685 HVAC 0% 130 dys 29/01/2019 03/07/2019
1686 Piping distribution, including insulation, valves and accessories 0% 20 dys 29/01/2019 20/02/2019
1687 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 29/01/2019 20/02/2019
1688 Equipment 0% 20 dys 09/02/2019 04/03/2019
1689 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 22/06/2019 03/07/2019
1690 Sanitary and fire fighting 0% 128 dys 04/02/2019 06/07/2019
1691 Water and sewage piping distribution, including valves and accessories 0% 15 dys 04/02/2019 20/02/2019
1692 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 04/02/2019 26/02/2019
1693 Last fix: sanitary fixtures 0% 7 dys 29/06/2019 06/07/2019
1694 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 22/06/2019 03/07/2019
1695 Last fix: hydrant boxes 0% 10 dys 28/03/2019 08/04/2019
1696 Low Voltage 0% 133 dys 09/02/2019 18/07/2019
1697 Cable trays and empty tubes 0% 20 dys 09/02/2019 04/03/2019

1698 Cabling 0% 20 dys 21/02/2019 15/03/2019


1699 Electrical pannels, electrical equipment and connections 0% 15 dys 05/03/2019 21/03/2019
1700 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 22/06/2019 03/07/2019
Employer's confirmation for Ceilings
1701 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 08/07/2019 18/07/2019
1702 Extra low voltage (Low currents) and BMS 0% 120 dys 09/02/2019 03/07/2019
1703 Cable trays and empty tubes 0% 20 dys 09/02/2019 04/03/2019
1704 Cabling 0% 20 dys 21/02/2019 15/03/2019

1705 Field equipment 0% 20 dys 05/03/2019 27/03/2019


1706 Automation panels/local automation stations and programming 0% 15 dys 27/02/2019 15/03/2019
1707 Last fix: sensors and equipment installed on walls 0% 15 dys 04/06/2019 21/06/2019
1708 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 22/06/2019 03/07/2019
confirmation for ceilings
1709 13th Floor 0% 137 dys 09/02/2019 23/07/2019
1710 HVAC 0% 124 dys 09/02/2019 08/07/2019
1711 Piping distribution, including insulation, valves and accessories 0% 20 dys 09/02/2019 04/03/2019
1712 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 09/02/2019 04/03/2019
1713 Equipment 0% 20 dys 21/02/2019 15/03/2019
1714 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 27/06/2019 08/07/2019
1715 Sanitary and fire fighting 0% 122 dys 15/02/2019 11/07/2019
1716 Water and sewage piping distribution, including valves and accessories 0% 15 dys 15/02/2019 04/03/2019
1717 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 15/02/2019 09/03/2019
1718 Last fix: sanitary fixtures 0% 7 dys 04/07/2019 11/07/2019
1719 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 27/06/2019 08/07/2019
1720 Last fix: hydrant boxes 0% 10 dys 03/04/2019 13/04/2019
1721 Low Voltage 0% 127 dys 21/02/2019 23/07/2019
1722 Cable trays and empty tubes 0% 20 dys 21/02/2019 15/03/2019

1723 Cabling 0% 20 dys 05/03/2019 27/03/2019


1724 Electrical pannels, electrical equipment and connections 0% 15 dys 16/03/2019 02/04/2019
1725 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 27/06/2019 08/07/2019
Employer's confirmation for Ceilings
1726 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 12/07/2019 23/07/2019

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline Manual Progress
Split External Tasks Inactive Summary Manual Summary Critical
Milestone External Milestone Manual Task Start-only Critical Split
Summary Inactive Task Duration-only Finish-only Progress

Data de referinta 31.10.2018


Cladire Birouri Ana Tower / Ana Tower Office Building
Grafic de lucrari / Time schedule

ID Task Name % Duration Start Finish 2019


Complete November December January February March April May June July August September October November
29/10
05/11
12/11
19/11
26/11
03/12
10/12
17/12
24/12
31/12
07/01
14/01
21/01
28/01
04/02
11/02
18/02
25/02
04/03
11/03
18/03
25/03
01/04
08/0415/04
22/04
29/04
06/05
13/05
20/05
27/05
03/06
10/06
17/06
24/06
01/07
08/07
15/07
22/07
29/07
05/08
12/08
19/08
26/08
02/09
09/09
16/09
23/09
30/09
07/10
14/10
21/10
28/10
04/11
11/11
18/11
1727 Extra low voltage (Low currents) and BMS 0% 114 dys 21/02/2019 08/07/2019
1728 Cable trays and empty tubes 0% 20 dys 21/02/2019 15/03/2019
1729 Cabling 0% 20 dys 05/03/2019 27/03/2019

1730 Field equipment 0% 20 dys 16/03/2019 08/04/2019


1731 Automation panels/local automation stations and programming 0% 15 dys 11/03/2019 27/03/2019
1732 Last fix: sensors and equipment installed on walls 0% 15 dys 08/06/2019 26/06/2019
1733 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 27/06/2019 08/07/2019
confirmation for ceilings
1734 14th Floor 0% 140 dys 09/02/2019 26/07/2019
1735 HVAC 0% 128 dys 09/02/2019 12/07/2019
1736 Piping distribution, including insulation, valves and accessories 0% 20 dys 09/02/2019 04/03/2019
1737 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 09/02/2019 04/03/2019
1738 Equipment 0% 20 dys 21/02/2019 15/03/2019
1739 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 02/07/2019 12/07/2019
1740 Sanitary and fire fighting 0% 125 dys 15/02/2019 15/07/2019
1741 Water and sewage piping distribution, including valves and accessories 0% 15 dys 15/02/2019 04/03/2019
1742 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 15/02/2019 09/03/2019
1743 Last fix: sanitary fixtures 0% 7 dys 08/07/2019 15/07/2019
1744 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 02/07/2019 12/07/2019
1745 Last fix: hydrant boxes 0% 10 dys 09/04/2019 19/04/2019
1746 Low Voltage 0% 130 dys 21/02/2019 26/07/2019
1747 Cable trays and empty tubes 0% 20 dys 21/02/2019 15/03/2019

1748 Cabling 0% 20 dys 05/03/2019 27/03/2019


1749 Electrical pannels, electrical equipment and connections 0% 15 dys 16/03/2019 02/04/2019
1750 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 02/07/2019 12/07/2019
Employer's confirmation for Ceilings
1751 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 16/07/2019 26/07/2019
1752 Extra low voltage (Low currents) and BMS 0% 118 dys 21/02/2019 12/07/2019
1753 Cable trays and empty tubes 0% 20 dys 21/02/2019 15/03/2019
1754 Cabling 0% 20 dys 05/03/2019 27/03/2019

1755 Field equipment 0% 20 dys 16/03/2019 08/04/2019


1756 Automation panels/local automation stations and programming 0% 15 dys 11/03/2019 27/03/2019
1757 Last fix: sensors and equipment installed on walls 0% 15 dys 13/06/2019 01/07/2019
1758 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 02/07/2019 12/07/2019
confirmation for ceilings
1759 15th Floor 0% 135 dys 21/02/2019 01/08/2019
1760 HVAC 0% 122 dys 21/02/2019 17/07/2019
1761 Piping distribution, including insulation, valves and accessories 0% 20 dys 21/02/2019 15/03/2019
1762 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 21/02/2019 15/03/2019
1763 Equipment 0% 20 dys 05/03/2019 27/03/2019
1764 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 06/07/2019 17/07/2019
1765 Sanitary and fire fighting 0% 120 dys 27/02/2019 20/07/2019
1766 Water and sewage piping distribution, including valves and accessories 0% 15 dys 27/02/2019 15/03/2019
1767 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 27/02/2019 21/03/2019
1768 Last fix: sanitary fixtures 0% 7 dys 13/07/2019 20/07/2019
1769 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 06/07/2019 17/07/2019
1770 Last fix: hydrant boxes 0% 10 dys 15/04/2019 25/04/2019
1771 Low Voltage 0% 125 dys 05/03/2019 01/08/2019
1772 Cable trays and empty tubes 0% 20 dys 05/03/2019 27/03/2019

1773 Cabling 0% 20 dys 16/03/2019 08/04/2019


1774 Electrical pannels, electrical equipment and connections 0% 15 dys 28/03/2019 13/04/2019
1775 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 06/07/2019 17/07/2019
Employer's confirmation for Ceilings
1776 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 22/07/2019 01/08/2019
1777 Extra low voltage (Low currents) and BMS 0% 112 dys 05/03/2019 17/07/2019
1778 Cable trays and empty tubes 0% 20 dys 05/03/2019 27/03/2019
1779 Cabling 0% 20 dys 16/03/2019 08/04/2019

1780 Field equipment 0% 20 dys 28/03/2019 19/04/2019


1781 Automation panels/local automation stations and programming 0% 15 dys 22/03/2019 08/04/2019
1782 Last fix: sensors and equipment installed on walls 0% 15 dys 19/06/2019 05/07/2019
1783 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 06/07/2019 17/07/2019
confirmation for ceilings
1784 16th Floor 0% 139 dys 21/02/2019 06/08/2019
1785 HVAC 0% 126 dys 21/02/2019 22/07/2019
1786 Piping distribution, including insulation, valves and accessories 0% 20 dys 21/02/2019 15/03/2019
1787 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 21/02/2019 15/03/2019
1788 Equipment 0% 20 dys 05/03/2019 27/03/2019
1789 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 11/07/2019 22/07/2019
1790 Sanitary and fire fighting 0% 124 dys 27/02/2019 25/07/2019
1791 Water and sewage piping distribution, including valves and accessories 0% 15 dys 27/02/2019 15/03/2019
1792 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 27/02/2019 21/03/2019
1793 Last fix: sanitary fixtures 0% 7 dys 18/07/2019 25/07/2019
1794 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 11/07/2019 22/07/2019
1795 Last fix: hydrant boxes 0% 10 dys 22/04/2019 04/05/2019
1796 Low Voltage 0% 129 dys 05/03/2019 06/08/2019
1797 Cable trays and empty tubes 0% 20 dys 05/03/2019 27/03/2019

1798 Cabling 0% 20 dys 16/03/2019 08/04/2019


1799 Electrical pannels, electrical equipment and connections 0% 15 dys 28/03/2019 13/04/2019
1800 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 11/07/2019 22/07/2019
Employer's confirmation for Ceilings
1801 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 26/07/2019 06/08/2019
1802 Extra low voltage (Low currents) and BMS 0% 116 dys 05/03/2019 22/07/2019
1803 Cable trays and empty tubes 0% 20 dys 05/03/2019 27/03/2019
1804 Cabling 0% 20 dys 16/03/2019 08/04/2019

1805 Field equipment 0% 20 dys 28/03/2019 19/04/2019


1806 Automation panels/local automation stations and programming 0% 15 dys 22/03/2019 08/04/2019
1807 Last fix: sensors and equipment installed on walls 0% 15 dys 24/06/2019 10/07/2019
1808 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 11/07/2019 22/07/2019
confirmation for ceilings
1809 17th Floor 0% 132 dys 05/03/2019 09/08/2019
1810 HVAC 0% 120 dys 05/03/2019 26/07/2019
1811 Piping distribution, including insulation, valves and accessories 0% 20 dys 05/03/2019 27/03/2019
1812 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 05/03/2019 27/03/2019
1813 Equipment 0% 20 dys 16/03/2019 08/04/2019
1814 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 16/07/2019 26/07/2019
1815 Sanitary and fire fighting 0% 117 dys 11/03/2019 29/07/2019
1816 Water and sewage piping distribution, including valves and accessories 0% 15 dys 11/03/2019 27/03/2019
1817 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 11/03/2019 02/04/2019
1818 Last fix: sanitary fixtures 0% 7 dys 22/07/2019 29/07/2019
1819 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 16/07/2019 26/07/2019
1820 Last fix: hydrant boxes 0% 10 dys 26/04/2019 09/05/2019
1821 Low Voltage 0% 122 dys 16/03/2019 09/08/2019
1822 Cable trays and empty tubes 0% 20 dys 16/03/2019 08/04/2019

1823 Cabling 0% 20 dys 28/03/2019 19/04/2019


1824 Electrical pannels, electrical equipment and connections 0% 15 dys 09/04/2019 25/04/2019
1825 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 16/07/2019 26/07/2019
Employer's confirmation for Ceilings
1826 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 30/07/2019 09/08/2019
1827 Extra low voltage (Low currents) and BMS 0% 110 dys 16/03/2019 26/07/2019
1828 Cable trays and empty tubes 0% 20 dys 16/03/2019 08/04/2019
1829 Cabling 0% 20 dys 28/03/2019 19/04/2019

1830 Field equipment 0% 20 dys 09/04/2019 03/05/2019


1831 Automation panels/local automation stations and programming 0% 15 dys 03/04/2019 19/04/2019
1832 Last fix: sensors and equipment installed on walls 0% 15 dys 28/06/2019 15/07/2019
1833 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 16/07/2019 26/07/2019
confirmation for ceilings
1834 18th Floor 0% 167 dys 29/01/2019 16/08/2019
1835 HVAC 0% 124 dys 05/03/2019 31/07/2019
1836 Piping distribution, including insulation, valves and accessories 0% 20 dys 05/03/2019 27/03/2019
1837 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 05/03/2019 27/03/2019
1838 Equipment 0% 20 dys 16/03/2019 08/04/2019
1839 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 20/07/2019 31/07/2019

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline Manual Progress
Split External Tasks Inactive Summary Manual Summary Critical
Milestone External Milestone Manual Task Start-only Critical Split
Summary Inactive Task Duration-only Finish-only Progress

Data de referinta 31.10.2018


Cladire Birouri Ana Tower / Ana Tower Office Building
Grafic de lucrari / Time schedule

ID Task Name % Duration Start Finish 2019


Complete November December January February March April May June July August September October November
29/10
05/11
12/11
19/11
26/11
03/12
10/12
17/12
24/12
31/12
07/01
14/01
21/01
28/01
04/02
11/02
18/02
25/02
04/03
11/03
18/03
25/03
01/04
08/0415/04
22/04
29/04
06/05
13/05
20/05
27/05
03/06
10/06
17/06
24/06
01/07
08/07
15/07
22/07
29/07
05/08
12/08
19/08
26/08
02/09
09/09
16/09
23/09
30/09
07/10
14/10
21/10
28/10
04/11
11/11
18/11
1840 Sanitary and fire fighting 0% 157 dys 29/01/2019 03/08/2019
1841 Water and sewage piping distribution, including valves and accessories 0% 15 dys 11/03/2019 27/03/2019
1842 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 11/03/2019 02/04/2019
1843 Last fix: sanitary fixtures 0% 7 dys 27/07/2019 03/08/2019
1844 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 20/07/2019 31/07/2019
1845 Last fix: hydrant boxes 0% 10 dys 29/01/2019 08/02/2019
1846 Low Voltage 0% 127 dys 16/03/2019 16/08/2019
1847 Cable trays and empty tubes 0% 20 dys 16/03/2019 08/04/2019

1848 Cabling 0% 20 dys 28/03/2019 19/04/2019


1849 Electrical pannels, electrical equipment and connections 0% 15 dys 09/04/2019 25/04/2019
1850 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 20/07/2019 31/07/2019
Employer's confirmation for Ceilings
1851 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 05/08/2019 16/08/2019
1852 Extra low voltage (Low currents) and BMS 0% 114 dys 16/03/2019 31/07/2019
1853 Cable trays and empty tubes 0% 20 dys 16/03/2019 08/04/2019
1854 Cabling 0% 20 dys 28/03/2019 19/04/2019

1855 Field equipment 0% 20 dys 09/04/2019 03/05/2019


1856 Automation panels/local automation stations and programming 0% 15 dys 03/04/2019 19/04/2019
1857 Last fix: sensors and equipment installed on walls 0% 15 dys 03/07/2019 19/07/2019
1858 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 20/07/2019 31/07/2019
confirmation for ceilings
1859 19th Floor 0% 131 dys 16/03/2019 21/08/2019
1860 HVAC 0% 118 dys 16/03/2019 05/08/2019
1861 Piping distribution, including insulation, valves and accessories 0% 20 dys 16/03/2019 08/04/2019
1862 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 16/03/2019 08/04/2019
1863 Equipment 0% 20 dys 28/03/2019 19/04/2019
1864 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 25/07/2019 05/08/2019
1865 Sanitary and fire fighting 0% 116 dys 22/03/2019 08/08/2019
1866 Water and sewage piping distribution, including valves and accessories 0% 15 dys 22/03/2019 08/04/2019
1867 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 22/03/2019 13/04/2019
1868 Last fix: sanitary fixtures 0% 7 dys 01/08/2019 08/08/2019
1869 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 25/07/2019 05/08/2019
1870 Last fix: hydrant boxes 0% 10 dys 10/05/2019 21/05/2019
1871 Low Voltage 0% 121 dys 28/03/2019 21/08/2019
1872 Cable trays and empty tubes 0% 20 dys 28/03/2019 19/04/2019

1873 Cabling 0% 20 dys 09/04/2019 03/05/2019


1874 Electrical pannels, electrical equipment and connections 0% 15 dys 20/04/2019 09/05/2019
1875 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 25/07/2019 05/08/2019
Employer's confirmation for Ceilings
1876 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 09/08/2019 21/08/2019
1877 Extra low voltage (Low currents) and BMS 0% 108 dys 28/03/2019 05/08/2019
1878 Cable trays and empty tubes 0% 20 dys 28/03/2019 19/04/2019
1879 Cabling 0% 20 dys 09/04/2019 03/05/2019

1880 Field equipment 0% 20 dys 20/04/2019 15/05/2019


1881 Automation panels/local automation stations and programming 0% 15 dys 15/04/2019 03/05/2019
1882 Last fix: sensors and equipment installed on walls 0% 15 dys 08/07/2019 24/07/2019
1883 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 25/07/2019 05/08/2019
confirmation for ceilings
1884 20th Floor 0% 135 dys 16/03/2019 26/08/2019
1885 HVAC 0% 122 dys 16/03/2019 09/08/2019
1886 Piping distribution, including insulation, valves and accessories 0% 20 dys 16/03/2019 08/04/2019
1887 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 16/03/2019 08/04/2019
1888 Equipment 0% 20 dys 28/03/2019 19/04/2019
1889 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 30/07/2019 09/08/2019
1890 Sanitary and fire fighting 0% 120 dys 22/03/2019 13/08/2019
1891 Water and sewage piping distribution, including valves and accessories 0% 15 dys 22/03/2019 08/04/2019
1892 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 22/03/2019 13/04/2019
1893 Last fix: sanitary fixtures 0% 7 dys 06/08/2019 13/08/2019
1894 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 30/07/2019 09/08/2019
1895 Last fix: hydrant boxes 0% 10 dys 16/05/2019 27/05/2019
1896 Low Voltage 0% 125 dys 28/03/2019 26/08/2019
1897 Cable trays and empty tubes 0% 20 dys 28/03/2019 19/04/2019

1898 Cabling 0% 20 dys 09/04/2019 03/05/2019


1899 Electrical pannels, electrical equipment and connections 0% 15 dys 20/04/2019 09/05/2019
1900 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 30/07/2019 09/08/2019
Employer's confirmation for Ceilings
1901 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 14/08/2019 26/08/2019
1902 Extra low voltage (Low currents) and BMS 0% 112 dys 28/03/2019 09/08/2019
1903 Cable trays and empty tubes 0% 20 dys 28/03/2019 19/04/2019
1904 Cabling 0% 20 dys 09/04/2019 03/05/2019

1905 Field equipment 0% 20 dys 20/04/2019 15/05/2019


1906 Automation panels/local automation stations and programming 0% 15 dys 15/04/2019 03/05/2019
1907 Last fix: sensors and equipment installed on walls 0% 15 dys 12/07/2019 29/07/2019
1908 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 30/07/2019 09/08/2019
confirmation for ceilings
1909 21st Floor 0% 129 dys 28/03/2019 30/08/2019
1910 HVAC 0% 116 dys 28/03/2019 14/08/2019
1911 Piping distribution, including insulation, valves and accessories 0% 20 dys 28/03/2019 19/04/2019
1912 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 28/03/2019 19/04/2019
1913 Equipment 0% 20 dys 09/04/2019 03/05/2019
1914 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 03/08/2019 14/08/2019
1915 Sanitary and fire fighting 0% 114 dys 03/04/2019 19/08/2019
1916 Water and sewage piping distribution, including valves and accessories 0% 15 dys 03/04/2019 19/04/2019
1917 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 03/04/2019 25/04/2019
1918 Last fix: sanitary fixtures 0% 7 dys 10/08/2019 19/08/2019
1919 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 03/08/2019 14/08/2019
1920 Last fix: hydrant boxes 0% 10 dys 22/05/2019 03/06/2019
1921 Low Voltage 0% 119 dys 09/04/2019 30/08/2019
1922 Cable trays and empty tubes 0% 20 dys 09/04/2019 03/05/2019

1923 Cabling 0% 20 dys 20/04/2019 15/05/2019


1924 Electrical pannels, electrical equipment and connections 0% 15 dys 04/05/2019 21/05/2019
1925 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 03/08/2019 14/08/2019
Employer's confirmation for Ceilings
1926 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 20/08/2019 30/08/2019
1927 Extra low voltage (Low currents) and BMS 0% 106 dys 09/04/2019 14/08/2019
1928 Cable trays and empty tubes 0% 20 dys 09/04/2019 03/05/2019
1929 Cabling 0% 20 dys 20/04/2019 15/05/2019

1930 Field equipment 0% 20 dys 04/05/2019 27/05/2019


1931 Automation panels/local automation stations and programming 0% 15 dys 26/04/2019 15/05/2019
1932 Last fix: sensors and equipment installed on walls 0% 15 dys 17/07/2019 02/08/2019
1933 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 03/08/2019 14/08/2019
confirmation for ceilings
1934 22nd Floor 0% 133 dys 28/03/2019 04/09/2019
1935 HVAC 0% 120 dys 28/03/2019 20/08/2019
1936 Piping distribution, including insulation, valves and accessories 0% 20 dys 28/03/2019 19/04/2019
1937 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 28/03/2019 19/04/2019
1938 Equipment 0% 20 dys 09/04/2019 03/05/2019
1939 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 08/08/2019 20/08/2019
1940 Sanitary and fire fighting 0% 118 dys 03/04/2019 23/08/2019
1941 Water and sewage piping distribution, including valves and accessories 0% 15 dys 03/04/2019 19/04/2019
1942 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 03/04/2019 25/04/2019
1943 Last fix: sanitary fixtures 0% 7 dys 16/08/2019 23/08/2019
1944 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 08/08/2019 20/08/2019
1945 Last fix: hydrant boxes 0% 10 dys 28/05/2019 08/06/2019
1946 Low Voltage 0% 123 dys 09/04/2019 04/09/2019
1947 Cable trays and empty tubes 0% 20 dys 09/04/2019 03/05/2019

1948 Cabling 0% 20 dys 20/04/2019 15/05/2019


1949 Electrical pannels, electrical equipment and connections 0% 15 dys 04/05/2019 21/05/2019
1950 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 08/08/2019 20/08/2019
Employer's confirmation for Ceilings
1951 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 24/08/2019 04/09/2019
1952 Extra low voltage (Low currents) and BMS 0% 110 dys 09/04/2019 20/08/2019

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline Manual Progress
Split External Tasks Inactive Summary Manual Summary Critical
Milestone External Milestone Manual Task Start-only Critical Split
Summary Inactive Task Duration-only Finish-only Progress

Data de referinta 31.10.2018


Cladire Birouri Ana Tower / Ana Tower Office Building
Grafic de lucrari / Time schedule

ID Task Name % Duration Start Finish 2019


Complete November December January February March April May June July August September October November
29/10
05/11
12/11
19/11
26/11
03/12
10/12
17/12
24/12
31/12
07/01
14/01
21/01
28/01
04/02
11/02
18/02
25/02
04/03
11/03
18/03
25/03
01/04
08/0415/04
22/04
29/04
06/05
13/05
20/05
27/05
03/06
10/06
17/06
24/06
01/07
08/07
15/07
22/07
29/07
05/08
12/08
19/08
26/08
02/09
09/09
16/09
23/09
30/09
07/10
14/10
21/10
28/10
04/11
11/11
18/11
1953 Cable trays and empty tubes 0% 20 dys 09/04/2019 03/05/2019
1954 Cabling 0% 20 dys 20/04/2019 15/05/2019

1955 Field equipment 0% 20 dys 04/05/2019 27/05/2019


1956 Automation panels/local automation stations and programming 0% 15 dys 26/04/2019 15/05/2019
1957 Last fix: sensors and equipment installed on walls 0% 15 dys 22/07/2019 07/08/2019
1958 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 08/08/2019 20/08/2019
confirmation for ceilings
1959 23rd Floor 0% 127 dys 09/04/2019 09/09/2019
1960 HVAC 0% 114 dys 09/04/2019 24/08/2019
1961 Piping distribution, including insulation, valves and accessories 0% 20 dys 09/04/2019 03/05/2019
1962 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 09/04/2019 03/05/2019
1963 Equipment 0% 20 dys 20/04/2019 15/05/2019
1964 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 13/08/2019 24/08/2019
1965 Sanitary and fire fighting 0% 112 dys 15/04/2019 28/08/2019
1966 Water and sewage piping distribution, including valves and accessories 0% 15 dys 15/04/2019 03/05/2019
1967 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 15/04/2019 09/05/2019
1968 Last fix: sanitary fixtures 0% 7 dys 21/08/2019 28/08/2019
1969 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 13/08/2019 24/08/2019
1970 Last fix: hydrant boxes 0% 10 dys 04/06/2019 14/06/2019
1971 Low Voltage 0% 117 dys 20/04/2019 09/09/2019
1972 Cable trays and empty tubes 0% 20 dys 20/04/2019 15/05/2019

1973 Cabling 0% 20 dys 04/05/2019 27/05/2019


1974 Electrical pannels, electrical equipment and connections 0% 15 dys 16/05/2019 03/06/2019
1975 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 13/08/2019 24/08/2019
Employer's confirmation for Ceilings
1976 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 29/08/2019 09/09/2019
1977 Extra low voltage (Low currents) and BMS 0% 104 dys 20/04/2019 24/08/2019
1978 Cable trays and empty tubes 0% 20 dys 20/04/2019 15/05/2019
1979 Cabling 0% 20 dys 04/05/2019 27/05/2019

1980 Field equipment 0% 20 dys 16/05/2019 08/06/2019


1981 Automation panels/local automation stations and programming 0% 15 dys 10/05/2019 27/05/2019
1982 Last fix: sensors and equipment installed on walls 0% 15 dys 26/07/2019 12/08/2019
1983 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 13/08/2019 24/08/2019
confirmation for ceilings
1984 24th Floor 0% 131 dys 09/04/2019 13/09/2019
1985 HVAC 0% 118 dys 09/04/2019 29/08/2019
1986 Piping distribution, including insulation, valves and accessories 0% 20 dys 09/04/2019 03/05/2019
1987 Ductwork distribution, including insulation, dampers and accessories 0% 20 dys 09/04/2019 03/05/2019
1988 Equipment 0% 20 dys 20/04/2019 15/05/2019
1989 Last fix: grilles-subject for Employer's confirmation for Ceilings 0% 10 dys 19/08/2019 29/08/2019
1990 Sanitary and fire fighting 0% 116 dys 15/04/2019 02/09/2019
1991 Water and sewage piping distribution, including valves and accessories 0% 15 dys 15/04/2019 03/05/2019
1992 Sprinkler and hydrant piping distribution, including valves and accessories 0% 20 dys 15/04/2019 09/05/2019
1993 Last fix: sanitary fixtures 0% 7 dys 26/08/2019 02/09/2019
1994 Last fix: sprinkler heads-subject for Employer's confirmation for Ceilings 0% 10 dys 19/08/2019 29/08/2019
1995 Last fix: hydrant boxes 0% 10 dys 10/06/2019 21/06/2019
1996 Low Voltage 0% 121 dys 20/04/2019 13/09/2019
1997 Cable trays and empty tubes 0% 20 dys 20/04/2019 15/05/2019

1998 Cabling 0% 20 dys 04/05/2019 27/05/2019


1999 Electrical pannels, electrical equipment and connections 0% 15 dys 16/05/2019 03/06/2019
2000 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 19/08/2019 29/08/2019
Employer's confirmation for Ceilings
2001 Last fix: floor boxes-Subject for Employer's confirmation for raised floor 0% 10 dys 03/09/2019 13/09/2019
2002 Extra low voltage (Low currents) and BMS 0% 108 dys 20/04/2019 29/08/2019
2003 Cable trays and empty tubes 0% 20 dys 20/04/2019 15/05/2019
2004 Cabling 0% 20 dys 04/05/2019 27/05/2019

2005 Field equipment 0% 20 dys 16/05/2019 08/06/2019


2006 Automation panels/local automation stations and programming 0% 15 dys 10/05/2019 27/05/2019
2007 Last fix: sensors and equipment installed on walls 0% 15 dys 31/07/2019 17/08/2019
2008 Last fix: sensors and equipment installed on ceilings-Subject for Employer's 0% 10 dys 19/08/2019 29/08/2019
confirmation for ceilings
2009 Technical Floor and Terrace 0% 102 dys 20/04/2019 22/08/2019
2010 HVAC 0% 70 dys 20/04/2019 15/07/2019
2011 Piping distribution, including insulation, valves and accessories 0% 65 dys 20/04/2019 09/07/2019

2012 Ductwork distribution, including insulation, dampers and accessories 0% 70 dys 20/04/2019 15/07/2019

2013 Equipment 0% 60 dys 04/05/2019 15/07/2019


2014 Last fix: grilles 0% 10 dys 04/07/2019 15/07/2019
2015 Sanitary and fire fighting 0% 97 dys 26/04/2019 22/08/2019
2016 Water and sewage piping distribution, including valves and accessories 0% 20 dys 26/04/2019 21/05/2019
2017 Hydrant piping distribution, including valves and accessories 0% 20 dys 26/04/2019 21/05/2019
2018 Rain water receptors 0% 5 dys 10/05/2019 15/05/2019
2019 Last fix: sanitary fixtures 0% 7 dys 14/08/2019 22/08/2019
2020 Last fix: hydrant boxes 0% 10 dys 10/08/2019 22/08/2019
2021 Low Voltage 0% 71 dys 04/05/2019 27/07/2019
2022 Cable trays and empty tubes 0% 50 dys 04/05/2019 03/07/2019

2023 Cabling 0% 55 dys 16/05/2019 20/07/2019


2024 Electrical pannels, electrical equipment and connections 0% 40 dys 28/05/2019 15/07/2019
2025 Last fix: lighting fixtures, switchessockets, motion detectors--subject for 0% 10 dys 17/07/2019 27/07/2019
Employer's confirmation for Ceilings
2026 Extra low voltage (Low currents) and BMS 0% 92 dys 04/05/2019 22/08/2019
2027 Cable trays and empty tubes 0% 50 dys 04/05/2019 03/07/2019
2028 Cabling 0% 60 dys 16/05/2019 26/07/2019

2029 Field equipment 0% 40 dys 28/05/2019 15/07/2019


2030 Automation panels/local automation stations and programming 0% 40 dys 10/06/2019 26/07/2019
2031 Last fix: sensors and equipment 0% 15 dys 05/08/2019 22/08/2019
2032 Montat lifturi/ elevators 0% 110 dys 02/04/2019 06/09/2019
2033 Finisaje scari / Staires finishings 0% 45 dys 23/07/2019 23/09/2019
2034 Aplicare vopsea epoxidica, mana curenta, etc / Epoxi finishes, metallic structure, etc
0% 45 dys 23/07/2019 23/09/2019
2035 Lucrari exterioare / External works 0% 60 dys 02/08/2019 24/10/2019
2036 Testare si comisionare / Testing and Commissioning 0% 40 dys 24/09/2019 08/11/2019

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline Manual Progress
Split External Tasks Inactive Summary Manual Summary Critical
Milestone External Milestone Manual Task Start-only Critical Split
Summary Inactive Task Duration-only Finish-only Progress

Data de referinta 31.10.2018