BY:
DIAN EKSANA WIBOWO, DIKA WAHYU TRI WARDANI , ELANK
VICKY CANDRA PRADIPTA
The problem that happen in the river bends
The example of Check Dam installation in the river
bends
The example of bronjong installation in the river bends
The Objective of the
research
Modeling design
Preparation
Preparation of Equipment
Preparation of Measurement Aids
Preparation of channel base material
Running Preparation
Preparation of the distance variation
Research
Conclusion
Done
Gabion preperation
Check dam preperation
Transverse profile of the river
Result
18
16
14
12
10
0
0 5 10 15 20 25 30 35
Gabion in 34
cm
Gabion in 51
cm
Check dam in
68 cm
Check dam in
85 cm
Check dam in
102 cm
Comparison Graphic in the middle of the
river bends
20
18
16
14
12
10
0
0 5 10 15 20 25 30 35
34 cm -0,01cm
85 cm -0,96 cm +1,32 cm
51 cm -1,07 cm
102 cm -0,50 cm -
Gabion in 17
cm
Gabion in 34
cm
Gabion in 51
cm
Check dam in
68 cm
Check dam in
85 cm
Check dam in
102 cm
Comparison Graphic in the end of the river
bends
20
18
16
14
12
10
0
0 5 10 15 20 25 30 35
Gabion in 34
cm
Gabion in 51
cm
Check dam in
68 cm
Check dam in
85 cm
Check dam in
102 cm
Conclusion
The research findings could be concluded that the strength of
check dam in the river bends was effective by using 85 cm
distance for the beginning and the end bends, also by using
102 cm for the middle bends. Using the strength of gabion was
effective by using 34 cm distance to use in the first and middle
bends, then in the last bends was effective by using 17 cm
distance.
The effective reinforcement for the beginning of the river
bends is by using check dam, and for the middle and the
ends of the river bends is by using gabion.