1. Plinth Area (PA) rates for Married Accommodation based on Standard Schedule
of Rates (SSR) 2010 as approved by Government is at Appendix A. These are basic
rates at par SSR 2010 for double storey conventional type of construction based on
E-in-C's Line Plans 1990 series as per Scale of Accommodation (SOA) 2009. The
specifications in brief, based on which the rates have been derived are at Annexure I.
Market variation as prevalent will be added to the estimates.
3. Additional provision over the rates at Appendix A will be made for the following:-
D
J shown at Appendix B caters for construction upto six storeys only.
(e) Anti-Termite Safeguards. This will be calculated for the ground floor area
only. For pre-treatment of soil and foundation, additional rate admissible will be
as per Appendix B.
.'
2
(f) Ceiling Height The rates given at Appendix A are for a floor to
ceiling height of 290 em. In case increased height is necessary, extra element as
per Appendix B will be allowed in the AEs.
(k) In case alternate specifications other than those mentioned in this letter
are desired to be adopted due to local practice I environmental conditions not
covered above, these shall be clearly spell out in the Board Proceedings and
specifically explained in the estimates giving financial effect of each item
separately.
(I) All concrete work included in PA rates I additional rates are of M25 grade.
4. The PA rates include cost of built-in items of furniture to the extent mentioned at
Appendix A. All other items shall be provisioned separately in the furniture estimates.
5. Servant quarters and garages will normally be built as part of the main building of
officers' quarter and rates for relevant accommodation will be applicable to that
construction also. However, wherever servants quarters and garages are built detached
from the main building due to site conditions, PA rates as shown at Appendix A for
servant quarters and garages will be applicable.
possible. CEs will ensure maximum economy in design and specifications, so that the
pre-priced amount does not exceed the cost of work as per approved PA rates. If there
is any variation, the same would be explained specifically giving financial effect of each
item separately. Where the pre-priced PA rates happen to be less than the approved PA
rates, a reduction statement shall be initiated to account for the same.
7. The PA Rates above are issued with the concurrence of the MoD I D (Works-1)
vide their U.O. No. 650/D (W-1)/12 dated 18 Oct 12.
(SK Khanna)
Brig
DDGW (PPC & Est)
Encls : As above.
Copy to:-
MoD I D (Works-ll
Coast Guards HQ
National Stadium Complex
New Delhi- 110001.
Internal
Appendix A
(Refers to E-in-C's Branch letter No
AI839751PAIMd AccniE2W (PPC) dated O'f- Dec 12)
Remarks:-
(iii) Cupboard I Wardrobes (3 Nos for Major and above & 2 Nos for
Capt and below).
5. At stations, where fans are not authorised, the following amount may be
deducted from the total cost, for a block of 4 quarters: -
Remarks:-
Appendix B
(Refers to E-in-C's Branch letter No
N83975/PAJMd Accn/E2W (PPC) dated 04- Dec 12)
PA RATES TO BE ADDED I OMITTED FROM BASIC PA RATE ON ACCOUNT OF
VARIOUS ADDITIONAL FACTORS OTHER THAN THOSE GIVEN AT APPENDIX A
17. (b) Terrazo Tiles Flooring with mixture of Grey and White
cement and no pigment in lieu of PCC Flooring
714
(c) Ceramic Tiles Flooring in lieu of PCC Flooring 415
(d) Kota Stone Flooring in lieu of PCC Flooring 433
Cost of following Internal finishes: -
(a) Dry Distemper in lieu of White Wash 8
18.
(b) Oil Bound in lieu of Dry Distemper 11
(c) Plastic Emulsion Paint in lieu of Oil Bound Distemper. 23
Cost for providing Copper Cable Wiring in lieu of fittings in lieu
19. of Aluminium Wiring
55
Cost for providing Fluorescent Tube Light fittings I CFL fittings
20. 24
in lieu of Incandescent light.
21. Cost for providing Cement Based Paint only 37
22. Cost for providing Stone Masonary in lieu of Brick Masonary. 888
·- 8
Annexure I
(Refers to E-in-C's Branch letter No
A/83975/PA/Md Accn/E2W (PPC) dated z:if- Dec 12)
BRIEF SPECIFICATIONS- MARRIED ACCOMMODATION
[::·~~;=~ ~E~i~s'"=·;cc,~~--~-~~~~
i _Qi='_g_____________________________~_LE_Q.Q__1~.2.-~-'N. it h__l/j<:~tE:lr__l''~()_()_fif1_g__ g_()_rT1_R_()~Il_cJ_._____________ ---------------------------------:
!~~!~~~:~~~:--~=::t~i~J:VJ~:l~!:~~:!~~~:~-of~~-::,~t-~:~~=:-~~~:~~=:~~~::=~~;~~~=
f ~~f~~%t_~~-Rg_()L__ _;--~-~:::~~~!;~\g!%J~f:~~~:d~\~:.-Q~()_u_t~d_if1_g_~__1_:3: __________________ _
-Fi"oorfn_g________________________________ -For Officers:ViilifTeCi7-ceramic--t1ie-s--over---f5-mm---iFiick'-scree_d__
bed in CM 1:4 over a layer of PCC 1:2:4 over sub base of PCC
1:5:10 as applicable.
For JCO I OR. Ceramic Tiles over 15mm thick screed bed in
CM 1:4 over a layer of PCC 1:2:4 over sub base of PCC 1:5:10
-------------------------------------------- __§_~_i:IP.()_I_ic;<:~~-!~,------------------------------------------------------------------------------------
Dado I Skirting For Officers.Vitrified I Ceramic Tiles dado I skirting over 10mm
thick cement screed in CM 1:3.
For JCO I OR. Ceramic Tiles dado I skirting over 10mm thick
----------------------- ce~_scr~~cj__if1__ g_M_J:_~'----------------------------------------------------------------'
Joinery (Doors & j : Frames. Second Class Hardwood.
--~~n-~-:~_> _ _ _ _ _ _ _ _ _ _ _ -~~~~;!~~:r~~~:.c~~~~-~~~~--~~~~~~~~~~[~~~b~:{~La.~-s~------------
Steel Grills/Guard : Steel Grills to Windows in Officers' Quarters and Guard Bars to ,
__E3_§i_8____________________~thers ·------------------------------------------------------------------------------------------------
f Fly Proofing : · Fly Proofing to Kitchen, Doors & Windows. .
J lron-Mongery·-----------------;-- -~u-~~~~-;;~A~~~~~~(f-titifrl9s__i_n___ofiicers-.--·-a·u-arters---ancriJTa-ci<-
--FTnisfl-es_________ Externai.-Resin--sase<:r--ralni"---iil--oifice-rs-.----a·u-arters-:--e:-en;·enfi
Based Paint in others quarters.
Internal. Oil Bound distemper in Officers' Quarters, Dry
Distemper in other quarters, White washes in servant quarter I
_______________________ ara.~~---------------------------------------------------------------------------------------------
Eiectric wiring . Concealed Conduit Electric Copper Wiring using PVC Conduit
_______________________________ wi!l_l__g F'=_Lfi.'=__@il}g_,_______________________________________________________________________,
~~=~~upp[y--------+c~~~ ~~~i*i~~i~r~a~~~i~~~~~g~~v~-6~~/t;~r~~~-~:_______________________,
·s-anita-ryFitti ngs·-----------q:Vii-reo-us-cflTnawareof'app-ro-verfm-ake--(Vilhilef' _____________________
::F>:[fil1~:£>:fiJ_t_~~tiQ~:::=::=::::1::?.~i!iiilJ~~~rfl:g:QJ::~:~=~Ye~::g_~?-~q~~r.::s.:f~6:~:Ea.i~:~~~~:::::::::::~~::~~::~~