V = 2.2 m/s
g = 9.81 m/s2
Ss = 2.35
T = 0.10497321 m
er 5.6.3 of IS 10751-1995
= 48.6 m
on length needed
A Apron Design
V = 2.2 m/s
g = 9.81 m/s2
Ss = 2.35
T = 0.10497321 m
er 5.6.3 of IS 10751-1995
= 42.4 m
on length needed
A Apron Design
V = 2.2 m/s
g = 9.81 m/s2
Ss = 2.35
T = 0.10497321 m
er 5.6.3 of IS 10751-1995
= 37.1 m
on length needed
A Apron Design
V = 2.2 m/s
g = 9.81 m/s2
Ss = 2.35
T = 0.10497321 m
er 5.6.3 of IS 10751-1995
= 29.4 m
on length needed
2 Apron Design
C) WEIGHT OF GEOBAG
D50 = 0.36 mm
Porisity e = 0.35208
Sm = 1.52262
φ 0
= 30 0.5236
V = 2 m/s
Sm = 1.52262
K = 0.45
W = 35.5345 Kg
of
Geobag = W / (Sm x 1000)
s
g = 9.81 m/s2
Sm = 1.52262
T = 0.60953 m
*** Notes
1 Bund Height should be increased upto 05. to 1 m (as Free board above HFL is required upto 1m)
2 4 layers of geobags or 1 layer of mega bag is required in apron pitching. These are either interconnected
3 Top Bund should be at slope towards drains for catching runof
ed over apron