Anda di halaman 1dari 12

A Apron Design

Qmax = 90000 cumecs

1 CALCULATION OF SCOUR DEPTH


As per CL 5.6.3 of IS - 10751-1995
Silt factor f = 0.95

D = 0.473 * (Q/f) 1/3 Asp er 5.6.3 of IS 10751-1995

D = 21.58 m Below LWL

Maximum scour depth Dmax = 2.25 * D

Width of Launching Apron = 1.5*[Dmax]

Apron Length = 72.8 m Apron length needed

2 CALCULATION OF THICKNESS OF GEO BAG IN APRON

V = 2.2 m/s

g = 9.81 m/s2

Ss = 2.35

T = 0.10497321 m

NO OF GEOBAGS (1.03 MX0.7M) FOR APRON LENGTH = 72.8 M 117 NOS


(d50) 0.29
f =1.76 * (d50) 1/2

er 5.6.3 of IS 10751-1995

= 48.6 m

on length needed
A Apron Design

Qmax = 60000 cumecs

1 CALCULATION OF SCOUR DEPTH


As per CL 5.6.3 of IS - 10751-1995
Silt factor f = 0.95

D = 0.473 * (Q/f) 1/3 Asp er 5.6.3 of IS 10751-1995

D = 18.85 m Below LWL

Maximum scour depth Dmax = 2.25 * D

Width of Launching Apron = 1.5*[Dmax]

Apron Length = 63.6 m Apron length needed

2 CALCULATION OF THICKNESS OF GEO BAG IN APRON

V = 2.2 m/s

g = 9.81 m/s2

Ss = 2.35

T = 0.10497321 m

NO OF GEOBAGS (1.03 MX0.7M) FOR APRON LENGTH = 63.6 M 102 NOS


(d50) 0.29
f =1.76 * (d50) 1/2

er 5.6.3 of IS 10751-1995

= 42.4 m

on length needed
A Apron Design

Qmax = 40000 cumecs

1 CALCULATION OF SCOUR DEPTH


As per CL 5.6.3 of IS - 10751-1995
Silt factor f = 0.95

D = 0.473 * (Q/f) 1/3 Asp er 5.6.3 of IS 10751-1995

D = 16.47 m Below LWL

Maximum scour depth Dmax = 2.25 * D

Width of Launching Apron = 1.5*[Dmax]

Apron Length = 55.6 m Apron length needed

2 CALCULATION OF THICKNESS OF GEO BAG IN APRON

V = 2.2 m/s

g = 9.81 m/s2

Ss = 2.35

T = 0.10497321 m

NO OF GEOBAGS (1.03 MX0.7M) FOR APRON LENGTH = 55.6 M 89 NOS


(d50) 0.29
f =1.76 * (d50) 1/2

er 5.6.3 of IS 10751-1995

= 37.1 m

on length needed
A Apron Design

Qmax = 20000 cumecs

1 CALCULATION OF SCOUR DEPTH


As per CL 5.6.3 of IS - 10751-1995
Silt factor f = 0.95

D = 0.473 * (Q/f) 1/3 Asp er 5.6.3 of IS 10751-1995

D = 13.07 m Below LWL

Maximum scour depth Dmax = 2.25 * D

Width of Launching Apron = 1.5*[Dmax]

Apron Length = 44.1 m Apron length needed

2 CALCULATION OF THICKNESS OF GEO BAG IN APRON

V = 2.2 m/s

g = 9.81 m/s2

Ss = 2.35

T = 0.10497321 m

NO OF GEOBAGS (1.03 MX0.7M) FOR APRON LENGTH = 44.1 M 71 NOS


(d50) 0.29
f =1.76 * (d50) 1/2

er 5.6.3 of IS 10751-1995

= 29.4 m

on length needed
2 Apron Design

Qmax = 1500 cumecs

B ) CALCULATION OF SCOUR DEPTH


f =1.76 * (d50)
1/2
As per CL 5.6.3 of IS - 10751-1995 OR
d = 0.2
Silt factor f = 0.7871

D = 0.473 * (Q/f) 1/3 Asp er 5.6.3 of IS 10751-1995

D = 5.86 m Below HFL

Maximum scour depth Dmax = 1.5 * D = 8.8 m

C) WEIGHT OF GEOBAG

Assumed mass specific gravity in Geob SS = 2.35

D50 = 0.36 mm

Porisity e = 0.35208

Sm = 1.52262

As per CL 3.1 of IS 14262-1995


Ɵ 0
= 26.58 0.46391

φ 0
= 30 0.5236

V = 2 m/s

Sm = 1.52262

K = 0.45

W = 35.5345 Kg
of
Geobag = W / (Sm x 1000)
s

Volume of = 0.02334 cum


Geo bag

E) Design of Geo bag PitchingAs per CL 3.5 of IS 14262-1995


V = 2.5 m/s

g = 9.81 m/s2

Sm = 1.52262

T = 0.60953 m

T = 60.95 cm Thickness of pitching required over apron

Width of Launching Apron = 1.5*[Dmax- (HFL-LWL) ]

Apron Length = #REF! m Apron length needed

*** Notes
1 Bund Height should be increased upto 05. to 1 m (as Free board above HFL is required upto 1m)
2 4 layers of geobags or 1 layer of mega bag is required in apron pitching. These are either interconnected
3 Top Bund should be at slope towards drains for catching runof
ed over apron

HFL is required upto 1m)


These are either interconnected with nylon ropes or Geobags put in crates at LWL.