RAB (RENCANA ANGGARAN BIAYA)

NAMA PEKERJAAN : PENGADAAN BACKDROOF


LOKASI : ULP PROV. JABAR

HARGA
NO URAIAN PEKERJAAN VOL SAT
SATUAN

A BACKDROOF
1 Pasangan Rangka Hollow 4x4; 2/4 101.21 m² 313,698.29
2 Pasangan Multipleks 18 mm 40.77 m² 158,436.22
3 Pasangan Multipleks 12 mm 40.77 m² 134,951.22
4 Pasangan HPL 81.54 m² 188,347.85
5 Pasangan Strip Stainless 1 mm 28.00 btg 40,000.00
6 Pasangan Gypsum 9mm 125.86 m² 47,027.00
7 Pasangan Wallpaper 125.86 m² 154,129.00
8 Pasangan Plint Lantai (Multipleks 12 mm) 3.00 m² 143,309.03
9 Pasangan HPL Plint Lantai 5.00 m² 188,347.85

B PLAFOND
1 Pasangan Rangka Hollow 4x4 9.80 m² 92,185.83
2 Pasangan Gypsum 9 mm 9.80 m² 47,027.43
3 Pasangan Instalasi Listrik 5.00 ttk 274,999.15
4 Pasangan Lampu Down Light 5.00 bh 317,622.10
5 Pasangan Lampu SL 18 Watt 5.00 bh 647,622.10
6 Pasangan Lampu Barret 1.00 bh 250,000.00
7 Pasangan Saklar Tunggal 1.00 bh 86,478.92

C PINTU DAN JENDELA


1 Pasangan Pintu Multipleks Fin. HPL 2.00 bh 1,220,000.00
2 Pasangan Kaca Cermin 0.90 m² 336,518.36
3 Pasangan Dinding Banner 2.00 ls 210,000.00

D PENGECATAN
1 Pengecatan Plafond 65.21 m² 61,908.20

E MEJA RECEPTIONIST (Hand Made)


1 Pasang Multipleks 18mm 49.23 m² 158,436.22
2 Pasang Multipleks 12mm 43.72 m² 134,951.22
3 Pasang HPL 42.86 m² 188,347.85
4 Pasang Strip Stainless 0.02 x 0.7 m 24.44 m² 48,000.00
5 Accessories 1.07 m¹ 750,000.00

Jumlah
Ppn 10%
JUMLAH TOTAL
JUMLAH
HARGA

31,749,403.87
6,459,444.60
5,501,961.15
15,357,883.61
1,120,000.00
5,918,818.22
19,398,675.94
429,927.09
941,739.24

903,421.14
460,868.84
1,374,995.76
1,588,110.50
3,238,110.50
250,000.00
86,478.92

2,440,000.00
302,866.52
420,000.00

4,037,033.75

7,800,000.00
5,900,000.00
8,073,000.00
1,173,000.00
804,000.00

125,729,739.66
12,572,973.97
138,302,713.62