Anda di halaman 1dari 2

VII.

PERHITUNGAN BALOK INDUK


A. LANTAI 2 As 2-AB
A. Data Perencanaan
Kuat Tekan Balok (Fc') = 30 Mpa
Teg. Leleh Tul. Lentur (Fy) = 400 Mpa
Teg. Leleh Tul. Geser (Fy) = 400 Mpa
Faktor Distribusi Teg. Beton (β1) = 0.84
Faktor Reduksi Kekuatan lentur (ϕ) = 0.9
Faktor Reduksi Kekuatan Geser dan torsi (ϕ) = 0.75
Tebal Selimut (ts) = 50 mm
L = 5 m
b = 350 mm
h = 500 mm
d = 450 mm

Berdasarkan Output SAP


Momen Tump kiri = 117920974 N-mm = 117920974 Nmm
Momen Lapangan = 69183779.89 N-mm = 69183779.89 Nmm
Momen Tump kanan = 356608391 N-mm = 356608391 Nmm
Geser Tumpuan = 142854.4253 Kg = 1428544.253 N
Torsi = 38635331 N-mm = 38635331 Nmm

Perhitungan Tulangan Lentur Balok


ρ min = 0.0035
ρ max = 0.025

Mu Mn m Rn ρ ρ pakai As Perlu TUL Tarik Pasang


kontrol
Nmm Nmm mm² D n As pasang
Tmp. Kiri 117920974 131023304.4 15.954 1.85 0.005 0.005 756.93 22 2 760.265 OK

MOHAMAD AGUS JIDNI


10111510000055
Lapangan 69183779.89 76870866.54 15.954 1.08 0.003 0.004 551.25 22 2 760.265 OK
Tmp. Kanan 356608391 396231545.6 15.954 5.59 0.016 0.016 2523.93 22 7 2660.93 OK

Mu Mn m Rn ρ ρ pakai As' Perlu TUL Tekan Pasang


kontrol
Nmm Nmm mm² D n As pasang
Tmp. Kiri 117920974 131023304.4 15.954 1.85 0.005 0.005 378.463 16 2 402.124 OK
Lapangan 69183779.89 76870866.54 15.954 1.08 0.003 0.004 275.625 16 2 402.124 OK
Tmp. Kanan 356608391 396231545.6 15.954 5.59 0.016 0.016 1261.966 22 4 1520.53 OK

Perhitungan Tulangan Geser


Vc = 0

Momen kap (+) Momen kap (-) Vu (N) Vs S S pakai Av Ǿ Sengkang Jumlah kaki
Nmm Nmm Kanan Kiri N mm mm mm2 mm
Tmp. Kiri 237161623.6 123084371.7 142854 190472.5671 113 100 105.818 10 2
Tmp. Kanan 541188706.1 300967101.6 86298.8 115065.0928 113 100 63.9251 10 2

Jadi, pasang tulangan geser : ø 10 - 100

Perhitungan tulangan torsi pada balok


Tu = 38635331.000 Nmm
Tn = 51513774.667 Nmm

Luas Penampang Keliling Penampang Kuat Torsi


Tn < T
Acp Pcp T
mm² mm Nmm Nmm
175000 1700 27956672.21 Tidak Perlu Tul.Torsi