250,476,000 Dua Ratus Lima Puluh Juta Empat Ratus Tujuh Puluh
Enam Ribu Rupiah
Sesuaikan sel yang berwarna merah dengan Sel yang akan ditulis terbilang pada Sheet anda
0
1 Satu
Sepuluh Ribu 2 Dua
Sebelas Ribu 3 Tiga
Belas Ribu 4 Empat
Puluh 5 Lima
Seratus 6 Enam
Ratus 7 Tujuh
Satu Juta 8 Delapan
Juta 9 Sembilan
250476000 250476000
MILYARAN
Enam Ribu 250 JUTAAN
Tujuh Puluh 476 RIBUAN
Empat Ratus 000 RATUSAN
Juta
Lima Puluh
Dua Ratus
PEMERINTAH KABUPATEN MANGGARAI TIMUR
DINAS PEMBERDAYAAN MASYARAKAT DAN DESA
JALAN LEHONG - BORONG - MANGGARAI TIMUR
RINCIAN PERHITUNGAN
KODE
URAIAN HARGA SATUAN JUMLAH DANA DESA
REKENING VOLUME SATUAN
(Rp) (Rp) (Rp)
1 2 3 4 5 6=5X4 7
BELANJA DESA
2.2.1 PEKERJAAN PENINGKATAN JALAN BENTENG JAWA - RENTUNG - SP. TUWA 250,476,739.96 250,476,739.96
2.2.1.1 Belanja Barang Dan jasa 25,152,739.00 25,152,739.00
1. Upah Kerja 12,241,567.00 12,241,567.00
a. Pekerja 1,295.00 OH 8,286.00 10,730,370.00 10,730,370.00
b. Tukang 124.45 OH 12,143.00 1,511,197.00 1,511,197.00
c. Kepala Tukang - OH - - -
d. Mandor - OH - - -
2. Honor Tim 12,911,172.00 12,911,172.00
a. Operasional Tim Pelaksana Kegiatan 2 %
- ATK - -
Bolpoint 3.00 Bh 5,000.00 15,000.00 15,000.00
Buku Tulis 1.00 Bh 5,000.00 5,000.00 5,000.00
Kertas HVS 2.00 Rim 55,000.00 110,000.00 110,000.00
Mistar Plastik 1.00 Bh 3,000.00 3,000.00 3,000.00
- -
- Dokumentasi dan Penggandaan - -
Foto Copy 100.00 Lembar 200.00 20,000.00 20,000.00
Cuci Foto Kegiatan 10.00 Lembar 1,500.00 15,000.00 15,000.00
- -
- Honor TPK 1.00 LS 4,996,469.00 4,996,469.00 4,996,469.00
b. Biaya Perencana 3 % 1.00 LS 7,746,703.00 7,746,703.00 7,746,703.00
DISETUJUI / MENGESAHKAN :
KEPALA DESA GORENG MENI
KEC. LAMBA LEDA
ALEKSIUS TALIS
ARAI TIMUR
AT DAN DESA
UR
SUMBER DANA
TOTAL
ADD BPHP/RD PADes SILPA
(Rp) (Rp) (Rp) (Rp) (Rp)
8 9 10 11 12
250,476,739.96
25,152,739.00
12,241,567.00
- - - - 10,730,370.00
- - - - 1,511,197.00
-
- - - - -
12,911,172.00
- - - - -
- - - - 15,000.00
5,000.00
110,000.00
3,000.00
-
-
20,000.00
15,000.00
-
4,996,469.00
- - - - 7,746,703.00
225,324,000.96
173,704,252.00
173,704,252.00
- - - - 106,699,264.00
- - - - 33,502,494.00
33,502,494.00
15,985,920.00
9,035,520.00
- - - - -
- - - - -
- - - - -
26,598,308.96
- - - - 5,755,161.76
- - - - 20,000,000.00
- - - - 508,121.83
335,025.38
- - - - -
- - - - -
- - - - -
-
(………………………………………………………..)
PEMERINTAH KABUPATEN MANGGARAI TIMUR
DESA GORENG MENI - KEC. LAMBA LEDA
TAHUN ANGGARAN 2018
DESA : GORENG MENI NO. RAB : 1
KECAMATAN : LAMBA LEDA BIDANG : PEMBANGUNAN DE
KABUPATEN : MANGGARAI TIMUR KEGIATAN : PEKERJAAN PENIN
PROVINSI : NUSA TENGGARA TIMUR : JAWA - RENTUNG -
TARGET PANJANG : 457 M'
RENCANA ANGGARAN BIAYA
A. Material
1 Batu Kancing 5/7 M3 82.00 408,567.00
2 Aspal Cair Kg 8506.00 12,544.00
3 Batu Pecah 3/5 M3 82.00 408,567.00
4 Batu Pecah 2/3 M3 23.00 695,040.00
5 Split M3 13.00 695,040.00
6 0 m3 9.0000 -
7 0 Zak 100.0000 -
8 0 m3 9.0000 -
9 0 kg 0.0000 -
10 Besi 8 mm kg 0.0000 -
11 Besi 6 mm kg 0.0000 -
12 0 kg 0.0000 -
13 0 m3 0.0000 -
14 0 lembar 2.0000 -
15 0 m3 0.2000 -
16 0 batang 1.0000 -
17 0 buah 0.0000 -
18 0 LS 1.0457 -
19 0 Buanh 16.0000 -
Total A
B. TENAGA KERJA
1 Pekerja Jam 1295.00 8,286.00
2 Tukang Jam 124.45 12,143.00
Total B
C. ALAT
1 Loader Jam 39.00 147,568.25
2 Mobilisasi LS 1.00 20,000,000.00
3 Linggis Bh 7.00 72,588.83
4 Skop Gali Bh 6.00 55,837.56
Total C
D. TOTAL HARGA
E. 3% JASA KONSULTAN DAN PERENCANA
F. 2% HONOR TPK
TOTAL RENCANA ANGGARAN BIAYA
EMBANGUNAN DESA
EKERJAAN PENINGKATAN JALAN BENTENG
AWA - RENTUNG - SP. TUWA
57 M'
33,502,494.00
106,699,264.00
33,502,494.00
15,985,920.00
9,035,520.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
198,725,692.00
10,730,370.00
1,511,196.35
12,241,566.35
5,755,161.76
20,000,000.00
508,121.83
335,025.38
26,598,308.96
237,565,567.31
7,746,703.00
5,164,469.00
250,476,739.31
PERENCANA :
KONSULTAN PERENCANA
ANALISA HARGA SATUAN PEKERJAAN PENINGKATAN JALAN BENTENG JAWA - RENTUNG - SP. T
NAMA PAKET : PEKERJAAN PENINGKATAN JALAN BENTENG JAWA - RENTUNG - SP. TUWA
DESA : GORENG MENI
KECAMATAN : LAMBA LEDA
KABUPATEN : MANGGARAI TIMUR
PROPINSI : NUSA TENGGARA TIMUR
PANJANG : 457 M'
SUMBER DANA : DD
TAHUN : 2018
TERBILANG :
Dua Ratus Lima Puluh Juta Empat Ratus Tujuh Puluh Enam Ribu Rupiah
MUR
DESA
2,050,294.45
38,313,157.85
18,190,632.26
159,011,091.31
20,000,000.00
237,565,175.87
7,746,690.52
5,164,460.35
250,476,326.73
250,476,000.00
PEMERINTAH KABUPATEN MANGGARAI TIMUR
DINAS PEMBERDAYAAN MASYARAKAT DAN DESA
Jln. Lehong - Borong - Manggarai Timur
ANALISA HARGA SATUAN PEKERJAAN PENINGKATAN JALAN BENTENG JAWA - RENTUNG - SP.
I. 1 M2 Pekerjaan Lahan Damija
NO. URAIAN KODE SATUAN KOEFISIEN
1 2 3 4 6
A. Tenaga Kerja
1. Pekerja LO.1 JAM 0.1518
2. Tukang
3. Kepala Tukang
4. Mandor LO.4 JAM 0.0400
Jumlah Harga Tenaga Kerja
B. Bahan
1 2 3 4 6
A. Tenaga Kerja
1. Pekerja LO.1 JAM 2.8110
2. Tukang
3. Kepala Tukang
4. Mandor LO.4 JAM 0.2810
Jumlah Harga Tenaga Kerja
B. Bahan
1. Batu Kancing 5/7 M.05 m3 1.2000
1 2 3 4 6
A. Tenaga Kerja
1. Pekerja LO.1 JAM 0.0933
2. Tukang LO.2
3. Kepala Tukang LO.4
4. Mandor LO.4 JAM 0.0233
Jumlah Harga Tenaga Kerja
B. Bahan
1. Aspal Cair M.14.b Kg 1.1220
1 2 3 4 6
A. Tenaga Kerja
1. Pekerja LO.1 JAM 12.4400
2. Tukang LO.2
3. Kepala Tukang LO.4
4. Mandor LO.4 JAM 0.6220
Jumlah Harga Tenaga Kerja
B. Bahan
1. Asphalt M.15 Kg 105.0400
2. Batu Pecah 3/5 M.16 M3 1.2000
3. Batu Pecah 2/3 M.17 M3 0.3300
4. Split M.18 M3 0.1870
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
6 7
8,285.71 1,257.94
-
-
12,142.86 485.71
Jumlah Harga Tenaga Kerja 1,743.65
-
Jumlah Harga Bahan -
500 500.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
6 7
8,285.71 23,291.14
12,142.86 3,412.14
Jumlah Harga Tenaga Kerja 26,703.29
408,566.54 490,279.84
-
-
500.00 500.00
147,568.25 41,466.68
Jumlah Harga Peralatan 41,966.68
HARGA SATUAN PEKERJAAN 558,949.81
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
6 7
8,285.71 773.06
12,142.86 282.93
Jumlah Harga Tenaga Kerja 1,055.99
12,543.79 14,074.13
-
500.00 500.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
6 7
8,285.71 103,074.29
12,142.86 7,552.86
Jumlah Harga Tenaga Kerja 110,627.14
12,543.79 1,317,599.71
408,566.54 490,279.84
695,040.42 229,363.34
695,040.42 129,972.56
500.00 500.00
147,568.25 41,466.68
Jumlah Harga Peralatan 41,966.68
HARGA SATUAN PEKERJAAN 2,319,809.27
PEMERINTAH KABUPATEN MANGGARA
DINAS PEMBERDAYAAN MASYARAKAT
Jalan Lehong - Borong - Manggarai Timur
BAHAN LOKAL
Pajak PPN
Harga Satuan Ongkos Harga Harga Satuan
Angkutan PPH Angkutan KET
Bahan RAB Angkut Satuan RAB RAB
23 (2 %) (10 %)
7 (4+5+6) 8 9 10 11 (8+9+10) 12(7 + 11) 13
NAGA KERJA
85,000 85,000 7 jam/hari
58,000 58,000 7 jam/hari
-
HAN LOKAL
Pajak PPN
Harga Satuan Ongkos Harga Harga Satuan
Angkutan PPH Angkutan KET
Bahan RAB Angkut Satuan RAB RAB
23 (2 %) (10 %)
500,000 - 500,000
N NON LOKAL
Pajak PPN
Harga Satuan Ongkos Harga Harga Satuan
Angkutan PPH Angkutan KET
Bahan RAB Angkut Satuan RAB RAB
23 (2 %) (10 %)
12,284 231 5 24 260 12,544 On Site
16,751 - - - 16,751 On Site
3,909 - - - 3,909 On Site
64,772 231 5 24 260 65,031 On Site
39,086 3,403 69 347 3,820 42,906 On Site
100,508 3,403 69 347 3,820 104,328 On Site
22,335 362 7 37 406 22,742 On Site
27,919 276 6 28 310 28,228 On Site
ERALATAN
83,756 On Site
111,675 On Site
16,751 On Site
72,589 On Site
223,350 On Site
502,538 On Site
167,513 On Site
16,751 On Site
72,589 On Site
55,838 On Site
558,376 On Site
LAMPIRAN X :KEPUTUSAN BUPATI MANGGARAI TIMUR
1 2 3 4 5
A UPAH
MO1 1 Pekerja OH
MO2 2 Tukang Gali OH
MO3 3 Tukang Cat OH
MO4 4 Tukang Batu OH
MO5 5 Tukang Batu/Pipa OH
MO6 6 Tukang Besi OH
MO7 7 Tukang Besi Konstruksi OH
MO8 8 Tukang Kayu OH
MO9 9 Tukang Las OH
MO10 10 Mandor OH
MO11 11 Kepala tukang OH
MO12 12 Mandor lapangan OH
MO13 13 Operator OH
MO14 14 Pembantu Operator OH
MO15 15 Mekanik OH
MO16 16 Pembantu Mekanik OH
MO17 17 Sopir OH
MO18 18 Pembantu Sopir OH
B BAHAN LOKAL
LK1 1 Batu Kali / Gunung 1 M3
LK2 2 Batu Belah 5/7 cm 1 M3
LK3 3 Batu Pecah 3/5 cm 1 M3
LK4 4 Batu Pecah 2/3 cm 1 M3
LK5 5 Batu Pecah 1/2 cm 1 M3
LK6 6 Bataco Ukuran Besar 10x20x30 1 Buah
LK7 7 Bata Merah 1 Buah
LK8 8 Pasir Pasang/Beton 1 M3
LK9 9 Pasir Urug 1 M3
LK10 10 Tanah Timbun 1 M3
LK11 11 Urugan Pilihan 1 M3
LK12 12 Tanah Liat 1 M3
LK13 13 Kerikil Alam 1 M3
LK14 Kayu Bulat Begesting 1 M3
LK15 Papan Tipis : 3,00 x 0,20 x 0,02 1 M3
C BAHAN NON LOKAL
NL01 14 Asphal 1 Kg
NL02 15 Afdunner / Tinner A 1 Ltr
NL03 16 Afdunner / Tinner B 1 Ltr
NL04 17 Amplas 1 Lbr
NL05 18 Besi Beton 6 mm 1 Kg
NL06 19 Besi Beton 8 mm 1 Kg
NL07 20 Besi Beton 10 mm 1 Kg
NL08 21 Besi Beton 12 mm 1 Kg
NL09 22 Besi Beton 16 mm 1 Kg
NL10 23 Besi Beton 19 mm 1 Kg
NL11 24 Besi Beton 25 mm 1 Kg
NL12 25 Besi Beton 32 mm 1 Kg
NL13 Besi Beton 6 mm 1 Btng
NL14 Besi Beton 8 mm 1 Btng
NL15 Besi Beton 10 mm 1 Btng
NL16 Besi Beton 12 mm 1 Btng
NL17 Besi Beton 16 mm 1 Btng
NL18 26 Cat kayu kwalitet baik (Emco) 1 Kg
NL19 27 Cat tembok (Decoplus) 1 Kg
NL20 28 Cat Tembok (Vitex) 1 Kg
NL21 29 Closet duduk (INA) 1 Bh
NL22 30 Closet jongkok (INA) 1 Bh
NL23 31 Deak standar 1 Bh
NL24 32 Dumpul 1 Kg
NL25 33 Ember coor 1 Bh
NL26 34 Rool matex 1 Bh
NL27 35 Gemuk 1 Kg
NL28 36 Grendel pintu jendela 1 Bh
NL29 37 Genteng semen 1 Bh
NL30 38 Gergaji kayu 1 Bh
NL31 39 Gagang + Gergaji besi 1 Bh
NL32 40 Hengsel 88x55 1 Bh
NL33 41 Hengsel 110x55 1 Bh
NL34 42 Hengsel 140x60 1 Bh
NL35 43 Kait angin 1 Bh
NL36 44 Hamer 10 P 1 Bh
NL37 45 Hamer 8P 1 Bh
NL38 46 Hamer 6P 1 Bh
NL39 47 Hamer 4P 1 Bh
NL40 48 Hamer 2P 1 Bh
NL41 49 Overval 1 1 Bh
NL42 50 Globe Besar 1 Bh
NL43 51 Globe Sedang 1 Bh
NL44 52 Globe Kecil 1 Bh
NL45 53 Kawat beton 1 Kg
NL46 54 Kwt. bronjong 2.7 mm (diameter lubang….) 1 1 Unit
NL47 55 Kunci laci kings 1 Bh
NL48 56 Kunci tanam jangkar 1 Bh
NL49 57 Kunci tanam union 1 Bh
NL50 58 Kunci Yalle 1 Bh
NL51 59 Kunci tanam anchor 1 Bh
NL52 60 Kuas cat 2 1 Bh
NL53 61 Kuas cat 3 1 Bh
NL54 62 Kuas cat 4 1 Bh
NL55 63 Kaca bening 3 1 M2
NL56 64 Kaca bening 5 1 M2
NL57 65 Kaca reben 3 1 M2
NL58 66 Kaca reben 5 1 M2
NL59 67 Kaca Es 3 1 M2
NL60 68 Kaca Es 5 1 M2
NL61 69 Linggis 1 Btg
NL62 70 Menie 1 Kg
NL63 71 Minyak Tanah Subsidi 1 Ltr
NL64 72 Minyak Tanah Industri 1 Ltr
NL65 73 Minyak Premium Subsidi 1 Ltr
NL66 74 Minyak Premium Industri 1 Ltr
NL67 75 Minyak Diesel Subsidi 1 Ltr
NL68 76 Minyak Diesel Industri 1 Ltr
NL69 77 Teac Oil 1 Ltr
NL70 78 Paku 2cm 1 Kg
NL71 79 Paku 3cm Kg
NL72 80 Paku 4cm Kg
NL73 81 Paku 5cm Kg
NL74 82 Paku 10-15 cm Kg
NL75 83 Rangka naco + Trali Daun
NL76 84 Pikwel / ganco Bh
NL77 85 Pahat kayu 1,2 Bh
NL78 86 Pahat kayu 1,0 Bh
NL79 87 Pahat kayu 1,5 Bh
NL80 88 Pahat kayu 2 Bh
NL81 89 Pahat besi Bh
NL82 90 Semen Kupang 40 kg Zak
NL83 91 Semen Tonasa 40 kg Zak
NL84 92 Semen Tiga Roda 40 kg Zak
NL85 93 Semen Warna Kg
NL86 94 Kapur Zak
NL87 95 Triplex 2 mm Lbr
NL88 96 Triplex 3 mm Lbr
NL89 97 Triplex 6 mm Lbr
NL90 98 Triplex 9 mm Lbr
NL91 99 Teakwood m2
NL92 100 Tegel Mozaik m2
NL93 101 Tegel Porselin 11x11 cm m2
NL94 102 Tegel Porselin 15x15 cm m2
NL95 103 Tegel Porselin 20x20 cm m2
NL96 104 Tegel Porselin 30x30 cm m2
NL97 105 Wastafel KIA Buah
NL98 106 Zink gelombang BJLS 0.20 Lbr
NL99 107 Zink gelombang BJLS 0.30 Lbr
NL100 108 Zink Plat 0.30 (Lebar 30X100 cm) M
NL101 109 Zink Plat 0.30 (Lebar 40X100 cm) M
NL102 110 Zink Plat 0.30 (Lebar 50X100 cm) M
NL103 111 Zink Plat 0.30 (Lebar 60X100 cm) M
NL104 112 Zink Plat 0.30 (Lebar 70X100 cm) M
NL105 113 Zink Plat 0.30 (Lebar 90X100 cm) M
NL106 114 Paku Zink Kg
NL107 Sekop Campur 1 bh
D PIPA GIP (TT)SNI 07-0039-1987/BS 1387 : 1985
115 Pipa GIP 0,5" (2.42) 1 Btg
116 Pipa GIP 0,75"(2.65) 1 Btg
117 Pipa GIP 0 1,0" (3.25) 1 Btg
118 Pipa GIP 0 1,5" (3.25) 1 Btg
119 Pipa GIP ukuran 0 2,0" (3.65) 1 Btg
120 Pipa GIP ukuran 0 3,0" (4.05) 1 Btg
121 Pipa GIP ukuran 0 4,0" (4.50) 1 Btg
122 Pipa GIP 0 6,0" (4.85) 1 Btg
E PIPA PVC MASPION
123 PIPA PVC 1/2 dim S-8 Mof 1 Btg
124 Pipa PVC 3/4 dim S-8 Mof 1 Btg
125 Pipa PVC 1 dim S-10 Mof 1 Btg
126 Pipa PVC 1 1/4 dim S-10 Mof 1 Btg
127 Pipa PVC 1 1/5 dim S-10 Mof 1 Btg
128 Pipa PVC 2 dim S-10 RR 1 Btg
129 Pipa PVC 2 1/2 dim S-10 (RR) 1 Btg
130 Pipa PVC 3 dim S-10 (RR) 1 Btg
131 Pipa PVC 4 dim S-10 (RR) 1 Btg
132 Pipa PVC 6 DIM S-10 (RR) 1 Btg
133 Pipa PVC 8 dim S-10 (RR) 1 Btg
F PIPA CLASS MEDIUM SIO- SNI
134 Pipa GIP 1/2 Inch (15) 1 Btg
135 Pipa GIP 3/4 Inch (20) 1 btg
136 Pipa GIP 1 Inch (25) 1 btg
137 Pipa GIP 1 1/4 Inch (32) 1 btg
138 Pipa GIP 1 1/2 Inch (40) 1 btg
139 Pipa GIP 2 Inch (50) 1 btg
140 Pipa GIP 2 1/2 Inch (65) 1 btg
141 Pipa GIP 3 Inch (80) 1 btg
142 Pipa GIP 4 Inch (100) 1 btg
143 Pipa GIP 5 Inch (125) 1 btg
144 Pipa GIP 6 Inch (150) 1 btg
145 Pipa GIP 8 Inch (200) 1 btg
PIPA
G PVC CLASS-AW-SNI
146 Pipa PVC 1/2 dim Mof 1 btg
147 Pipa PVC 3/4 dim Mof 1 btg
148 Pipa PVC 1 dim Mof 1 btg
149 Pipa PVC 1 1/4 dim Mof 1 btg
150 Pipa PVC 1 1/5 dim Mof 1 btg
151 Pipa PVC 2 dim Rubber Ring (RR) 1 btg
152 Pipa PVC 2 1/2 dim (RR) 1 btg
153 Pipa PVC 3 dim (RR) 1 btg
154 Pipa PVC 4 dim (RR) 1 btg
155 Pipa PVC 6 dim (RR) 1 btg
156 Pipa PVC 8 dim (RR) 1 btg
H PIPA PE - SDR 17/PN - 10
157 Pipa PE 1/2 Inch (15) 1 mtr
158 Pipa PE 3/4 Inch (20) 1 mtr
159 Pipa PE 1 Inch (25) 1 mtr
160 Pipa PE 1 1/4 Inch (32) 1 mtr
161 Pipa PE 1 1/2 Inch (40) 1 mtr
162 Pipa PE 2 Inch (50) 1 mtr
163 Pipa PE 2 1/2 Inch (65) 1 mtr
164 Pipa PE 3 Inch (80) 1 mtr
165 Pipa PE 4 Inch (100) 1 btg
166 Pipa PE 5 Inch (125) 1 btg
167 Pipa PE 6 Inch (150) 1 btg
168 Pipa PE 8 Inch (225) 1 btg
169 Pipa PE 10 Inch 1 btg
J ASSESORIES PIPA HDPE
170 Straight Coupling PE Ǿ 20 mm 1 bh
171 Straight Coupling PE Ǿ 25 mm 1 bh
172 Straight Coupling PE Ǿ 32 mm 1 bh
173 Straight Coupling PE Ǿ 50 mm 1 bh
174 Straight Coupling PE Ǿ 63 mm 1 bh
175 Elbow Coupling PE Ǿ 20 mm 1 bh
176 Elbow Coupling PE Ǿ 25 mm 1 bh
177 Elbow Coupling PE Ǿ 32 mm 1 bh
178 Elbow Coupling PE Ǿ 50 mm 1 bh
179 Elbow Coupling PE Ǿ 63 mm 1 bh
180 Equal Tee Coupling PE Ǿ 20 mm 1 bh
181 Equal Tee Coupling PE Ǿ 25 mm 1 bh
182 Equal Tee Coupling PE Ǿ 32 mm 1 bh
183 Equal Tee Coupling PE Ǿ 50 mm 1 bh
184 Equal Tee Coupling PE Ǿ 63 mm 1 bh
185 Reducing Coupling PE 50 mm X 40 mm 1 bh
186 Reducing Coupling PE 40 mm X 32 mm 1 bh
187 Reducing Coupling PE 50 mm X 32 mm 1 bh
188 Reducing Coupling PE 63 mm X 50 mm 1 bh
189 Reducing Coupling PE 32 mm X 25 mm 1 bh
190 Reducing Coupling PE 25 mm X 20 mm 1 bh
191 Reducing Tee Coupling PE 63 mm X 50 mm 1 bh
192 Reducing Tee Coupling PE 63 mm X 25 mm 1 bh
193 Reducing Tee Coupling PE 50 mm X 32 mm 1 bh
194 Reducing Tee Coupling PE 50 mm X 20 mm 1 bh
195 Reducing Tee Coupling PE 32 mm X 25 mm 1 bh
196 Reducing Tee Coupling PE 32 mm X 20 mm 1 bh
197 Reducing Tee Coupling PE 25 mm X 20 mm 1 bh
198 Male Threat Adaptor PE 20 mm X 20 mm 1 bh
199 Male Threat Adaptor PE 25 mm X 25 mm 1 bh
200 Male Threat Adaptor PE 32 mm X 32 mm 1 bh
201 Male Threat Adaptor PE 50 mm X 50 mm 1 bh
202 Male Threat Adaptor PE 63 mm X 63 mm 1 bh
203 Farmale Threat Adaptor PE 20 mm X 20 mm 1 bh
204 Farmale Threat Adaptor PE 25 mm X 25 mm 1 bh
205 Farmale Threat Adaptor PE 32 mm X 32 mm 1 bh
206 Farmale Threat Adaptor PE 50 mm X 50 mm 1 bh
207 Farmale Threat Adaptor PE 63 mm X 63 mm 1 bh
208 End Cap 20 1 bh
209 End Cap 25 1 bh
210 End Cap 32 1 bh
211 End Cap 40 1 bh
212 End Cap 50 1 bh
213 End Cap 63 1 bh
J ACCSESOREIS
214 Sney Pipa Ukuran 1/2" - 2 " 1 Buah
215 Kunci Pipa Ukuran Besar 1 Buah
216 Socket GIP 0 0,5" 1 Buah
217 Socket GIP 0 0,75" 1 Buah
218 Socket GIP 0 1,0" 1 Buah
219 Socket GIP 0 1,5" 1 Buah
220 Socket GIP 0 2,0" 1 Buah
221 Socket GIP 0 3,0" 1 Buah
222 Socket GIP 0 4,0" 1 Buah
223 Socket GIP 0 6,0" 1 Buah
224 Socket GIP 0 0,5" x 45 1 Buah
225 Socket GIP 0 0,5" x 90 1 Buah
226 Socket GIP 0 3/4 x 45 1 Buah
227 Socket GIP 0 3/4 x 90 1 Buah
228 Boog GIP 0 1x 11,25 1 Buah
229 Boog GIP 0 1x 22,5 1 Buah
230 Boog GIP 0 1x 45 1 Buah
231 Boog GIP 0 1x 90 1 Buah
232 Boog GIP 0 1,5"x 11,2 1 Buah
233 Boog GIP 0 1,5x 22,5 1 Buah
234 Boog GIP 0 1,5x 45 1 Buah
235 Boog GIP 0 1,5x 90 1 Buah
236 Boog GIP 0 2x 11,5 1 Buah
237 Boog GIP 0 2x 22,5 1 Buah
238 Boog GIP 0 2x 45 1 Buah
239 Boog GIP 0 2x 90 1 Buah
240 Boog GIP 0 3x 11,25 1 Buah
241 Boog GIP 0 3x 22,5 1 Buah
242 Boog GIP 0 3x 45 1 Buah
243 Boog GIP 0 3x 90 1 Buah
244 Boog GIP 0 4x 11,5 1 Buah
245 Boog GIP 0 4x 45 1 Buah
246 Boog GIP 0 4x 90 1 Buah
247 Boog GIP 0 6x 11,5 1 Buah
248 Boog GIP 0 6x 45 1 Buah
249 Boog GIP 0 6x 90 1 Buah
250 Kopling GIP 0 0,5" 1 Buah
251 Kopling GIP 0 0,75" 1 Buah
252 Kopling GIP 0 1,0" 1 Buah
253 Kopling GIP 0 1,5" 1 Buah
254 Kopling GIP 0 2,0" 1 Buah
255 Kopling GIP 0 3,0" 1 Buah
256 Kopling GIP 0 4,0" 1 Buah
257 Kopling GIP 0 6,0" 1 Buah
258 Reduser socket 1 1/2 x 1/2 1 Buah
259 Reduser socket GIP 1 1/2 x 3/4 1 Buah
260 Reduser socket GIP 1 1/2 x 1 1 Buah
261 Reduser socket GIP 1 1/2 x 1 1 Buah
262 Reduser socket GIP 2 x 1/2 1 Buah
263 Reduser socket GIP 2 x 3/4 1 Buah
264 Reduser socket GIP 2x1 1 Buah
265 Reduser socket GIP 2 x 1 1/2 1 Buah
266 Reduser socket GIP 3 x 3/4 1 Buah
267 Reduser socket GIP GIP 3 x 1 1 Buah
268 Reduser socket GIP 3 x 1 1/2 1 Buah
269 Reduser socket GIP 3x2 1 Buah
270 Reduser socket GIP 4x1 1 Buah
271 Reduser socket GIP 4 x 1 1/2 1 Buah
272 Reduser socket GIP 4x2 1 Buah
273 Reduser socket GIP 4x3 1 Buah
274 Reduser socket GIP 6 x 1 1/2 1 Buah
275 Reduser socket GIP 6x2 1 Buah
276 Reduser socket GIP 6x3 1 Buah
277 Reduser socket GIP 6x4 1 Buah
278 Reduser Tee GIP 1/2 x 1/2 1 Buah
279 Reduser Tee GIP 3/4 x 1/2 1 Buah
280 Reduser Tee GIP 3/4 x 3/4 1 Buah
281 Reduser Tee GIP 1 x 1/2 1 Buah
282 Reduser Tee GIP 1 x 3/4 1 Buah
283 Reduser Tee GIP 1x1 1 Buah
284 Reduser Tee GIP 1 1/2 x 1/2 1 Buah
285 Reduser Tee GIP 1 1/2 x 3/4 1 Buah
286 Reduser Tee GIP 1 1/2 x 1 1 Buah
287 Reduser Tee GIP 1 1/2 x 1 1/2 1 Buah
288 Reduser Tee GIP 2 x 1/2 1 Buah
289 Reduser Tee GIP GIP 2 x 3/4 1 Buah
290 Reduser Tee GIP 2x1 1 Buah
291 Reduser Tee GIP 2 x 1 1/2 1 Buah
292 Reduser Tee GIP 2x2 1 Buah
293 Reduser Tee GIP 3 x 1 1/2 1 Buah
294 Reduser Tee GIP 3 x 3/4 1 Buah
295 Reduser Tee GIP 3x1 1 Buah
296 Reduser Tee GIP 3 x 1 1/2 1 Buah
297 Reduser Tee GIP 3x2 1 Buah
298 Reduser Tee GIP 3x3 1 Buah
299 Kran dorong 0 0,5" 1 Buah
300 Kran putar 0 0,5" 1 Buah
301 Stop kran KITZ 1/2 1 Buah
302 Stop kran KITZ 3/4 1 Buah
303 Stop kran KITZ 1 1 Buah
304 Stop kran KITZ 1 1/2 1 Buah
305 Stop kran KITZ 2 1 Buah
306 Stop kran KITZ 3 1 Buah
307 Stop kran KITZ 4 1 Buah
308 Stop kran KITZ 6 1 Buah
309 Water meter 1/2 1 Buah
310 Water meter 3/4 1 Buah
311 Water meter 1 1 Buah
312 Water meter 1 1/2 1 Buah
313 Water meter 2 1 Buah
314 Water meter 3 1 Buah
315 Water meter 4 1 Buah
316 Water meter 6 1 Buah
317 Double nipel 1/2 1 Buah
318 Double nipel 3/4 1 Buah
319 Double nipel 1 1 Buah
320 Double nipel 1 1/2 1 Buah
321 Double nipel 2 1 Buah
322 Double nipel 3 1 Buah
323 Double nipel 4 1 Buah
324 Double nipel 6 1 Buah
325 Valve socket 1/2 1 Buah
326 Valve socket 3/4 1 Buah
327 Valve socket 1 1 Buah
328 Valve socket 1 1/2 1 Buah
329 Valve socket 2 1 Buah
330 Valve socket 3 1 Buah
331 Valve socket 4 1 Buah
332 Valve socket 6 1 Buah
333 Doop GIP 1/2 1 Buah
334 Doop GIP 3/4 1 Buah
335 Doop GIP 1 1 Buah
336 Doop GIP 1 1/2 1 Buah
337 Doop GIP 2 1 Buah
338 Doop GIP 3 1 Buah
339 Doop GIP 4 1 Buah
340 Doop GIP 6 1 Buah
341 Taping Sadle (Clem Sadle) 3x3/4 1 Buah
342 Taping Sadle (Clem Sadle) 3x 1 1/2 1 Buah
343 Taping Sadle (Clem Sadle) 4x3/4 1 Buah
344 Taping Sadle (Clem Sadle) 4x1 4x1 1 Buah
345 Taping Sadle (Clem Sadle) 4x2 1 Buah
346 Taping Sadle (Clem Sadle) 6x1/2 1 Buah
347 Taping Sadle (Clem Sadle) 6x2 1 Buah
348 Gilboult Joint 1 1 Buah
349 Gilboult Joint 1 1/2 1 Buah
350 Gilboult Joint 2 1 Buah
351 Gilboult Joint 3 1 Buah
352 Gilboult Joint 4 1 Buah
353 Gilboult Joint 6 1 Buah
354 Boog PVC 1/2 x 90 1 Buah
355 Boog PVC 3/4 x 90 1 Buah
356 Boog PVC 1 x 90 1 Buah
357 Boog PVC 1 1/2 x 90 1 Buah
358 Boog PVC 2 x 90 1 Buah
359 Boog PVC 3 x 90 1 Buah
360 Boog PVC 4 x 90 1 Buah
361 Boog PVC 6 x 90 1 Buah
362 Reducer Tee PVC 1/2x1/2 1 Buah
363 Reducer Tee PVC 3/4x1/2 1 Buah
364 Reducer Tee PVC 3/4x3/4 1 Buah
365 Reducer Tee PVC 1x1/2 1 Buah
366 Reducer Tee PVC 1x3/4 1 Buah
367 Reducer Tee PVC 1x1 1 Buah
368 Reducer Tee PVC 1 1/2x1/2 1 Buah
369 Reducer Tee PVC 1 1/2x3/4 1 Buah
370 Reducer Tee PVC 1 1/2x1 1 Buah
371 Reducer Tee PVC 1 1/2x1 1/2 1 Buah
372 Reducer Tee PVC 2x3/4 1 Buah
373 Reducer Tee PVC 2x1 1 Buah
374 Reducer Tee PVC 2x2 1 Buah
375 Reducer Tee PVC 3x1 1 Buah
376 Reducer Tee PVC 3x1 1/2 1 Buah
377 Reducer Tee PVC 3x2 1 Buah
378 Reducer Tee PVC 3x3 1 Buah
379 Reducer Tee PVC 4x1 1 Buah
380 Reducer Tee PVC 4x2 1 Buah
381 Reducer Tee PVC 4x3 1 Buah
382 Reducer Tee PVC 4x4 1 Buah
383 Reducer Tee PVC 6x6 1 Buah
384 Faucet Socket 1/2 1 Buah
385 Faucet Socket 3/4 1 Buah
386 Faucet Socket 1 1 Buah
387 Faucet Socket 1 1/2 1 Buah
388 Faucet Socket 2 1 Buah
389 Faucet Socket 3 1 Buah
390 Faucet Socket 4 1 Buah
391 Faucet Socket 6 1 Buah
392 Doop PVC 1/2 1 Buah
393 Doop PVC 3/4 1 Buah
394 Doop PVC 1 1 Buah
395 Doop PVC 1 1/2 1 Buah
396 Doop PVC 2 1 Buah
397 Doop PVC 3 1 Buah
398 Doop PVC 4 1 Buah
399 Doop PVC 6 1 Buah
400 Reducer Sock PVC 3/4x1/2 1 Buah
401 Reducer Sock PVC 1x1/2 1 Buah
402 Reducer Sock PVC 1x3/4 1 Buah
403 Reducer Sock PVC 1 1/2x1/2 1 Buah
404 Reducer Sock PVC 1 1/2x3/4 1 Buah
405 Reducer Sock PVC 1 1/2x1 1 Buah
406 Reducer Sock PVC 2x1/2 1 Buah
407 Reducer Sock PVC 2x3/4 1 Buah
408 Reducer Sock PVC 2x1 1 Buah
409 Reducer Sock PVC 2x1 1/2 1 Buah
410 Reducer Sock PVC 3x1/2 1 Buah
411 Reducer Sock PVC 3x3/4 1 Buah
412 Reducer Sock PVC 3x1 1 Buah
413 Reducer Sock PVC 3x1 1/2 1 Buah
414 Lem Pipa PVC Stiki 3x2 1 Buah
415 Kotak Meteran 1 Buah
416 Lem Pipa PVC Stiki 1 1 Kg
417 Selotip Pipa 1 Buah
K MULTIROOOF
417 Genteng Multiroof 2 susun (2x5 Genteng) (77 1 m2 = 1,3 1 lembar
cm x 100 cm) Stone tebal 0,40 mm lembar
418 Genteng Multicolor 2 susun (2x5 Genteng) (77 1 m2 = 1,3 1 lembar
cm x 100 cm) Polos tebal 0,40 mm lembar
PAJAK
HargaSatuan GALIAN C 25 ONGKOS
PPN 10% PPH 1,5% ANGKUTAN
2018 (Rp) % ANGKUT
PPH 23 (2%)
6 7 8 9 10 11
58,000
58,000
60,000
85,000
75,000
75,000
75,000
85,000
75,000
85,000
100,000
85,000
85,000
70,000
100,000
80,000
75,000
60,000
106,920
10,855 1,628
95,040
9,649 1,447
- -
223,560
22,696 3,404
144,210
14,641 2,196
137,310
13,940 2,091
89,010
9,037 1,355
66,240
6,725 1,009
72,000
7,310 1,096
BUPATI MANGGARAI TIMUR,
YOSEPH TOTE
PPN
Harga Dalam jam
ANGKUTAN
RAB Efektif
10%
12 13 14
58,000 7
58,000 7
60,000 7
85,000 7
75,000 7
75,000 7
75,000 7
85,000 7
75,000 7
85,000 7
100,000 7
85,000 7
85,000
70,000
100,000
80,000
75,000
60,000
-
13,469 416,200
10,857 398,600
10,857 510,300
10,857 622,000
10,857 845,300
3,400
1,800
12,510 405,600
8,878 204,900
8,092 162,700
8,878 231,700
88,400
10,857 264,600
6,551 909,100
2,029,400
-
15,600
83,800
44,700
9,200
23 18,700
23 18,700
23 18,700
23 18,700
23 18,700
23 18,700
23 18,700
23 18,700
62 49,700
111 88,800
174 138,300
251 199,900
446 355,000
85,800
20,100
16,800
614,200
195,400
181,800
52,400
11,200
22,300
33,500
16,800
39,200
67,000
74,300
40,500
51,300
69,500
11,200
160,800
131,100
101,300
72,600
50,300
11,200
33,500
22,300
16,800
21 30,400
949,200
21,200
167,500
167,500
335,000
335,000
8,400
11,200
16,800
201,000
279,200
256,900
307,100
83,800
167,500
81,500
33,500
-
-
-
-
-
-
94,900
11 22,500
11 22,500
11 22,500
11 22,500
22,300
317,200
89,300
27,900
27,900
33,500
39,100
39,100
1,469 77,600
1,469 77,600
1,469 77,600
16,800
73,700
60,300
67,000
94,900
139,600
55,800
96,000
134,000
122,800
94,900
94,900
675,600
53,600
89,300
11,200
14,500
16,800
22,300
27,900
44,700
22,300
72,600
-
486,400
614,000
968,600
1,240,100
1,453,600
2,023,300
2,553,000
3,373,700
-
57,800
88,600
98,300
145,600
239,300
392,700
551,300
773,000
1,154,800
2,434,400
3,910,400
-
321 362,400
422 485,200
663 556,100
861 711,600
997 799,900
1,406 1,034,200
1,825 1,121,400
2,380 2,207,900
2,733,900
3,390,100
4,071,900
9,799,100
-
98,800
119,700
150,700
213,900
279,000
448,800
575,300
801,800
1,164,000
2,092,300
3,120,800
-
74 12,400
86 14,300
137 23,000
214 35,900
334 55,900
531 88,900
117,900
167,500
250,600
402,000
678,100
1,041,300
1,188,700
-
27,900
30,700
50,300
83,800
274,200
31,300
36,900
53,600
98,300
277,500
42,400
53,600
75,900
103,900
282,500
109,400
98,300
103,900
137,400
95,500
92,700
476,900
461,200
450,100
461,200
309,900
304,900
254,100
31,300
48,000
70,400
392,500
450,100
31,300
48,000
75,900
115,000
450,100
10,100
14,500
20,100
25,700
31,300
35,700
-
1,340,100
268,000
21,500
39,000
49,800
64,900
97,500
130,000
184,100
249,200
21,500
21,500
39,000
39,000
49,800
49,800
49,800
49,800
64,900
64,900
64,900
64,900
97,500
97,500
97,500
97,500
130,000
130,000
130,000
130,000
184,100
184,100
184,100
249,200
249,200
249,200
54,100
75,800
108,300
151,600
184,100
292,400
487,500
704,200
49,800
49,800
49,800
49,800
60,500
60,500
64,900
86,600
92,100
92,100
97,500
97,500
101,700
108,300
108,300
1,300,200
162,400
1,624,000
162,400
162,400
32,400
32,400
36,800
36,800
36,800
36,800
60,500
60,500
60,500
60,500
75,800
86,600
86,600
86,600
86,600
97,500
97,500
108,300
162,400
162,400
162,400
32,400
25,900
97,500
134,300
195,000
270,900
433,300
606,700
758,400
1,083,600
390,100
585,000
758,400
996,800
1,571,100
2,004,600
3,792,600
4,334,400
12,900
17,300
25,900
49,800
60,500
75,800
86,600
97,600
10,700
16,100
21,500
32,400
43,200
60,500
86,600
130,000
151,600
21,400
29,400
39,300
55,000
78,800
118,200
137,800
308,200
325,000
325,000
346,700
379,200
541,800
606,700
97,500
130,000
162,400
216,700
595,900
1,625,400
15,100
25,900
36,800
43,200
108,300
151,600
227,500
379,200
19,500
21,500
25,900
25,900
27,000
32,400
49,800
56,300
60,500
64,900
60,500
60,500
108,300
151,600
151,600
151,600
140,700
75,800
411,600
422,500
433,300
845,100
10,700
16,100
21,500
32,400
39,000
60,500
75,800
86,600
8,600
10,700
17,300
25,900
32,400
49,800
60,500
64,900
21,500
21,500
21,500
43,200
43,200
43,200
58,500
58,500
58,500
58,500
64,900
64,900
64,900
64,900
64,900
146,600
178,800
5,600
-
119,400
106,100
-
249,700
161,000
153,300
99,400
74,000
80,400
X. DAFTAR HARGA UPAH DAN BAHAN BANGUNAN TAHUN ANGGARAN 2016
HargaSatuan
No Jenis Barang Merk/Type Ukuran Satuan
2016 (Rp)
1 2 3 4 5 6
A UPAH
1 Pekerja OH 58,000
2 Tukang Gali OH 58,000
3 Tukang Cat OH 60,000
4 Tukang Batu OH 85,000
5 Tukang Batu/Pipa OH 75,000
6 Tukang Besi OH 75,000
7 Tukang Besi Konstruksi OH 75,000
8 Tukang Kayu OH 85,000
9 Tukang Las OH 75,000
10 Mandor OH 85,000
11 Kepala tukang OH 100,000
12 Mandor lapangan OH 85,000
13 Operator OH 85,000
14 Pembantu Operator OH 70,000
15 Mekanik OH 100,000
16 Pembantu Mekanik OH 80,000
17 Sopir OH 75,000
18 Pembantu Sopir OH 60,000
B BAHAN LOKAL
1 Batu Kali / Gunung 10/15 1 M3 108,750
2 Batu Belah 5/7 cm 1 M3 250,000
3 Batu Pecah 3/5 cm 1 M3 350,000
4 Batu Pecah 2/3 cm 1 M3 450,000
5 Batu Pecah 1/2 cm 1 M3 650,000
6 Bataco Ukuran Besar 10x20x30 1 Buah 3,000
7 Bataco Standar 1 Buah 6,553.75
8 Bata Merah Standar 1 Buah 2,117.50
9 Pasir Pasang/Beton 1 M3 126,875
10 Pasir Urug 1 M3 72,500
11 Tanah Timbun 1 M3 55,000
12 Tanah Timbun/Liat 1 M3 72,500
13 Timbunan Pilihan 1 M3 145,000
14 Urugan Pilihan 1 M3 100,000
15 Tanah Liat 1 M3 66,000
16 Kerikil Alam 1 M3 163,125
C BAHAN NON LOKAL
14 Asphal 1 Kg 14,000
15 Afdunner / Tinner A 1 Ltr 75,000
16 Afdunner / Tinner B 1 Ltr 40,000
17 Amplas 1 Lbr 8,250
18 Besi Beton 6 mm 1 Kg 16,500
19 Besi Beton 8 mm 1 Kg 16,500
20 Besi Beton 10 mm 1 Kg 16,500
21 Besi Beton 12 mm 1 Kg 16,500
22 Besi Beton 16 mm 1 Kg 16,500
23 Besi Beton 19 mm 1 Kg 16,500
24 Besi Beton 25 mm 1 Kg 16,500
25 Besi Beton 32 mm 1 Kg 16,500
26 Cat kayu kwalitet baik (Emco) 1 Kg 76,835
27 Cat tembok (Decoplus) 1 Kg 18,029
28 Cat Tembok (Vitex) 1 Kg 15,000
29 Closet duduk (INA) 1 Bh 550,000
30 Closet jongkok (INA) 1 Bh 175,000
31 Deak standar 1 Bh 162,769
32 Dumpul 1 Kg 46,948
33 Ember coor 1 Bh 10,000
34 Rool matex 1 Bh 20,000
35 Gemuk 1 Kg 30,000
36 Grendel pintu jendela 1 Bh 15,000
37 Genteng semen 1 Bh 35,090
38 Gergaji kayu 1 Bh 60,000
39 Gagang + Gergaji besi 1 Bh 66,550
40 Hengsel 88x55 1 Bh 36,300
41 Hengsel 110x55 1 Bh 45,980
42 Hengsel 140x60 1 Bh 62,260
43 Kait angin 1 Bh 10,000
44 Hamer 10 P 1 Bh 144,000
45 Hamer 8P 1 Bh 117,370
46 Hamer 6P 1 Bh 90,750
47 Hamer 4P 1 Bh 65,000
48 Hamer 2P 1 Bh 45,000
49 Overval 1 1 Bh 10,000
50 Globe Besar 1 Bh 30,000
51 Globe Sedang 1 Bh 20,000
52 Globe Kecil 1 Bh 15,000
53 Kawat beton 1 Kg 27,000
54 Kwt. bronjong 2.7 mm (diameter lubang….) 1 1 Unit 850,000
55 Kunci laci kings 1 Bh 19,000
56 Kunci tanam jangkar 1 Bh 150,000
57 Kunci tanam union 1 Bh 150,000
58 Kunci Yalle 1 Bh 300,000
59 Kunci tanam anchor 1 Bh 300,000
60 Kuas cat 2 1 Bh 7,500
61 Kuas cat 3 1 Bh 10,000
62 Kuas cat 4 1 Bh 15,000
63 Kaca bening 3 1 M2 180,000
64 Kaca bening 5 1 M2 250,000
65 Kaca reben 3 1 M2 230,000
66 Kaca reben 5 1 M2 275,000
67 Kaca Es 3 1 M2 75,000
68 Kaca Es 5 1 M2 150,000
69 Linggis 1 Btg 73,000
70 Menie 1 Kg 30,000
71 Minyak Tanah Subsidi 1 Ltr
72 Minyak Tanah Industri 1 Ltr
73 Minyak Premium Subsidi 1 Ltr
74 Minyak Premium Industri 1 Ltr
75 Minyak Diesel Subsidi 1 Ltr
76 Minyak Diesel Industri 1 Ltr
77 Teac Oil 1 Ltr 85,000
78 Paku 2cm 1 Kg 20,000
79 Paku 3cm Kg 20,000
80 Paku 4cm Kg 20,000
81 Paku 5cm Kg 20,000
82 Paku 10-15 cm Kg 20,000
83 Rangka naco + Trali Daun 284,000
84 Pikwel / ganco Bh 80,000
85 Pahat kayu 1,2 Bh 25,000
86 Pahat kayu 1,0 Bh 25,000
87 Pahat kayu 1,5 Bh 30,000
88 Pahat kayu 2 Bh 35,000
89 Pahat besi Bh 35,000
90 Semen Kupang 40 kg Zak 58,000
91 Semen Tonasa 40 kg Zak 58,000
92 Semen Tiga Roda 40 kg Zak 58,000
93 Semen Warna Kg 15,000
94 Kapur Zak 66,000
95 Triplex 2 mm Lbr 54,000
96 Triplex 3 mm Lbr 60,000
97 Triplex 6 mm Lbr 85,000
98 Triplex 9 mm Lbr 125,000
99 Teakwood m2 50,000
100 Tegel Mozaik m2 86,000
101 Tegel Porselin 11x11 cm m2 120,000
102 Tegel Porselin 15x15 cm m2 110,000
103 Tegel Porselin 20x20 cm m2 85,000
104 Tegel Porselin 30x30 cm m2 85,000
105 Wastafel KIA Buah 605,000
106 Zink gelombang BJLS 0.20 Lbr 48,000
107 Zink gelombang BJLS 0.30 Lbr 80,000
108 Zink Plat 0.30 (Lebar 30X100 cm) M 10,000
109 Zink Plat 0.30 (Lebar 40X100 cm) M 13,000
110 Zink Plat 0.30 (Lebar 50X100 cm) M 15,000
111 Zink Plat 0.30 (Lebar 60X100 cm) M 20,000
112 Zink Plat 0.30 (Lebar 70X100 cm) M 25,000
113 Zink Plat 0.30 (Lebar 90X100 cm) M 40,000
114 Paku Zink Kg 20,000
DPIPA GIP (TT)SNI 07-0039-1987/BS 1387 : 1985
115 Pipa GIP 0,5" (2.42) 1 Btg 435,528
116 Pipa GIP 0,75"(2.65) 1 Btg 549,792
117 Pipa GIP 0 1,0" (3.25) 1 Btg 867,330
118 Pipa GIP 0 1,5" (3.25) 1 Btg 1,110,486
119 Pipa GIP ukuran 0 2,0" (3.65) 1 Btg 1,301,616
120 Pipa GIP ukuran 0 3,0" (4.05) 1 Btg 1,811,802
121 Pipa GIP ukuran 0 4,0" (4.50) 1 Btg 2,286,108
122 Pipa GIP 0 6,0" (4.85) 1 Btg 3,020,958
E PIPA PVC MASPION
123 PIPA PVC 1/2 dim S-8 Mof 1 Btg 62,100
124 Pipa PVC 3/4 dim S-8 Mof 1 Btg 79,350
125 Pipa PVC 1 dim S-10 Mof 1 Btg 87,998
126 Pipa PVC 1 1/4 dim S-10 Mof 1 Btg 130,411
127 Pipa PVC 1 1/5 dim S-10 Mof 1 Btg 214,314
128 Pipa PVC 2 dim S-10 RR 1 Btg 351,660
129 Pipa PVC 2 1/2 dim S-10 (RR) 1 Btg 493,626
130 Pipa PVC 3 dim S-10 (RR) 1 Btg 692,147
131 Pipa PVC 4 dim S-10 (RR) 1 Btg 1,034,107
132 Pipa PVC 6 DIM S-10 (RR) 1 Btg 2,179,924
133 Pipa PVC 8 dim S-10 (RR) 1 Btg 3,501,571
F PIPA CLASS MEDIUM SIO- SNI
134 Pipa GIP 1/2 Inch (15) 1 Btg 321,345
135 Pipa GIP 3/4 Inch (20) 1 btg 430,307
136 Pipa GIP 1 Inch (25) 1 btg 491,422
137 Pipa GIP 1 1/4 Inch (32) 1 btg 628,680
138 Pipa GIP 1 1/2 Inch (40) 1 btg 706,492
139 Pipa GIP 2 Inch (50) 1 btg 912,212
140 Pipa GIP 2 1/2 Inch (65) 1 btg 986,184
141 Pipa GIP 3 Inch (80) 1 btg 1,953,666
142 Pipa GIP 4 Inch (100) 1 btg 2,448,094
143 Pipa GIP 5 Inch (125) 1 btg 3,035,696
144 Pipa GIP 6 Inch (150) 1 btg 3,646,175
145 Pipa GIP 8 Inch (200) 1 btg 8,774,632
PIPA PVC
G CLASS-AW-SNI
146 Pipa PVC 1/2 dim Mof 1 btg 88,499
147 Pipa PVC 3/4 dim Mof 1 btg 107,201
148 Pipa PVC 1 dim Mof 1 btg 134,920
149 Pipa PVC 1 1/4 dim Mof 1 btg 191,526
150 Pipa PVC 1 1/5 dim Mof 1 btg 249,802
151 Pipa PVC 2 dim Rubber Ring (RR) 1 btg 401,921
152 Pipa PVC 2 1/2 dim (RR) 1 btg 515,133
153 Pipa PVC 3 dim (RR) 1 btg 718,014
154 Pipa PVC 4 dim (RR) 1 btg 1,042,289
155 Pipa PVC 6 dim (RR) 1 btg 1,873,557
156 Pipa PVC 8 dim (RR) 1 btg 2,794,500
H PIPA PE - SDR 17/PN - 10
157 Pipa PE 1/2 Inch (15) 1 mtr 10,382
158 Pipa PE 3/4 Inch (20) 1 mtr 12,000
159 Pipa PE 1 Inch (25) 1 mtr 19,200
160 Pipa PE 1 1/4 Inch (32) 1 mtr 30,000
161 Pipa PE 1 1/2 Inch (40) 1 mtr 46,800
162 Pipa PE 2 Inch (50) 1 mtr 74,400
163 Pipa PE 2 1/2 Inch (65) 1 mtr 105,600
164 Pipa PE 3 Inch (80) 1 mtr 150,000
165 Pipa PE 4 Inch (100) 1 btg 224,400
166 Pipa PE 5 Inch (125) 1 btg 360,000
167 Pipa PE 6 Inch (150) 1 btg 607,200
168 Pipa PE 8 Inch (225) 1 btg 932,400
169 Pipa PE 10 Inch 1 btg 1,064,400
J ACCSESOREIS
170 Socket GIP 0 0,5" 1 Buah 19,279
171 Socket GIP 0 0,75" 1 Buah 34,914
172 Socket GIP 0 1,0" 1 Buah 44,629
173 Socket GIP 0 1,5" 1 Buah 58,139
174 Socket GIP 0 2,0" 1 Buah 87,285
175 Socket GIP 0 3,0" 1 Buah 116,431
176 Socket GIP 0 4,0" 1 Buah 164,855
177 Socket GIP 0 6,0" 1 Buah 223,146
178 Socket GIP 0 0,5" x 45 1 Buah 19,279
179 Socket GIP 0 0,5" x 90 1 Buah 19,279
180 Socket GIP 0 3/4 x 45 1 Buah 34,914
181 Socket GIP 0 3/4 x 90 1 Buah 34,914
182 Boog GIP 0 1x 11,25 1 Buah 44,629
183 Boog GIP 0 1x 22,5 1 Buah 44,629
184 Boog GIP 0 1x 45 1 Buah 44,629
185 Boog GIP 0 1x 90 1 Buah 44,629
186 Boog GIP 0 1,5"x 11,2 1 Buah 58,139
187 Boog GIP 0 1,5x 22,5 1 Buah 58,139
188 Boog GIP 0 1,5x 45 1 Buah 58,139
189 Boog GIP 0 1,5x 90 1 Buah 58,139
190 Boog GIP 0 2x 11,5 1 Buah 87,285
191 Boog GIP 0 2x 22,5 1 Buah 87,285
192 Boog GIP 0 2x 45 1 Buah 87,285
193 Boog GIP 0 2x 90 1 Buah 87,285
194 Boog GIP 0 3x 11,25 1 Buah 116,431
195 Boog GIP 0 3x 22,5 1 Buah 116,431
196 Boog GIP 0 3x 45 1 Buah 116,431
197 Boog GIP 0 3x 90 1 Buah 116,431
198 Boog GIP 0 4x 11,5 1 Buah 164,855
199 Boog GIP 0 4x 45 1 Buah 164,855
200 Boog GIP 0 4x 90 1 Buah 164,855
201 Boog GIP 0 6x 11,5 1 Buah 223,146
202 Boog GIP 0 6x 45 1 Buah 223,146
203 Boog GIP 0 6x 90 1 Buah 223,146
204 Kopling GIP 0 0,5" 1 Buah 48,424
205 Kopling GIP 0 0,75" 1 Buah 67,855
206 Kopling GIP 0 1,0" 1 Buah 97,000
207 Kopling GIP 0 1,5" 1 Buah 135,709
208 Kopling GIP 0 2,0" 1 Buah 164,855
209 Kopling GIP 0 3,0" 1 Buah 261,855
210 Kopling GIP 0 4,0" 1 Buah 436,577
211 Kopling GIP 0 6,0" 1 Buah 630,577
212 Reduser socket 1 1/2 x 1/2 1 Buah 44,629
213 Reduser socket GIP 1 1/2 x 3/4 1 Buah 44,629
214 Reduser socket GIP 1 1/2 x 1 1 Buah 44,629
215 Reduser socket GIP 1 1/2 x 1 1 Buah 44,629
216 Reduser socket GIP 2 x 1/2 1 Buah 54,193
217 Reduser socket GIP 2 x 3/4 1 Buah 54,193
218 Reduser socket GIP 2x1 1 Buah 58,139
219 Reduser socket GIP 2 x 1 1/2 1 Buah 77,570
220 Reduser socket GIP 3 x 3/4 1 Buah 82,427
221 Reduser socket GIP GIP 3 x 1 1 Buah 82,427
222 Reduser socket GIP 3 x 1 1/2 1 Buah 87,285
223 Reduser socket GIP 3x2 1 Buah 87,285
224 Reduser socket GIP 4x1 1 Buah 91,080
225 Reduser socket GIP 4 x 1 1/2 1 Buah 97,000
226 Reduser socket GIP 4x2 1 Buah 97,000
227 Reduser socket GIP 4x3 1 Buah 1,164,306
228 Reduser socket GIP 6 x 1 1/2 1 Buah 145,424
229 Reduser socket GIP 6x2 1 Buah 1,454,244
230 Reduser socket GIP 6x3 1 Buah 145,424
231 Reduser socket GIP 6x4 1 Buah 145,424
232 Reduser Tee GIP 1/2 x 1/2 1 Buah 28,994
233 Reduser Tee GIP 3/4 x 1/2 1 Buah 28,994
234 Reduser Tee GIP 3/4 x 3/4 1 Buah 32,941
235 Reduser Tee GIP 1 x 1/2 1 Buah 32,941
236 Reduser Tee GIP 1 x 3/4 1 Buah 32,941
237 Reduser Tee GIP 1x1 1 Buah 32,941
238 Reduser Tee GIP 1 1/2 x 1/2 1 Buah 54,193
239 Reduser Tee GIP 1 1/2 x 3/4 1 Buah 54,193
240 Reduser Tee GIP 1 1/2 x 1 1 Buah 54,193
241 Reduser Tee GIP 1 1/2 x 1 1/2 1 Buah 54,193
242 Reduser Tee GIP 2 x 1/2 1 Buah 67,855
243 Reduser Tee GIP GIP 2 x 3/4 1 Buah 77,570
244 Reduser Tee GIP 2x1 1 Buah 77,570
245 Reduser Tee GIP 2 x 1 1/2 1 Buah 77,570
246 Reduser Tee GIP 2x2 1 Buah 77,570
247 Reduser Tee GIP 3 x 1 1/2 1 Buah 87,285
248 Reduser Tee GIP 3 x 3/4 1 Buah 87,285
249 Reduser Tee GIP 3x1 1 Buah 97,000
250 Reduser Tee GIP 3 x 1 1/2 1 Buah 145,424
251 Reduser Tee GIP 3x2 1 Buah 145,424
252 Reduser Tee GIP 3x3 1 Buah 145,424
253 Kran dorong 0 0,5" 1 Buah 28,994
254 Kran putar 0 0,5" 1 Buah 23,225
255 Stop kran KITZ 1/2 1 Buah 87,285
256 Stop kran KITZ 3/4 1 Buah 120,226
257 Stop kran KITZ 1 1 Buah 174,570
258 Stop kran KITZ 1 1/2 1 Buah 242,576
259 Stop kran KITZ 2 1 Buah 388,001
260 Stop kran KITZ 3 1 Buah 543,292
261 Stop kran KITZ 4 1 Buah 679,153
262 Stop kran KITZ 6 1 Buah 970,306
263 Water meter 1/2 1 Buah 349,292
264 Water meter 3/4 1 Buah 523,862
265 Water meter 1 1 Buah 679,153
266 Water meter 1 1/2 1 Buah 892,584
267 Water meter 2 1 Buah 1,406,882
268 Water meter 3 1 Buah 1,795,035
269 Water meter 4 1 Buah 3,396,070
270 Water meter 6 1 Buah 3,881,222
271 Double nipel 1/2 1 Buah 11,537
272 Double nipel 3/4 1 Buah 15,484
273 Double nipel 1 1 Buah 23,225
274 Double nipel 1 1/2 1 Buah 44,629
275 Double nipel 2 1 Buah 54,193
276 Double nipel 3 1 Buah 67,855
277 Double nipel 4 1 Buah 77,570
278 Double nipel 6 1 Buah 87,423
279 Valve socket 1/2 1 Buah 9,563
280 Valve socket 3/4 1 Buah 14,421
281 Valve socket 1 1 Buah 19,279
282 Valve socket 1 1/2 1 Buah 28,994
283 Valve socket 2 1 Buah 38,709
284 Valve socket 3 1 Buah 54,193
285 Valve socket 4 1 Buah 77,570
286 Valve socket 6 1 Buah 116,431
287 Doop GIP 1/2 1 Buah 135,709
288 Doop GIP 3/4 1 Buah 19,182
289 Doop GIP 1 1 Buah 26,358
290 Doop GIP 1 1/2 1 Buah 35,190
291 Doop GIP 2 1 Buah 49,266
292 Doop GIP 3 1 Buah 70,518
293 Doop GIP 4 1 Buah 105,846
294 Doop GIP 6 1 Buah 123,372
295 Taping Sadle (Clem Sadle) 3x3/4 1 Buah 276,000
296 Taping Sadle (Clem Sadle) 3x 1 1/2 1 Buah 291,001
297 Taping Sadle (Clem Sadle) 4x3/4 1 Buah 291,001
298 Taping Sadle (Clem Sadle) 4x1 4x1 1 Buah 310,431
299 Taping Sadle (Clem Sadle) 4x2 1 Buah 339,577
300 Taping Sadle (Clem Sadle) 6x1/2 1 Buah 485,153
301 Taping Sadle (Clem Sadle) 6x2 1 Buah 543,292
302 Gilboult Joint 1 1 Buah 87,285
303 Gilboult Joint 1 1/2 1 Buah 116,431
304 Gilboult Joint 2 1 Buah 145,424
305 Gilboult Joint 3 1 Buah 194,000
306 Gilboult Joint 4 1 Buah 533,577
307 Gilboult Joint 6 1 Buah 1,455,458
308 Boog PVC 1/2 x 90 1 Buah 13,510
309 Boog PVC 3/4 x 90 1 Buah 23,225
310 Boog PVC 1 x 90 1 Buah 32,941
311 Boog PVC 1 1/2 x 90 1 Buah 38,709
312 Boog PVC 2 x 90 1 Buah 97,000
313 Boog PVC 3 x 90 1 Buah 135,709
314 Boog PVC 4 x 90 1 Buah 203,716
315 Boog PVC 6 x 90 1 Buah 339,577
316 Reducer Tee PVC 1/2x1/2 1 Buah 17,457
317 Reducer Tee PVC 3/4x1/2 1 Buah 19,279
318 Reducer Tee PVC 3/4x3/4 1 Buah 23,225
319 Reducer Tee PVC 1x1/2 1 Buah 23,225
320 Reducer Tee PVC 1x3/4 1 Buah 24,136
321 Reducer Tee PVC 1x1 1 Buah 28,994
322 Reducer Tee PVC 1 1/2x1/2 1 Buah 44,629
323 Reducer Tee PVC 1 1/2x3/4 1 Buah 50,398
324 Reducer Tee PVC 1 1/2x1 1 Buah 54,193
325 Reducer Tee PVC 1 1/2x1 1/2 1 Buah 58,139
326 Reducer Tee PVC 2x3/4 1 Buah 54,193
327 Reducer Tee PVC 2x1 1 Buah 54,193
328 Reducer Tee PVC 2x2 1 Buah 97,000
329 Reducer Tee PVC 3x1 1 Buah 135,709
330 Reducer Tee PVC 3x1 1/2 1 Buah 135,709
331 Reducer Tee PVC 3x2 1 Buah 135,709
332 Reducer Tee PVC 3x3 1 Buah 125,994
333 Reducer Tee PVC 4x1 1 Buah 67,855
334 Reducer Tee PVC 4x2 1 Buah 368,570
335 Reducer Tee PVC 4x3 1 Buah 378,286
336 Reducer Tee PVC 4x4 1 Buah 388,001
337 Reducer Tee PVC 6x6 1 Buah 756,723
338 Faucet Socket 1/2 1 Buah 9,563
339 Faucet Socket 3/4 1 Buah 14,421
340 Faucet Socket 1 1 Buah 19,279
341 Faucet Socket 1 1/2 1 Buah 28,994
342 Faucet Socket 2 1 Buah 34,914
343 Faucet Socket 3 1 Buah 54,193
344 Faucet Socket 4 1 Buah 67,855
345 Faucet Socket 6 1 Buah 77,570
346 Doop PVC 1/2 1 Buah 7,742
347 Doop PVC 3/4 1 Buah 9,563
348 Doop PVC 1 1 Buah 15,484
349 Doop PVC 1 1/2 1 Buah 23,225
350 Doop PVC 2 1 Buah 28,994
351 Doop PVC 3 1 Buah 44,629
352 Doop PVC 4 1 Buah 54,193
353 Doop PVC 6 1 Buah 58,139
354 Reducer Sock PVC 3/4x1/2 1 Buah 19,279
355 Reducer Sock PVC 1x1/2 1 Buah 19,279
356 Reducer Sock PVC 1x3/4 1 Buah 19,279
357 Reducer Sock PVC 1 1/2x1/2 1 Buah 38,709
358 Reducer Sock PVC 1 1/2x3/4 1 Buah 38,709
359 Reducer Sock PVC 1 1/2x1 1 Buah 38,709
360 Reducer Sock PVC 2x1/2 1 Buah 52,371
361 Reducer Sock PVC 2x3/4 1 Buah 52,371
362 Reducer Sock PVC 2x1 1 Buah 52,371
363 Reducer Sock PVC 2x1 1/2 1 Buah 52,371
364 Reducer Sock PVC 3x1/2 1 Buah 58,139
365 Reducer Sock PVC 3x3/4 1 Buah 58,139
366 Reducer Sock PVC 3x1 1 Buah 58,139
367 Reducer Sock PVC 3x1 1/2 1 Buah 58,139
368 Lem Pipa PVC Stiki 3x2 1 Buah 58,139
369 Kotak Meteran 1 Buah 131,307
370 Lem Pipa PVC Stiki 1 1 Kg 160,149
K MULTIROOOF
371 Genteng Multiroof 2 susun (2x5 Genteng) (77 1 m2 = 1,3 1 lembar
cm x 100 cm) Stone tebal 0,40 mm lembar 106,920
377 Rangka atap baja ringan lapisan 45% ZINC, 6 meter 1 batang
Kode UT-RE Tebal 0,45 mm 66,240
jam
Ket
Efektif
7 8
7 5800/jam
7 6800/jam
7 5800/jam
7 7200/jam
7 7200/jam
7 7200/jam
7 7200/jam
7 7200/jam
7 7200/jam
7 9000/jam
7 10200/jam
7 8200/jam
Belum
Termasuk
Pajak dan
Ongkos
Angkut
Disesuiakan
dengan
harga Pabrik
Disesuaikan
dengan
harga Pabrik
PEMERINTAH KABUPATEN MANGGARAI TIMUR
DINAS PEMBERDAYAAN MASYARAKAT DAN DESA
Jalan Lehong - Borong - Manggarai Timur
II. PERHITUNGAN
- Jumlah Waktu Pertrip WP 6.20 Jam
WP = ( 2 x L ) / V + WBM
III. HARGA
Total Harga Pengangkutan ke Lokasi : OA
Harga Angkut = OA + BM
231.21 Rupah/Kg
PEMERINTAH KABUPATEN MANGGARAI TIMUR
DINAS PEMBERDAYAAN MASYARAKAT DAN DESA
Jalan Lehong - Borong - Manggarai Timur
JENIS MATERIAL : BESI BETON 12 MM
LOKASI : REO
TUJUAN : GORENG MENI
II. PERHITUNGAN
- Jumlah Waktu Pertrip WP 3.70 Jam
WP = ( 2 x L ) / V + WBM
III. HARGA
Total Harga Pengangkutan ke Lokasi : OA
Harga Angkut = OA + BM
279.41 Rupiah/Kg
2,980.80 Rupiah/Btg
PEMERINTAH KABUPATEN MANGGARAI TIMUR
DINAS PEMBERDAYAAN MASYARAKAT DAN DESA
Jalan Lehong - Borong - Manggarai Timur
JENIS MATERIAL : KAWAT IKAT
LOKASI : BENTENG JAWA
TUJUAN : GORENG MENI
II. PERHITUNGAN
- Jumlah Waktu Pertrip WP 4.20 Jam
WP = ( 2 x L ) / V + WBM
III. HARGA
Total Harga Pengangkutan ke Lokasi : OA
Harga Angkut = OA + BM
317.17 Rupah/Kg
2,980.80 Rupiah/Btg
PEMERINTAH KABUPATEN MANGGARAI TIMUR
DINAS PEMBERDAYAAN MASYARAKAT DAN DESA
Jalan Lehong - Borong - Manggarai Timur
JENIS MATERIAL : PAKU
LOKASI : BENTENG JAWA
TUJUAN : GORENG MENI
II. PERHITUNGAN
- Jumlah Waktu Pertrip WP 3.20 Jam
WP = ( 2 x L ) / V + WBM
III. HARGA
Total Harga Pengangkutan ke Lokasi : OA
Harga Angkut = OA + BM
241.66 Rupiah/Kg
PEMERINTAH KABUPATEN MANGGARAI TIMUR
DINAS PEMBERDAYAAN MASYARAKAT DAN DESA
Jalan Lehong - Borong - Manggarai Timur
JENIS MATERIAL : PASIR BETON
LOKASI : TENGKU LEDA
TUJUAN : GORENG MENI
II. PERHITUNGAN
- Jumlah Waktu Pertrip WP 2.24 Jam
WP = ( 2 x L ) / V + WBM
III. HARGA
Total Harga Pengangkutan ke Lokasi : OA
Harga Angkut = OA + BM
169,474.00 Rupiah/M3
PEMERINTAH KABUPATEN MANGGARAI TIMUR
DINAS PEMBERDAYAAN MASYARAKAT DAN DESA
Jalan Lehong - Borong - Manggarai Timur
JENIS MATERIAL : PASIR URUG
LOKASI : WASO
TUJUAN : GORENG MENI
II. PERHITUNGAN
- Jumlah Waktu Pertrip WP 2.24 Jam
WP = ( 2 x L ) / V + WBM
III. HARGA
Total Harga Pengangkutan ke Lokasi : OA
Harga Angkut = OA + BM
169,474.00 Rupiah/M3
PEMERINTAH KABUPATEN MANGGARAI TIMUR
DINAS PEMBERDAYAAN MASYARAKAT DAN DESA
Jalan Lehong - Borong - Manggarai Timur
JENIS MATERIAL : BATU PECAH
LOKASI : QUARY CREASER
TUJUAN : GORENG MENI
II. PERHITUNGAN
- Jumlah Waktu Pertrip WP 1.56 Jam
WP = ( 2 x L ) / V + WBM
III. HARGA
Total Harga Pengangkutan ke Lokasi : OA
Harga Angkut = OA + BM
118,081.46 Rupiah/M3
PEMERINTAH KABUPATEN MANGGARAI TIMUR
DINAS PEMBERDAYAAN MASYARAKAT DAN DESA
Jalan Lehong - Borong - Manggarai Timur
JENIS MATERIAL : BATU KALI
LOKASI : GORENG MENI
TUJUAN : GORENG MENI
II. PERHITUNGAN
- Jumlah Waktu Pertrip WP 0.92 Jam
WP = ( 2 x L ) / V + WBM
III. HARGA
Total Harga Pengangkutan ke Lokasi : OA
Harga Angkut = OA + BM
77,369.43 Rupiah/Kg
PEMERINTAH KABUPATEN MANGGARAI TIMUR
DINAS PEMBERDAYAAN MASYARAKAT DAN DESA
Jalan Lehong - Borong - Manggarai Timur
JENIS MATERIAL : BATU BELAH 10/15
LOKASI : GORENG MENI
TUJUAN : GORENG MENI
II. PERHITUNGAN
- Jumlah Waktu Pertrip WP 0.92 Jam
WP = ( 2 x L ) / V + WBM
III. HARGA
Total Harga Pengangkutan ke Lokasi : OA
Harga Angkut = OA + BM
77,369.43 Rupiah/M3
PEMERINTAH KABUPATEN MANGGARAI TIMUR
DINAS PEMBERDAYAAN MASYARAKAT DAN DESA
Jalan Lehong - Borong - Manggarai Timur
JENIS MATERIAL : BATU PECAH 5/7
LOKASI : QUARY CREASER
TUJUAN : GORENG MENI
II. PERHITUNGAN
- Jumlah Waktu Pertrip WP 1.13 Jam
WP = ( 2 x L ) / V + WBM
III. HARGA
Total Harga Pengangkutan ke Lokasi : OA
Harga Angkut = OA + BM
85,586.55 Rupiah/M3
PEMERINTAH KABUPATEN MANGGARAI TIMUR
DINAS PEMBERDAYAAN MASYARAKAT DAN DESA
Jalan Lehong - Borong - Manggarai Timur
JENIS MATERIAL : ABU BATU
LOKASI : QUARY
TUJUAN : GORENG MENI
II. PERHITUNGAN
- Jumlah Waktu Pertrip WP 0.84 Jam
WP = ( 2 x L ) / V + WBM
III. HARGA
Total Harga Pengangkutan ke Lokasi : OA
Harga Angkut = OA + BM
63,445.95 Rupiah/M3
R
SA
SATUAN
Km
Hari
Ton
Km/Jam
Kg
Orang
Jam
Hari
Jam
Trip
Kg
Rupiah/Kg
Rupiah/Kg
Rupah/Kg
R
SA
SATUAN
Km
Hari
Ton
Km/Jam
Kg
Orang
Jam
Hari
Jam
Trip
Kg
Rupiah/Kg
Rupiah/Kg
Rupiah/Kg
Rupiah/Btg
R
SA
SATUAN
Km
Hari
Ton
Km/Jam
Kg
Orang
Jam
Hari
Jam
Trip
Kg
Rupiah/Kg
Rupiah/Kg
Rupah/Kg
Rupiah/Btg
R
SA
SATUAN
Km
Hari
Ton
Km/Jam
Kg
Orang
Jam
Hari
Jam
Trip
Kg
Rupiah/Kg
Rupiah/Kg
Rupiah/Kg
R
SA
SATUAN
Km
Hari
Ton
Km/Jam
M3
Orang
Jam
Hari
Jam
Trip
M3
Rupiah/M3
Rupiah/M3
Rupiah/M3
R
SA
SATUAN
Km
Hari
Ton
Km/Jam
M3
Orang
Jam
Hari
Jam
Trip
Kg
Rupiah/M3
Rupiah/M3
Rupiah/M3
R
SA
SATUAN
Km
Hari
Ton
Km/Jam
M3
Orang
Jam
Hari
Jam
Trip
M3
Rupiah/M3
Rupiah/M3
Rupiah/M3
R
SA
SATUAN
Km
Hari
Ton
Km/Jam
M3
Orang
Jam
Hari
Jam
Trip
Kg
Rupiah/Kg
Rupiah/Kg
Rupiah/Kg
R
SA
SATUAN
Km
Hari
Ton
Km/Jam
m3
Orang
Jam
Hari
Jam
Trip
M3
Rupiah/M3
Rupiah/M3
Rupiah/M3
R
SA
SATUAN
Km
Hari
Ton
Km/Jam
Kg
Orang
Jam
Hari
Jam
Trip
M3
Rupiah/M3
Rupiah/M3
Rupiah/M3
R
SA
SATUAN
Km
Hari
Ton
Km/Jam
m3
Orang
Jam
Hari
Jam
Trip
M3
Rupiah/M3
Rupiah/M3
Rupiah/M3
ANALISA BIAYA SEWA PERALAT
TENAGA KAPASITAS HARGA ALAT YANG DIPAKAI NILAI FAKTOR BIAYA PAS
ALAT ALAT ALAT JAM SISA PENGEM- BIAYA
UMUR KERJA HARGA ALAT BALIAN PENGEM-
ALAT 1 TAHUN ALAT MODAL BALIAN
MODAL
(HP) - (Tahun) (Tahun) (Jam) (Rp.) (Rp.) - (Rp.)
No. JENIS PERALATAN KODE
ALAT i(1+i)^A (B - C) x D
(10% X B) ----------- -----------
(1+i)^A-1 W
HP Cp B A W B C D e1
1 2 2a 3 4 5 6 7 8 9 10 11
1. ASPHALT MIXING PLANT E01 150.0 30.0 T/Jam 3,000,000,000 10.0 1,500.0 3,000,000,000 300,000,000 0.16275 292,941.71
2. ASPHALT FINISHER E02 47.0 6.0 Ton 600,000,000 6.0 2,000.0 600,000,000 60,000,000 0.22961 61,993.99
3. ASPHALT SPRAYER E03 15.0 800.0 Liter 80,000,000 5.0 2,000.0 80,000,000 8,000,000 0.26380 9,496.71
4. BULLDOZER 100-150 HP E04 140.0 - 850,000,000 5.0 2,000.0 850,000,000 85,000,000 0.26380 100,902.54
5. COMPRESSOR 4000-6500 L\M E05 80.0 - 125,000,000 5.0 2,000.0 125,000,000 12,500,000 0.26380 14,838.61
6. CONCRETE MIXER 0.3-0.6 M3 E06 15.0 300.0 Liter 14,000,000 4.0 2,000.0 14,000,000 1,400,000 0.31547 1,987.47
7. CRANE 10-15 TON E07 150.0 15.0 Ton 450,000,000 5.0 2,000.0 450,000,000 45,000,000 0.26380 53,418.99
8. DUMP TRUCK 3-4 M3 E08 100.0 6.0 Ton 350,000,000 5.0 2,000.0 350,000,000 35,000,000 0.26380 41,548.10
9. DUMP TRUCK E09 220.0 8.0 Ton 450,000,000 5.0 2,000.0 450,000,000 45,000,000 0.26380 53,418.99
10. EXCAVATOR 80-140 HP E10 140.0 0.9 M3 1,200,000,000 5.0 2,000.0 1,200,000,000 120,000,000 0.26380 142,450.64
11. FLAT BED TRUCK 3-4 M3 E11 100.0 4.0 M3 350,000,000 5.0 2,000.0 350,000,000 35,000,000 0.26380 41,548.10
12. GENERATOR SET E12 175.0 125.0 KVA 250,000,000 5.0 2,000.0 250,000,000 25,000,000 0.26380 29,677.22
13. MOTOR GRADER >100 HP E13 125.0 - 500,000,000 5.0 2,000.0 500,000,000 50,000,000 0.26380 59,354.43
14. TRACK LOADER 75-100 HP E14 90.0 1.6 M3 750,000,000 5.0 2,000.0 750,000,000 75,000,000 0.26380 89,031.65
15. WHEEL LOADER 1.0-1.6 M3 E15 125.0 1.5 M3 800,000,000 5.0 2,000.0 800,000,000 80,000,000 0.26380 94,967.09
16. THREE WHEEL ROLLER 6-8 T E16 55.0 3.0 Ton 300,000,000 5.0 2,000.0 300,000,000 30,000,000 0.26380 35,612.66
17. TANDEM ROLLER 6-8 T. E17 50.0 8.0 Ton 600,000,000 5.0 2,000.0 600,000,000 60,000,000 0.26380 71,225.32
18. TIRE ROLLER 8-10 T. E18 60.0 10.0 Ton 600,000,000 5.0 1,800.0 600,000,000 60,000,000 0.26380 79,139.24
19. VIBRATORY ROLLER 5-8 T. E19 75.0 7.0 Ton 750,000,000 4.0 2,000.0 750,000,000 75,000,000 0.31547 106,471.40
20. CONCRETE VIBRATOR E20 3.0 - 7,500,000 7.0 571.4 7,500,000 750,000 0.20541 2,426.35
21. STONE CRUSHER E21 220.0 60.0 T/Jam 950,000,000 5.0 2,000.0 950,000,000 95,000,000 0.26380 112,773.42
22. WATER PUMP 70-100 mm E22 6.0 300.0 300.0 8,000,000 2.0 2,000.0 8,000,000 800,000 0.57619 2,074.29
23. WATER TANKER 3000-4500 L. E23 100.0 4,000.0 Liter 350,000,000 5.0 2,000.0 350,000,000 35,000,000 0.26380 41,548.10
24. PEDESTRIAN ROLLER E24 11.0 1.0 Ton 68,000,000 4.0 2,000.0 68,000,000 6,800,000 0.31547 9,653.41
25. TAMPER E25 5.0 0.2 Ton 15,000,000 4.0 1,000.0 15,000,000 1,500,000 0.31547 4,258.86
26. BREAKER E26 20.0 - 200,000,000 5.0 800.0 200,000,000 20,000,000 0.26380 59,354.43
27. FULVI MIXER E27 75.0 - 75,000,000 5.0 2,000.0 75,000,000 7,500,000 0.26380 8,903.16
28. CONCRETE PUMP E28 100.0 8.00 M3 112,500,000 6.0 2,000.0 112,500,000 11,250,000 0.22961 11,623.87
29. TRAILER 20 TON E29 175.0 10.00 Ton 450,000,000 6.0 2,000.0 450,000,000 45,000,000 0.22961 46,495.49
30. PILE DRIVER + HAMMER E30 25.0 2.50 Ton 150,000,000 5.0 2,000.0 150,000,000 15,000,000 0.26380 17,806.33
31. CRANE ON TRACK 35 TON E31 125.0 35.00 Ton 1,000,000,000 6.0 2,000.0 1,000,000,000 100,000,000 0.22961 103,323.32
32. WELDING SET E32 40.0 250.00 Amp 27,500,000 5.0 2,000.0 27,500,000 2,750,000 0.26380 3,264.49
33. BORE PILE MACHINE E33 150.0 2,000.0 Meter 3,000,000,000 6.0 2,000.0 3,000,000,000 300,000,000 0.22961 309,969.96
34.
KETERANGAN : 1. Tingkat Suku Bunga = 10.00 % per-tahun
2. Upah Operator / Sopir / Mekanik = 12,143 Rupiah per-orang/jam
3. Upah Pembantu Operator/Sopir/Mekanik = 8,286 Rupiah per-orang/jam
4. Harga Bahan Bakar Bensin = 9,653 Rupiah per-liter
5. Harga Bahan Bakar Solar = 7,635 Rupiah per-liter
6. Minyak Pelumas = 36,341 Rupiah per-liter
7. Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
8. Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7
0 DIKETAHUI OL
0 KEPALA DES
0 GORENG ME
0
EWA PERALATAN PER JAM KERJA
BIAYA PASTI PER JAM BIAYA OPERASI PER JAM KERJA TOTAL
ASURANSI TOTAL BAHAN BAKAR & PELUMAS PERBAIKAN & PERAWATAN UPAH TOTAL BIAYA
DAN BIAYA BAHAN MINYAK OPERATOR PEMBANTU BIAYA SEWA ALAT
LAIN-LAIN PASTI / JAM BAKAR PELUMAS BIAYA KOEF. BIAYA / SOPIR OPERATOR OPERASI PER
/ SOPIR / JAM JAM KERJA
(Rp.) (Rp.) Lt/HP/Jam Ltr/HP/Jam (Rp.) - (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) KET.
f1 x HP x 1 Orang 1 Orang
0.002 x B 0.125 0.01 Harga BBM 0.125 (g1 x B') Per Per
----------- (e1 + e2) s/d s/d + s/d ----------- Jam Kerja Jam Kerja F+G+H+I E+J
W 0.175 0.02 f2 x HP x 0.175 W = =
Harga Olie Rp12,142.9 Rp8,285.7
e2 E f1 f2 F g1 G H I J K L
12 13 14 15 16 17 18 19 20 21 22 23
4,000.00 296,941.71 0.1250 0.0100 2,121,640.10 0.1250 250,000.00 12,142.86 24,857.14 2,408,640.10 2,705,581.81 Alat baru
600.00 62,593.99 0.1250 0.0100 61,934.91 0.1250 37,500.00 12,142.86 8,285.71 119,863.48 182,457.47 Alat baru
80.00 9,576.71 0.1250 0.0100 19,766.46 0.1250 5,000.00 12,142.86 8,285.71 45,195.03 54,771.74 Alat baru
850.00 101,752.54 0.1250 0.0100 184,486.96 0.1250 53,125.00 12,142.86 8,285.71 258,040.53 359,793.06 Alat baru
125.00 14,963.61 0.1250 0.0100 105,421.12 0.1250 7,812.50 12,142.86 8,285.71 133,662.19 148,625.80 Alat baru
14.00 2,001.47 0.1250 0.0100 19,766.46 0.1250 875.00 12,142.86 8,285.71 41,070.03 43,071.50 Alat baru
450.00 53,868.99 0.1250 0.0100 197,664.60 0.1250 28,125.00 12,142.86 8,285.71 246,218.17 300,087.16 Alat baru
350.00 41,898.10 0.1250 0.0100 131,776.40 0.1250 21,875.00 12,142.86 8,285.71 174,079.97 215,978.07 Alat baru
450.00 53,868.99 0.1250 0.0100 289,908.08 0.1250 28,125.00 12,142.86 8,285.71 338,461.65 392,330.64 Alat baru
1,200.00 143,650.64 0.1250 0.0100 184,486.96 0.1250 75,000.00 12,142.86 8,285.71 279,915.53 423,566.17 Alat baru
350.00 41,898.10 0.1250 0.0100 131,776.40 0.1250 21,875.00 12,142.86 8,285.71 174,079.97 215,978.07 Alat baru
250.00 29,927.22 0.1250 0.0100 230,608.70 0.1250 15,625.00 12,142.86 8,285.71 266,662.27 296,589.48 Alat baru
500.00 59,854.43 0.1250 0.0100 164,720.50 0.1250 31,250.00 12,142.86 8,285.71 216,399.07 276,253.50 Alat baru
750.00 89,781.65 0.1250 0.0100 118,598.76 0.1250 46,875.00 12,142.86 8,285.71 185,902.33 275,683.98 Alat baru
800.00 95,767.09 0.1250 0.0100 164,720.50 0.1250 50,000.00 12,142.86 8,285.71 235,149.07 330,916.16 Alat baru
300.00 35,912.66 0.1250 0.0100 72,477.02 0.1250 18,750.00 12,142.86 8,285.71 111,655.59 147,568.25 Alat baru
600.00 71,825.32 0.1250 0.0100 65,888.20 0.1250 37,500.00 12,142.86 8,285.71 123,816.77 195,642.09 Alat baru
666.67 79,805.91 0.1250 0.0100 79,065.84 0.1250 41,666.67 12,142.86 8,285.71 141,161.08 220,966.99 Alat baru
750.00 107,221.40 0.1250 0.0100 98,832.30 0.1250 46,875.00 12,142.86 8,285.71 166,135.87 273,357.27 Alat baru
26.25 2,452.60 0.1250 0.0100 3,953.29 0.1250 1,640.63 12,142.86 8,285.71 26,022.49 28,475.09 Alat baru
950.00 113,723.42 0.1250 0.0100 289,908.08 0.1250 59,375.00 12,142.86 16,571.43 377,997.36 491,720.78 Alat baru
8.00 2,082.29 0.1250 0.0100 7,906.58 0.1250 500.00 12,142.86 8,285.71 28,835.16 30,917.44 Alat baru
350.00 41,898.10 0.1250 0.0100 131,776.40 0.1250 21,875.00 12,142.86 8,285.71 174,079.97 215,978.07 Alat baru
68.00 9,721.41 0.1250 0.0100 14,495.40 0.1250 4,250.00 12,142.86 8,285.71 39,173.98 48,895.38 Alat baru
30.00 4,288.86 0.1250 0.0100 6,588.82 0.1250 1,875.00 12,142.86 8,285.71 28,892.39 33,181.25 Alat baru
500.00 59,854.43 0.1250 0.0100 26,355.28 0.1250 31,250.00 12,142.86 8,285.71 51,678.57 111,533.00 Alat baru
75.00 8,978.16 0.1250 0.0100 98,832.30 0.1250 4,687.50 12,142.86 8,285.71 123,948.37 132,926.53 Alat baru
112.50 11,736.37 0.1250 0.0100 131,776.40 0.1250 7,031.25 12,142.86 8,285.71 159,236.22 170,972.59 Alat baru
450.00 46,945.49 0.1250 0.0100 230,608.70 0.1250 28,125.00 12,142.86 8,285.71 279,162.27 326,107.76 Alat baru
150.00 17,956.33 0.1250 0.0100 32,944.10 0.1250 9,375.00 12,142.86 8,285.71 62,747.67 80,704.00 Alat baru
1,000.00 104,323.32 0.1250 0.0100 164,720.50 0.1250 62,500.00 12,142.86 8,285.71 247,649.07 351,972.39 Alat baru
27.50 3,291.99 0.1250 0.0100 52,710.56 0.1250 1,718.75 12,142.86 8,285.71 74,857.88 78,149.87 Alat baru
3,000.00 312,969.96 0.1250 0.0100 197,664.60 0.1250 187,500.00 12,142.86 8,285.71 405,593.17 718,563.13 Alat baru
itas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16) RENTUNG, 04 MARET 2017
DOROTEUS F. GANGGUR, ST
COST ESTIMATE