FacultyTechnology
of Engineering Technology
Semester 1, Session 2018/2019
Semester 1, Session 2016/ 2017
GROUP 5
BALLING MACHINE
Abdul Hadi Izaan bin Ibrahim1, Adriana Farniza binti Pozi@Fauzi2, Muhammad Nazmi Aiman
bin Zulkaply3, Noor Fateen Nabiella Azemi4, Nur Kameelya binti Kamaluddin5
1
Department of Civil Engineering Technology, University Tun Hussein Onn Malaysia, Parit
Raja, Johor, Malaysia
2
Department of Civil Engineering Technology, University Tun Hussein Onn Malaysia, Parit
Raja, Johor, Malaysia
3
Department of Civil Engineering Technology, University Tun Hussein Onn Malaysia, Parit
Raja, Johor, Malaysia
4
Department of Civil Engineering Technology, University Tun Hussein Onn Malaysia, Parit
Raja, Johor, Malaysia
5
Department of Civil Engineering Technology, University Tun Hussein Onn Malaysia, Parit
Raja, Johor, Malaysia
1.0 INTRODUCTION
1
Faculty of Engineering
FacultyTechnology
of Engineering Technology
Semester 1, Session 2018/2019
Semester 1, Session 2016/ 2017
2.0 THEORY
At the beginning of the demolition of a building the life and welfare of citizens is affected.
Statistics indicate that, by demolition operations, the adjacent buildings or surrounding buildings
are destroyed and these events are sometimes associated with loss of life, and this issue should be
discussed with a more professional look. Considering the above, demolition operations should be
done as quite professional, and with scientific perspective and reviewing the situation, the most
appropriate method for demolition of building must be selected, more importantly, the safety issue
of demolition operations is very important (Foruzesh, 2016). With proper planning and
implementation of the demolition operations in a variety of ways for a variety of steel structures
and their parts, we obtain the following objectives:
1. Minimum damage to persons and property
2. Protection of the health and safety of the workplace forces
3. Reducing environmental pollutions
Article 198: demolition should start from the top class and terminates to the lowest floor of the
building, except in specific cases, demolition is done at one time and using explosives in the
foundation, and as remote complying with all the relevant safety precautions and regulations and
obtaining the necessary permits, or is done by dragging with the cable and overturn, or through
tapping by weight fluctuations.
Article 202: the demolition of parts of the building which leads to sudden demolition and loss of
other parts of the building should be avoided.
Article 192: before demolition begins, all parts of the building which must be destroyed should
be inspected closely and if there is danger and loss, precautionary measures must be taken such as
the installation of piles, shield and retaining temporary.
The choice of demolition technique will depend on the nature of the building or structure,
type of construction, materials used, its height and free area after demolition. Risks to the public,
operatives involved in the demolition process and adjacent structures and buildings should be
considered.
2
Faculty of Engineering
FacultyTechnology
of Engineering Technology
Semester 1, Session 2018/2019
Semester 1, Session 2016/ 2017
ADVANTAGES DISADVANTAGES
To demolish roofs and other horizontal spans. It demands a great deal of skill from the crane
operator.
The wrecking balls are still used when The height of a building that can be
demolition may not be possible due to local demolished is limited by crane size and
environmental issues or asbestos/lead building working room; however, buildings as high as
content. 20 stories have been demolished.
.
Figure 1.1: Example of a balling machine
3
Faculty of Engineering
FacultyTechnology
of Engineering Technology
Semester 1, Session 2018/2019
Semester 1, Session 2016/ 2017
Since the safety and success of the project depend highly on the operator and site personnel,
the operator must have proven experience and skill for operating the wrecking ball to the
satisfaction of the approval authority; and
A spot person shall be on site during the operation to assist the operator and to ensure site
safety. The spot person shall have extensive knowledge and experience in the use of
wrecking ball. The qualification and experience of the spot person shall be equivalent to
those of the wrecking ball operator.
4.0 CONCLUSION
It is concluded that before carrying out any demolition works, building survey must be done
carefully, so that it may not cause any severe damage to the environment, public and adjacent
properties around the building which is to be demolished. Any type of building to be demolished,
its method depends upon various factors such as site condition, type of structures, age of building,
height of building and economy and most important its location with presence of its surrounding
with its structural stability. Controlled demolition of building is necessary to ensure safety of both
the workers and the surroundings so as to cause least amount of injuries and accidents. The
procedure of demolishment should be carried out with the aim of minimizing the risks of causing
damage to persons and properties of the public, endangering the health and safety of site personnel
and damaging the environment.
5
Faculty of Engineering
FacultyTechnology
of Engineering Technology
Semester 1, Session 2018/2019
Semester 1, Session 2016/ 2017
ACKNOWLEDGEMENT
Alhamdulillah, we praised to Allah S.W.T. for giving us opportunity to complete this group
assignment. We would like to thanks our lecturer, Sr Abd Sukor Bin Sarif for his time and
contributon in helping us completing this task. By doing this assignment, we gained lots of
knowledge and found exciting new facts about demolition works in Malaysia and other countries.
We also want to thanks Universiti Tun Hussein Onn Malaysia for allowing us using facilities and
utilities such as internet, library and classes for us to search for information and completing this
task. Lastly, we would like to thank our classmates and friends for guiding us throughout the
process of completing this assignment.
REFERENCES