Purchased science
apparatus and equipment
Schedule of review
classes with specified Conduct review classes twice a
teachers to handle the week.
classes BLGU
To increase NAT Students
Increase NAT June-October MOOE
Performance of the Teachers 30,000.00
Performance Educational tour of 2018 PTA Funds
students. Teachers and students' Principal
teachers and students to
educational tour to schools or
different schools and
places once a year.
places
KRA 2: LEARNING ENVIRONMENT
Reproduce reading materials
for the students.
School-based Students,
Symposium/ Orientation School Funds
Child Protection Educate both teachers Teachers,
0% Bullying incidence Jan.- Dec MOOE PLGU
and Anti- and students about Anti- LGU, GPTA 10,000.00
in school 2018 BLGU GPTA
Bullying bullying program. and DSWD
Anti-Bullying Campaign FUNDS
Program
Orientation on the proper
To provide clean water disposal and segregation of
Constructed Comfort
and practice hygiene and garbage
rooms
sanitation in school.
School Head
Implementation
Teachers Whole Year MOOE PTA
of PROJECT Acquired clean water 15,390.00
Sudents Round Fund
WINS source
Handwashing, toothbrushing; Parents
waste segragating
Provided hand washing
facility
To implement basic
Provision of • Teachers • June - Dec MOOE
computer education for 100,000.00
Computer Units School Head 2018 Fund Raising
students.
MOOE, PTA,
To ensure safety and Skilled Masons NGO,LGU &
Establishment of security of the school Carpenters Fund Raising
On-going Constrution of
Concrete and its properties and Concrete Parameter Fence School Head Jan-Dec 2018 100,000.00 Other sources
Perimeter Fence Perimeter Fence
refrain students from
cutting classes.
MOOE, PTA,
To ensure safety and Skilled Masons NGO,LGU &
Establishment of security of the school Carpenters Fund Raising
On-going Constrution of
Concrete and its properties and Concrete Parameter Fence School Head Jan-Dec 2018 100,000.00 Other sources
Perimeter Fence Perimeter Fence
refrain students from
cutting classes.
To maintain cleanliness
Establishment of and sanitation of the Mason and
Concrete school. Established Material Laborers
Construction of MRF Jan-Dec 2018 25,000.00 MOOE, SSG
Material Recovery Facility School Head Funds
Recovery Facility Fund Raising
To create an income
generating project Other sources
Skilled Masons
and carpenters
Major repairs of Make program of works for repair Principal PTA, MOOE,
To ensure the safety of the Repaired school
school buildings, of school building. Finance Officers LGU, NGO &
students from falling rotten buildings, ceilings and Jan-Dec 2018 250,000.00 Fund Raising
ceilings and Purchase materials needed for the
debris of the building. roofing
roofing project.
Skilled Masons
Make program of works for the and Carpenters
To properly channel the
Construction of rain water so as to avoid establishment of a drainage Principal PTA, MOOE,
Constructed school system. Finance Officers Jan-Dec 2018 LGU, NGO &
School drainage seepage of rooms that
drainage system
100,000.00 Fund Raising
system cause diseases, electrical
shock and discomfort.
Purchase the materials needed.
Hired
Installation and To avoid the risk of health
Repairperson PTA, MOOE,
Repair of problems and negative Installed and repaired Installation and Repair of
Classroom effects on learning among classroom ventilator
School Head Jan-Dec 2018 50,000.00 LGU, NGO &
Classroom Ventilation Fund Raising
Ventilation students.
Installation of Skilled Masons
To provide potable and PTA, MOOE,
Senior High Installation of Senior Installation of Senior High and carpenters
School Water
sufficient water in CR’s High School water system School water system Principal
Jan-Dec 2018 20,000.00 LGU, NGO &
and façade cleanliness Fund Raising
System Finance Officers
Skilled Masons
and Carpenters
To provide clean and
Repair of School School Head
hygienic rooms for Complete repair of school Repair the school CRs and
CRs, Lavatory
students and teachers' CR’s and septic tanks
Jan-Dec 2018 50,000.00 MOOE
and Septic Tank septic tanks
personal necessities.
Reimbursement of Training
Expenses
Principal
Ensure that the planned
• MOOE Liquidation • Monthly and On - time Book keeper
MOOE budget is disbursed
Report Liquidation Report Disbursing
Jan-Dec 2018 5,000.00 MOOE
properly
Students
To intensify the 100% MOOE
Teachers
preparation for the opening • Prepared school NGO’s
Conduct of Parents
Brigada Eskwela
of classes ensuring the • Attendance Conduct f Brigada Eskwela
School Head
May '2018 5,000.00 LGU
most conducive • MOV’s PTA
Bookkeeper
environment for learnig
GPP
Coordinator
To decrease the number of School funds
• Sustained school feeding TLE teachers
Implementation wasted and severely MOOE
program Implement GPP (Gulayan Ng Students
of GPP (Gulayan wasted students and teach
• MOV’s Paaralan Program) School Head
Jan-Dec 2018 56,260.00 Dept. of
ng Paaralan) students the importance of Agriculture
Dept. of
agriculture to sustain life. LGU
Agriculture
Purchased of
Purchased materials for Purchase materials and orient School Head
Survival Kit for To implement disaster risk
Disaster reduction management.
survival kit in case of students for the use of such Students Jan-Dec 2018 16,600.00 MOOE
emergency situation. materials. Teachers
Preparedness
Purchased
and/or printing School Head
To ensure the Purchased/printed
Instruct every student to wear Students
of Identification identification of every identificaion card for
their id's during school days. Parents
Jan-Dec 2018 15,000.00 MOOE GPTA
cards of students enrolled. every students.
Teachers
students
Skilled workers
Repair and
To provide the teachers a (masons and
place to do their works, Constructed Faculty carpenters)
Improvement of
Room
Construction of Facuty Office School Head
Jan-Dec 2018 50,000.00 MOOE
preparations and to safe
Faculty Office
keep the students’ outputs.