Anda di halaman 1dari 18

LABORATORIUM SISTEM PRODUKSI Commented [MAES1]: Sesuaikan dengan POV

MODUL I FORECASTING
BAB I PENDAHULUAN
1.1 Latar Belakang .................................................................. I-01
1.2 Rumusan Masalah ............................................................. I-01
1.3 Tujuan Praktikum ............................................................. I-01
1.4 Batasan Masalah ............................................................... I-02
1.5 Asumsi .............................................................................. I-02

BAB II LANDASAN TEORI


2.1 Peramalan ......................................................................... II-01
2.1.1 Pengertian Peramalan............................................ II-01
2.1.2 Jenis-Jenis Peramalan ........................................... II-01
2.1.3 Pola Data Peramalan ............................................. II-04
2.1.4 Langkah-Langkah dalam Melakukan Peramalan.. II-06
2.1.5 Ukuran Akurasi dari Peramalan ............................ II-06
2.2 Perencanaan Produksi ....................................................... II-09
2.2.1 Pengertian Perencanaan Produksi ......................... II-09
2.2.2 Karakteristik Perencanaan Produksi ..................... II-10
2.2.3 Langkah-Langkah Perencanaan Produksi ............. II-10

BAB III METODOLOGI PENELITIAN


3.1 Flowchart Metodologi Penelitian ..................................... III-01
3.2 Penjelasan Metodologi Penelitian..................................... III-02
3.2.1 Tahap Identifikasi Awal ........................................ III-02
3.2.2 Tahap Pengumpulan dan Pengolahan Data........... III-03
3.2.3 Tahap Analisis dan Interpertasi Hasil ................... III-04
3.2.4 Kesimpulan dan Saran .......................................... III-05

BAB IV PENGUMPULAN DAN PENGOLAHAN DATA


4.1 Rekapitulasi Data Historis ................................................ IV-01
4.1.1 Data Historis Kursi Dynamic ................................ IV-01
4.1.2 Data Historis Kursi Elegant .................................. IV-01
4.1.3 Data Historis Kursi Smart ..................................... IV-02

iv
4.2 Peramalan Permintaan ...................................................... IV-03
4.2.1 Peramalan Permintaan Kursi Dynamic ................. IV-03
4.2.2 Peramalan Permintaan Kursi Elegant ................... IV-16
4.2.3 Peramalan Permintaan Kursi Smart ...................... IV-29
4.3 Rekapitulasi MAD dan Tracking Signal........................... IV-42
4.3.1 Rekapitulasi MAD dan Tracking Signal
kursi Dynamic ....................................................... IV-42
4.3.2 Rekapitulasi MAD dan Tracking Signal
kursi Elegant ......................................................... IV-43
4.3.3 Rekapitulasi MAD dan Tracking Signal
kursi Smart ............................................................ IV-43
4.4 Rencana Produksi Metode Terpilih .................................. IV-43
4.4.1 Rencana Produksi Metode Terpilih
kursi Dynamic ....................................................... IV-43
4.4.2 Rencana Produksi Metode Terpilih
kursi Elegant ......................................................... IV-44
4.4.3 Rencana Produksi Metode Terpilih
kursi Smart ............................................................ IV-45

BAB V ANALISIS
5.1 Analisis Data Historis ....................................................... V-01
5.1.1 Analisis Data Historis kursi Dynamic ................... V-01
5.1.2 Analisis Data Historis kursi Elegant ..................... V-01
5.1.3 Analisis Data Historis kursi Smart ........................ V-02
5.2 Analisis Peramalan Permintaan ........................................ V-02
5.2.1 Analisis Peramalan Permintaan kursi Dynamic .... V-02
5.2.2 Analisis Peramalan Permintaan kursi Elegant ...... V-08
5.2.3 Analisis Peramalan Permintaan kursi Smart ......... V-14
5.3 Analisis Metode Peramalan Terpilih ................................ V-19
5.3.1 Analisis Metode Peramalan Terpilih
kursi Dynamic ....................................................... V-20
5.3.2 Analisis Metode Peramalan Terpilih
kursi Elegant ......................................................... V-20

v
5.3.3 Analisis Metode Peramalan Terpilih kursi Smart . V-21
5.4 Analisis Rencana Produksi Metode Terpilih .................... V-21
5.4.1 Analisis Rencana Produksi Metode Terpilih
kursi Dynamic ....................................................... V-21
5.4.2 Analisis Rencana Produksi Metode Terpilih
kursi Elegant ......................................................... V-22
5.4.3 Analisis Rencana Produksi Metode Terpilih
kursi Smart ............................................................ V-22

BAB VI KESIMPULAN DAN SARAN


6.1 Kesimpulan ....................................................................... VI-01
6.2 Saran ................................................................................. VI-02

MODUL II MASTER PRODUCTION SCHEDULE


BAB I PENDAHULUAN
1.1 Latar Belakang .................................................................. I-01
1.2 Rumussan Masalah ........................................................... I-02
1.3 Tujuan Praktikum ............................................................. I-02
1.4 Batasan Masalah ............................................................... I-02
1.5 Asumsi .............................................................................. I-03

BAB II LANDASAN TEORI


2.1 Master Production Schedule (MPS) ................................. II-01
2.2 Rough Cut Capacity Planning (RCCP) ............................ II-02
2.3 Perhitungan Yang Terkait ................................................. II-04

BAB III METODOLOGI PENELITIAN


3.1 Flowchart Metodologi Penelitian ..................................... III-01
3.2 Penjelasan Metodologi Penelitian..................................... III-02
3.2.1 Tahap Identifikasi Awal ........................................ III-02
3.2.2 Tahap Pengumpulan dan Pengolahan Data........... III-03
3.2.3 Tahap Analisis dan Interpertasi Hasil ................... III-04
3.2.4 Tahap Pengumpulan dan Pengolahan Data........... III-05

vi
BAB IV PENGUMPULAN DAN PENGOLAHAN DATA
4.1 Prosedur Praktikum ........................................................... IV-01
4.1.1 Prosedur Praktikum Untuk kursi Dynamic ............ IV-01
4.1.2 Prosedur Praktikum Untuk kursi Elegant .............. IV-04
4.1.3 Prosedur Praktikum Untuk kursi Smart ................. IV-07
4.2 Rekapitulasi Data Kursi Dynamic ..................................... IV-11
4.2.1 Demand History kursi Dynamic............................. IV-11
4.2.2 Data Kapasitas Produksi ........................................ IV-11
4.2.3 Perhitungan Waktu Baku kursi Dynamic ............... IV-12
4.2.4 Data Runtime CPOF Kursi Dynamic ..................... IV-13
4.2.5 Data Runtime BOL Kursi Dynamic ....................... IV-14
4.2.6 Waktu Baku Tiap Stasiun, Efisiensi dan Utilitas ... IV-14
4.3 Rekapitulasi Data Kursi Elegant ....................................... IV-15
4.3.1 Demand History Kursi Elegant .............................. IV-16
4.3.2 Data Kapasitas Produksi ........................................ IV-16
4.3.3 Perhitungan Waktu Baku kursi Elegant ................. IV-17
4.3.4 Data Runtime CPOF kursi Elegant ........................ IV-18
4.3.5 Data Runtime BOL kursi Elegant .......................... IV-19
4.3.6 Waktu Baku Tiap Stasiun, Efisiensi dan Utilitas ... IV-19
4.4 Rekapitulasi Data Kursi Smart .......................................... IV-20
4.4.1 Demand History kursi Smart ................................. IV-21
4.4.2 Data Kapasitas Produksi ........................................ IV-21
4.4.3 Perhitungan Waktu Baku kursi Smart.................... IV-22
4.4.4 Data Runtime CPOF kursi Smart ........................... IV-23
4.4.5 Data Runtime BOL kursi Smart ............................. IV-24
4.4.6 Waktu Baku Tiap Stasiun, Efisiensi dan Utilitas ... IV-24
4.5 Konversi Produk dan MPS Kursi Dynamic ....................... IV-25
4.5.1 Konversi Produk kursi Dynamic ............................ IV-26
4.5.2 MPS kursi Dynamic ............................................... IV-26
4.6 Konversi Produk dan MPS Kursi Elegant ......................... IV-27
4.6.1 Konversi Produk kursi Elegant .............................. IV-27
4.6.2 MPS kursi Elegant ................................................. IV-27

vii
4.7 Konversi Produk dan MPS Kursi Smart ............................ IV-28
4.7.1 Konversi Produk kursi Smart ................................. IV-28
4.7.2 MPS kursi Smart .................................................... IV-28
4.8 Penyusunan RCCP Awal Kursi Dynamic.......................... IV-29
4.8.1 Rekapitulasi Data Runtime ..................................... IV-29
4.8.2 Perhitungan Historical Proportion ........................ IV-30
4.8.3 Perhitungan Kapasitas Total Yang Dibutuhkan
Setiap Periode ........................................................ IV-30
4.8.4 Perhitungan Calculated Capacity Tiap Stasiun
Tiap Periode ........................................................... IV-32
4.8.5 Perhitungan RCCP Dengan Metode CPOF ........... IV-33
4.8.6 Grafik Perbandingan Kapasitas Tersedia Dengan
Kapasitas Yang Dibutuhkan Metode CPOF .......... IV-33
4.8.7 Perhitungan RCCP Dengan Metode BOL ............. IV-35
4.8.8 Grafik Perbandingan Kapasitas Tersedia Dengan
Kapasitas Yang Dibutuhkan Metode BOL ............ IV-36
4.9 Penyusunan RCCP Awal Kursi Elegant............................ IV-38
4.9.1 Rekapitulasi Data Runtime ..................................... IV-38
4.9.2 Perhitungan Historical Proportion ........................ IV-39
4.9.3 Perhitungan Kapasitas Total Yang Dibutuhkan
Setiap Periode ........................................................ IV-39
4.9.4 Perhitungan Calculated Capacity Tiap Stasiun
Tiap Periode ........................................................... IV-40
4.9.5 Perhitungan RCCP Dengan Metode CPOF ........... IV-41
4.9.6 Grafik Perbandingan Kapasitas Tersedia Dengan
Kapasitas Yang Dibutuhkan Metode CPOF .......... IV-41
4.9.7 Perhitungan RCCP Dengan Metode BOL ............. IV-44
4.9.8 Grafik Perbandingan Kapasitas Tersedia Dengan
Kapasitas Yang Dibutuhkan Metode BOL ............ IV-44
4.10 Penyusunan RCCP Awal Kursi Smart............................... IV-47
4.10.1 Rekapitulasi Data Runtime ..................................... IV-47
4.10.2 Perhitungan Historical Proportion ........................ IV-48

viii
4.10.3 Perhitungan Kapasitas Total Yang Dibutuhkan
Setiap Periode ........................................................ IV-48
4.10.4 Perhitungan Calculated Capacity Tiap Stasiun
Tiap Periode ........................................................... IV-49
4.10.5 Perhitungan RCCP Dengan Metode CPOF ........... IV-50
4.10.6 Grafik Perbandingan Kapasitas Tersedia Dengan
Kapasitas Yang Dibutuhkan Metode CPOF .......... IV-50
4.10.7 Perhitungan RCCP Dengan Metode BOL ............. IV-52
4.10.8 Grafik Perbandingan Kapasitas Tersedia Dengan
Kapasitas Yang Dibutuhkan Metode BOL ............ IV-53
4.11 Pemilihan RCCP Pada Kursi Dynamic.............................. IV-55
4.11.1 Rekapitulasi Kapasitas Dibutuhkan ....................... IV-55
4.11.2 Selisih Kapasitas Metode CPOF dan BOL ............ IV-55
4.12 Pemilihan RCCP Pada Kursi Elegant................................ IV-56
4.12.1 Rekapitulasi Kapasitas Dibutuhkan ....................... IV-56
4.12.2 Selisih Kapasitas Metode CPOF dan BOL ............ IV-57
4.13 Pemilihan RCCP Pada Kursi Smart................................... IV-57
4.13.1 Rekapitulasi Kapasitas Dibutuhkan ....................... IV-58
4.13.2 Selisih Kapasitas Metode CPOF dan BOL ............ IV-58
4.14 Adjustment Pada Kursi Dynamic ....................................... IV-59
4.14.1 Penambahan Overtime dan Subcontract ................ IV-59
4.14.2 Selisih Kapasitas Yang Tersedia ............................ IV-60
4.14.3 Perhitungan Lot Pengurang.................................... IV-61
4.14.4 Revisi MPS ............................................................ IV-62
4.15 Adjustment Pada Kursi Elegant ......................................... IV-63
4.15.1 Penambahan Overtime dan Subcontract ................ IV-63
4.15.2 Selisih Kapasitas Yang Tersedia ............................ IV-65
4.15.3 Perhitungan Lot Pengurang.................................... IV-66
4.15.4 Revisi MPS ............................................................ IV-66
4.16 Adjustment Pada Kursi Smart ............................................ IV-67
4.16.1 Penambahan Overtime dan Subcontract ................ IV-67
4.16.2 Selisih Kapasitas Yang Tersedia ............................ IV-68

ix
4.16.3 Perhitungan Lot Pengurang.................................... IV-70
4.16.4 Revisi MPS ............................................................ IV-70
4.17 Penyusunan RCCP Akhir .................................................. IV-71
4.17.1 RCCP Akhir kursi Dynamic................................... IV-71
4.17.2 RCCP Akhir kursi Elegant..................................... IV-74
4.17.3 RCCP Akhir kursi Smart ....................................... IV-77
4.18 Perhitungan Perbandingan Biaya ....................................... IV-80
4.18.1 Perbandingan Biaya kursi Dynamic ....................... IV-80
4.18.2 Perbandingan Biaya kursi Elegant ......................... IV-82
4.18.3 Perbandingan Biaya kursi Smart ............................ IV-84

BAB V ANALISIS
5.1 Analisis Perhitungan Waktu Baku .................................... V-01
5.1.1 Analisis Perhitungan Waktu Baku kursi Dynamic V-01
5.1.2 Analisis Perhitungan Waktu Baku kursi Elegant.. V-02
5.1.3 Analisis Perhitungan Waktu Baku kursi Smart .... V-03
5.2 Analisis Perbandingan Perhitungan dengan Metode
CPOF dan BOL................................................................. V-03
5.2.1 Analisis Perbandingan Perhitungan Dengan
Metode CPOF dan BOL pada kursi Dynamic....... V-04
5.2.2 Analisis Perbandingan Perhitungan Dengan
Metode CPOF dan BOL pada kursi Elegant......... V-06
5.2.3 Analisis Perbandingan Perhitungan Dengan
Metode CPOF dan BOL pada kursi Smart ........... V-08
5.3 Analisis Pemilihan Metode RCCP Terbaik ...................... V-10
5.3.1 Analisis Pemilihan Metode RCCP Terbaik pada
kursi Dynamic ....................................................... V-10
5.3.2 Analisis Pemilihan Metode RCCP Terbaik pada
kursi Elegant ......................................................... V-11
5.3.3 Analisis Pemilihan Metode RCCP Terbaik pada
kursi Smart ............................................................ V-11
5.4 Analisis Adjustment .......................................................... V-12
5.4.1 Analisis Adjustment untuk kursi Dynamic ............ V-12

x
5.4.2 Analisis Adjustment untuk kursi Elegant .............. V-14
5.4.3 Analisis Adjustment untuk kursi Smart ................. V-17
5.5 Analisis RCCP Akhir ........................................................ V-17
5.5.1 Analisis RCCP Akhir untuk kursi Dynamic ......... V-17
5.5.2 Analisis RCCP Akhir untuk kursi Elegant ........... V-19
5.5.3 Analisis RCCP Akhir untuk kursi Smart .............. V-20
5.6 Analisis Perhitungan Perbandingan Biaya ........................ V-21
5.6.1 Analisis Perhitungan Perbandingan Biaya
kursi Dynamic ....................................................... V-22
5.6.2 Analisis Perhitungan Perbandingan Biaya
kursi Elegant ......................................................... V-22
5.6.3 Analisis Perhitungan Perbandingan Biaya
kursi Smart ............................................................ V-23

BAB VI KESIMPULAN DAN SARAN


6.3 Kesimpulan ....................................................................... VI-01
6.4 Saran ................................................................................. VI-02

MODUL III MATERIAL REQUIREMENT PLANNING


BAB I PENDAHULUAN
1.1 Latar Belakang .................................................................. I-01
1.2 Rumusan Masalah ............................................................. I-02
1.3 Tujuan Praktikum ............................................................. I-02
1.4 Batasan Masalah ............................................................... I-02
1.5 Asumsi .............................................................................. I-03

BAB II LANDASAN TEORI


2.1 Material Requirement Planning(MRP) ............................ II-01
2.1.1 Pengertian ............................................................. II-01
2.1.2 Fungsi MRP .......................................................... II-01
2.1.3 Tujuan Utama MRP ............................................. II-02
2.1.4 Input MRP ............................................................. II-03
2.1.5 Tahap Penyusunan MRP ...................................... II-04

xi
2.2 Capacity Requirement Planning (CRP) ............................ II-08
2.2.1 Pengertian ............................................................. II-08
2.2.2 Input CRP.............................................................. II-08
2.2.3 Tahapan CRP ........................................................ II-10

BAB III METODOLOGI PENELITIAN


3.1 Flowchart Metodologi Penelitian ..................................... III-01
3.2 Penjelasan Metodologi Penelitian..................................... III-02
3.2.1 Tahap Identifikasi Awal ........................................ III-02
3.2.2 Tahap Pengumpulan dan Pengolahan Data........... III-03
3.2.3 Tahap Analisis dan Interpertasi Hasil ................... III-04
3.2.4 Kesimpulan dan Saran .......................................... III-05

BAB IV PENGUMPULAN DAN PENGOLAHAN DATA


4.1 Rekapitulasi Data Kursi Dynamic ..................................... IV-01
4.1.1 Rekapitulasi Jadwal Induk Produksi (JIP) dan Net
Requirement (NR) kursi ........................................ IV-01
4.1.2 Rekapitulasi Data Bill Of Material (BOM) Kursi
Kuliah ..................................................................... IV-02
4.1.3 Rekapitulasi Data Inventory Part ........................... IV-03
4.1.4 Rekapitulasi Net Requirement Part ....................... IV-04
4.1.5 Rekapitulasi Biaya Persediaan Material ................ IV-05
4.2 Rekapitulasi Data Kursi Elegant ....................................... IV-06
4.2.1 Rekapitulasi Jadwal Induk Produksi (JIP) dan Net
Requirement (NR) kursi ......................................... IV-06
4.2.2 Rekapitulasi Data Bill Of Material (BOM) Kursi
Kuliah ..................................................................... IV-07
4.2.3 Rekapitulasi Data Inventory Part ........................... IV-08
4.2.4 Rekapitulasi Net Requirement Part ....................... IV-09
4.2.5 Rekapitulasi Biaya Persediaan Material ................ IV-10
4.3 Rekapitulasi Data Kursi Smart .......................................... IV-11
4.3.1 Rekapitulasi Jadwal Induk Produksi (JIP) dan Net
Requirement (NR) kursi ......................................... IV-11

xii
4.3.2 Rekapitulasi Data Bill Of Material (BOM) Kursi
Kuliah ..................................................................... IV-12
4.3.3 Rekapitulasi Data Inventory Part ........................... IV-13
4.3.4 Rekapitulasi Net Requirement Part ....................... IV-14
4.3.5 Rekapitulasi Biaya Persediaan Material ................ IV-15
4.4 Penyusunan Lotting Kursi Dynamic .................................. IV-15
4.4.1 Penyusunan Lotting dengan Metode LFL .............. IV-15
4.4.2 Penyusunan Lotting dengan Metode EOQ ............. IV-20
4.4.3 Penyusunan Lotting dengan Metode LUC ............. IV-28
4.5 Penyusunan Lotting Kursi Elegant .................................... IV-44
4.5.1 Penyusunan Lotting dengan Metode LFL .............. IV-44
4.5.2 Penyusunan Lotting dengan Metode EOQ ............. IV-50
4.5.3 Penyusunan Lotting dengan Metode LUC ............. IV-59
4.6 Penyusunan Lotting Kursi Smart ....................................... IV-76
4.6.1 Penyusunan Lotting dengan Metode LFL .............. IV-76
4.6.2 Penyusunan Lotting dengan Metode EOQ ............. IV-81
4.6.3 Penyusunan Lotting dengan Metode LUC ............. IV-88
4.7 Rekapitulasi Total Biaya Persediaan Kursi Tiap Metode .. IV-101
4.7.1 Rekapitulasi Total Biaya Persediaan kursi
Dynamic .................................................................. IV-101
4.7.2 Rekapitulasi Total Biaya Persediaan kursi
Elegant ................................................................... IV-102
4.7.3 Rekapitulasi Total Biaya Persediaan kursi
Smart ...................................................................... IV-102
4.8 Penyusunan MRP Dengan Metode Terpilih ...................... IV-103
4.8.1 Penyusunan MRP kursi Dynamic .......................... IV-103
4.8.2 Penyusunan MRP kursi Elegant ............................ IV-107
4.8.3 Penyusunan MRP kursi Smart ............................... IV-112
4.9 Rekapitulasi Data Planned Order Release ........................ IV-103
4.9.1 Rekapitulasi Data Planned Order Release kursi
Dynamic .................................................................. IV-117
4.9.2 Rekapitulasi Data Planned Order Release kursi

xiii
Elegant ................................................................... IV-117
4.9.3 Rekapitulasi Data Planned Order Release kursi
Smart ...................................................................... IV-117
4.10Rekapitulasi Data Routing File Kursi ................................ IV-119
4.10.1 Rekapitulasi Data Routing kursi Dynamic ............. IV-119
4.10.2 Rekapitulasi Data Routing kursi Elegant ............... IV-121
4.10.3 Rekapitulasi Data Routing kursi Smart .................. IV-123
4.11Penyusunan Capacity Requirement Planning(CRP) ......... IV-124
4.11.1 Penyusunan Capacity Requirement Planning kursi
Dynamic ................................................................. IV-125
4.11.2 Penyusunan Capacity Requirement Planning kursi
Elegant ................................................................... IV-128
4.11.3 Rekapitulasi Data Planned Order Release kursi
Smart ...................................................................... IV-133

BAB V ANALISIS
5.1 Analisis Data JIP, BOM, Inventory Part, dan Net
Requirement Part .............................................................. V-01
5.1.1 Analisis Data JIP, BOM, Inventory Part, dan Net
Requirement Part Kursi Dynamic…………………...V-01
5.1.2 Analisis Data JIP, BOM, Inventory Part, dan Net
Requirement Part Kursi Elegantc ......................... V-03
5.1.3 Analisis Data JIP, BOM, Inventory Part, dan Net
Requirement Part Kursi Smart.............................. V-05
5.2 Analisis Perbandingan Total Biaya Persediaan Tiap
Metode Lotting.................................................................. V-06
5.2.1 Analisis Perbandingan Total Biaya Persediaan
kursi dynamic ...................................................... V-06
5.2.2 Analisis Perbandingan Total Biaya Persediaan
kursi elegant .......................................................... V-07
5.2.3 Analisis Perbandingan Total Biaya Persediaan
kursi smart ............................................................ V-08

xiv
5.3 Analisis Material Requirement Planning (MRP) Dengan
Metode Terpilih ................................................................ V-09
5.3.1 Analisis Material Requirement Planning kursi
Dynamic ....................................................................... V-09
5.3.2 Analisis Material Requirement Planning kursi
Elegant .................................................................. V-11
5.3.3 Analisis Material Requirement Planning kursi
Smart ..................................................................... V-12
5.4 Analisis Data Planned Order Release dan Routing File .. V-14
5.4.1 Analisis Data Planned Order Release dan Routing
File kursi Dynamic ................................................ V-14
5.4.2 Analisis Data Planned Order Release dan Routing
File kursi Elegant .................................................. V-15
5.4.3 Analisis Data Planned Order Release dan Routing
File kursi Smart..................................................... V-16
5.5 Analisis Capacity Requirement Planning (CRP) ............. V-18
5.5.1 Analisis Capacity Requirement Planning kursi
Dynamic ................................................................ V-18
5.5.2 Analisis Capacity Requirement Planning kursi
Elegant .................................................................. V-19
5.5.3 Analisis Capacity Requirement Planning kursi
Smart ..................................................................... V-20

BAB VI KESIMPULAN DAN SARAN


6.1 Kesimpulan ....................................................................... VI-01
6.2 Saran ................................................................................. VI-03

MODUL IV LINE BALANCING


BAB I PENDAHULUAN
1.1 Latar Belakang .................................................................. I-01
1.2 Rumusan Masalah ............................................................. I-02
1.3 Tujuan Praktikum ............................................................. I-02
1.4 Batasan Masalah ............................................................... I-02

xv
1.5 Asumsi .............................................................................. I-02

BAB II LANDASAN TEORI


2.1 Keseimbangan Lini (LINE BALANCING) ........................ II-01
2.2 Istilah-istilah dalam LINE BALANCING ........................ II-03

BAB III METODOLOGI PENELITIAN


3.1 Flowchart Metodologi Penelitian ..................................... III-01
3.2 Penjelasan Metodologi Penelitian..................................... III-02
3.2.1 Tahap Identifikasi Awal ........................................ III-03
3.2.2 Tahap Pengumpulan dan Pengolahan Data........... III-04
3.2.3 Tahap Analisis dan Interpertasi Hasil ................... III-05
3.2.4 Kesimpulan dan Saran .......................................... III-07

BAB IV PENGUMPULAN DAN PENGOLAHAN DATA


4.1 Rekapitulasi Data Waktu Proses dan Waktu Baku ........... IV-01
4.1.1 Rekapitulasi Data Waktu Proses dan Waktu Baku
kursi Dynamic ....................................................... IV-01
4.1.2 Rekapitulasi Data Waktu Proses dan Waktu Baku
kursi Elegant ........................................................ IV-04
4.1.3 Rekapitulasi Data Waktu Proses dan Waktu Baku
kursi Smart ........................................................... IV-07
4.2 Perhitungan Line Efficiency, Balace Delay, Efisiensi
Stasiun dan Utilitas Awal .................................................. IV-09
4.2.1 Perhitungan Line Efficiency, Balace Delay,
Efisiensi Stasiun dan Utilitas Awal kursi Dynamic IV-09
4.2.2 Perhitungan Line Efficiency, Balace Delay,
Efisiensi Stasiun dan Utilitas Awal kursi Elegant . IV-11
4.2.3 Perhitungan Line Efficiency, Balace Delay,
Efisiensi Stasiun dan Utilitas Awal kursi Smart .... IV-13
4.3 Pembuatan Precedence Diagram ....................................... IV-15
4.3.1 Pembuatan Precedence Diagram kursi Dynamic ... IV-15
4.3.2 Pembuatan Precedence Diagram kursi Elegant ..... IV-16
4.3.3 Pembuatan Precedence Diagram kursi Smart........ IV-17

xvi
4.4 Perhitungan Penentuan Jumlah Stasiun Yang Diusulkan
dan Alokasi Waktu Tiap Stasiun ....................................... IV-18
4.4.1 Perhitungan Penentuan Jumlah Stasiun Yang
Diusulkan dan Alokasi Waktu Tiap Stasiun
kursi Dynamic ........................................................ IV-18
4.4.2 Perhitungan Penentuan Jumlah Stasiun Yang
Diusulkan dan Alokasi Waktu Tiap Stasiun
kursi Elegant .......................................................... IV-20
4.4.3 Perhitungan Penentuan Jumlah Stasiun Yang
Diusulkan dan Alokasi Waktu Tiap Stasiun
kursi Smart ............................................................. IV-21
4.5 Line Balancing Dengan Metode Largest Candidate Rule . IV-22
4.5.1 Line Balancing Dengan Metode Largest Candidate
Rule kursi Dynamic ................................................ IV-22
4.5.2 Line Balancing Dengan Metode Largest Candidate
Rule kursi Elegant .................................................. IV-24
4.5.3 Line Balancing Dengan Metode Largest Candidate
Rule kursi Smart ..................................................... IV-26
4.6 Pemilihan Alternatif Terbaik Berdasarkan Selisih Waktu
Alokasi Terkecil................................................................. IV-27
4.6.1 Pemilihan Alternatif Terbaik Berdasarkan Selisih
Waktu Alokasi Terkecil kursi Dynamic ................. IV-27
4.6.2 Pemilihan Alternatif Terbaik Berdasarkan Selisih
Waktu Alokasi Terkecil kursi Elegant ................... IV-28
4.6.3 Pemilihan Alternatif Terbaik Berdasarkan Selisih
Waktu Alokasi Terkecil kursi Smart...................... IV-29
4.7 Pemilihan Waktu Baku Setelah Perbaikan ........................ IV-29
4.7.1 Pemilihan Waktu Baku Setelah Perbaikan kursi
Dynamic ................................................................. IV-29
4.7.2 Pemilihan Waktu Baku Setelah Perbaikan kursi
Elegant ................................................................... IV-30
4.7.3 Pemilihan Waktu Baku Setelah Perbaikan kursi

xvii
Smart ...................................................................... IV-31
4.8 Perhitungan Line Efficiency, Balace Delay, Efisiensi
Stasiun dan Utilitas Setelah Perbaikan .............................. IV-32
4.8.1 Perhitungan Line Efficiency, Balace Delay,
Efisiensi Stasiun dan Utilitas Setelah Perbaikan
kursi Dynamic……… ............................................. IV-33
4.8.2 Perhitungan Line Efficiency, Balace Delay,
Efisiensi Stasiun dan Utilitas Setelah Perbaikan
kursi Elegant .......................................................... IV-34
4.8.3 Perhitungan Line Efficiency, Balace Delay,
Efisiensi Stasiun dan Utilitas Setelah Perbaikan
kursi Smart ............................................................. IV-36
4.9 Perbandingan Line Efficiency, Balance Delay, Efisiensi
Stasiun, Dan Utilitas Sebelum Dan Sesudah Perbaikan .... IV-37
4.9.1 Perbandingan Line Efficiency, Balance Delay,
Efisiensi Stasiun, Dan Utilitas Sebelum Dan
Sesudah Perbaikan kursi Dynamic……… .............. IV-38
4.9.2 Perbandingan Line Efficiency, Balance Delay,
Efisiensi Stasiun, Dan Utilitas Sebelum Dan
Sesudah Perbaikan kursi Elegant ........................... IV-38
4.9.3 Perbandingan Line Efficiency, Balance Delay,
Efisiensi Stasiun, Dan Utilitas Sebelum Dan
Sesudah Perbaikan kursi Smart .............................. IV-38

BAB V Analisis
5.1 Analisis Data Awal ........................................................... V-01
5.1.1 Analisis Data Awal kursi Dynamic ....................... V-01
5.1.2 Analisis Data Awal kursi Elegant ........................ V-02
5.1.3 Analisis Data Awal kursi Smart ........................... V-04
5.2 Analisis Line Efficiency, Balace Delay, Efisiensi Stasiun
dan Utilitas Awal ............................................................... V-06
5.2.1 Analisis Line Efficiency, Balace Delay, Efisiensi
Stasiun dan Utilitas Awal kursi Dynamic ............... V-06

xviii
5.2.2 Analisis Line Efficiency, Balace Delay, Efisiensi
Stasiun dan Utilitas Awal kursi Elegant ................ V-07
5.2.3 Analisis Line Efficiency, Balace Delay, Efisiensi
Stasiun dan Utilitas Awal kursi Smart ................... V-08
5.3 Analisis Precedence Diagram............................................ V-08
5.3.1 Analisis Precedence Diagram kursi Dynamic ....... V-09
5.3.2 Analisis Precedence Diagram kursi Elegant ......... V-09
5.3.3 Analisis Precedence Diagram kursi Smart ............ V-10
5.4 Analisis Data Elemen Kerja Sebelum Diurutkan .............. V-11
5.4.1 Analisis Data Elemen Kerja Sebelum Diurutkan
kursi Dynamic ........................................................ V-11
5.4.2 Analisis Data Elemen Kerja Sebelum Diurutkan
kursi Elegant .......................................................... V-12
5.4.3 Analisis Data Elemen Kerja Sebelum Diurutkan
kursi Smart ............................................................. V-12
5.5 Analisis Perbaikan Lintasan Produksi Dengan Metode
Largest Candidate Rule ..................................................... V-12
5.5.1 Analisis Perbaikan Lintasan Produksi Dengan
Metode Largest Candidate Rule kursi Dynamic .... V-13
5.5.2 Analisis Perbaikan Lintasan Produksi Dengan
Metode Largest Candidate Rule kursi Elegant...... V-15
5.5.3 Analisis Perbaikan Lintasan Produksi Dengan
Metode Largest Candidate Rule kursi Smart......... V-17
5.6 Analisis Selisih Waktu Alokasi Untuk Kedua Alternatif
Perbaikan. .......................................................................... V-19
5.6.1 Analisis Selisih Waktu Alokasi Untuk Kedua
Alternatif Perbaikan l kursi Dynamic .................... V-20
5.6.2 Analisis Selisih Waktu Alokasi Untuk Kedua
Alternatif Perbaikan kursi Elegant......................... V-20
5.6.3 Analisis Selisih Waktu Alokasi Untuk Kedua
Alternatif Perbaikan kursi Smart ........................... V-21
5.7 Analisis Line Efficiency, Balace Delay, Efisiensi Stasiun

xix
dan Utilitas Setelah Perbaikan ........................................... V-22
5.7.1 Analisis Line Efficiency, Balace Delay, Efisiensi
Stasiun dan Utilitas Setelah Perbaikan kursi
Dynamic……… ...................................................... V-22
5.7.2 Analisis Line Efficiency, Balace Delay, Efisiensi
Stasiun dan Utilitas Setelah Perbaikan kursi
Elegant ................................................................... V-23
5.7.3 Analisis Line Efficiency, Balace Delay, Efisiensi
Stasiun dan Utilitas Setelah Perbaikan kursi
Smart ...................................................................... V-24
5.8 Analisis Perbandingan Line Efficiency, Balance Delay,
Efisiensi Stasiun, Dan Utilitas Sebelum Dan Sesudah
Perbaikan ........................................................................... V-25
5.8.1 Analisis Perbandingan Line Efficiency, Balance
Delay, Efisiensi Stasiun, Dan Utilitas Sebelum
Dan Sesudah Perbaikan kursi Dynamic……… ....... V-25
5.8.2 Analisis Perbandingan Line Efficiency, Balance
Delay, Efisiensi Stasiun, Dan Utilitas Sebelum
Dan Sesudah Perbaikan kursi Elegant ................... V-26
5.9 Analisis Batasan Dan Kelemahan Dari Urutan
Elemen Kerja Usulan ......................................................... V-28
5.9.1 Analisis Batasan Dan Kelemahan Dari Urutan
Elemen Kerja Usulan kursi Dynamic……… .......... V-29
5.9.2 Analisis Batasan Dan Kelemahan Dari Urutan
Elemen Kerja Usulan kursi Elegant ....................... V-30
5.9.3 Analisis Batasan Dan Kelemahan Dari Urutan
Elemen Kerja Usulan kursi Smart.......................... V-31

BAB VI KESIMPULAN DAN SARAN


6.1 Kesimpulan ....................................................................... VI-01
6.2 Saran ................................................................................. VI-02

xx
DAFTAR PUSTAKA
Anonim. http://president-a9u52006.blogspot.co.id/2011/02/line-balancing.html
(diakses pada 20 November 2016)
Anonim. https://rayvel.files.wordpress.com/2012/07/bab-6-line-balancing.pdf
(diakses pada 20 November 2016)
Bosa, Saskia. 2013. Forecasting (Peramalan) untuk Manajemen Operasi.
http://saskiabosa.blogspot.co.id/2013/10/forecasting-peramalan-untuk-
manajemen.html (diakses pada 6 November 2016)
Grisyafti, Munsy. 2013. Jadwal Induk Produksi
http://itsfreakolotion.blogspot.co.id/2013/04/jadwal-induk-produksi-mps-
jadwalinduk.html (diakses pada 11 November 2016)
Pradhana, Faried. 2012. Forecasting (Peramalan)
https://fariedpradhana.wordpress.com/2012/06/28/forecasting-peramalan/
(diakses pada 6 November 2016)
Tim Dosen dan Asisten LSP. 2016. Modul Praktikum Perencanaan dan
Pengendalian Produksi. Surakarta: Laboratorium Sistem Produksi Teknik
Industri UNS.

xxi

Anda mungkin juga menyukai