Perencanaan Terowongan Headrace Warsamson

Data Teknis
1 Diameter Terowongan Headrace = 4 m
2 Panjang Terowongan Headrace = 288 m
3 Kemiringan Terowongan (Slope) = 0 Variasi
4 Elevasi Intake Hulu Terowongan + 36.5
5 Elevasi Outlet Hilir Terowongan + 35.83
6 Elevasi High Water Level Waduk + 355
7 Elevasi Surge Tank + 69.63
8 Tinggi Surge Tank = 33.13 m
9 Berat Jenis Air (γw) = 1 t/m3
10 Berat Jenis Beton (γ concrete) = 2.4 t/m3
11 Berat Jenis Baja (γsteel) = 7.85 t/m3
12 Lebar Terowongan (B) = 4 m
13 Tinggi Terowongan (HT) = 4 m
14 Diameter dalam Terowongan (d) = 4 m
15 Diameter luar Terowongan (D) = 8 m
16 Jari-jari dalam Terowongan ® = 2 m
17 Elevasi Atap Terowongan 203.26
18 Elevasi Dasar bawah Terowongan 198.26
Daerah DAS WARSAMSON Kabupaten Sorong Propinsi Papua

ad = Z x ac X V Periode Ulang ac
Z
k = ad / g T g
10 127 1.60
ad 20 155 1.60
Z 0.9 50 196 1.60
ac 0.227 100 227 1.60
v 1.1 200 255 1.60
500 289 1.60
1000 313 1.60
5000 364 1.60
10000 385 1.60

Peta Gempa 2004


Periode Ulang ac
Z
T g
10 127 0.10
20 155 0.10
50 196 0.10
100 227 0.10
200 255 0.10
500 289 0.10
1000 313 0.10
0 0.0 0.10
5000 364 0.10
10000 385 0.10
bupaten Sorong Propinsi Papua Barat

Faktor Koreksi Percepatan Gempa Gravitasi Koefisien gempa

V ad g k
0.8 162.56 980 0.166
0.8 198.40 980 0.202
0.8 250.88 980 0.256
0.8 290.56 980 0.296
0.8 326.40 980 0.333
0.8 369.92 980 0.377
0.8 400.64 980 0.409
0.8 465.92 980 0.475
0.8 492.80 980 0.503

Faktor Koreksi Percepatan Gempa Gravitasi Koefisien gempa


V ad g k
1.1 13.97 980 0.014
1.1 17.05 980 0.017
1.1 21.56 980 0.022
1.1 24.97 980 0.025
1.1 28.05 980 0.029
1.1 31.79 980 0.032
1.1 34.43 980 0.035
1.1 0.00 0 #DIV/0!
1.1 40.04 980 0.041
1.1 42.35 980 0.043
Elv muka air 355.6
Rock Quality
No Section Kategori Batuan Klasifikasi Terzaghi
RQD (%)
1 P1 Andesit 70 Very Blocky and Crushed
2 P2 Andesit 70 Very Blocky and Crushed
3 P3 Andesit 70 Very Blocky and Crushed
4 P4 Andesit 70 Very Blocky and Crushed
5 P5 Andesit 70 Very Blocky and Crushed
6 P6 Andesit 70 Very Blocky and Crushed
7 P7 Andesit 70 Very Blocky and Crushed
8 P8 Andesit 70 Very Blocky and Crushed
9 P9 Andesit 70 Very Blocky and Crushed
10 P10 Andesit 70 Very Blocky and Crushed
11 P11 Andesit 70 Very Blocky and Crushed
12 P12 Andesit 70 Very Blocky and Crushed
13 P13 Andesit 70 Very Blocky and Crushed
elevasi atap tunnel 203.26 211.46
Nilai Hp Elevasi Hg Nilai Hw Elevasi Hw
248.46
0.25B(B+Ht) 345.61 9.99 355.6 110.82
0.25B(B+Ht) 332.19 23.41 355.6 35.5 212.96 208.86 207.72
0.25B(B+Ht) 314.08 41.52 355.6
0.25B(B+Ht) 302.46 53.14 355.6 49.72
0.25B(B+Ht) 290.8 64.8 355.6
0.25B(B+Ht) 280.8 74.8 355.6 110.82
0.25B(B+Ht) 272.75 82.85 355.6
0.25B(B+Ht) 264.58 91.02 355.6
0.25B(B+Ht) 256.4 99.2 355.6
0.25B(B+Ht) 254.77 107.37 355.6
0.25B(B+Ht) 249.26 115.74 355.6
0.25B(B+Ht) 244.49 124.12 355.6
0.25B(B+Ht) 236.6 137.24 355.6
Perhitungan Pembebanan Vertikal Tanah diketahui

Nilai Pembebanan
Pv = ɣxH
Terzaghi Theory

No Section Klasifikasi Terzaghi Nilai Hp

m
1 P1 Very Blocky and Crushed 5.6
2 P2 Very Blocky and Crushed 5.6
3 P3 Very Blocky and Crushed 5.6
4 P4 Very Blocky and Crushed 2.8
5 P5 Very Blocky and Crushed 2.8
6 P6 Very Blocky and Crushed 2.8
7 P7 Very Blocky and Crushed 2.8
8 P8 Very Blocky and Crushed 2.8
9 P9 Very Blocky and Crushed 2.8
10 P10 Very Blocky and Crushed 2.8
11 P11 Very Blocky and Crushed 2.8
12 P12 Very Blocky and Crushed 2.8
13 P13 Very Blocky and Crushed 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8

Kondisi Gempa
Nilai
Kv 0.333061

No Potongan Klasifikasi Terzaghi Nilai Hp

m
1 P1 Very Blocky and Crushed 1
2 P2 Very Blocky and Crushed 1
3 P3 Very Blocky and Crushed 2.8
4 P4 Very Blocky and Crushed 2.8
5 P5 Very Blocky and Crushed 2.8
6 P6 Very Blocky and Crushed 2.8
7 P7 Very Blocky and Crushed 2.8
8 P8 Very Blocky and Crushed 2.8
9 P9 Very Blocky and Crushed 2.8
10 P10 Very Blocky and Crushed 2.8
11 P11 Very Blocky and Crushed 2.8
12 P12 Very Blocky and Crushed 2.8
13 P13 Very Blocky and Crushed 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
0 0 0 2.8
B 4
D 8
d 4
ɣt 2
Ht 4

Tekanan Tanah Vertikal (Pv) Beban Terowongan Berat Tanah Vertikal No

t/m2 t/m t 1
11.20 11.20 44.80 2
11.20 11.20 44.80 3
11.20 11.20 44.80 4
5.60 5.60 22.40 5
5.60 5.60 22.40 6
5.60 5.60 22.40 7
5.60 5.60 22.40 8
5.60 5.60 22.40 9
5.60 5.60 22.40 10
5.60 5.60 22.40 11
5.60 5.60 22.40 12
5.60 5.60 22.40 13
5.60 5.60 22.40 14
5.60 5.60 22.40 15
5.60 5.60 22.40 16
5.60 5.60 22.40 17
5.60 5.60 22.40 18
5.60 5.60 22.40 19
5.60 5.60 22.40 20
5.60 5.60 22.40 21
5.60 5.60 22.40 22
5.60 5.60 22.40 23
5.60 5.60 22.40 24
5.60 5.60 22.40 25
5.60 5.60 22.40 26
5.60 5.60 22.40

Nilai Berat Tanah Horizontal


Tekanan Tanah Vertikal (Pv) Beban Terowongan Berat Tanah Vertikal
Koefisien Gempa
t/m2 t/m t Kh
2.00 2.00 8.00 0.3774693878 3.019755
2.00 2.00 8.00 0.3774693878 3.019755
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
5.60 5.60 22.40 0.3774693878 8.455314
Rock Quality
Section Kategori Batuan Klasifikasi Terzaghi
RQD (%)
P1 Breksi 70 Very Blocky and Crushed
P2 Breksi 70 Very Blocky and Crushed
P3 Andesit 70 Very Blocky and Crushed
P4 Andesit 70 Very Blocky and Crushed
P5 Andesit 70 Very Blocky and Crushed
P6 Andesit 70 Very Blocky and Crushed
P7 Andesit 70 Very Blocky and Crushed
P8 Andesit 70 Very Blocky and Crushed
P9 Andesit 70 Very Blocky and Crushed
P10 Andesit 70 Very Blocky and Crushed
P11 Andesit 70 Very Blocky and Crushed
P12 Andesit 70 Very Blocky and Crushed
P13 Andesit 70 Very Blocky and Crushed
P14 Andesit 0 0
P15 Andesit 0 0
P16 Andesit 0 0
P17 Andesit 0 0
P18 Andesit 0 0
P19 Andesit 0 0
P20 Andesit 0 0
P21 Andesit 0 0
P22 Andesit 0 0
P23 Andesit 0 0
P24 Andesit 0 0
P25 Andesit 0 0
P26 Andesit 0 0

Berat Tanah Horizontal


Tekanan Batuan
Nilai Hp Terzaghi Nilai Hp No Section
Pv (t/m2)
0.25B(B+Ht) 5.6 11.2 1 P1
0.25B(B+Ht) 5.6 11.2 2 P2
0.25B(B+Ht) 5.6 11.2 3 P3
0.25B(B+Ht) 2.8 5.6 4 P4
0.25B(B+Ht) 2.8 5.6 5 P5
0.25B(B+Ht) 2.8 5.6 6 P6
0.25B(B+Ht) 2.8 5.6 7 P7
0.25B(B+Ht) 2.8 5.6 8 P8
0.25B(B+Ht) 2.8 5.6 9 P9
0.25B(B+Ht) 2.8 5.6 10 P10
0.25B(B+Ht) 2.8 5.6 11 P11
0.25B(B+Ht) 2.8 5.6 12 P12
0.25B(B+Ht) 2.8 5.6 13 P13
0 2.8 5.6 14 P14
0 2.8 5.6 15 P15
0 2.8 5.6 16 P16
0 2.8 5.6 17 P17
0 2.8 5.6 18 P18
0 2.8 5.6 19 P19
0 2.8 5.6 20 P20
0 2.8 5.6 21 P21
0 2.8 5.6 22 P22
0 2.8 5.6 23 P23
0 2.8 5.6 24 P24
0 2.8 5.6 25 P25
0 2.8 5.6 26 P26
Tekanan Batuan Koefisien Gempa Batuan Gempa
Pv (t/m2) Kh Ph Gempa (t/m2)
11.2 0.377 4.228
11.2 0.377 4.228
11.2 0.377 4.228
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
5.6 0.377 2.114
Kondisi Muka air Tanah Sepanjang Terowongan
Elevasi Atap 203.26 Lebar Terowongan (B)
Berat jenis Air 1 t/m3 Elevasi Dasar Bawah Terowongan
Pembebanan Air Tanah Atas
Tinggi Muka Air Tanah
Tekanan Air Tanah Vertikal
Berat Air Tanah
No Section
Hw (Elevasi) t/m2 t
1 P1 355.6 152.34 609.36
2 P2 355.6 152.34 609.36
3 P3 355.6 152.34 609.36
4 P4 355.6 152.34 609.36
5 P5 355.6 152.34 609.36
6 P6 355.6 152.34 609.36
7 P7 355.6 152.34 609.36
8 P8 355.6 152.34 609.36
9 P9 355.6 152.34 609.36
10 P10 355.6 152.34 609.36
11 P11 355.6 152.34 609.36
12 P12 355.6 152.34 609.36
13 P13 355.6 152.34 609.36
0 0 0 -203.26 -813.04
0 0 0 -203.26 -813.04
0 0 0 -203.26 -813.04
0 0 0 -203.26 -813.04
0 0 0 -203.26 -813.04
0 0 0 -203.26 -813.04
0 0 0 -203.26 -813.04
0 0 0 -203.26 -813.04
0 0 0 -203.26 -813.04
0 0 0 -203.26 -813.04
0 0 0 -203.26 -813.04
0 0 0 -203.26 -813.04
0 0 0 -203.26 -813.04

Pembebanan Uplif
No Section Tinggi Muka Air Tanah Tekanan Uplif Berat Uplif
Hw (Elevasi) t/m2 t
1 P1 355.6 157.34 629.36
2 P2 355.6 157.34 629.36
3 P3 355.6 157.34 629.36
4 P4 355.6 157.34 629.36
5 P5 355.6 157.34 629.36
6 P6 355.6 157.34 629.36
7 P7 355.6 157.34 629.36
8 P8 355.6 157.34 629.36
9 P9 355.6 157.34 629.36
10 P10 355.6 157.34 629.36
11 P11 355.6 157.34 629.36
12 P12 355.6 157.34 629.36
13 P13 355.6 157.34 629.36
0 0 0 -198.26 -793.04
0 0 0 -198.26 -793.04
0 0 0 -198.26 -793.04
0 0 0 -198.26 -793.04
0 0 0 -198.26 -793.04
0 0 0 -198.26 -793.04
0 0 0 -198.26 -793.04
0 0 0 -198.26 -793.04
0 0 0 -198.26 -793.04
0 0 0 -198.26 -793.04
0 0 0 -198.26 -793.04
0 0 0 -198.26 -793.04
0 0 0 -198.26 -793.04
4
198.26

Elevasi Muka Air Tanah Tinggi Air Tanah


Tekanan Air Tanah Vertikal
No Section
+ Hw t/m2
1 P1 355.6 152.34 152.34
2 P2 355.6 152.34 152.34
3 P3 355.6 152.34 152.34
4 P4 355.6 152.34 152.34
5 P5 355.6 152.34 152.34
6 P6 355.6 152.34 152.34
7 P7 355.6 152.34 152.34
8 P8 355.6 152.34 152.34
9 P9 355.6 152.34 152.34
10 P10 355.6 152.34 152.34
11 P11 355.6 152.34 152.34
12 P12 355.6 152.34 152.34
13 P13 355.6 152.34 152.34
0 0 0 -203.26 -203.26
0 0 0 -203.26 -203.26
0 0 0 -203.26 -203.26
0 0 0 -203.26 -203.26
0 0 0 -203.26 -203.26
0 0 0 -203.26 -203.26
0 0 0 -203.26 -203.26
0 0 0 -203.26 -203.26
0 0 0 -203.26 -203.26
0 0 0 -203.26 -203.26
0 0 0 -203.26 -203.26
0 0 0 -203.26 -203.26
0 0 0 -203.26 -203.26

Elevasi Muka Air Tanah Tinggi Air Tanah Tekanan Uplif


No Section
+ Hw t/m2
1 P1 355.6 157.34 157.34
2 P2 355.6 157.34 157.34
3 P3 355.6 157.34 157.34
4 P4 355.6 157.34 157.34
5 P5 355.6 157.34 157.34
6 P6 355.6 157.34 157.34
7 P7 355.6 157.34 157.34
8 P8 355.6 157.34 157.34
9 P9 355.6 157.34 157.34
10 P10 355.6 157.34 157.34
11 P11 355.6 157.34 157.34
12 P12 355.6 157.34 157.34
13 P13 355.6 157.34 157.34
0 0 0 -198.26 -198.26
0 0 0 -198.26 -198.26
0 0 0 -198.26 -198.26
0 0 0 -198.26 -198.26
0 0 0 -198.26 -198.26
0 0 0 -198.26 -198.26
0 0 0 -198.26 -198.26
0 0 0 -198.26 -198.26
0 0 0 -198.26 -198.26
0 0 0 -198.26 -198.26
0 0 0 -198.26 -198.26
0 0 0 -198.26 -198.26
0 0 0 -198.26 -198.26
Lebar Terowongan (B)
Berat Sendiri Diketahui Diamater Dalam (d)
Diameter Luar (D)
Tinggi Terowongan
ɣbeton

Luas Terowongan Luar Luas Terowongan Dalam Berat Terowongan


No Section
m2 m2 t
1 P1 33.133 14.283 45.239
2 P2 33.133 14.283 45.239
3 P3 33.133 14.283 45.239
4 P4 33.133 14.283 45.239
5 P5 33.133 14.283 45.239
6 P6 33.133 14.283 45.239
7 P7 33.133 14.283 45.239
8 P8 33.133 14.283 45.239
9 P9 33.133 14.283 45.239
10 P10 33.133 14.283 45.239
11 P11 33.133 14.283 45.239
12 P12 33.133 14.283 45.239
13 P13 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239

Kondisi Gempa

Luas Terowongan Luar Luas Terowongan Dalam Berat Terowongan


No Section
m2 m2 t
1 P1 33.133 14.283 45.239
2 P2 33.133 14.283 45.239
3 P3 33.133 14.283 45.239
4 P4 33.133 14.283 45.239
5 P5 33.133 14.283 45.239
6 P6 33.133 14.283 45.239
7 P7 33.133 14.283 45.239
8 P8 33.133 14.283 45.239
9 P9 33.133 14.283 45.239
10 P10 33.133 14.283 45.239
11 P11 33.133 14.283 45.239
12 P12 33.133 14.283 45.239
13 P13 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
0 0 33.133 14.283 45.239
Lebar Terowongan (B) 4
4
8
4
2.4

Beban Terowongan
t/m
11.310
11.310
11.310
11.310
11.310
11.310
11.310
11.310
11.310
11.310
11.310
11.310
11.310
11.310
11.310
11.310
11.310
11.310
11.310
11.310
11.310
11.310
11.310
11.310
11.310
11.310

Beban Terowongan Nilai Beban Gempa


No Section
t/m Koefisien Gempa Horizontal
11.310 0.3774693878 4.2690781999 1 P1
11.310 0.3774693878 4.2690781999 2 P2
11.310 0.3774693878 4.2690781999 3 P3
11.310 0.3774693878 4.2690781999 4 P4
11.310 0.3774693878 4.2690781999 5 P5
11.310 0.3774693878 4.2690781999 6 P6
11.310 0.3774693878 4.2690781999 7 P7
11.310 0.3774693878 4.2690781999 8 P8
11.310 0.3774693878 4.2690781999 9 P9
11.310 0.3774693878 4.2690781999 10 P10
11.310 0.3774693878 4.2690781999 11 P11
11.310 0.3774693878 4.2690781999 12 P12
11.310 0.3774693878 4.2690781999 13 P13
11.310 0.3774693878 4.2690781999 0 0
11.310 0.3774693878 4.2690781999 0 0
11.310 0.3774693878 4.2690781999 0 0
11.310 0.3774693878 4.2690781999 0 0
11.310 0.3774693878 4.2690781999 0 0
11.310 0.3774693878 4.2690781999 0 0
11.310 0.3774693878 4.2690781999 0 0
11.310 0.3774693878 4.2690781999 0 0
11.310 0.3774693878 4.2690781999 0 0
11.310 0.3774693878 4.2690781999 0 0
11.310 0.3774693878 4.2690781999 0 0
11.310 0.3774693878 4.2690781999 0 0
11.310 0.3774693878 4.2690781999 0 0
Berat Sendiri Koefisien Gempa Berat Sendiri Gempa
(t/m2) Kh (t/m2)
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
11.310 0.377 4.269
Tekanan Tanah AKtif

Tinggi Terowongan (Ht) 4 Elevasi Atap Terowongan


Berat jenis Tanah Saturat (ɣsat) 2 Elevasi Dasar Bawah Terowon
Berat jenis Tanah Submerged (ɣsub) 1 Nilai Koefisien Tekanan Tanah A

Elevasi Muka Air Elevasi Tanah Hw Tekanan Air Tanah Horizontal


No Section
Hw Hp m Pw1
1 P1 355.6 5.6 152.34 152.34
2 P2 355.6 5.6 152.34 152.34
3 P3 355.6 5.6 152.34 152.34
4 P4 355.6 2.8 152.34 152.34
5 P5 355.6 2.8 152.34 152.34
6 P6 355.6 2.8 152.34 152.34
7 P7 355.6 2.8 152.34 152.34
8 P8 355.6 2.8 152.34 152.34
9 P9 355.6 2.8 152.34 152.34
10 P10 355.6 2.8 152.34 152.34
11 P11 355.6 2.8 152.34 152.34
12 P12 355.6 2.8 152.34 152.34
13 P13 355.6 2.8 152.34 152.34
0 0 0 2.8 -203.26 -203.26
0 0 0 2.8 -203.26 -203.26
0 0 0 2.8 -203.26 -203.26
0 0 0 2.8 -203.26 -203.26
0 0 0 2.8 -203.26 -203.26
0 0 0 2.8 -203.26 -203.26
0 0 0 2.8 -203.26 -203.26
0 0 0 2.8 -203.26 -203.26
0 0 0 2.8 -203.26 -203.26
0 0 0 2.8 -203.26 -203.26
0 0 0 2.8 -203.26 -203.26
0 0 0 2.8 -203.26 -203.26
0 0 0 2.8 -203.26 -203.26
Elevasi Atap Terowongan 203.26 Berat Jenis Air

Ph  H tan 2 (
Elevasi Dasar Bawah Terowongan 198.26
Nilai Koefisien Tekanan Tanah Aktif 0.508

anan Air Tanah Horizontal Tekanan Tanah Horizontal Elevasi Muka Air
No Section
Pw2 Ph +
157.34 5.82 1 P1 355.6
157.34 5.82 2 P2 355.6
157.34 5.82 3 P3 355.6
157.34 4.14 4 P4 355.6
157.34 4.14 5 P5 355.6
157.34 4.14 6 P6 355.6
157.34 4.14 7 P7 355.6
157.34 4.14 8 P8 355.6
157.34 4.14 9 P9 355.6
157.34 4.14 10 P10 355.6
157.34 4.14 11 P11 355.6
157.34 4.14 12 P12 355.6
157.34 4.14 13 P13 355.6
-198.26 4.14 0 0 0
-198.26 4.14 0 0 0
-198.26 4.14 0 0 0
-198.26 4.14 0 0 0
-198.26 4.14 0 0 0
-198.26 4.14 0 0 0
-198.26 4.14 0 0 0
-198.26 4.14 0 0 0
-198.26 4.14 0 0 0
-198.26 4.14 0 0 0
-198.26 4.14 0 0 0
-198.26 4.14 0 0 0
-198.26 4.14 0 0 0
1 t/m

 H tan 2 ( 45   / 2)
Tinggi Muka Air Tekanan Air Tanah Horizontal
Hw (m) Pw1 Pw2
152.34 152.34 157.34
152.34 152.34 157.34
152.34 152.34 157.34
152.34 152.34 157.34
152.34 152.34 157.34
152.34 152.34 157.34
152.34 152.34 157.34
152.34 152.34 157.34
152.34 152.34 157.34
152.34 152.34 157.34
152.34 152.34 157.34
152.34 152.34 157.34
152.34 152.34 157.34
-203.26 -203.26 -198.26
-203.26 -203.26 -198.26
-203.26 -203.26 -198.26
-203.26 -203.26 -198.26
-203.26 -203.26 -198.26
-203.26 -203.26 -198.26
-203.26 -203.26 -198.26
-203.26 -203.26 -198.26
-203.26 -203.26 -198.26
-203.26 -203.26 -198.26
-203.26 -203.26 -198.26
-203.26 -203.26 -198.26
-203.26 -203.26 -198.26
Analisa Hidrolika Terowongan

Elevasi Fully Deep level 355

Diamter Terowongan Dalam (d) 4 Berat Jenis Air


Lebar Dasar dalam Terowongan 4 Lebar dalam Terowongan
Elevasi Tinggi muka air Sudut Luas Terowongan Berat air Kondisi Penuh

+ m ɸ m2 t
36.500 0.000 0 0.000 0.000
36.800 0.300 0 1.200 1.200
37.100 0.600 0 2.400 2.400
37.400 0.900 0 3.600 3.600
37.700 1.200 0 4.800 4.800
38.000 1.550 0 6.200 6.200
38.300 1.800 0 7.200 7.200
38.600 2.100 0 8.400 8.400
38.900 2.400 0 9.600 9.600
39.200 2.700 0 10.800 10.800
39.500 3.000 0 12.000 12.000
39.600 3.100 0 12.400 12.400
39.800 3.300 79.921 19.033 19.033
40.100 3.600 84.261 20.221 20.221
40.400 3.900 88.567 21.419 21.419
40.700 4.200 92.866 22.618 22.618
41.000 4.650 99.352 24.406 24.406
41.300 4.800 101.537 24.996 24.996
41.600 5.100 105.962 26.161 26.161
41.900 5.400 110.487 27.300 27.300
42.200 5.700 115.151 28.406 28.406
42.500 6.000 120.000 29.469 29.469
42.700 6.200 123.367 30.150 30.150

Kondisi Pembebanan Terowongan dalam tiap bukaan Pintu

1 Kondisi 1/4 terowongan


Tinggi 1/4 1m
Luas (A) 6.200 m2
Beban air 1 t/m

2 kondisi 1/2 Terowongan


Tinggi 1/2 2m
Luas (A) 12.400 m2
Beban air 2 t/m
3 Kondisi 3/4 Terowongan
Tinggi 3/4 3m
Luas (A) 24.406 m2
Beban air 3.936 t/m
4 Kondisi Penuh Air
Tinggi 4m
Luas (A) 30.150 m2
Beban air 4.863 t/m 106.130

5 Internal Pressure
Kondisi Water Hammer saat terjadi penutupan pada pintu intake power
Tinnggi Head Efektif (Hf) 69.63 m elevasi
Head Efektif 33.130 m
Beban Air 33.13 t/m
1 t/m
6.2 t/m
Tekanan dalam

t/m2 Luas Terowongan


Luas Terowongan
0.000 7.000
0.194
6.000
0.387
0.581 5.000
0.774
4.000
1.000
TInggi (m)

1.161 3.000
1.355 2.000
1.548
1.742 1.000
1.935 0.000
2.000
24.406

28.406
0.000
2.400
4.800
7.200
9.600
12.000
19.033
21.419

26.161

30.150
3.070
3.262 Luas (m2)
3.455
3.648
3.936
4.032
4.220 Tekanan Kondisi Pesat Telanan kondisi Penuh Air
4.403 Kemiringan slope 0.0025
4.582 Beda Tinggi Besar Tekanan
No Section No Section
4.753 m t/m2
4.863 1 P1 0.025 155.765 1 P1
2 P2 0.050 155.790 2 P2
3 P3 0.075 155.815 3 P3
4 P4 0.100 155.840 4 P4
5 P5 0.125 155.865 5 P5
6 P6 0.150 155.890 6 P6
7 P7 0.175 155.915 7 P7
8 P8 0.200 155.940 8 P8
9 P9 0.225 155.965 9 P9
10 P10 0.250 155.990 10 P10
11 P11 0.275 156.015 11 P11
12 P12 0.300 156.040 12 P12
13 P13 0.325 156.065 13 P13
0 0 0.350 156.090 0 0
0 0 0.375 156.115 0 0
0 0 0.400 156.140 0 0
0 0 0.425 156.165 0 0
0 0 0.450 156.190 0 0
0 0 0.475 156.215 0 0
0 0 0.500 156.240 0 0
0 0 0.525 156.265 0 0
0 0 0.550 156.290 0 0
0 0 0.575 156.315 0 0
0 0 0.600 156.340 0 0
0 0 0.625 156.365 0 0
0 0 0.650 156.390 0 0
ondisi Penuh Air

Beda TinggBesar Tekanan


m t/m2
0.025 155.765
0.050 155.790
0.075 155.815
0.100 155.840
0.125 155.865
0.150 155.890
0.175 155.915
0.200 155.940
0.225 155.965
0.250 155.990
0.275 156.015
0.300 156.040
0.325 156.065
0.350 156.090
0.375 156.115
0.400 156.140
0.425 156.165
0.450 156.190
0.475 156.215
0.500 156.240
0.525 156.265
0.550 156.290
0.575 156.315
0.600 156.340
0.625 156.365
0.650 156.390
Tabel 5.18 Analisis Perencanaan Saluran Pengelak

Data Teknis Saluran Pengelak :


Bentuk Saluran Lingkaran
Diameter Saluran (m) 3 1.5
Panjang Saluran (m) 306.2341
Elevasi Hulu 355
Elevasi Hilir 340
Slope (Δh/ L) 0.04898213
Debit Rencana Q25 th 207.76857 m3/detik
Angka Kekasaran (Beton) 0.014

Perhitungan Untuk Pengaliran Bebas Rekapitulasi

El. MA Tinggi MA θ A P R B v Q Qc F El. MA Tinggi MA Q


(m) (m) ( o) (m2) (m) (m) (m) (m/detik) (m3/detik) (m3/detik) Nilai Keterangan (m) (m) (m3/detik)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (1) (2) (3)
355.5 0.5 48.190 0.773 2.522 0.307 0.457 7.189 5.560 3.151 1.765 superkritis 355.000 0.000 0.000
356 1 70.529 2.061 3.693 0.558 1.052 10.717 22.088 9.034 2.445 superkritis 355.500 0.500 3.151
356.5 1.5 90.000 3.533 4.712 0.750 1.499 13.045 46.082 16.983 2.713 superkritis 356.000 1.000 9.034
357 2 109.471 5.004 5.732 0.873 1.646 14.440 72.255 27.325 2.644 superkritis 356.500 1.500 16.983
357.5 2.5 131.810 6.292 6.902 0.912 1.359 14.863 93.510 42.401 2.205 superkritis 357.000 2.000 27.325
357.500 2.500 42.401
358.000 3.000 103.860
358.500 3.500 114.210
359.000 4.000 124.560
359.500 4.500 134.909
360.000 5.000 140.873
360.500 5.500 146.837
361.000 6.000 152.801
Perhitungan Untuk Pengaliran Tekan 361.500 6.500 158.765
Aliran Tekan Berlaku Jika H > 1,5D 362.000 7.000 164.729
355 0 0 362.500 7.500 170.693
El. MA Tinggi MA θ A R Ci Cf Co v Q 355.5 0.5 5.560 363.000 8.000 176.657
(m) (m) ( o) (m2) (m) (rounded) (gesekan) (outlet) (m/detik) (m3/detik) 356 1 22.088 363.500 8.500 182.621
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 356.5 1.5 46.082 364.000 9.000 188.584
359.5 4.5 8.982 7.069 9.425 0.5 0.236614004 1 19.086 134.909 357 2 72.255 364.500 9.500 194.548
365 10 19.801 7.069 9.425 0.5 0.236614004 1 28.367 200.512 357.5 2.5 93.510 365.000 10.000 200.512
359.5 4.5 134.909
365 10 200.512

2.5 6.292
4.5 7.069
TEKANAN TOTAL Tekanan Vertikal Total
Tekanan Total Vertikal
No Section Tanah Air Total Point
t/m2 t/m2 t/m2
1.00 P1 11.20 40.24 51.44 1
2.00 P2 11.20 41.44 52.64 2
3.00 P3 11.20 42.64 53.84 3
4.00 P4 5.60 43.84 49.44 4
5.00 P5 5.60 45.04 50.64 5
6.00 P6 5.60 46.44 52.04 6
7.00 P7 5.60 47.44 53.04 7
8.00 P8 5.60 48.64 54.24 8
9.00 P9 5.60 49.84 55.44 9
10.00 P10 5.60 51.04 56.64 10
11.00 P11 5.60 52.24 57.84 11
12.00 P12 5.60 52.64 58.24 12
13.00 P13 5.60 59.27 64.87 13
0.00 0.00 5.60 60.46 66.06 0
0.00 0.00 5.60 61.66 67.26 0
0.00 0.00 5.60 62.86 68.46 0
0.00 0.00 5.60 64.65 70.25 0
0.00 0.00 5.60 65.24 70.84 0
0.00 0.00 5.60 66.40 72.00 0
0.00 0.00 5.60 67.54 73.14 0
0.00 0.00 5.60 68.64 74.24 0
0.00 0.00 5.60 69.71 75.31 0
0.00 0.00 5.60 70.39 75.99 0
0.00 0.00 5.60 40.24 45.84 0
0.00 0.00 5.60 40.24 45.84 0
0.00 0.00 5.60 40.24 45.84 0

Point

1
2
3
4
5
6
7
8
9
10
11
12
13
0
0
0
0
0
0
0
0
0
0
0
0
0
Tekanan Vertikal Total
Tekanan Vertikal
Tanah Air Tanah Berat Sendiri Berat Air Dalam Penuh Tekanan Air Dalam
t/m t/m t/m t/m t/m
11.20 152.34 45.24 4.86 155.77 207.20
11.20 152.34 45.24 4.86 155.79
11.20 152.34 45.24 4.86 155.82
5.60 152.34 45.24 4.86 155.84
5.60 152.34 45.24 4.86 155.87
5.60 152.34 45.24 4.86 155.89
5.60 152.34 45.24 4.86 155.92
5.60 152.34 45.24 4.86 155.94
5.60 152.34 45.24 4.86 155.97
5.60 152.34 45.24 4.86 155.99
5.60 152.34 45.24 4.86 156.02
5.60 152.34 45.24 4.86 156.04
5.60 152.34 45.24 4.86 156.07
5.60 -203.26 45.24 4.86 156.09
5.60 -203.26 45.24 4.86 156.12
5.60 -203.26 45.24 4.86 156.14
5.60 -203.26 45.24 4.86 156.17
5.60 -203.26 45.24 4.86 156.19
5.60 -203.26 45.24 4.86 156.22
5.60 -203.26 45.24 4.86 156.24
5.60 -203.26 45.24 4.86 156.27
5.60 -203.26 45.24 4.86 156.29
5.60 -203.26 45.24 4.86 156.32
5.60 -203.26 45.24 4.86 156.34
5.60 -203.26 45.24 4.86 156.37
5.60 -203.26 45.24 4.86 156.39

Tekanan Vertikal
Total
Tanah Air Tanah Berat Sendiri Berat Air Dalam Penuh Uplif
t/m t/m t/m t/m t/m t/m
11.20 157.34 45.24 4.86 157.34 61.302
11.20 157.34 45.24 4.86 157.34 61.302
11.20 157.34 45.24 4.86 157.34 61.302
5.60 157.34 45.24 4.86 157.34 55.702
5.60 157.34 45.24 4.86 157.34 55.702
5.60 157.34 45.24 4.86 157.34 55.702
5.60 157.34 45.24 4.86 157.34 55.702
5.60 157.34 45.24 4.86 157.34 55.702
5.60 157.34 45.24 4.86 157.34 55.702
5.60 157.34 45.24 4.86 157.34 55.702
5.60 157.34 45.24 4.86 157.34 55.702
5.60 -198.26 45.24 4.86 157.34 -299.898
5.60 -198.26 45.24 4.86 157.34 -299.898
5.60 -198.26 45.24 4.86 -198.26 55.702
5.60 -198.26 45.24 4.86 -198.26 55.702
5.60 -198.26 45.24 4.86 -198.26 55.702
5.60 -198.26 45.24 4.86 -198.26 55.702
5.60 -198.26 45.24 4.86 -198.26 55.702
5.60 -198.26 45.24 4.86 -198.26 55.702
5.60 -198.26 45.24 4.86 -198.26 55.702
5.60 -198.26 45.24 4.86 -198.26 55.702
5.60 -198.26 45.24 4.86 -198.26 55.702
5.60 -198.26 45.24 4.86 -198.26 55.702
5.60 -198.26 45.24 4.86 -198.26 55.702
5.60 0 45.24 4.86 -198.26 253.962
5.60 0 45.24 4.86 -198.26 253.962
Tekanan Horisontal
Tanah Air Tanah Kondisi Gemp
Point
Ph Pw1 Pw2
t/m t/m t/m
1 5.82 152.34 157.34
2 5.82 152.34 157.34
3 5.82 152.34 157.34
4 4.14 152.34 157.34
5 4.14 152.34 157.34
6 4.14 152.34 157.34
7 4.14 152.34 157.34
8 4.14 152.34 157.34
9 4.14 152.34 157.34
10 4.14 152.34 157.34
11 4.14 152.34 157.34
12 4.14 152.34 157.34
13 4.14 152.34 157.34
0 4.14 -203.26 -198.26
0 4.14 -203.26 -198.26
0 4.14 -203.26 -198.26
0 4.14 -203.26 -198.26
0 4.14 -203.26 -198.26
0 4.14 -203.26 -198.26
0 4.14 -203.26 -198.26
0 4.14 -203.26 -198.26
0 4.14 -203.26 -198.26
0 4.14 -203.26 -198.26
0 4.14 -203.26 -198.26
0 4.14 -203.26 -198.26
0 4.14 -203.26 -198.26
Kondisi Kosong Tanpa Air pada Terowongan dengan tanpa Gempa

Tekanan Vertikal Total


Poin Batuan Air Tanah Berat Sendiri Uplif Tekanan Vertikal
t/m t/m t/m t/m t/m
1 11.20 152.34 11.31 157.3 17.51
2 11.20 152.34 11.31 157.3 17.51
3 11.20 152.34 11.31 157.3 17.51
4 5.60 152.34 11.31 157.3 11.91
5 5.60 152.34 11.31 157.3 11.91
6 5.60 152.34 11.31 157.3 11.91
7 5.60 152.34 11.31 157.3 11.91
8 5.60 152.34 11.31 157.3 11.91
9 5.60 152.34 11.31 157.3 11.91
10 5.60 152.34 11.31 157.3 11.91
11 5.60 152.34 11.31 157.3 11.91
12 5.60 152.34 11.31 157.3 11.91
13 5.60 152.34 11.31 157.3 11.91
14 5.60 -203.26 11.31 -198 11.91
15 5.60 -203.26 11.31 -198 11.91
16 5.60 -203.26 11.31 -198 11.91
17 5.60 -203.26 11.31 -198 11.91
18 5.60 -203.26 11.31 -198 11.91
19 5.60 -203.26 11.31 -198 11.91
20 5.60 -203.26 11.31 -198 11.91
21 5.60 -203.26 11.31 -198 11.91
22 5.60 -203.26 11.31 -198 11.91
23 5.60 -203.26 11.31 -198 11.91
24 5.60 -203.26 11.31 -198 11.91
25 5.60 -203.26 11.31 -198 11.91
26 5.60 -203.26 11.31 -198 11.91
Sumber: Perhitungan
Keterangan
1 Lapisan Batuan Andesit
2
Koefisien Gempa (Kh) 0.3774693878

Tekanan Horizontal
Poin Batuan Aktif (Ph) Air Tanah Aktif Pwh1 Air Tanah Aktif Pwh2 Tekanan Batuan Gempa
t/m t/m t/m t/m
1 5.82 152.34 157.34 4.23
2 5.82 152.34 157.34 4.23
3 5.82 152.34 157.34 4.23
4 4.14 152.34 157.34 2.11
5 4.14 152.34 157.34 2.11
6 4.14 152.34 157.34 2.11
7 4.14 152.34 157.34 2.11
8 4.14 152.34 157.34 2.11
9 4.14 152.34 157.34 2.11
10 4.14 152.34 157.34 2.11
11 4.14 152.34 157.34 2.11
12 4.14 152.34 157.34 2.11
13 4.14 152.34 157.34 2.11
14 4.14 -203.26 -198.26 2.11
15 4.14 -203.26 -198.26 2.11
16 4.14 -203.26 -198.26 2.11
17 4.14 -203.26 -198.26 2.11
18 4.14 -203.26 -198.26 2.11
19 4.14 -203.26 -198.26 2.11
20 4.14 -203.26 -198.26 2.11
21 4.14 -203.26 -198.26 2.11
22 4.14 -203.26 -198.26 2.11
23 4.14 -203.26 -198.26 2.11
24 4.14 -203.26 -198.26 2.11
25 4.14 -203.26 -198.26 2.11
26 4.14 -203.26 -198.26 2.11
Berat sendiri Gempa
t/m
4.27
4.27
4.27
4.27
4.27
4.27
4.27
4.27
4.27
4.27
4.27
4.27
4.27
4.27
4.27
4.27
4.27
4.27
4.27
4.27
4.27
4.27
4.27
4.27
4.27
4.27
Kondisi Kosong Tanpa Air pada Terowongan dengan tanpa Gempa

Tekanan Vertikal
Section Batuan Air Tanah Berat Sendiri Uplif Berat Air Dalam
t/m t/m t/m t/m t/m
1 11.20 152.34 11.31 157.34 4.863
2 11.20 152.34 11.31 157.34 4.863
3 11.20 152.34 11.31 157.34 4.863
4 5.60 152.34 11.31 157.34 4.863
5 5.60 152.34 11.31 157.34 4.863
6 5.60 152.34 11.31 157.34 4.863
7 5.60 152.34 11.31 157.34 4.863
8 5.60 152.34 11.31 157.34 4.863
9 5.60 152.34 11.31 157.34 4.863
10 5.60 152.34 11.31 157.34 4.863
11 5.60 152.34 11.31 157.34 4.863
12 5.60 152.34 11.31 157.34 4.863
13 5.60 152.34 11.31 157.34 4.863
14 5.60 -203.26 11.31 -198.26 4.863
15 5.60 -203.26 11.31 -198.26 4.863
16 5.60 -203.26 11.31 -198.26 4.863
17 5.60 -203.26 11.31 -198.26 4.863
18 5.60 -203.26 11.31 -198.26 4.863
19 5.60 -203.26 11.31 -198.26 4.863
20 5.60 -203.26 11.31 -198.26 4.863
21 5.60 -203.26 11.31 -198.26 4.863
22 5.60 -203.26 11.31 -198.26 4.863
23 5.60 -203.26 11.31 -198.26 4.863
24 5.60 -203.26 11.31 -198.26 4.863
25 5.60 -203.26 11.31 -198.26 4.863
26 5.60 -203.26 11.31 -198.26 4.863
Total Tekanan Horizontal
Tekanan Vertikal Poin Batuan Aktif (Ph) Air Tanah Aktif Pwh1
t/m t/m t/m
22.37 1 5.82 152.34
22.37 2 5.82 152.34
22.37 3 5.82 152.34
16.77 4 4.14 152.34
16.77 5 4.14 152.34
16.77 6 4.14 152.34
16.77 7 4.14 152.34
16.77 8 4.14 152.34
16.77 9 4.14 152.34
16.77 10 4.14 152.34
16.77 11 4.14 152.34
16.77 12 4.14 152.34
16.77 13 4.14 152.34
16.77 14 4.14 -203.26
16.77 15 4.14 -203.26
16.77 16 4.14 -203.26
16.77 17 4.14 -203.26
16.77 18 4.14 -203.26
16.77 19 4.14 -203.26
16.77 20 4.14 -203.26
16.77 21 4.14 -203.26
16.77 22 4.14 -203.26
16.77 23 4.14 -203.26
16.77 24 4.14 -203.26
16.77 25 4.14 -203.26
16.77 26 4.14 -203.26
n Horizontal
Air Tanah Aktif Pwh2
t/m
157.34
157.34
157.34
157.34
157.34
157.34
157.34
157.34
157.34
157.34
157.34
157.34
157.34
-198.26
-198.26
-198.26
-198.26
-198.26
-198.26
-198.26
-198.26
-198.26
-198.26
-198.26
-198.26
-198.26
Kondisi Kosong Tanpa Air pada Terowongan dengan tanpa Gempa

Tekanan Vertikal
Section Batuan Air Tanah Berat Sendiri Uplif Tekanan Water Hammer
t/m t/m t/m t/m t/m
1 11.20 152.34 11.31 157.3 33.13
17.51 2 11.20 152.34 11.31 157.3 33.13
17.51 3 11.20 152.34 11.31 157.3 33.13
11.91 4 5.60 152.34 11.31 157.3 33.13
5 5.60 152.34 11.31 157.3 33.13
6 5.60 152.34 11.31 157.3 33.13
7 5.60 152.34 11.31 157.3 33.13
8 5.60 152.34 11.31 157.3 33.13
9 5.60 152.34 11.31 157.3 33.13
10 5.60 152.34 11.31 157.3 33.13
11 5.60 152.34 11.31 157.3 33.13
12 5.60 152.34 11.31 157.3 33.13
13 5.60 152.34 11.31 157.3 33.13
14 5.60 -203.26 11.31 -198 33.13
15 5.60 -203.26 11.31 -198 33.13
16 5.60 -203.26 11.31 -198 33.13
17 5.60 -203.26 11.31 -198 33.13
18 5.60 -203.26 11.31 -198 33.13
19 5.60 -203.26 11.31 -198 33.13
20 5.60 -203.26 11.31 -198 33.13
21 5.60 -203.26 11.31 -198 33.13
22 5.60 -203.26 11.31 -198 33.13
23 5.60 -203.26 11.31 -198 33.13
24 5.60 -203.26 11.31 -198 33.13
25 5.60 -203.26 11.31 -198 33.13
26 5.60 -203.26 11.31 -198 33.13
Koefisien Gempa (Kh) 0.3774693878

Total Tekanan Horizontal


Tekanan Vertikal Section Batuan Aktif (Ph) Air Tanah Aktif Pwh1 Air Tanah Aktif Pwh2
t/m t/m t/m t/m
50.64 1 5.82 152.34 157.34
50.64 2 5.82 152.34 157.34
50.64 3 5.82 152.34 157.34
45.04 4 4.14 152.34 157.34
45.04 5 4.14 152.34 157.34
45.04 6 4.14 152.34 157.34
45.04 7 4.14 152.34 157.34
45.04 8 4.14 152.34 157.34
45.04 9 4.14 152.34 157.34
45.04 10 4.14 152.34 157.34
45.04 11 4.14 152.34 157.34
45.04 12 4.14 152.34 157.34
45.04 13 4.14 152.34 157.34
45.04 14 4.14 -203.26 -198.26
45.04 15 4.14 -203.26 -198.26
45.04 16 4.14 -203.26 -198.26
45.04 17 4.14 -203.26 -198.26
45.04 18 4.14 -203.26 -198.26
45.04 19 4.14 -203.26 -198.26
45.04 20 4.14 -203.26 -198.26
45.04 21 4.14 -203.26 -198.26
45.04 22 4.14 -203.26 -198.26
45.04 23 4.14 -203.26 -198.26
45.04 24 4.14 -203.26 -198.26
45.04 25 4.14 -203.26 -198.26
45.04 26 4.14 -203.26 -198.26
orizontal
Batuan Gempa Berat sendiri Gempa
t/m t/m
4.228 4.269
4.228 4.269
4.228 4.269
2.114 4.269
2.114 4.269
2.114 4.269
2.114 4.269
2.114 4.269
2.114 4.269
2.114 4.269
2.114 4.269
2.114 4.269
2.114 4.269
2.114 4.269
2.114 4.269
2.114 4.269
2.114 4.269
2.114 4.269
2.114 4.269
2.114 4.269
2.114 4.269
2.114 4.269
2.114 4.269
2.114 4.269
2.114 4.269
2.114 4.269
DiKetahui
13.65854 12.65854
0.024405 1.024405
12.35697
Diketahui
W beban 11.20
Jari-jari 2
Koefisien Beban Vertikal Tanah W

M T S Besaran
Point
vr2
vr vr Momen Normal Lintang
1 0.317 0.06 0 14.20 1.34 -
2 0.275 0.147 0.318 12.32 3.29 7.12
3 0.16 0.385 0.547 7.17 8.62 12.25
4 0.004 0.709 0.624 0.18 15.88 13.98
5 -0.148 1.03 0.525 (6.63) 23.07 11.76
6 -0.253 1.26 0.275 (11.33) 28.22 6.16
7 -0.28 1.333 -0.06 (12.54) 29.86 (1.34)
8 -0.26 1.333 -0.06 (11.65) 29.86 (1.34)
9 -0.24 1.333 -0.06 (10.75) 29.86 (1.34)
10 -0.22 1.333 -0.06 (9.86) 29.86 (1.34)
11 -0.043 -0.06 -1 (1.93) (1.34) (22.40)
12 0.235 -0.06 -0.667 10.53 (1.34) (14.94)
13 0.401 -0.06 -0.333 17.96 (1.34) (7.46)
14 0.457 -0.06 0 20.47 (1.34) -

M T S Besaran
Point
gr3 gr2 gr2 Momen Normal Lintang
1 0.037 -0.027 0 3.3152 -1.2096 0
2 0.036 0.025 0.012 3.2256 1.12 0.5376
3 0.03 -0.004 0.047 2.688 -0.1792 2.1056
4 0.015 0.062 0.1 1.344 2.7776 4.48
5 -0.007 0.18 0.135 -0.6272 8.064 6.048
6 -0.03 0.313 0.112 -2.688 14.0224 5.0176
7 -0.044 0.382 0.027 -3.9424 17.1136 1.2096
8 -0.053 0.382 0.027 -4.7488 17.1136 1.2096
9 -0.062 0.382 0.027 -5.5552 17.1136 1.2096
10 -0.071 0.382 0.027 -6.3616 17.1136 1.2096
11 -0.028 0.027 -0.286 -2.5088 1.2096 -12.8128
12 0.051 0.027 -0.191 4.5696 1.2096 -8.5568
13 0.099 0.027 -0.095 8.8704 1.2096 -4.256
14 0.115 0.027 0 10.304 1.2096 0

Komulatif Momen Lintang Normal


M T S Tekanan tanah
Point
vr2 vr vr Momen Normal Lintang
1 0.354 0.033 0 17.52 0.13 -
2 0.311 0.172 0.33 15.55 4.41 7.66
3 0.19 0.381 0.594 9.86 8.44 14.36
4 0.019 0.771 0.724 1.52 18.66 18.46
5 -0.155 1.21 0.66 (7.26) 31.14 17.81
6 -0.283 1.573 0.387 (14.02) 42.25 11.18
7 -0.324 1.715 -0.033 (16.49) 46.97 (0.13)
8 -0.313 1.715 -0.033 (16.40) 46.97 (0.13)
9 -0.302 1.715 -0.033 (16.31) 46.97 (0.13)
10 -0.291 1.715 -0.033 (16.22) 46.97 (0.13)
11 -0.071 -0.033 -1.286 (4.44) (0.13) (35.21)
12 0.286 -0.033 -0.858 15.10 (0.13) (23.50)
13 0.5 -0.033 -0.428 26.84 (0.13) (11.72)
14 0.572 -0.033 0 30.78 (0.13) -

W 152.34

Koefisien Tekanan air tanah


Point
M T S Momen Normal Lintang
1 0.117 1.126 0 215.71344 10.05444 0
2 0.095 1.214 0.186 189.51096 52.40496 100.5444
3 0.039 1.456 0.303 115.7784 116.08308 180.97992
4 -0.03 1.793 0.309 11.57784 234.90828 220.58832
5 -0.081 2.141 0.192 -94.4508 368.6628 201.0888
6 -0.088 2.42 -0.012 -172.4489 479.26164 117.91116
7 -0.041 2.572 -0.238 -197.4326 522.5262 -10.05444
8 -0.043 2.728 0.262 -190.7297 522.5262 -10.05444
9 -0.229 2.884 0.874 -184.0267 522.5262 -10.05444
10 -0.638 3.04 1.596 -177.3238 522.5262 -10.05444
11 -0.487 2.429 -2.458 -43.26456 -10.05444 -391.8185
12 0.218 2.429 -1.757 174.27696 -10.05444 -261.4154
13 0.671 2.429 -0.937 304.68 -10.05444 -130.403
14 0.83 2.429 0 348.55392 -10.05444 0

Berat Sendiri 11.30973


M T S Berat Sendiri
Point
Cr3 Cr2 Cr2 Momen Normal Lintang
1 0.121 0.019 0 175.04209 2.4302914 0
2 0.107 0.045 0.093 154.78929 5.7559533 11.895637
3 0.067 0.119 0.167 96.924133 15.221299 21.360982
4 0.01 0.23 0.202 14.466288 29.419317 25.837835
5 -0.05 0.362 0.187 -72.33144 46.303446 23.919184
6 -0.097 0.497 0.113 -140.323 63.571306 14.453838
7 -0.112 0.611 -0.019 -162.0224 78.153055 -2.430291
8 -0.105 0.722 -0.019 -151.896 92.351073 -2.430291
9 -0.099 0.833 -0.019 -143.2163 106.54909 -2.430291
10 -0.092 0.944 -0.019 -133.0899 120.74711 -2.430291
11 -0.004 -0.019 -0.531 -5.786515 -2.430291 -67.92025
12 0.121 -0.019 -0.236 175.04209 -2.430291 -30.18678
13 0.166 -0.019 -0.059 240.14039 -2.430291 -7.546694
14 0.173 -0.019 0 250.26679 -2.430291 0

Internal Pressure 33.13


M T S Internal Pressure
Point
Pr2 Pr Pr Momen Normal Lintang
1 0.062 -1.142 0 8.21624 -75.66892 0
2 0.056 -1.137 0.037 7.42112 -75.33762 2.45162
3 0.04 -1.123 0.071 5.3008 -74.40998 4.70446
4 0.013 -1.1 0.1 1.72276 -72.886 6.626
5 -0.021 -1.071 0.123 -2.78292 -70.96446 8.14998
6 -0.061 -1.037 0.137 -8.08372 -68.71162 9.07762
7 -0.104 -1 0.142 -13.78208 -66.26 9.40892
8 -0.096 -1 -0.191 -12.72192 -66.26 -12.65566
9 0.024 -1 -0.525 3.18048 -66.26 -34.7865
10 0.254 -1 -0.858 33.66008 -66.26 -56.85108
11 0.231 -0.858 1 30.61212 -56.85108 66.26
12 -0.047 -0.858 0.667 -6.22844 -56.85108 44.19542
13 -0.214 -0.858 0.333 -28.35928 -56.85108 22.06458
14 -0.269 -0.858 0 -35.64788 -56.85108 0

Beban air kondisi penuh 4.862852 t/m


M T S Berat Air Penuh
Point
Wr3 Wr Wr Momen Normal Lintang
1 0.256 -0.684 0 9.96 -26.61 0.00
2 0.229 -0.661 0.174 8.91 -25.71 6.77
3 0.152 -0.596 0.319 5.91 -23.19 12.41
4 0.04 -0.499 0.408 1.56 -19.41 15.87
5 -0.089 -0.389 0.421 -3.46 -15.13 16.38
6 -0.209 -0.286 0.348 -8.13 -11.13 13.54
7 -0.292 -0.215 0.184 -11.36 -8.36 7.16
8 -0.292 -0.215 -0.205 -11.36 -8.36 -7.98
9 -0.144 -0.215 -0.705 -5.60 -8.36 -27.43
10 0.19 -0.215 -1.316 7.39 -8.36 -51.20
11 0.299 0.299 0.661 11.63 11.63 25.71
12 0.115 0.115 0.441 4.47 4.47 17.16
13 0.005 0.005 0.22 0.19 0.19 8.56
14 -0.031 -0.031 0 -1.21 -1.21 0.00

M T S Air Tanah arch


Point
Wr3 Wr2 Wr2 Momen Normal Lintang
1 -0.079 1.085 -96.27888 661.1556 0
2 -0.073 1.112 -0.039 -88.96656 677.60832 -23.76504
3 -0.054 1.19 -0.077 -65.81088 725.1384 -46.92072
4 -0.024 1.314 -0.113 -29.24928 800.69904 -68.85768
5 0.017 1.473 -0.146 20.71824 897.58728 -88.96656
6 0.068 1.657 -0.174 82.87296 1009.7095 -106.0286
7 0.127 1.85 -0.197 154.77744 1127.316 -120.0439
8 0.112 2.117 0.303 136.49664 1290.0151 184.63608
9 -0.088 2.384 0.915 -107.2474 1452.7142 557.5644
10 -0.51 2.651 1.637 -621.5472 1615.4134 997.52232
11 -0.448 2.47 -1.989 -545.9866 1505.1192 -1212.017
12 0.104 2.47 -1.326 126.74688 1505.1192 -808.0114
13 0.436 2.47 -0.663 531.36192 1505.1192 -404.0057
14 0.546 2.47 0 665.42112 1505.1192 0

Tekanan air tanah


Point
Momen Normal Lintang
1 193.1671 18.2808 0
2 167.574 44.78796 96.88824
3 97.4976 117.3018 166.66
4 2.43744 216.0181 190.1203
5 -90.1853 313.8204 159.957
6 -154.168 383.8968 83.787
7 -170.621 406.1384 -18.2808
8 -158.434 406.1384 -18.2808
9 -146.246 406.1384 -18.2808
10 -134.059 406.1384 -18.2808
11 -26.2025 -18.2808 -304.68
12 143.1996 -18.2808 -203.222
13 244.3534 -18.2808 -101.458
14 278.4775 -18.2808 0
batuan 11.20
Diketahui
W beban 11.20
Jari-jari 2
Koefisien Beban Vertikal Tanah W

M T S Besaran
Point
vr2
vr vr Momen Normal Lintang
1 0.317 0.06 0 14.20 1.34 -
2 0.275 0.147 0.318 12.32 3.29 7.12
3 0.16 0.385 0.547 7.17 8.62 12.25
4 0.004 0.709 0.624 0.18 15.88 13.98
5 -0.148 1.03 0.525 (6.63) 23.07 11.76
6 -0.253 1.26 0.275 (11.33) 28.22 6.16
7 -0.28 1.333 -0.06 (12.54) 29.86 (1.34)
8 -0.26 1.333 -0.06 (11.65) 29.86 (1.34)
9 -0.24 1.333 -0.06 (10.75) 29.86 (1.34)
10 -0.22 1.333 -0.06 (9.86) 29.86 (1.34)
11 -0.043 -0.06 -1 (1.93) (1.34) (22.40)
12 0.235 -0.06 -0.667 10.53 (1.34) (14.94)
13 0.401 -0.06 -0.333 17.96 (1.34) (7.46)
14 0.457 -0.06 0 20.47 (1.34) -

M T S Besaran
Point
gr3 gr2 gr2 Momen Normal Lintang
1 0.037 -0.027 0 3.3152 -1.2096 0
2 0.036 0.025 0.012 3.2256 1.12 0.5376
3 0.03 -0.004 0.047 2.688 -0.1792 2.1056
4 0.015 0.062 0.1 1.344 2.7776 4.48
5 -0.007 0.18 0.135 -0.6272 8.064 6.048
6 -0.03 0.313 0.112 -2.688 14.0224 5.0176
7 -0.044 0.382 0.027 -3.9424 17.1136 1.2096
8 -0.053 0.382 0.027 -4.7488 17.1136 1.2096
9 -0.062 0.382 0.027 -5.5552 17.1136 1.2096
10 -0.071 0.382 0.027 -6.3616 17.1136 1.2096
11 -0.028 0.027 -0.286 -2.5088 1.2096 -12.8128
12 0.051 0.027 -0.191 4.5696 1.2096 -8.5568
13 0.099 0.027 -0.095 8.8704 1.2096 -4.256
14 0.115 0.027 0 10.304 1.2096 0

Komulatif Momen Lintang Normal


M T S Tekanan tanah
Point
vr2 vr vr Momen Normal Lintang
1 0.354 0.033 0 17.52 0.13 -
2 0.311 0.172 0.33 15.55 4.41 7.66
3 0.19 0.381 0.594 9.86 8.44 14.36
4 0.019 0.771 0.724 1.52 18.66 18.46
5 -0.155 1.21 0.66 (7.26) 31.14 17.81
6 -0.283 1.573 0.387 (14.02) 42.25 11.18
7 -0.324 1.715 -0.033 (16.49) 46.97 (0.13)
8 -0.313 1.715 -0.033 (16.40) 46.97 (0.13)
9 -0.302 1.715 -0.033 (16.31) 46.97 (0.13)
10 -0.291 1.715 -0.033 (16.22) 46.97 (0.13)
11 -0.071 -0.033 -1.286 (4.44) (0.13) (35.21)
12 0.286 -0.033 -0.858 15.10 (0.13) (23.50)
13 0.5 -0.033 -0.428 26.84 (0.13) (11.72)
14 0.572 -0.033 0 30.78 (0.13) -

W 152.34

Koefisien Tekanan air tanah


Point
M T S Momen Normal Lintang
1 0.117 1.126 0 215.71344 10.05444 0
2 0.095 1.214 0.186 189.51096 52.40496 100.5444
3 0.039 1.456 0.303 115.7784 116.08308 180.97992
4 -0.03 1.793 0.309 11.57784 234.90828 220.58832
5 -0.081 2.141 0.192 -94.4508 368.6628 201.0888
6 -0.088 2.42 -0.012 -172.4489 479.26164 117.91116
7 -0.041 2.572 -0.238 -197.4326 522.5262 -10.05444
8 -0.043 2.728 0.262 -190.7297 522.5262 -10.05444
9 -0.229 2.884 0.874 -184.0267 522.5262 -10.05444
10 -0.638 3.04 1.596 -177.3238 522.5262 -10.05444
11 -0.487 2.429 -2.458 -43.26456 -10.05444 -391.8185
12 0.218 2.429 -1.757 174.27696 -10.05444 -261.4154
13 0.671 2.429 -0.937 304.68 -10.05444 -130.403
14 0.83 2.429 0 348.55392 -10.05444 0

Berat Sendiri 11.30973


M T S Berat Sendiri
Point
Cr3 Cr2 Cr2 Momen Normal Lintang
1 0.121 0.019 0 175.04209 2.4302914 0
2 0.107 0.045 0.093 154.78929 5.7559533 11.895637
3 0.067 0.119 0.167 96.924133 15.221299 21.360982
4 0.01 0.23 0.202 14.466288 29.419317 25.837835
5 -0.05 0.362 0.187 -72.33144 46.303446 23.919184
6 -0.097 0.497 0.113 -140.323 63.571306 14.453838
7 -0.112 0.611 -0.019 -162.0224 78.153055 -2.430291
8 -0.105 0.722 -0.019 -151.896 92.351073 -2.430291
9 -0.099 0.833 -0.019 -143.2163 106.54909 -2.430291
10 -0.092 0.944 -0.019 -133.0899 120.74711 -2.430291
11 -0.004 -0.019 -0.531 -5.786515 -2.430291 -67.92025
12 0.121 -0.019 -0.236 175.04209 -2.430291 -30.18678
13 0.166 -0.019 -0.059 240.14039 -2.430291 -7.546694
14 0.173 -0.019 0 250.26679 -2.430291 0

Internal Pressure 33.13


M T S Internal Pressure
Point
Pr2 Pr Pr Momen Normal Lintang
1 0.062 -1.142 0 8.21624 -75.66892 0
2 0.056 -1.137 0.037 7.42112 -75.33762 2.45162
3 0.04 -1.123 0.071 5.3008 -74.40998 4.70446
4 0.013 -1.1 0.1 1.72276 -72.886 6.626
5 -0.021 -1.071 0.123 -2.78292 -70.96446 8.14998
6 -0.061 -1.037 0.137 -8.08372 -68.71162 9.07762
7 -0.104 -1 0.142 -13.78208 -66.26 9.40892
8 -0.096 -1 -0.191 -12.72192 -66.26 -12.65566
9 0.024 -1 -0.525 3.18048 -66.26 -34.7865
10 0.254 -1 -0.858 33.66008 -66.26 -56.85108
11 0.231 -0.858 1 30.61212 -56.85108 66.26
12 -0.047 -0.858 0.667 -6.22844 -56.85108 44.19542
13 -0.214 -0.858 0.333 -28.35928 -56.85108 22.06458
14 -0.269 -0.858 0 -35.64788 -56.85108 0

Beban air kondisi penuh 4.862852 t/m


M T S Berat Air Penuh
Point
Wr3 Wr Wr Momen Normal Lintang
1 0.256 -0.684 0 9.96 -26.61 0.00
2 0.229 -0.661 0.174 8.91 -25.71 6.77
3 0.152 -0.596 0.319 5.91 -23.19 12.41
4 0.04 -0.499 0.408 1.56 -19.41 15.87
5 -0.089 -0.389 0.421 -3.46 -15.13 16.38
6 -0.209 -0.286 0.348 -8.13 -11.13 13.54
7 -0.292 -0.215 0.184 -11.36 -8.36 7.16
8 -0.292 -0.215 -0.205 -11.36 -8.36 -7.98
9 -0.144 -0.215 -0.705 -5.60 -8.36 -27.43
10 0.19 -0.215 -1.316 7.39 -8.36 -51.20
11 0.299 0.299 0.661 11.63 11.63 25.71
12 0.115 0.115 0.441 4.47 4.47 17.16
13 0.005 0.005 0.22 0.19 0.19 8.56
14 -0.031 -0.031 0 -1.21 -1.21 0.00

M T S Air Tanah arch


Point
Wr3 Wr2 Wr2 Momen Normal Lintang
1 -0.079 1.085 -96.27888 661.1556 0
2 -0.073 1.112 -0.039 -88.96656 677.60832 -23.76504
3 -0.054 1.19 -0.077 -65.81088 725.1384 -46.92072
4 -0.024 1.314 -0.113 -29.24928 800.69904 -68.85768
5 0.017 1.473 -0.146 20.71824 897.58728 -88.96656
6 0.068 1.657 -0.174 82.87296 1009.7095 -106.0286
7 0.127 1.85 -0.197 154.77744 1127.316 -120.0439
8 0.112 2.117 0.303 136.49664 1290.0151 184.63608
9 -0.088 2.384 0.915 -107.2474 1452.7142 557.5644
10 -0.51 2.651 1.637 -621.5472 1615.4134 997.52232
11 -0.448 2.47 -1.989 -545.9866 1505.1192 -1212.017
12 0.104 2.47 -1.326 126.74688 1505.1192 -808.0114
13 0.436 2.47 -0.663 531.36192 1505.1192 -404.0057
14 0.546 2.47 0 665.42112 1505.1192 0

Tekanan air tanah


Point
Momen Normal Lintang
1 193.1671 18.2808 0
2 167.574 44.78796 96.88824
3 97.4976 117.3018 166.66
4 2.43744 216.0181 190.1203
5 -90.1853 313.8204 159.957
6 -154.168 383.8968 83.787
7 -170.621 406.1384 -18.2808
8 -158.434 406.1384 -18.2808
9 -146.246 406.1384 -18.2808
10 -134.059 406.1384 -18.2808
11 -26.2025 -18.2808 -304.68
12 143.1996 -18.2808 -203.222
13 244.3534 -18.2808 -101.458
14 278.4775 -18.2808 0
batuan 11.20
Tekanan Tanah horizontal Tanpa Gempa Tekanan Tanah horizontal Dengan Gempa
M T S Tekanan Tanah Horisontal M
Point Point
hr2 hr hr Momen Normal Lintang hr2
1 -0.379 1.415 0 -21.20 25.53 0.00 1 -0.379
2 -0.331 1.323 -0.355 -18.51 23.87 -6.40 2 -0.331
3 -0.199 1.071 -0.618 -11.13 19.32 -11.15 3 -0.199
4 -0.018 0.725 -0.725 -1.01 13.08 -13.08 4 -0.018
5 0.169 0.374 -0.648 9.45 6.75 -11.69 5 0.169
6 0.314 0.111 -0.413 17.56 2.00 -7.45 6 0.314
7 0.384 0 -0.082 21.48 0.00 -1.48 7 0.384
8 0.355 0 0.251 19.86 0.00 4.53 8 0.355
9 0.216 0 0.585 12.08 0.00 10.55 9 0.216
10 -0.034 0 0.918 -1.90 0.00 16.56 10 -0.034
11 -0.187 1.251 0 -10.46 22.57 0.00 11 -0.187
12 -0.187 1.251 0 -10.46 22.57 0.00 12 -0.187
13 -0.187 1.251 0 -10.46 22.57 0.00 13 -0.187
14 -0.187 1.251 0 -10.46 22.57 0.00 14 -0.187

Tekanan Air Tanah Horizontal beban maksimal Pwatap 152.34


Pwbawah 157.34
M T S Tekanan Horisontal
Point
hr2 hr hr Momen Normal Lintang
1 -0.379 1.415 0 -230.95 431.12 0.00
2 -0.331 1.323 -0.355 -201.70 403.09 -108.16
3 -0.199 1.071 -0.618 -121.26 326.31 -188.29
4 -0.018 0.725 -0.725 -10.97 220.89 -220.89
5 0.169 0.374 -0.648 102.98 113.95 -197.43
6 0.314 0.111 -0.413 191.34 33.82 -125.83
7 0.384 0 -0.082 233.99 0.00 -24.98
8 0.355 0 0.251 216.32 0.00 76.47
9 0.216 0 0.585 131.62 0.00 178.24
10 -0.034 0 0.918 -20.72 0.00 279.70
11 -0.187 1.251 0 -113.95 381.15 0.00
12 -0.187 1.251 0 -113.95 381.15 0.00
13 -0.187 1.251 0 -113.95 381.15 0.00
14 -0.187 1.251 0 -113.95 381.15 0.00

M T S
Point
qr2 qr qr M T S
1 -0.172 0.44 0.00 -104.81 134.06 0.00
2 -0.155 0.425 -0.11 -94.45 129.49 -34.73
3 -0.105 0.376 -0.22 -63.98 114.56 -66.12
4 -0.029 0.291 -0.29 -17.67 88.66 -88.66
5 0.059 0.178 -0.31 35.95 54.23 -94.15
6 0.14 0.066 -0.25 85.31 20.11 -75.56
7 0.193 0 -0.11 117.61 0.00 -32.60
8 0.199 0 0.08 125.24 0.00 25.49
9 0.135 0 0.31 84.96 0.00 97.55
10 -0.013 0 0.58 -8.18 0.00 182.83
11 -0.108 0.893 0.00 -67.97 281.01 0.00
12 -0.108 0.893 0.00 -67.97 281.01 0.00
13 -0.108 0.893 0.00 -67.97 281.01 0.00
14 -0.108 0.893 0.00 -67.97 281.01 0.00

Komulatif
Point M T S
1 -335.76 565.18 0.00
2 -296.15 532.58 -142.89
3 -185.25 440.87 -254.41
4 -28.64 309.55 -309.55
5 138.93 168.18 -291.58
6 276.65 53.93 -201.39
7 351.60 0.00 -57.58
8 341.57 0.00 101.96
9 216.59 0.00 275.79
10 -28.90 0.00 462.53
11 -181.92 662.16 0.00
12 -181.92 662.16 0.00
13 -181.92 662.16 0.00
14 -181.92 662.16 0.00
Tanah horizontal Dengan Gempa
T S Tekanan Tanah Horisontal
hr hr Momen Normal Lintang
1.415 0 -52.14 62.80 0.00
1.323 -0.355 -45.54 58.72 -15.76
1.071 -0.618 -27.38 47.53 -27.43
0.725 -0.725 -2.48 32.18 -32.18
0.374 -0.648 23.25 16.60 -28.76
0.111 -0.413 43.20 4.93 -18.33
0 -0.082 52.83 0.00 -3.64
0 0.251 48.84 0.00 11.14
0 0.585 29.72 0.00 25.96
0 0.918 -4.68 0.00 40.74
1.251 0 -25.73 55.52 0.00
1.251 0 -25.73 55.52 0.00
1.251 0 -25.73 55.52 0.00
1.251 0 -25.73 55.52 0.00
Tekanan Tanah horizontal Tanpa Gempa Tekanan Tanah horizontal Dengan Gempa
M T S Tekanan Tanah Horisontal M
Point Point
hr2 hr hr Momen Normal Lintang hr2
1 -0.379 1.415 0 -21.20 25.53 0.00 1 -0.379
2 -0.331 1.323 -0.355 -18.51 23.87 -6.40 2 -0.331
3 -0.199 1.071 -0.618 -11.13 19.32 -11.15 3 -0.199
4 -0.018 0.725 -0.725 -1.01 13.08 -13.08 4 -0.018
5 0.169 0.374 -0.648 9.45 6.75 -11.69 5 0.169
6 0.314 0.111 -0.413 17.56 2.00 -7.45 6 0.314
7 0.384 0 -0.082 21.48 0.00 -1.48 7 0.384
8 0.355 0 0.251 19.86 0.00 4.53 8 0.355
9 0.216 0 0.585 12.08 0.00 10.55 9 0.216
10 -0.034 0 0.918 -1.90 0.00 16.56 10 -0.034
11 -0.187 1.251 0 -10.46 22.57 0.00 11 -0.187
12 -0.187 1.251 0 -10.46 22.57 0.00 12 -0.187
13 -0.187 1.251 0 -10.46 22.57 0.00 13 -0.187
14 -0.187 1.251 0 -10.46 22.57 0.00 14 -0.187

Tekanan Air Tanah Horizontal beban maksimal Pwatap 152.34


Pwbawah 157.34
M T S Tekanan Horisontal
Point
hr2 hr hr Momen Normal Lintang
1 -0.379 1.415 0 -230.95 431.12 0.00
2 -0.331 1.323 -0.355 -201.70 403.09 -108.16
3 -0.199 1.071 -0.618 -121.26 326.31 -188.29
4 -0.018 0.725 -0.725 -10.97 220.89 -220.89
5 0.169 0.374 -0.648 102.98 113.95 -197.43
6 0.314 0.111 -0.413 191.34 33.82 -125.83
7 0.384 0 -0.082 233.99 0.00 -24.98
8 0.355 0 0.251 216.32 0.00 76.47
9 0.216 0 0.585 131.62 0.00 178.24
10 -0.034 0 0.918 -20.72 0.00 279.70
11 -0.187 1.251 0 -113.95 381.15 0.00
12 -0.187 1.251 0 -113.95 381.15 0.00
13 -0.187 1.251 0 -113.95 381.15 0.00
14 -0.187 1.251 0 -113.95 381.15 0.00

M T S
Point
qr2 qr qr M T S
1 -0.172 0.44 0.00 -104.81 134.06 0.00
2 -0.155 0.425 -0.11 -94.45 129.49 -34.73
3 -0.105 0.376 -0.22 -63.98 114.56 -66.12
4 -0.029 0.291 -0.29 -17.67 88.66 -88.66
5 0.059 0.178 -0.31 35.95 54.23 -94.15
6 0.14 0.066 -0.25 85.31 20.11 -75.56
7 0.193 0 -0.11 117.61 0.00 -32.60
8 0.199 0 0.08 125.24 0.00 25.49
9 0.135 0 0.31 84.96 0.00 97.55
10 -0.013 0 0.58 -8.18 0.00 182.83
11 -0.108 0.893 0.00 -67.97 281.01 0.00
12 -0.108 0.893 0.00 -67.97 281.01 0.00
13 -0.108 0.893 0.00 -67.97 281.01 0.00
14 -0.108 0.893 0.00 -67.97 281.01 0.00

Komulatif
Point M T S
1 -335.76 565.18 0.00
2 -296.15 532.58 -142.89
3 -185.25 440.87 -254.41
4 -28.64 309.55 -309.55
5 138.93 168.18 -291.58
6 276.65 53.93 -201.39
7 351.60 0.00 -57.58
8 341.57 0.00 101.96
9 216.59 0.00 275.79
10 -28.90 0.00 462.53
11 -181.92 662.16 0.00
12 -181.92 662.16 0.00
13 -181.92 662.16 0.00
14 -181.92 662.16 0.00
Tanah horizontal Dengan Gempa
T S Tekanan Tanah Horisontal
hr hr Momen Normal Lintang
1.415 0 -52.14 62.80 0.00
1.323 -0.355 -45.54 58.72 -15.76
1.071 -0.618 -27.38 47.53 -27.43
0.725 -0.725 -2.48 32.18 -32.18
0.374 -0.648 23.25 16.60 -28.76
0.111 -0.413 43.20 4.93 -18.33
0 -0.082 52.83 0.00 -3.64
0 0.251 48.84 0.00 11.14
0 0.585 29.72 0.00 25.96
0 0.918 -4.68 0.00 40.74
1.251 0 -25.73 55.52 0.00
1.251 0 -25.73 55.52 0.00
1.251 0 -25.73 55.52 0.00
1.251 0 -25.73 55.52 0.00
Kondisi Banjir Penuh Tekanan (Water Hammer) Tanpa Gempa
Tekanan Vertikal
Batuan Air Tanah Berat Sendiri
Point
Momen Normal Lintang Momen Normal Lintang Momen Normal
tm t t tm t t tm t
1 17.52 0.13 0.00 193.17 18.28 0.00 175.04 2.43
2 15.55 4.41 7.66 167.57 44.79 96.89 154.79 5.76
3 9.86 8.44 14.36 97.50 117.30 166.66 96.92 15.22
4 1.52 18.66 18.46 2.44 216.02 190.12 14.47 29.42
5 -7.26 31.14 17.81 -90.19 313.82 159.96 -72.33 46.30
6 -14.02 42.25 11.18 -154.17 383.90 83.79 -140.32 63.57
7 -16.49 46.97 -0.13 -170.62 406.14 -18.28 -162.02 78.15
8 -16.40 46.97 -0.13 -158.43 406.14 -18.28 -151.90 92.35
9 -16.31 46.97 -0.13 -146.25 406.14 -18.28 -143.22 106.55
10 -16.22 46.97 -0.13 -134.06 406.14 -18.28 -133.09 120.75
11 -4.44 -0.13 -35.21 -26.20 -18.28 -304.68 -5.79 -2.43
12 15.10 -0.13 -23.50 143.20 -18.28 -203.22 175.04 -2.43
13 26.84 -0.13 -11.72 244.35 -18.28 -101.46 240.14 -2.43
14 30.78 -0.13 0.00 278.48 -18.28 0.00 250.27 -2.43

Kondisi Banjir Penuh Tekanan (Water Hammer) Dengan Gempa


Tekanan Vertikal
Batuan Air Tanah Berat Sendiri
Point
Momen Normal Lintang Momen Normal Lintang Momen Normal
tm t t tm t t tm t
1 17.52 0.13 0.00 193.17 18.28 0.00 175.04 2.43
2 15.55 4.41 7.66 167.57 44.79 96.89 154.79 5.76
3 9.86 8.44 14.36 97.50 117.30 166.66 96.92 15.22
4 1.52 18.66 18.46 2.44 216.02 190.12 14.47 29.42
5 -7.26 31.14 17.81 -90.19 313.82 159.96 -72.33 46.30
6 -14.02 42.25 11.18 -154.17 383.90 83.79 -140.32 63.57
7 -16.49 46.97 -0.13 -170.62 406.14 -18.28 -162.02 78.15
8 -16.40 46.97 -0.13 -158.43 406.14 -18.28 -151.90 92.35
9 -16.31 46.97 -0.13 -146.25 406.14 -18.28 -143.22 106.55
10 -16.22 46.97 -0.13 -134.06 406.14 -18.28 -133.09 120.75
11 -4.44 -0.13 -35.21 -26.20 -18.28 -304.68 -5.79 -2.43
12 15.10 -0.13 -23.50 143.20 -18.28 -203.22 175.04 -2.43
13 26.84 -0.13 -11.72 244.35 -18.28 -101.46 240.14 -2.43
14 30.78 -0.13 0.00 278.48 -18.28 0.00 250.27 -2.43

Kondisi Banjir Penuh Tanpa Gempa


Tekanan Vertikal
Point
Batuan Air Tanah Berat Sendiri
Point
Momen Normal Lintang Momen Normal Lintang Momen Normal
tm t t tm t t tm t
1 17.52 0.13 0.00 193.17 18.28 0.00 175.04 2.43
2 15.55 4.41 7.66 167.57 44.79 96.89 154.79 5.76
3 9.86 8.44 14.36 97.50 117.30 166.66 96.92 15.22
4 1.52 18.66 18.46 2.44 216.02 190.12 14.47 29.42
5 -7.26 31.14 17.81 -90.19 313.82 159.96 -72.33 46.30
6 -14.02 42.25 11.18 -154.17 383.90 83.79 -140.32 63.57
7 -16.49 46.97 -0.13 -170.62 406.14 -18.28 -162.02 78.15
8 -16.40 46.97 -0.13 -158.43 406.14 -18.28 -151.90 92.35
9 -16.31 46.97 -0.13 -146.25 406.14 -18.28 -143.22 106.55
10 -16.22 46.97 -0.13 -134.06 406.14 -18.28 -133.09 120.75
11 -4.44 -0.13 -35.21 -26.20 -18.28 -304.68 -5.79 -2.43
12 15.10 -0.13 -23.50 143.20 -18.28 -203.22 175.04 -2.43
13 26.84 -0.13 -11.72 244.35 -18.28 -101.46 240.14 -2.43
14 30.78 -0.13 0.00 278.48 -18.28 0.00 250.27 -2.43

Kondisi Banjir Penuh Dengan Gempa


Tekanan Vertikal
Batuan Air Tanah Berat Sendiri
Point
Momen Normal Lintang Momen Normal Lintang Momen Normal
tm t t tm t t tm t
1 17.52 0.13 0.00 193.17 18.28 0.00 175.04 2.43
2 15.55 4.41 7.66 167.57 44.79 96.89 154.79 5.76
3 9.86 8.44 14.36 97.50 117.30 166.66 96.92 15.22
4 1.52 18.66 18.46 2.44 216.02 190.12 14.47 29.42
5 -7.26 31.14 17.81 -90.19 313.82 159.96 -72.33 46.30
6 -14.02 42.25 11.18 -154.17 383.90 83.79 -140.32 63.57
7 -16.49 46.97 -0.13 -170.62 406.14 -18.28 -162.02 78.15
8 -16.40 46.97 -0.13 -158.43 406.14 -18.28 -151.90 92.35
9 -16.31 46.97 -0.13 -146.25 406.14 -18.28 -143.22 106.55
10 -16.22 46.97 -0.13 -134.06 406.14 -18.28 -133.09 120.75
11 -4.44 -0.13 -35.21 -26.20 -18.28 -304.68 -5.79 -2.43
12 15.10 -0.13 -23.50 143.20 -18.28 -203.22 175.04 -2.43
13 26.84 -0.13 -11.72 244.35 -18.28 -101.46 240.14 -2.43
14 30.78 -0.13 0.00 278.48 -18.28 0.00 250.27 -2.43

Kondisi Kosong Tanpa Gempa


Tekanan Vertikal
Batuan Air Tanah Berat Sendiri
Point
Momen Normal Lintang Momen Normal Lintang Momen Normal
Point

tm t t tm t t tm t
1 17.52 0.13 0.00 193.17 18.28 0.00 175.04 2.43
2 15.55 4.41 7.66 167.57 44.79 96.89 154.79 5.76
3 9.86 8.44 14.36 97.50 117.30 166.66 96.92 15.22
4 1.52 18.66 18.46 2.44 216.02 190.12 14.47 29.42
5 -7.26 31.14 17.81 -90.19 313.82 159.96 -72.33 46.30
6 -14.02 42.25 11.18 -154.17 383.90 83.79 -140.32 63.57
7 -16.49 46.97 -0.13 -170.62 406.14 -18.28 -162.02 78.15
8 -16.40 46.97 -0.13 -158.43 406.14 -18.28 -151.90 92.35
9 -16.31 46.97 -0.13 -146.25 406.14 -18.28 -143.22 106.55
10 -16.22 46.97 -0.13 -134.06 406.14 -18.28 -133.09 120.75
11 -4.44 -0.13 -35.21 -26.20 -18.28 -304.68 -5.79 -2.43
12 15.10 -0.13 -23.50 143.20 -18.28 -203.22 175.04 -2.43
13 26.84 -0.13 -11.72 244.35 -18.28 -101.46 240.14 -2.43
14 30.78 -0.13 0.00 278.48 -18.28 0.00 250.27 -2.43

Kondisi Kosong Dengan Gempa


Tekanan Vertikal
Batuan Air Tanah Berat Sendiri
Point
Momen Normal Lintang Momen Normal Lintang Momen Normal
tm t t tm t t tm t
1 17.52 0.13 0.00 193.17 18.28 0.00 175.04 2.43
2 17.52 0.13 0.00 193.17 18.28 0.00 175.04 2.43
3 15.55 4.41 7.66 167.57 44.79 96.89 154.79 5.76
4 9.86 8.44 14.36 97.50 117.30 166.66 96.92 15.22
5 1.52 18.66 18.46 2.44 216.02 190.12 14.47 29.42
6 -7.26 31.14 17.81 -90.19 313.82 159.96 -72.33 46.30
7 -14.02 42.25 11.18 -154.17 383.90 83.79 -140.32 63.57
8 -16.49 46.97 -0.13 -170.62 406.14 -18.28 -162.02 78.15
9 -16.40 46.97 -0.13 -158.43 406.14 -18.28 -151.90 92.35
10 -16.31 46.97 -0.13 -146.25 406.14 -18.28 -143.22 106.55
11 -16.22 46.97 -0.13 -134.06 406.14 -18.28 -133.09 120.75
12 -4.44 -0.13 -35.21 -26.20 -18.28 -304.68 -5.79 -2.43
13 15.10 -0.13 -23.50 143.20 -18.28 -203.22 175.04 -2.43
14 26.84 -0.13 -11.72 244.35 -18.28 -101.46 240.14 -2.43
Tekanan Horisontal
Berat Sendiri Internal Pressure Air Tanah Batuan
Lintang Momen Normal Lintang Momen Normal Lintang Momen Normal Lintang
t tm t t tm t t tm t t
0.00 8.22 -75.67 0.00 -335.76 565.18 0.00 -21.20 25.53 0.00
11.90 7.42 -75.34 2.45 -296.15 532.58 -142.89 -18.51 23.87 -6.40
21.36 5.30 -74.41 4.70 -185.25 440.87 -254.41 -11.13 19.32 -11.15
25.84 1.72 -72.89 6.63 -28.64 309.55 -309.55 -1.01 13.08 -13.08
23.92 -2.78 -70.96 8.15 138.93 168.18 -291.58 9.45 6.75 -11.69
14.45 -8.08 -68.71 9.08 276.65 53.93 -201.39 17.56 2.00 -7.45
-2.43 -13.78 -66.26 9.41 351.60 0.00 -57.58 21.48 0.00 -1.48
-2.43 -12.72 -66.26 -12.66 341.57 0.00 101.96 19.86 0.00 4.53
-2.43 3.18 -66.26 -34.79 216.59 0.00 275.79 12.08 0.00 10.55
-2.43 33.66 -66.26 -56.85 -28.90 0.00 462.53 -1.90 0.00 16.56
-67.92 30.61 -56.85 66.26 -181.92 662.16 0.00 -10.46 22.57 0.00
-30.19 -6.23 -56.85 44.20 -181.92 662.16 0.00 -10.46 22.57 0.00
-7.55 -28.36 -56.85 22.06 -181.92 662.16 0.00 -10.46 22.57 0.00
0.00 -35.65 -56.85 0.00 -181.92 662.16 0.00 -10.46 22.57 0.00
Maksimum

Tekanan Horisontal
Berat Sendiri Internal Pressure Air Tanah Batuan + Gempa
Lintang Momen Normal Lintang Momen Normal Lintang Momen Normal Lintang
t tm t t tm t t tm t t
0.00 8.22 -75.67 0.00 -335.76 565.18 0.00 -52.14 62.80 0.00
11.90 7.42 -75.34 2.45 -296.15 532.58 -142.89 -45.54 58.72 -15.76
21.36 5.30 -74.41 4.70 -185.25 440.87 -254.41 -27.38 47.53 -27.43
25.84 1.72 -72.89 6.63 -28.64 309.55 -309.55 -2.48 32.18 -32.18
23.92 -2.78 -70.96 8.15 138.93 168.18 -291.58 23.25 16.60 -28.76
14.45 -8.08 -68.71 9.08 276.65 53.93 -201.39 43.20 4.93 -18.33
-2.43 -13.78 -66.26 9.41 351.60 0.00 -57.58 52.83 0.00 -3.64
-2.43 -12.72 -66.26 -12.66 341.57 0.00 101.96 48.84 0.00 11.14
-2.43 3.18 -66.26 -34.79 216.59 0.00 275.79 29.72 0.00 25.96
-2.43 33.66 -66.26 -56.85 -28.90 0.00 462.53 -4.68 0.00 40.74
-67.92 30.61 -56.85 66.26 -181.92 662.16 0.00 -25.73 55.52 0.00
-30.19 -6.23 -56.85 44.20 -181.92 662.16 0.00 -25.73 55.52 0.00
-7.55 -28.36 -56.85 22.06 -181.92 662.16 0.00 -25.73 55.52 0.00
0.00 -35.65 -56.85 0.00 -181.92 662.16 0.00 -25.73 55.52 0.00
Maksimum

Tekanan Horisontal
Berat Sendiri Berat Air Dalam Penuh Air Tanah Batuan
Lintang Momen Normal Lintang Momen Normal Lintang Momen Normal Lintang
t tm t t tm t t tm t t
0.00 9.96 -26.61 0.00 -335.76 565.18 0.00 -21.20 25.53 0.00
11.90 8.91 -25.71 6.77 -296.15 532.58 -142.89 -18.51 23.87 -6.40
21.36 5.91 -23.19 12.41 -185.25 440.87 -254.41 -11.13 19.32 -11.15
25.84 1.56 -19.41 15.87 -28.64 309.55 -309.55 -1.01 13.08 -13.08
23.92 -3.46 -15.13 16.38 138.93 168.18 -291.58 9.45 6.75 -11.69
14.45 -8.13 -11.13 13.54 276.65 53.93 -201.39 17.56 2.00 -7.45
-2.43 -11.36 -8.36 7.16 351.60 0.00 -57.58 21.48 0.00 -1.48
-2.43 -11.36 -8.36 -7.98 341.57 0.00 101.96 19.86 0.00 4.53
-2.43 -5.60 -8.36 -27.43 216.59 0.00 275.79 12.08 0.00 10.55
-2.43 7.39 -8.36 -51.20 -28.90 0.00 462.53 -1.90 0.00 16.56
-67.92 11.63 11.63 25.71 -181.92 662.16 0.00 -10.46 22.57 0.00
-30.19 4.47 4.47 17.16 -181.92 662.16 0.00 -10.46 22.57 0.00
-7.55 0.19 0.19 8.56 -181.92 662.16 0.00 -10.46 22.57 0.00
0.00 -1.21 -1.21 0.00 -181.92 662.16 0.00 -10.46 22.57 0.00
Maksimum

Tekanan Horisontal
Berat Sendiri Berat Air Dalam Penuh Air Tanah Batuan + Gempa
Lintang Momen Normal Lintang Momen Normal Lintang Momen Normal Lintang
t tm t t tm t t tm t t
0.00 9.96 -26.61 0.00 -335.76 565.18 0.00 -52.14 62.80 0.00
11.90 8.91 -25.71 6.77 -296.15 532.58 -142.89 -45.54 58.72 -15.76
21.36 5.91 -23.19 12.41 -185.25 440.87 -254.41 -27.38 47.53 -27.43
25.84 1.56 -19.41 15.87 -28.64 309.55 -309.55 -2.48 32.18 -32.18
23.92 -3.46 -15.13 16.38 138.93 168.18 -291.58 23.25 16.60 -28.76
14.45 -8.13 -11.13 13.54 276.65 53.93 -201.39 43.20 4.93 -18.33
-2.43 -11.36 -8.36 7.16 351.60 0.00 -57.58 52.83 0.00 -3.64
-2.43 -11.36 -8.36 -7.98 341.57 0.00 101.96 48.84 0.00 11.14
-2.43 -5.60 -8.36 -27.43 216.59 0.00 275.79 29.72 0.00 25.96
-2.43 7.39 -8.36 -51.20 -28.90 0.00 462.53 -4.68 0.00 40.74
-67.92 11.63 11.63 25.71 -181.92 662.16 0.00 -25.73 55.52 0.00
-30.19 4.47 4.47 17.16 -181.92 662.16 0.00 -25.73 55.52 0.00
-7.55 0.19 0.19 8.56 -181.92 662.16 0.00 -25.73 55.52 0.00
0.00 -1.21 -1.21 0.00 -181.92 662.16 0.00 -25.73 55.52 0.00
Maksimum

Tekanan Horisontal Total


Berat Sendiri Air Tanah Batuan
Momen Normal Lintang
Lintang Momen Normal Lintang Momen Normal Lintang
t tm t t tm t t tm t t
0.00 -335.76 565.18 0.00 -21.20 25.53 0.00 28.77 611.56 0.00
11.90 -296.15 532.58 -142.89 -18.51 23.87 -6.40 23.25 611.41 -32.86
21.36 -185.25 440.87 -254.41 -11.13 19.32 -11.15 7.90 601.16 -63.18
25.84 -28.64 309.55 -309.55 -1.01 13.08 -13.08 -11.22 586.73 -88.22
23.92 138.93 168.18 -291.58 9.45 6.75 -11.69 -21.39 566.19 -101.59
14.45 276.65 53.93 -201.39 17.56 2.00 -7.45 -14.30 545.65 -99.43
-2.43 351.60 0.00 -57.58 21.48 0.00 -1.48 23.95 531.26 -79.91
-2.43 341.57 0.00 101.96 19.86 0.00 4.53 34.69 545.46 85.65
-2.43 216.59 0.00 275.79 12.08 0.00 10.55 -77.10 559.66 265.50
-2.43 -28.90 0.00 462.53 -1.90 0.00 16.56 -314.17 573.86 458.24
-67.92 -181.92 662.16 0.00 -10.46 22.57 0.00 -228.80 663.89 -407.81
-30.19 -181.92 662.16 0.00 -10.46 22.57 0.00 140.96 663.89 -256.91
-7.55 -181.92 662.16 0.00 -10.46 22.57 0.00 318.95 663.89 -120.72
0.00 -181.92 662.16 0.00 -10.46 22.57 0.00 367.14 663.89 0.00
Maksimum 367.14 663.89 -407.81

Tekanan Horisontal Total


Berat Sendiri Air Tanah Batuan + Gempa
Momen Normal Lintang
Lintang Momen Normal Lintang Momen Normal Lintang
t tm t t tm t t tm t t
0 -335.76 565.18 0.00 -52.14 62.80 0.00 -2.18 648.83 0.00
0.00 -296.15 532.58 -142.89 -45.54 58.72 -15.76 44.04 612.14 -158.65
11.90 -185.25 440.87 -254.41 -27.38 47.53 -27.43 125.28 543.36 -165.39
21.36 -28.64 309.55 -309.55 -2.48 32.18 -32.18 173.16 482.70 -139.35
25.84 138.93 168.18 -291.58 23.25 16.60 -28.76 180.61 448.88 -85.92
23.92 276.65 53.93 -201.39 43.20 4.93 -18.33 150.08 450.11 -18.04
14.45 351.60 0.00 -57.58 52.83 0.00 -3.64 95.92 489.71 48.19
-2.43 341.57 0.00 101.96 48.84 0.00 11.14 41.28 531.26 92.26
-2.43 216.59 0.00 275.79 29.72 0.00 25.96 -80.42 545.46 280.91
-2.43 -28.90 0.00 462.53 -4.68 0.00 40.74 -339.35 559.66 482.42
-2.43 -181.92 662.16 0.00 -25.73 55.52 0.00 -491.02 1291.54 -20.85
-67.92 -181.92 662.16 0.00 -25.73 55.52 0.00 -244.07 696.84 -407.81
-30.19 -181.92 662.16 0.00 -25.73 55.52 0.00 125.69 696.84 -256.91
-7.55 -181.92 -1.21 0.00 -25.73 55.52 0.00 303.68 33.47 -120.72
Maksimum 303.68 1291.54 -407.81
Total
Momen Normal Lintang
tm tm ton
tm t t
36.987 535.887 0.000
30.668 536.069 -30.404
13.203 526.753 -58.474
-9.497 513.846 -81.594
-24.171 495.226 -93.436
-22.386 476.934 -90.349
10.166 465.004 -70.501
21.972 479.202 72.991
-73.923 493.400 230.711
-280.508 507.598 401.391
-198.192 607.038 -341.553
134.731 607.038 -212.711
290.590 607.038 -98.656
331.494 607.038 0.000
331.49 507.60 -341.55 3314.94

Total
Momen Normal Lintang
tm tm ton
tm t t
6.041 573.158 0.000
3.641 570.917 -39.754
-3.046 554.963 -74.752
-10.967 532.942 -100.690
-10.371 505.078 -110.504
3.254 479.858 -101.227
41.521 465.004 -72.660
50.959 479.202 79.602
-56.286 493.400 246.120
-283.284 507.598 425.571
-213.461 639.989 -341.553
119.461 639.989 -212.711
275.320 639.989 -98.656
316.225 639.989 0.000
316.22 507.60 -341.55

Total
Momen Normal Lintang

tm t t
38.73 584.95 0.00
32.16 585.69 -26.09
13.82 577.98 -50.77
-9.66 567.32 -72.35
-24.85 551.06 -85.21
-22.43 534.52 -85.89
12.59 522.90 -72.75
23.33 537.10 77.67
-82.71 551.30 238.07
-306.78 565.49 407.05
-217.17 675.52 -382.10
145.43 668.36 -239.75
319.14 664.08 -112.16
365.94 662.68 0.00
365.94 675.52 -382.10

Total
Momen Normal Lintang
Momen Normal Lintang
tm t t
7.78 622.22 0.00
5.13 620.54 -35.44
-2.43 606.19 -67.05
-11.13 586.42 -91.44
-11.05 560.91 -102.28
3.21 537.44 -96.77
43.94 522.90 -74.91
52.32 537.10 84.28
-65.07 551.30 253.48
-309.55 565.49 431.23
-232.44 708.47 -382.10
130.16 701.31 -239.75
303.87 697.03 -112.16
350.67 695.63 0.00
350.67 708.47 -382.10
295
324
89.7476 250.0674 73.71078
89.7476 250.0674 73.71078
263681 7860 KNm
200000 3690 KNm
188714.6 2951

20000

256766
222928
239251.3
251213.8

0.253
-6.23343 -63.6702 -10.6099
-63.6702 -10.6099
4870
3450
4135
a Data Terowongan
Bentang Terowongan (b) 1 m 1000 mm
Tebal Dinding Terowongan (h) 1 m 1000 mm
Tebal Selimut Beton (d') 200 mm

b Tegangan izin Beton


Mutu Beton Fc' 35 Mpa 350 Kg/cm2
Mutu Beton K K = 421.6867 Kg/cm2
K-450
Tegangan Tekan Leleh Beton 350 Kg/cm2
Tegangan Geser Leleh Beton 1/6 √fc' 0.986013 Mpa
9.860133 Kg/cm2
Tegangan Torsi Leleh Beton 1/24 √fc' 0.246503 Mpa
2.465033 Kg/cm2

c Modulus Elastisitas dan Rasio Possion


Possion Ratio Beton (Vc) 0.3
Modulus Elastisitas Beton (Ec) 4700 √Fc' 27805.57 Mpa
278055.7 Kg/cm2
Possion Ratio Baja (Vs) 0.25
Modulus Elastisitas Baja (Es) 2100000 Kg/cm2 2100

d Tegangan Izin Baja


Mutu Baja fy (deform/ulir) 400 Mpa 4000 Kg/cm2
Tegangan leleh Baja Polos 2400 Kg/cm2
Tegangan Ijin Tarik Baja 0.666 fy 160.008 Mpa
1600.08 Kg/cm2
Tegangan Ijin Tekan Baja 1600 Kg/cm2
Jenis Baja BJ 55
Data
Mu My Max 440.57 tm akibat displacement
Pu Fx max 796.67 ton
F'c 35 Mpa 350 Kg/cm2 b 1000
fy 400 Mpa 4000 Kg/cm2 h 1000
Diameter tulangan Utama 22 1/2Ø 11 mm d h-d'
Diameter tulangan bagi 10 mm
d' 221 mm 22.1 cm
Luas Tulangan longitudinal komponen struktur tekan non-komposit tdak boleh kurang 1% atau lebih dari 8% kali luas bruto pen
digunakan ρ 0.015
Ast ρ.b.d 11685 mm2

Rencana Tulangan Utama D 22


Rencana Tulangan Bagi D 10
Luasan Tulangan Utama
As 380.132711084 380.1327111
n 30.7548560299 30 40-D22
Digunakan Tulangan 2 sisi sehingga
Tulangan Tarik = 15-D22 (379.94 mm2)
Tulangan Tarik = 15-D22 (379.94 mm2)

Cek Keadaan Seimbang


Cb = 600d = 467400 = 467.4 mm
600+fy 1000
ab = 0.85 . Cb 397.29 mm

Es = Cb-d' x Es = 0.7392 = 0.0015815148


Cb 467.4
Ey = fy = 4000 = 0.0019048
Es 2100000

Karena Es,Ey maka tulangan baja tekan belum meleleh

Fs = Es x Es = 3321.181 Kg/cm2 332.118 Mpa

Pub = 0.65 F'c xabxb = 1181938

Maka : Kolom Hancur diawali dengan lelehnya tulangan

Cek Momen Kapasitas Kolom

As As' y = 1/2 h = 50 cm 500

c = 600
d 600+fy
c = 600.d 467400 = 467.4 mm 467.4
600+fy 1000
a = βxc 397.29 mm 39.729
T = As x fy 152053.08 Kg
Cs = As' x fy 152053.08 Kg
Cc = 0.85 x f'c x b x a 1181937.75 Kg
Mn = Cs (d-d') + Cc (d-a/2) - T(d-y)
= 9123185.066 + 89319035.77 - 4242281.1
= 94199939.78 Kgcm
= 941999.3978 Kgm

Øb.Mn = 800699.4881 Kgm

Cek Penampang Kolom

e = Mu 440.57 = 0.553017 m 5.5301681305


Pu 796.67

m = fy 4000 = 13.44538 m 134.453781513


0.85 f'c 297.5
e' = e+(d+(h/2)) 1832.0168 mm

1- e' = 1- 1832.0168
d 779
1- d' = 1- 221
d 779
ρ 0.05
Pn = Cs + Cc - T
= 1181937.8
ɸPn = 768259.54 > Pu 796666.76

(penulangan Tarik yang menentukan)

Kontrol

eb = Mn 941999.4 = 0.796996 m 796.995778989


Pn 1181937.8

Digunakan Persamaan Berdasarkan tarik

Pn = 0,85.f’c.b.d

= 10832112 x 0.290094 + 0.863058456


0.929009395
= 38232392 Kg

ØPn = 24851055 Kg > Pu 796667


Kait Sambungan
ldb = 514.03325 mm
51 cm
6db = 60 mm

Tulangan Bagi
As hitung = 2103.3 mm2
Ast = 78.54 mm2
Jumlah Tulangan Bagi
n 26.780047
Jarak Antar Tulangan
37.341233 mm
3524142.52 kNm 352414.3 tm

mm 100 cm
mm 100 cm
77.9 cm 779 mm

h dari 8% kali luas bruto penampang (istimawan 322)

mm
mm

cm 553.0168 mm

cm

-1.351754574

0.716302953

mm < 553.0168 mm

+ 9.630964
Kg OK
Data Momen Bawah
Mu My Max 440.57 tm akibat displacement
Pu Fx max 834.76 ton
F'c 35 Mpa 350 Kg/cm2 b
fy 400 Mpa 4000 Kg/cm2 h
Diameter tulangan Utama Tarik 25 1/2Ø 12.5 mm d
Diameter Tulangan Utama Tekan 20 mm
Diameter tulangan bagi Tarik 18 mm
Diameter tulangan bagi Tekan 16 mm
d' 232.5 mm 23.25 cm
Luas Tulangan longitudinal komponen struktur tekan non-komposit tdak boleh kurang 1% atau lebih dari 8% kali luas bruto p
digunakan ρ 0.015
Ast ρ.b.d 11512.5 mm2

Rencana Tulangan Utama D 25


Rencana Tulangan Bagi D 18
Luasan Tulangan Utama
As 490.8738521234 490.8738521
n 23.453072414
Digunakan Tulangan 2 sisi sehingga
Tulangan Tarik = 15-D22 (380.132mm2)
Tulangan Tarik = 15-D22 (380.132 mm2)

Cek Keadaan Seimbang


Cb = 600d = 460500 = 460.5
600+fy 1000
ab = 0.85 . Cb 391.425 mm

Es = Cb-d' x Es = 0.684 =
Cb 460.5
Ey = fy = 4000 = 0.0019048
Es 2100000

Karena Es,Ey maka tulangan baja tekan belum meleleh

Fs = Es x Es = 3119.218 Kg/cm2 311.922

Pub = 0.85 F'c xabxb = 1164489.375

Maka : Kolom Hancur diawali dengan lelehnya tulangan

Cek Momen Kapasitas Kolom

As As' y = 1/2 h = 50 cm
c = 600
d 600+fy

c = 600.d 460500 = 460.5 mm


600+fy 1000
a = βxc 391.425 mm 39.1425
T = As x fy 196349.54 Kg
Cs = As' x fy 196349.54 Kg
Cc = 0.85 x f'c x b x a 1164489.375 Kg
Mn = Cs (d-d') + Cc (d-a/2) - T(d-y)
= 105047004.4 + 66584046.85 - 5252350.2
= 166378701 Kgcm
= 1663787.01 Kgm

Øb.Mn = 1414218.958 Kgm

Cek Penampang Kolom

e = Mu 440.57 = 0.527779941 m
Pu 834.76

m = fy 4000 = 13.44537815 m
0.85 f'c 297.5
e' = e+(d+(h/2)) 1795.2799 mm

1- e' = 1- 1795.2799
d 767.5
1- d' = 1- 232.5
d 767.5
ρ 0.05
Pn = Cs + Cc - T
= 1164489.4
ɸPn = 756918.09 > Pu 834761.01

(penulangan Tarik yang menentukan)

Kontrol

eb = Mn 1663787 = 1.428769593 m
Pn 1164489.4

Digunakan Persamaan Berdasarkan tarik

Pn = 0,85.f’c.b.d
= 10514654 x 0.312338839 +

= 36930280 Kg

ØPn = 24004682 Kg > Pu


Rangkuman Penulangan
Tulangan Utama Tarik
As Hitung 11512.5 Rencana Tulangan Tunggal
Ast 490.8738521 Jarak Tulangan 40
Jumlah Tulangan 23.45307241 Jumlah Tulangan 22
Jarak Tulangan 42.63833678 As baru 10799.2

Tulangan Bagi
As hitung = 2072.25 mm2 Rencana Tulangan Tunggal
Ast = 254.47 mm2 Jarak Tulangan
Jumlah Tulangan Bagi Jumlah Tulangan
n 8.1434279 As Baru
Jarak Antar Tulangan
122.79841 mm
Tulangan Utama Tekan Rencana D 20
As Hitung 5756.25 Rencana Tulangan Tunggal
Ast 314.1592654 Jarak Tulangan 50
Jumlah Tulangan 18.32271282 Jumlah Tulangan 20
Jarak Tulangan 54.57707107 As baru 6283.2

Tulangan Bagi Rencana D 16


As hitung = 1036.125 mm2 Rencana Tulangan Tunggal
Ast = 201.06 mm2 Jarak Tulangan
Jumlah Tulangan Bagi Jumlah Tulangan
n 5.153263 As Baru
Jarak Antar Tulangan 194.05181 mm

Kontrol terhadap geser


Vu = 407.813 ton = 4078 KN
Vc = = 23931017 KN
Data Momen Pojok Bawah
akibat displacement 3524142.52 kNm 352414.3 tm Mu
Pu
1000 mm 100 cm F'c
1000 mm 100 cm fy
h-d' 76.75 cm 767.5 mm Diameter tulangan Utama T
Diameter Tulangan Utama
Diameter tulangan bagi Tar
Diameter tulangan bagi Tek
d'
au lebih dari 8% kali luas bruto penampang SNI 03-2847-2002 hal. 75 Luas Tulangan longitudinal
digunakan
Ast

10000 luas bruto = 1000000 mm2 Rencana Tulangan Utama


490.873852123 55.55555556 Rencana Tulangan Bagi
luas tulangan utama Tarik = 10799.2 mm Luasan Tulangan Utama
Luas Tulangan Utama Tekan = 6283.2 As
Luas Tulangan Bagi Tarik 2137.5 n
Luas Tulangan Bagi Tekan 6283.2 Digunakan Tulangan 2 sisi s
Total = 25503.1 mm Tulangan Tarik
0.025503 2.5503135 % Tulangan Tarik

Cek Keadaan Seimbang


mm Cb
25
ab

0.001485342 Es

Ey

Karena Es,Ey maka tulangan

Mpa Fs

Pub

Maka : Kolom Hancur diaw

Cek Momen Kapasitas Kolo

500 mm As
c
d

460.5 mm c

a
T
Cs
Cc
Mn

Øb.Mn

Cek Penampang Kolom

5.2777994126 cm 527.779941262 mm e

134.453781513 cm m

e'

-1.339126959

0.697068404

1428.76959257 mm < 527.7799 mm


0.8671965465 + 9.3723482878
0.9312338839

834761 Kg OK
Rangkuman Penulangan
Tulangan Utama Tarik

0.0107992247
Gak Oke

Tulangan Bagi
gan Tunggal
120
8.4
2137.5396415 OKE Josssssssssssss

Tulangan Utama Tekan

OKE Josssssssssssss

Tulangan Bagi
gan Tunggal
190
5.3
1065.6282281 OKE Josssssssssssss

Kontrol terhadap geser


f = 0.65 Vu
fVc = 15555161 KN Vc
Vu < fVc tidak diberi tulangan geser
Data Momen Pojok Bawah
My Max 377.00 tm akibat displacement
Fx max 688.63 ton
35 Mpa 350 Kg/cm2 b 1000
400 Mpa 4000 Kg/cm2 h 1000
Diameter tulangan Utama Tarik 25 1/2Ø 12.5 mm d h-d'
Diameter Tulangan Utama Tekan 20 mm
Diameter tulangan bagi Tarik 18 mm
Diameter tulangan bagi Tekan 16 mm
232.5 mm 23.25 cm
Luas Tulangan longitudinal komponen struktur tekan non-komposit tdak boleh kurang 1% atau lebih dari 8% kali luas bruto penampan
ρ 0.015
ρ.b.d 11512.5 mm2

Rencana Tulangan Utama D 25


Rencana Tulangan Bagi D 18 490.8739
Luasan Tulangan Utama
490.8738521234 490.8739
23.453072414 30
Digunakan Tulangan 2 sisi sehingga
Tulangan Tarik = 15-D22 (380.132mm2)
Tulangan Tarik = 15-D22 (380.132 mm2)

Cek Keadaan Seimbang


= 600d = 460500 = 460.5 mm
600+fy 1000
= 0.85 . Cb 391.425 mm

= Cb-d' x Es = 0.684 = 0.001485


Cb 460.5
= fy = 4000 = 0.001905
Es 2100000

Karena Es,Ey maka tulangan baja tekan belum meleleh

= Es x Es = 3119.218 Kg/cm2 311.922 Mpa

= 0.85 F'c xabxb = 1164489.375

Maka : Kolom Hancur diawali dengan lelehnya tulangan

Cek Momen Kapasitas Kolom

As' y = 1/2 h = 50 cm 500


= 600
600+fy

= 600.d 460500 = 460.5 mm 460.5


600+fy 1000
= βxc 391.425 mm 39.1425
= As x fy 196349.5 Kg
= As' x fy 196349.5 Kg
= 0.85 x f'c x b x a 1164489 Kg
= Cs (d-d') + Cc (d-a/2) - T(d-y)
= 11780972 + 88000462 - 5252350
= 94529084 Kgcm
= 945290.8 Kgm

= 803497.2 Kgm

Cek Penampang Kolom

= Mu 377.00 = 0.5474664629 m 5.474665


Pu 688.63

= fy 4000 = 13.4453781513 m 134.4538


0.85 f'c 297.5
= e+(d+(h/2)) 1814.966 mm

1- e' = 1- 1814.966
d 767.5
1- d' = 1- 232.5
d 767.5
ρ 0.05
Pn = Cs + Cc - T
= 1164489
ɸPn = 756918.1 > Pu 688630

(penulangan Tarik yang menentukan)

Kontrol

eb = Mn 945290.8 = 0.811764249 m 811.7642


Pn 1164489

Digunakan Persamaan Berdasarkan tarik

Pn = 0,85.f’c.b.d
= 10514654 x 0.2866886476 + 0.862426
0.928669
= 36652738 Kg

ØPn = 23824280 Kg > Pu 688630


Rangkuman Penulangan
Tulangan Utama Tarik
As Hitung 11512.5 Rencana Tulangan Tunggal
Ast 490.8739 Jarak Tulangan 40
Jumlah Tulangan 23.45307 Jumlah Tulangan 25
Jarak Tulangan 42.63834 As baru 12271.8

Tulangan Bagi
As hitung = 2072.25 mm2 Rencana Tulangan Tunggal
Ast = 254.47 mm2 Jarak Tulangan 120
Jumlah Tulangan Bagi Jumlah Tulangan 8.4
n 8.143428 As Baru 2137.54
Jarak Antar Tulangan
122.7984 mm
Tulangan Utama Tekan Rencana D 20
As Hitung 5756.25 Rencana Tulangan Tunggal
Ast 314.1593 Jarak Tulangan 50
Jumlah Tulangan 18.32271 Jumlah Tulangan 20
Jarak Tulangan 54.57707 As baru 6283.2

Tulangan Bagi Rencana D 16


As hitung = 1036.125 mm2 Rencana Tulangan Tunggal
Ast = 201.06 mm2 Jarak Tulangan 190
Jumlah Tulangan Bagi Jumlah Tulangan 5.3
n 5.153263 As Baru 1065.628
Jarak Antar Tulangan 194.0518 mm

Kontrol terhadap geser


= 458.242 ton = 4582 KN f
= = 23931017 KN fVc
Vu
Data Momen Samping
0.00 kNm 0 tm Mu
Pu
mm 100 cm F'c
mm 100 cm fy
76.75 cm 767.5 mm Diameter tulangan Utama Tarik
Diameter Tulangan Utama Tekan
Diameter tulangan bagi Tarik
Diameter tulangan bagi Tekan
d'
kali luas bruto penampang SNI 03-2847-2002 hal. 75 Luas Tulangan longitudinal komponen stru
digunakan
Ast

10000 luas bruto = 1000000 mm2 Rencana Tulangan Utama


55.55556 Rencana Tulangan Bagi
luas tulangan = 14726.2155637022 mm Luasan Tulangan Utama
luas tulangan geser 2820 mm As
= 17546.2155637022 mm n
0.017546 1.7546215564 % Digunakan Tulangan 2 sisi sehingga
Tulangan Tarik
Tulangan Tarik

Cek Keadaan Seimbang


Cb
25
ab

Es

Ey

Karena Es,Ey maka tulangan baja tekan bel

Fs

Pub

Maka : Kolom Hancur diawali dengan leleh

Cek Momen Kapasitas Kolom

mm As
c
d

mm c

a
T
Cs
Cc
Mn

Øb.Mn

Cek Penampang Kolom

cm 547.46646293 mm e

cm m

e'

-1.36478

0.697068

mm < 547.4665 mm
+ 9.3723482878

Kg OK
Rangkuman Penulangan
Tulangan Utama Tarik

OKE Josssssssssssss

Tulangan Bagi

OKE Josssssssssssss

Tulangan Utama Tekan

OKE Josssssssssssss

Tulangan Bagi

OKE Josssssssssssss

Kontrol terhadap geser


= 0.65 Vu
= 15555161 KN Vc
< fVc tidak diberi tulangan geser
omen Samping
My Max 28.74 tm akibat displacement 0.00 kNm
Fx max 637.52 ton
35 Mpa 350 Kg/cm2 b 1000 mm 100
400 Mpa 4000 Kg/cm2 h 1000 mm 100
er tulangan Utama Tarik 25 1/2Ø 12.5 mm d h-d' 76.75
er Tulangan Utama Tekan 20 mm
er tulangan bagi Tarik 18 mm
er tulangan bagi Tekan 16 mm
232.5 mm 23.25 cm
langan longitudinal komponen struktur tekan non-komposit tdak boleh kurang 1% atau lebih dari 8% kali luas bruto penampang SNI 03-
ρ 0.015
ρ.b.d 11512.5 mm2

a Tulangan Utama D 25 10000 luas bruto


a Tulangan Bagi D 18 490.873852 55.55556
Tulangan Utama luas tulangan utama T
490.8738521234 490.8739 Luas Tulangan Utama
23.453072414 30 Luas Tulangan Bagi Tarik
kan Tulangan 2 sisi sehingga Luas Tulangan Bagi Tekan
= 15-D22 (380.132mm2) Total
= 15-D22 (380.132 mm2)

daan Seimbang
= 600d = 460500 = 460.5 mm
600+fy 1000
= 0.85 . Cb 391.425 mm

= Cb-d' x Es = 0.684 = 0.00148534


Cb 460.5
= fy = 4000 = 0.001905
Es 2100000

Es,Ey maka tulangan baja tekan belum meleleh

= Es x Es = 3119.218 Kg/cm2 311.922 Mpa

= 0.85 F'c xabxb = 1164489.38

Kolom Hancur diawali dengan lelehnya tulangan

men Kapasitas Kolom

As' y = 1/2 h = 50 cm 500 mm


= 600
600+fy

= 600.d 460500 = 460.5 mm 460.5 mm


600+fy 1000
= βxc 391.425 mm 39.1425
= As x fy 196349.5 Kg
= As' x fy 196349.5 Kg
= 0.85 x f'c x b x a 1164489 Kg
= Cs (d-d') + Cc (d-a/2) - T(d-y)
= 11780972 + 88000462 - 5252350
= 94529084 Kgcm
= 945290.8 Kgm

= 803497.2 Kgm

ampang Kolom

= Mu 28.74 = 0.04507791 m 0.45077914 cm 45.07791


Pu 637.52

= fy 4000 = 13.4453782 m 134.453782 cm


0.85 f'c 297.5
= e+(d+(h/2)) 1312.578 mm

1- e' = 1- 1312.578 -0.7102


d 767.5
1- d' = 1- 232.5 0.697068
d 767.5
ρ 0.05
Pn = Cs + Cc - T
= 1164489
ɸPn = 756918.1 > Pu 637517.2

(penulangan Tarik yang menentukan)

Kontrol

eb = Mn 945290.8 = 0.81176425 m 811.764249 mm <


Pn 1164489

Digunakan Persamaan Berdasarkan tarik

Pn = 0,85.f’c.b.d
= 10514654 x 0.94126656 + 0.98828781 + 9.372348
0.99412666
= 43741600 Kg

ØPn = 28432040 Kg > Pu 637517 Kg OK


man Penulangan
n Utama Tarik
As Hitung 11512.5 Rencana Tulangan Tunggal
Ast 490.8739 Jarak Tulangan 40
Jumlah Tulangan 23.45307 Jumlah Tulangan 25
Jarak Tulangan 42.63834 As baru 12271.8 OKE Josssssssssssss

As hitung = 2072.25 mm2 Rencana Tulangan Tunggal


Ast = 254.47 mm2 Jarak Tulangan 120
Jumlah Tulangan Bagi Jumlah Tulangan 8.4
n 8.143428 As Baru 2137.53964 OKE Josssssssssssss
Jarak Antar Tulangan
122.7984 mm
n Utama Tekan Rencana D 20
As Hitung 5756.25 Rencana Tulangan Tunggal
Ast 314.1593 Jarak Tulangan 50
Jumlah Tulangan 18.32271 Jumlah Tulangan 20
Jarak Tulangan 54.57707 As baru 6283.2 OKE Josssssssssssss

Rencana D 16
As hitung = 1036.125 mm2 Rencana Tulangan Tunggal
Ast = 201.06 mm2 Jarak Tulangan 190
Jumlah Tulangan Bagi Jumlah Tulangan 5.3
n 5.153263 As Baru 1065.62823 OKE Josssssssssssss
Jarak Antar Tulangan 194.0518 mm

terhadap geser
= -79.909 ton = -799 KN f = 0.65
= = 23931017 KN fVc = ###
Vu < fVc

10 71.5
1 7.15
1.67832168 12
1

3
Data Momen Atas
0 tm Mu My Max 34.53 tm
Pu Fx max 733.87 ton
cm F'c 35 Mpa 350 Kg/cm2
cm fy 400 Mpa 4000 Kg/cm2
cm 767.5 mm Diameter tulangan Ut 25 1/2Ø 12.5 mm
Diameter Tulangan 20 mm
Diameter tulangan bag 18 mm
Diameter tulangan ba 16 mm
d' 232.5 mm 23.25 cm
bruto penampang SNI 03-2847-2002 hal. 75 Luas Tulangan longitudinal komponen struktur tekan non-komposit tdak boleh kur
digunakan ρ 0.015
Ast ρ.b.d 11512.5 mm2

= 1000000 mm2 Rencana Tulangan Utama D 25


Rencana Tulangan Bagi D 18
= 12271.8 mm Luasan Tulangan Utama
= 6283.2 As 490.8739 490.8739
ngan Bagi Tarik 2137.5 n 23.45307 30
ngan Bagi Tekan 6283.2 Digunakan Tulangan 2 sisi sehingga
= 26975.8 mm Tulangan Tarik = 15-D22 (380.132mm2)
0.026976 2.697576 % Tulangan Tarik = 15-D22 (380.132 mm2)

Cek Keadaan Seimbang


Cb = 600d = 460500 =
25 600+fy 1000
ab = 0.85 . Cb 391.425 mm

Es = Cb-d' x Es = 0.684
Cb 460.5
Ey = fy = 4000 =
Es 2100000

Karena Es,Ey maka tulangan baja tekan belum meleleh

Fs = Es x Es = 3119.218 Kg/cm2

Pub = 0.85 F'c xabxb = 1164489

Maka : Kolom Hancur diawali dengan lelehnya tulangan

Cek Momen Kapasitas Kolom

As As' y = 1/2 h = 50
c = 600
d 600+fy

c = 600.d 460500 = 460.5


600+fy 1000
a = βxc 391.425 mm 39.1425
T = As x fy 196349.5 Kg
Cs = As' x fy 196349.5 Kg
Cc = 0.85 x f'c x b x a 1164489 Kg
Mn = Cs (d-d') + Cc (d-a/2) - T(d-y)
= 11780972 + 88000462 -
= 94529084 Kgcm
= 945290.8 Kgm

Øb.Mn = 803497.2 Kgm

Cek Penampang Kolom

mm e = Mu 34.53 = 0.047046
Pu 733.87

m = fy 4000 = 13.44538
0.85 f'c 297.5
e' = e+(d+(h/2)) 1314.546 mm

1- e' = 1-
d
1- d' = 1-
d
ρ 0.05
Pn = Cs + Cc - T
= 1164489
ɸPn = 756918.1 > Pu

(penulangan Tarik yang menentukan)

Kontrol

45.07791 mm eb = Mn 945290.8 = 0.811764


Pn 1164489

Digunakan Persamaan Berdasarkan tarik

Pn = 0,85.f’c.b.d
= 10514654 x 0.938703

= 43713809 Kg

ØPn = 28413976 Kg >


Rangkuman Penulangan
Tulangan Utama Tarik
As Hitung 11512.5 Rencana Tulangan Tunggal
Ast 490.8739 Jarak Tulangan
Jumlah Tu 23.45307 Jumlah Tulangan
Jarak Tula 42.63834 As baru

Tulangan Bagi
As hitung = 2072.25 mm2 Rencana Tulangan Tunggal
Ast = 254.47 mm2 Jarak Tulangan
Jumlah Tulangan Bagi Jumlah Tulangan
OKE Josssssssssssss n 8.143428 As Baru
Jarak Antar Tulangan
122.7984 mm
Tulangan Utama Tek Rencana D 20
As Hitung 5756.25 Rencana Tulangan Tunggal
Ast 314.1593 Jarak Tulangan
Jumlah Tul 18.32271 Jumlah Tulangan
Jarak Tula 54.57707 As baru

Tulangan Bagi Rencana D 16


As hitung = 1036.125 mm2 Rencana Tulangan Tunggal
Ast = 201.06 mm2 Jarak Tulangan
Jumlah Tulangan Bagi Jumlah Tulangan
OKE Josssssssssssss n 5.153263 As Baru
Jarak Antar Tulangan 194.0518 mm

Kontrol terhadap geser


Vu = 0.000 ton = 0
KN Vc = = ###
tidak diberi tulangan geser

1 2.8
2 5.6
3 8.4
4 11.2
5 14
6 16.8
7 19.6
8 22.4
9 25.2
10 28
11 30.8
12 33.6
13 36.4
14 39.2
15 42
16 44.8
17 47.6
18 50.4
19 53.2
20 56
21 58.8
22 61.6
23 64.4
24 67.2
25 70
26 72.8
27 75.6
78.4
81.2
84
86.8
89.6
92.4
95.2
98
100.8
103.6
106.4
109.2
112
akibat displacement 0.00 kNm 0 tm

b 1000 mm 100 cm
h 1000 mm 100 cm
d h-d' 76.75 cm 767.5 mm

an non-komposit tdak boleh kurang 1% atau lebih dari 8% kali luas bruto penampang SNI 03-2847-2002 hal. 75

767500
10000 luas bruto = 1000000 mm2
490.8739 55.55556
luas tulangan utama T= 12271.8 mm
Luas Tulangan Utama= 6283.2
Luas Tulangan Bagi Tarik 2137.5
Luas Tulangan Bagi Tekan 6283.2
Total = 26975.8 mm
0.026976 2.697576 %

460.5 mm
25

= 0.001485

0.001905

311.922 Mpa

cm 500 mm
mm 460.5 mm

5252350

m 0.470457 cm 47.04572 mm

m 134.4538 cm

1314.546 -0.71276
767.5
232.5 0.697068
767.5

733867.6

m 811.7642 mm < 47.04572 mm


+ 0.987778 + 9.372348
0.99387

Pu 733868 Kg OK

Tulangan Tunggal
40
25
12271.8 OKE Josssssssssssss

Rencana Tulangan Tunggal


Jarak Tulangan 120
Jumlah Tulangan 8.4
2137.54 OKE Josssssssssssss

Tulangan Tunggal
50
20
6283.2 OKE Josssssssssssss

Rencana Tulangan Tunggal


Jarak Tulangan 190
Jumlah Tulangan 5.3
1065.628 OKE Josssssssssssss

KN f = 0.65
KN fVc = ### KN
Vu < fVc tidak diberi tulangan geser
2.5 17.02
3 20.42
1.1 7.5
Data Momen Bawah
Mu My Max 440.57 tm akibat displacement
Pu Fx max 834.76 ton
F'c 35 Mpa 350 Kg/cm2 b
fy 400 Mpa 4000 Kg/cm2 h
Diameter tulangan Utama Tarik 22 1/2Ø 11 mm d
Diameter Tulangan Utama Tekan 20 mm
Diameter tulangan bagi Tarik 18 mm
Diameter tulangan bagi Tekan 16 mm
d' 233 mm 23.3 cm
Luas Tulangan longitudinal komponen struktur tekan non-komposit tdak boleh kurang 1% atau lebih dari 8% kali luas bruto p
digunakan ρ 0.015
Ast ρ.b.d 11505 mm2

Rencana Tulangan Utama D 22 20


Rencana Tulangan Bagi D 14
Luasan Tulangan Utama
As 380.1327110844 380.1327111 314.1592654
n 30.2657457896
Digunakan Tulangan 2 sisi sehingga
Tulangan Tarik = 15-D22 (380.132mm2)
Tulangan Tekan = 15-D22 (380.132 mm2)

Cek Keadaan Seimbang


Cb = 600d = 460200 = 460.2
600+fy 1000
ab = 0.85 . Cb 391.17 mm

Es = Cb-d' x Es = 0.6816 =
Cb 460.2
Ey = fy = 4000 = 0.0019048
Es 2100000

Karena Es,Ey maka tulangan baja tekan belum meleleh

Fs = Es x Es = 3110.300 Kg/cm2 311.030

Pub = 0.85 F'c xabxb = 1163730.75

Maka : Kolom Hancur diawali dengan lelehnya tulangan

Cek Momen Kapasitas Kolom

As As' y = 1/2 h = 50 cm
c = 600
d 600+fy

c = 600.d 460200 = 460.2 mm


600+fy 1000
a = βxc 391.17 mm 39.117
T = As x fy 152053.08 Kg
Cs = As' x fy 152053.08 Kg
Cc = 0.85 x f'c x b x a 1163730.75 Kg
Mn = Cs (d-d') + Cc (d-a/2) - T(d-y)
= 81196347.09 + 66497320.65 - 4059817.4
= 143633850.4 Kgcm
= 1436338.504 Kgm

Øb.Mn = 1220887.728 Kgm

Cek Penampang Kolom

e = Mu 440.57 = 0.527779941 m
Pu 834.76

m = fy 4000 = 13.44537815 m
0.85 f'c 297.5
e' = e+(d+(h/2)) 1794.7799 mm

1- e' = 1- 1794.7799
d 767
1- d' = 1- 233
d 767
ρ 0.05
Pn = Cs + Cc - T
= 1163730.8
ɸPn = 756424.99 > Pu 834761.01

(penulangan Tarik yang menentukan)

Kontrol

eb = Mn 1436338.5 = 1.234253287 m
Pn 1163730.8

Digunakan Persamaan Berdasarkan tarik

Pn = 0,85.f’c.b.d
= 10500959 x 0.311890559 +

= 36858590 Kg

ØPn = 23958084 Kg > Pu


Rangkuman Penulangan
Tulangan Utama Tarik
As Hitung 11505 Rencana Tulangan Tunggal
Ast 380.1327111 Jarak Tulangan 30
Jumlah Tulangan 30.26574579 Jumlah Tulangan 33.4
Jarak Tulangan 33.04065285 As baru 12696.4
6348.2163
As Pakai rangkap 760.26542
Jumlah tulangan rangkap 8.35
Jarak Tulangan 119.76048
11.976048

Tulangan Bagi
As hitung = 1035.45 mm2 Rencana Tulangan Tunggal
Ast = 153.94 mm2 Jarak Tulangan
Jumlah Tulangan Bagi Jumlah Tulangan
n 6.7264076 As Baru
Jarak Antar Tulangan
148.66777 mm
Tulangan Utama Tekan Rencana D 20
As Hitung 5752.5 Rencana Tulangan Tunggal
Ast 314.1592654 Jarak Tulangan 50
Jumlah Tulangan 18.3107762 Jumlah Tulangan 20
Jarak Tulangan 54.61264935 As baru 6283.2

Tulangan Bagi Rencana D 16


As hitung = 1035.45 mm2 Rencana Tulangan Tunggal
Ast = 201.06 mm2 Jarak Tulangan
Jumlah Tulangan Bagi Jumlah Tulangan
n 5.1499058 As Baru
Jarak Antar Tulangan 194.17831 mm

Kontrol terhadap geser


Vu = 489.376 ton = 4894 KN
Vc = = 23915427 KN
380.1327111 12164.24675 mm2
0.012164247 1.2164247
Data Momen Pojok Bawah
akibat displacement 3524142.52 kNm 352414.3 tm Mu
Pu
1000 mm 100 cm F'c
1000 mm 100 cm fy
h-d' 76.7 cm 767 mm Diameter tulangan Utama T
Diameter Tulangan Utama
Diameter tulangan bagi Tar
Diameter tulangan bagi Tek
d'
au lebih dari 8% kali luas bruto penampang SNI 03-2847-2002 hal. 75 Luas Tulangan longitudinal
digunakan
Ast

10000 luas bruto = 1000000 mm2 Rencana Tulangan Utama


490.873852123 55.55555556 Rencana Tulangan Bagi
luas tulangan utama Tarik = 12696.4 mm Luasan Tulangan Utama
Luas Tulangan Utama Tekan = 6283.2 As
Luas Tulangan Bagi Tarik 1108.4 n
Luas Tulangan Bagi Tekan 6283.2 Digunakan Tulangan 2 sisi s
Total = 26371.2 mm Tulangan Tarik
0.026371 2.637115705 % Tulangan Tekan

Cek Keadaan Seimbang


mm Cb
25
ab

0.0014810952 Es

Ey

Karena Es,Ey maka tulangan

Mpa Fs

Pub

Maka : Kolom Hancur diaw

Cek Momen Kapasitas Kolo

500 mm As
c
d

460.2 mm c

a
T
Cs
Cc
Mn

Øb.Mn

Cek Penampang Kolom

5.2777994126 cm 527.779941262 mm e

134.453781513 cm m

e'

-1.339999923

0.696219035

1234.25328741 mm < 527.7799 mm


0.8671130578 + 9.3609282044
0.9311890559

834761 Kg OK
Rangkuman Penulangan
Tulangan Utama Tarik

mm 0.003 m
17 per-sisi 10 57.52
OKE Josssssssssssss 0.8 4.6
mm2 1.130309902 6.5
Per-sisi
Per-sisi
mm
cm 25 mm
12.5 mm

3 17.28 Tulangan Bagi


gan Tunggal 2.5 14.4
140 23.42857143 2.777778 16
7.2
1108.35388819 mm2 OKE Josssssssssssss 2.77
11.0835388819 cm 5.44
5.5417694409 8.11
28 10.78 Tulangan Utama Tekan
13.45
16.12
18.79
OKE Josssssssssssss 21.46
24.13
26.8 Tulangan Bagi
gan Tunggal 29.47
190 32.14
5.3 34.81
1065.6282281 OKE Josssssssssssss 37.48
40.15
42.82
45.49 Kontrol terhadap geser
f = 0.65 48.16 Vu
fVc = 15545027 KN 50.83 Vc
Vu < fVc 53.5
tidak diberi tulangan geser
3 17.17
2.5 14.31
2.445804196 14

2.45
4.9
7.35
9.8
12.25
14.7
17.15
19.6
22.05
24.5
26.95
29.4
31.85
34.3
36.75
39.2
41.65
44.1
46.55
49
51.45
53.9
56.35
58.8
61.25
63.7
66.15
68.6
71.05
73.5
75.95
78.4
Data Momen Pojok Bawah
My Max 377.00 tm akibat displacement
Fx max 688.63 ton
35 Mpa 350 Kg/cm2 0b 1000
400 Mpa 4000 Kg/cm2 h 1000
Diameter tulangan Utama Tarik 22 1/2Ø 11 mm d h-d'
Diameter Tulangan Utama Tekan 20 mm
Diameter tulangan bagi Tarik 18 mm
Diameter tulangan bagi Tekan 16 mm
233 mm 23.3 cm
Luas Tulangan longitudinal komponen struktur tekan non-komposit tdak boleh kurang 1% atau lebih dari 8% kali luas bruto penampan
ρ 0.015
ρ.b.d 11505 mm2

Rencana Tulangan Utama D 22 20


Rencana Tulangan Bagi D 14 490.8739
Luasan Tulangan Utama
380.1327110844 380.1327 314.159265359
30.2657457896
Digunakan Tulangan 2 sisi sehingga
Tulangan Tarik = 15-D22 (380.132mm2)
Tulangan Tekan = 15-D22 (380.132 mm2)

Cek Keadaan Seimbang


= 600d = 460200 = 460.2 mm
600+fy 1000
= 0.85 . Cb 391.17 mm

= Cb-d' x Es = 0.6816 = 0.001481


Cb 460.2
= fy = 4000 = 0.001905
Es 2100000

Karena Es,Ey maka tulangan baja tekan belum meleleh

= Es x Es = 3110.300 Kg/cm2 311.030 Mpa

= 0.85 F'c xabxb = 1163730.75

Maka : Kolom Hancur diawali dengan lelehnya tulangan

Cek Momen Kapasitas Kolom

As' y = 1/2 h = 50 cm 500


= 600
600+fy

= 600.d 460200 = 460.2 mm 460.2


600+fy 1000
= βxc 391.17 mm 39.117
= As x fy 152053.1 Kg
= As' x fy 152053.1 Kg
= 0.85 x f'c x b x a 1163731 Kg
= Cs (d-d') + Cc (d-a/2) - T(d-y)
= 81196347 + 66497321 - 4059817
= 1.44E+08 Kgcm
= 1436339 Kgm

= 1220888 Kgm

Cek Penampang Kolom

= Mu 377.00 = 0.5474664629 m 5.474665


Pu 688.63

= fy 4000 = 13.4453781513 m 134.4538


0.85 f'c 297.5
= e+(d+(h/2)) 1814.466 mm

1- e' = 1- 1814.466
d 767
1- d' = 1- 233
d 767
ρ 0.05
Pn = Cs + Cc - T
= 1163731
ɸPn = 756425 > Pu 688630

(penulangan Tarik yang menentukan)

Kontrol

eb = Mn 1436339 = 1.2342532874 m 1234.253


Pn 1163731

Digunakan Persamaan Berdasarkan tarik

Pn = 0,85.f’c.b.d
= 10500959 x 0.2862236468 + 0.862339
0.928622
= 36581225 Kg

ØPn = 23777796 Kg > Pu 688630


Rangkuman Penulangan
Tulangan Utama Tarik
As Hitung 11505 Rencana Tulangan Tunggal
Ast 380.1327 Jarak Tulangan 30 mm
Jumlah Tulangan 30.26575 Jumlah Tulangan 33.4 17
Jarak Tulangan 33.04065 As baru 12696.4
6348.216 mm2
As Pakai rangkap 760.2654 Per-sisi
Jumlah tulangan rangkap 8.35 Per-sisi
Jarak Tulangan 119.7605 mm
11.97605 cm

Tulangan Bagi
As hitung = 1035.45 mm2 Rencana Tulangan Tunggal
Ast = 153.94 mm2 Jarak Tulangan 140
Jumlah Tulangan Bagi Jumlah Tulangan 7.2
n 6.726408 As Baru 1108.354
Jarak Antar Tulangan 11.08354
148.6678 mm 5.541769
Tulangan Utama Tekan Rencana D 20
As Hitung 5752.5 Rencana Tulangan Tunggal
Ast 314.1593 Jarak Tulangan 50
Jumlah Tulangan 18.31078 Jumlah Tulangan 20
Jarak Tulangan 54.61265 As baru 6283.2

Tulangan Bagi Rencana D 16


As hitung = 1035.45 mm2 Rencana Tulangan Tunggal
Ast = 201.06 mm2 Jarak Tulangan 190
Jumlah Tulangan Bagi Jumlah Tulangan 5.3
n 5.149906 As Baru 1065.628
Jarak Antar Tulangan 194.1783 mm

Kontrol terhadap geser


= 0.000 ton = 0 KN f
= = 23915427 KN fVc
Vu
0.00 kNm 0 tm

mm 100 cm
mm 100 cm
76.7 cm 767 mm

kali luas bruto penampang SNI 03-2847-2002 hal. 75

10000 luas bruto = 1000000 mm2


55.55556
luas tulangan utama Tarik = 12696.4 mm
Luas Tulangan Utama Teka = 6283.2
Luas Tulangan Bagi Tarik 1108.4
Luas Tulangan Bagi Tekan 6283.2
Total = 26371.2 mm
0.026371 2.6371157053 %

25

mm
mm

cm 547.46646293 mm

cm

-1.36567

0.696219

mm < 547.4665 mm
+ 9.3609282044

Kg OK

0.003 m
per-sisi 10 57.52
OKE Josssssssssssss 0.8 4.6
1.1303099017 6.5

25 mm
12.5 mm

3 17.28
2.5 14.4
23.42857 2.777778 16

mm2 OKE Josssssssssssss 2.77


cm 5.44
8.11
28 10.78
13.45
16.12
18.79
OKE Josssssssssssss 21.46
24.13
26.8
29.47
32.14
34.81
OKE Josssssssssssss 37.48
40.15
42.82
45.49
= 0.65 48.16
= 15545027 KN 50.83
< fVc 53.5
tidak diberi tulangan geser
Dimensi Plat
Ht = tebal total beton
b = selimut beton
p = lebar beton

Direncanakan menggunakan tulangan utama


Diameter = 19 mm
Rasio Penulangan

r max =

= 0.055781 x 0.11086957

= 0.006184

r min = 1.4 = 0.0035


fy
Koefisien Tahanan

Rn = M = 4405701153

Øbd2 722760200
= 6.09566099

w = 0.85 * 1- 0.768243
= 0.196993

Rasio Penulangan

r = 0.0612 35
400

= 0.005355

Digunkan Rhu Minimum..


Diketahui Penurunan (displacement)
Pias 13 displacement maksimal
r
jarak pias (bentang)
EI

Momen Primer Akibat Zetting


peraturan beton
mutu uji beton M13-14 6 x EI x Δ =
l
2

M13-12 6 x EI x Δ =
l
2

M12-13 6 x EI x Δ =
l2

M12-11 6 x EI x Δ =
l2

M11-12 6 x EI x Δ =
l2

Tabel Cross 14
Titik M14-13
Distribution Factor (DF) 1
Momen Primer -961200

1201500

420525

195243.75

116395.3125

79787.10938

57962.98828
43002.90527

32134.84497

24071.80023

18046.5168

13533.05426

10149.33236

7611.884683

5708.884867

4281.656488

3211.240576

2408.429984

1806.322376

1354.741754

1016.056309

762.0422298

571.5316719

428.6487538

321.4865653

241.114924

180.836193

135.6271447

101.7203586
76.29026892

57.21770169

42.91327627

Momen Titik 1281471.26


0.12 m
ent maksimal
3.1 m
1m
1335000 KnM2 133500 tm2

Stiffnes Factor

961200 = -961200 kNm K13-14 EI = EI =


1 l 1

961200 = -961200 kNm K13-12 EI = EI =


1 ; 1

961200 = -961200 kNm K12-13 EI = EI =


1 ; 1

640800 = -640800 kNm K12-11 EI = EI =


1 l 1

640800 = -640800 kNm K11-12 EI = EI =


1 l 1

13 12 11 Nilai Momen nilai q


M13-14 M13-12 M12-13 M12-11 M11-12
1 1 1 1 1 R14 = 1
-961200 -961200 -961200 -640800 -640800 2
Mmax = 1
-480600 1602000 1602000 -320400 1
2403000 2403000 1201500 480600 961200 R14 = R13
-841050 -1682100 -1441800 -720900
841050 841050 420525 360450 720900 Nilai Lintang
-390488 -780975 -1081350 -540675
390487.5 390487.5 195243.8 270337.5 540675 R14 = R14'
-232791 -465581 -811013 -405506
232790.625 232790.6 116395.3 202753.1 405506.3 R13kiri = R13kiri
-159574 -319148 -608259 -304130
159574.21875 159574.2 79787.11 152064.8 304129.7 R13kanan = R13kanan
-115926 -231852 -456195 -228097
115925.97656 115926 57962.99 114048.6 228097.3 R13 Total = R13kiri
-86005.8 -172012 -342146 -171073
86005.810547 86005.81 43002.91 85536.47 171072.9 R12kiri = R12kiri
-64269.7 -128539 -256609 -128305
64269.689941 64269.69 32134.84 64152.36 128304.7 R12kanan = R12kanan
-48143.6 -96287.2 -192457 -96228.5
48143.600464 48143.6 24071.8 48114.27 96228.53 R12 Total = R12kiri
-36093 -72186.1 -144343 -72171.4
36093.0336 36093.03 18046.52 36085.7 72171.4
-27066.1 -54132.2 -108257 -54128.6
27066.108513 27066.11 13533.05 27064.28 54128.55
-20298.7 -40597.3 -81192.8 -40596.4
20298.664713 20298.66 10149.33 20298.21 40596.41
-15223.8 -30447.5 -60894.6 -30447.3
15223.769367 15223.77 7611.885 15223.65 30447.31
-11417.8 -22835.5 -45671 -22835.5
11417.769733 11417.77 5708.885 11417.74 22835.48
-8563.31 -17126.6 -34253.2 -17126.6
8563.3129768 8563.313 4281.656 8563.306 17126.61
-6422.48 -12845 -25689.9 -12845
6422.4811519 6422.481 3211.241 6422.479 12844.96
-4816.86 -9633.72 -19267.4 -9633.72
4816.8599687 4816.86 2408.43 4816.86 9633.719
-3612.64 -7225.29 -14450.6 -7225.29
3612.6447527 3612.645 1806.322 3612.645 7225.289
-2709.48 -5418.97 -10837.9 -5418.97
2709.4835086 2709.484 1354.742 2709.483 5418.967
-2032.11 -4064.23 -8128.45 -4064.23
2032.1126175 2032.113 1016.056 2032.113 4064.225
-1524.08 -3048.17 -6096.34 -3048.17
1524.0844596 1524.084 762.0422 1524.084 3048.169
-1143.06 -2286.13 -4572.25 -2286.13
1143.0633438 1143.063 571.5317 1143.063 2286.127
-857.298 -1714.6 -3429.19 -1714.6
857.29750765 857.2975 428.6488 857.2975 1714.595
-642.973 -1285.95 -2571.89 -1285.95
642.97313068 642.9731 321.4866 642.9731 1285.946
-482.23 -964.46 -1928.92 -964.46
482.229848 482.2298 241.1149 482.2298 964.4597
-361.672 -723.345 -1446.69 -723.345
361.672386 361.6724 180.8362 361.6724 723.3448
-271.254 -542.509 -1085.02 -542.509
271.2542895 271.2543 135.6271 271.2543 542.5086
-203.441 -406.881 -813.763 -406.881
203.44071712 203.4407 101.7204 203.4407 406.8814
-152.581 -305.161 -610.322 -305.161
152.58053784 152.5805 76.29027 152.5805 305.1611
-114.435 -228.871 -457.742 -228.871
114.43540338 114.4354 57.2177 114.4354 228.8708
-85.8266 -171.653 -343.306 -171.653
85.826552536 85.82655 42.91328 85.82655 171.6531

3524142.52 961200 -1281214 -2882828 0


352414.25203 ton
Distributie Factor (D.F)

1 kNm μ13-14 = 1
1

1 kNm μ13-12 = 1
1

1 kNm μ12-13 = 1
1

1 kNm μ12-11 = 1
1

1 kNm μ11-12 = 1
1

11.91 Kg/m

q l = 1 11.91 1= 5.954867 ton 59.54867


2
q l2 = 1 11.91 1= 11.90973 ton.m 119.0973
1
= R12 = R11

+ M14-13 = 59.54867 + 1281471 = 1281531 kN


1
+ M14-13 = 59.54867 + 1281471 = 1281531 kN
1
+ M13-12 = 59.54867 + 961200 = 961259.5 kN
1
+ R13kanan = 1281531 + 961259.5 = 2242790 kN 224279
+ M14-13 = 59.54867 + 961200 = 961259.5 kN
1
+ M13-12 = 59.54867 + -2882828 = -2882768 kN
1
+ R12kanan = 961259.5 + -2882768 = -1921508 kN
kN

kNm

ton
Data
Mu My Max 345.00 tm
Pu Fx max 738.00 ton
F'c 35 Mpa 350 Kg/cm2 b 1000
fy 400 Mpa 4000 Kg/cm2 h 1000
d' 200 mm 20 cm d h-d'

Luas Tulangan longitudinal komponen struktur tekan non-komposit tdak boleh kurang 1% atau lebih dari 8% kali luas bruto pen
digunakan ρ 0.015
Ast ρ.b.h 15000 mm2

Rencana memakai tulangan D-22


As 379.94
n 39.47992 39 40-D22

Digunakan Tulangan 2 sisi sehingga


Tulangan Tarik = 20-D22 (379.94 mm2)
Tulangan Tarik = 20-D22 (379.94 mm2)

Cek Keadaan Seimbang


Cb = 600d = 480000 = 480 mm
600+fy 1000
ab = 0.85 . Cb 408 mm

Es = Cb-d' x Es = 0.84 = 0.00175


Cb 480
Ey = fy = 4000 = 0.0019048
Es 2100000

Karena Es,Ey maka tulangan baja tekan belum meleleh

Fs = Es x Es = 3675 Kg/cm2 367.5 Mpa

Pub = 0.85 F'c xabxb = 1213800

Maka : Kolom Hancur diawali dengan lelehnya tulangan

Cek Momen Kapasitas Kolom

As As' y = 1/2 h = 50 cm 500

c = 600
d 600+fy

c = 600.d 480000 = 480 mm 480


600+fy 1000
a = βxc 408 mm 40.8
T = As x fy 151976 Kg
Cs = As' x fy 151976 Kg
Cc = 0.85 x f'c x b x a 1213800 Kg
Mn = Cs (d-d') + Cc (d-a/2) - T(d-y)
= 9118560 + 91726866 - 4559280
= 96286146 Kgcm
= 962861.46 Kgm

Øb.Mn = 818432.241 Kgm

Cek Penampang Kolom

e = Mu 345.00 = 0.46748 m 4.674796748


Pu 738.00

m = fy 4000 = 13.44538 m 134.453781513


0.85 f'c 297.5
e' = e+(d+(h/2)) 1767.4797 mm

1- e' = 1- 1767.4797
d 800
1- d' = 1- 200
d 800
ρ 0.05
Pn = Cs + Cc - T
= 1213800
ɸPn = 788970 > Pu 738000

(penulangan Tarik yang menentukan)

Kontrol

eb = Mn 962861.46 = 0.793262 m 793.262036579


Pn 1213800

Digunakan Persamaan Berdasarkan tarik

Pn = 0,85.f’c.b.d

= 11424000 x 0.41565 + 0.8865447258


0.9415650407
= 42586807 Kg
ØPn = 27681425 Kg > Pu 738000
mm 100 cm
mm 100 cm
80 cm 800 mm

u lebih dari 8% kali luas bruto penampang

mm

mm
cm 467.4797 mm

cm

-1.20935

0.75

mm

+ 10.08403
Kg OK
Data
Vu Max Fy Max = 2376 ton 23760000 N
s jarak antar tulangan geser

Diambil section Plat yang direncanakan gesernya


d 1000
b 1000

Perhitungan Kapasitas Geser yang tersedia

ɸ (Vs + Vc) = Vu
ɸ (Vs + 0) = Vu

Vs = Vu = 23760000 = 31680000
Ø 0.75

As = Vs x s = 6336000000 = 15840 mm2


fy x d 400000

Digunakan tulangan Geser 2D32-100 (8042)


0
Displacement K

Diketahui

μa

μa

1 Mpa = 101971 Kg/m2


10840
0.106305
=

a 4.1
b 11.0810811 11.08108
K Metabasics 0.006

= 4.1 - 16.81 - 0.006 105.9804


0.635882
16.17412 4.021706
= 0.07829416

= 385.757286 - 50.81249 - 332.9471 K = 385.7573


385.7573 - 52.81017

= 1.99768268 = 8.303439
332.947114 332.9471
= 0.006 m = 0.024939
= 0.6 cm = 2.493921

Diketahui
H 8.2 m
N 10
K 0.247 Mpa Kondisi Kosong

ua = 3.534177
a 43.11238

ua = 0.336101
- 44.50673 - 332.9471
385.7573 - 52.81017

m
cm

Anda mungkin juga menyukai

  • Surat Ijin & Surat Cuti
    Surat Ijin & Surat Cuti
    Dokumen2 halaman
    Surat Ijin & Surat Cuti
    Pramita Niki Utami
    Belum ada peringkat
  • KM Dapur
    KM Dapur
    Dokumen1 halaman
    KM Dapur
    Pramita Niki Utami
    Belum ada peringkat
  • Minus
    Minus
    Dokumen1 halaman
    Minus
    Pramita Niki Utami
    Belum ada peringkat
  • Pagar Sadang Layout4
    Pagar Sadang Layout4
    Dokumen1 halaman
    Pagar Sadang Layout4
    Pramita Niki Utami
    Belum ada peringkat
  • Tanda Terima
    Tanda Terima
    Dokumen1 halaman
    Tanda Terima
    Pramita Niki Utami
    Belum ada peringkat
  • Cover Laporan
    Cover Laporan
    Dokumen4 halaman
    Cover Laporan
    Pramita Niki Utami
    Belum ada peringkat
  • Pagar Sadang Layout1
    Pagar Sadang Layout1
    Dokumen1 halaman
    Pagar Sadang Layout1
    Pramita Niki Utami
    Belum ada peringkat
  • Pagar Sadang Layout1
    Pagar Sadang Layout1
    Dokumen1 halaman
    Pagar Sadang Layout1
    Pramita Niki Utami
    Belum ada peringkat
  • Perencanaan Jaringan Pipa Air Perumahan Kebumen Indah
    Perencanaan Jaringan Pipa Air Perumahan Kebumen Indah
    Dokumen1 halaman
    Perencanaan Jaringan Pipa Air Perumahan Kebumen Indah
    Pramita Niki Utami
    Belum ada peringkat
  • Peraturan Pembebanan Indonesia 1983
    Peraturan Pembebanan Indonesia 1983
    Dokumen32 halaman
    Peraturan Pembebanan Indonesia 1983
    Robert H. Jati
    Belum ada peringkat
  • Pagar Sadang Layout1
    Pagar Sadang Layout1
    Dokumen1 halaman
    Pagar Sadang Layout1
    Pramita Niki Utami
    Belum ada peringkat
  • 1 MPa
    1 MPa
    Dokumen5 halaman
    1 MPa
    Pramita Niki Utami
    Belum ada peringkat
  • M
    M
    Dokumen6 halaman
    M
    Pramita Niki Utami
    Belum ada peringkat
  • Visi Pegdaian
    Visi Pegdaian
    Dokumen5 halaman
    Visi Pegdaian
    Pramita Niki Utami
    Belum ada peringkat
  • M
    M
    Dokumen2 halaman
    M
    Pramita Niki Utami
    Belum ada peringkat
  • M
    M
    Dokumen6 halaman
    M
    Pramita Niki Utami
    Belum ada peringkat
  • M
    M
    Dokumen6 halaman
    M
    Pramita Niki Utami
    Belum ada peringkat
  • M
    M
    Dokumen6 halaman
    M
    Pramita Niki Utami
    Belum ada peringkat