ATTACHMENT-1: SPACE CONSTRAINT FOR INSTALLATION OF CL2 & O2 ANALYZER

MATERIAL APPROVAL SUBMISSION FOR OPTION-1


Material Approval Requests of MGT-RESA-MHDP-MA-0083

Date : 18- Apr- 2018

Rev. No:- 02

Transmittal ref.# MGT-RESA-MHDP-T-0252

S.No. Title or Description Status MAH Comments Servomex Comment MAH Responses Servomex Comment

1) Sampling System, sample tube bundle along with required 1) Noted and agreed.
tubing from process tapping is in Vendor Scope. For process
2) There is no moisture available in
1) Process Sample Tube bundle with accessories not in Servomex parameter detail, Vendor to refer ISS.
sample (dry sample) and hence heat
Scope. Let us know if we need to consider in our scope. Please 2) Sampling System, sample tube bundle along with required
advise process data detail with pressure and temperature. tubing from process tapping is in Vendor Scope. Vendor to check tracer line is not required. Sample line is
1) Detail for process sample tube bundle with accessaries from process tapping point to analyser unit which is normal tubes only.
2) Process Sample Tube bundle with accessories not in requirement of tube bundel having heater cable as normal
to be located in analyser shelter is not shown. 3) Shelter Considered & Please confirm
Servomex Scope. Let us know if we need to consider in our temperature is -18 degC. For process parameter detail, Vendor to
2) Considering the normal temperature of -18 Deg C , check for requirement of tube bundel having heater
scope. Please advise process data detail with pressure and refer ISS. about the Option Shelter or Cabinet
cable requirement to receive proper sample gas at analyser.
temperature. 3) Noted. Vendor to provide two analyser shelters. One shelter 4) Noted and Confirmed.
2AE/AT-2501 3) How this analyser will be installed in analyser shelter? Provide complete detail so that suitability of
1 COMMENTS 3) The analyzer will be installed on the interior wall of the for HCL analyser and another shelter for both Chlorine analyser 5) Noted.
HCL ANALYSER installation in shelter can be verified.
shelter and the SHS on the exterior wall just behind the SHS. and Oxygen analyser. Sampling System, sample tube bundle along 6) Zero Calibration: 100%N2
4) Provide typical schematic diagram indicating the sampling system, sample tube bundle and analyser unit
4) Typical diagram will provide at the time of detailed with required tubing from process tapping is in Vendor Scope. Span Calibration: 100%HCL
which is to be installed in shelter.Sampling system will be located outside of shelter.
engineering 4) Noted. Vendor to include Sampling System, sample tube
5) Check for requirement of sample pump if it is require considering specified response time in data sheet. No Carrier Gas Required.
5) The sample Pressure is too low so we have considered sample bundle along with required tubing from process tapping in
6) Calibration gas detail not provided. As the installation is not in our scope, we
pump. Vendor Scope.
6) Calibration gas details will provide at the time of detailed 5) Noted and agreed. prefer if you can exclude the piping for
engineering. 6) Noted. Vendor to include Calibration gas, Carrier gas along with the calibration bottles to Analyzer SHS
required piping or tubing in Vendor scope. Revise DWG:
821003355 accordingly.

1) Sampling System, sample tube bundle along with required


tubing from process tapping is in Vendor Scope. For process 1) Noted and agreed.
parameter detail, Vendor to refer ISS. 2) Noted and Confirmed.
1) Detail for process sample tube bundle with accessaries from process tapping point to analyser unit which
1) Process Sample Tube bundle with accessories not in 2) Noted. Vendor to provide two analyser shelters. One shelter 3) Noted and Confirmed.
is to be located in analyser shelter is not shown. This will be common for AE-2503 and Analyser AE-2504
Servomex Scope. Let us know if we need to consider in our for HCL analyser and another shelter for both Chlorine analyser 4) Shelter Considered & Please confirm
because both of these analyser will be located in one shelter.
scope. Please advise process data detail with pressure and and Oxygen analyser. Sampling System, sample tube bundle along about the Option Shelter or Cabinet
2) How this analyser will be installed in analyser shelter? Provide complete detail so that suitability of
temperature. with required tubing from process tapping is in Vendor Scope. 5) Noted.
installation in shelter can be verified.
2AE/AT-2503 2) The analyzer will be installed on the interior wall of the 3) Noted. Vendor to include Sampling System, sample tube
3) Provide typical schematic diagram indicating the sampling system, sample tube bundle and analyser unit 6) Zero Calibration: 100%N2
2 SPONGE RECYCLE GAS CHLORINE COMMENTS shelter and the SHS on the exterior wall just behind the SHS. bundle along with required tubing from process tapping in
which is to be installed in shelter.Sampling system will be located outside of shelter. Span Calibration: 100%CL2
ANALYSER 3) Revised Typical diagram already submitted. Vendor Scope.
4) This analyser AE-2503 and O2 Analyser AE-2504 will be located in one shelter of 3x3 meter so is there a No Carrier Gas Required
4) Revised Typical diagram already submitted. 4) Vendor to provide two analyser shelters. One shelter for HCL
common sampling arrangment for both of these analyser?
5) Sample Pump not required for this both Tags. analyser and another shelter for both Chlorine analyser and
5) Check for requirement of sample pump if it is require considering the distance limitation and proposer
6) Calibration gas details will provide at the time of detailed Oxygen analyser.
response time.
engineering. 5) Noted and agreed.
6) Calibration gas detail not provided.
6) Noted. Vendor to include Calibration gas, Carrier gas along with
required piping or tubing in Vendor scope. Revise DWG:
821003355 accordingly.

1) Xendos 1802 is suitable for safe area


1) Datasheet requirement is for Model Number: Xendos 1802.
Vendor to justify/clarify why Model: X1910B1 is offered instead. only and Model X1910B1 is suitable for
1) Why Xendos 1800 is not offered? 2) Agreed and closed. Offered Model: X1910B1 SERVOTOUGH Oxy Hazardous area.
1) As per the data sheets, the area classification required is 2) Noted.
2) X1910B1 SERVOTOUGH Oxy O2 Analyser has measurement range of 0-21%O2 where as we have 0-25% O2 Analyser has measurement range upto 25%.
class 1 Div 2, however Xendos is a safe area.
mentioned in data sheet. Check for suitability of model. 2) Noted. Vendor to provide two analyser shelters. One shelter 3) Noted and Confrmed
2) the quoted model has the range of 25%, please refer to the
2AE/AT-2504 3) How this analyser will be installed in analyser shelter? Provide complete detail so that suitability of for HCL analyser and another shelter for both Chlorine analyser 4) Noted and Confirmed. We will include
attached Catalogue
3 SPONGE RECYCLE GAS OXYGEN COMMENTS installation in shelter can be verified. and Oxygen analyser. Sampling System, sample tube bundle along the scope for sample lines in our final
3) The analyzer will be installed on the interior wall of the
ANALYSER 4) Provide typical schematic diagram indicating the sampling system, sample tube bundle and analyser unit with required tubing from process tapping is in Vendor Scope. revised proposal.
shelter and the SHS on the exterior wall just behind the SHS.
which is to be installed in shelter.Sampling system will be located outside of shelter. 4) Sampling System, sample tube bundle along with required 5) Noted and confirmed
4) Revised Typical diagram already submitted.
5) This analyser AE-2504 and Analyser AE-2503 Cl2 analyser will be located in one common shelter so tubing from process tapping is in Vendor Scope.
5) Revised Typical diagram already submitted.
accordingly sampling arrangement can be made on one platform. 5) Vendor to consider two analyser shelters. One shelter for HCL
analyser and another shelter for both Chlorine analyser and
Oxygen analyser.

Page 1 of 2
Material Approval Requests of MGT-RESA-MHDP-MA-0083

Date : 18- Apr- 2018

Rev. No:- 02

Transmittal ref.# MGT-RESA-MHDP-T-0252

S.No. Title or Description Status MAH Comments Servomex Comment MAH Responses Servomex Comment

2AE/AT-2503
1) Vendor to offer Cell material, Wetted parts material, Tube/Pipe
4 SPONGE RECYCLE GAS CHLORINE COMMENTS 1) Noted and confirmed.
material : Monel as per ISS as the fluid is Chlorine.
ANALYSER

1) Vendor to provide Oxygen Analyser with Outputs: mA + 2 x


2AE/AT-2504 Relays-Potential free contacts (Alarm/Fault) + Modbus TCP/IP as
1) Noted and confirmed.
5 SPONGE RECYCLE GAS OXYGEN COMMENTS per ISS.
2) Noted and confirmed.
ANALYSER 2) Vendor to offer Element material, Wetted parts material,
Tube/Pipe material : Monel as per ISS as the fluid is Chlorine.

1) Vendor to provide two analyser shelters. One shelter for HCL


analyser and another shelter for both Chlorine analyser and
Oxygen analyser. Vendor to refer attached Doc: MGT-250-M-
SP001, Analyzer Shelter Design Data Sheet and Specification for
more details.
1) Noted and Confrmed
2) For O2 & Cl2 shelter, Vendor to provide O2 and Cl2 gas
6 ANALYSER SHELTER COMMENTS 2) Noted and confirmed.
detector one each with horn having auto off time setting and
beacon. Horn and beacon shall be installed outside of shelter at 3) Noted and confirmed.
top of entry door.
3) For HCL shelter, Vendor to provide Cl2 gas detector with horn
having auto off time setting and beacon. Horn and beacon shall
be installed outside of shelter at top of entry door.

Only one no. (01) power supply 480V, 3Ph, 3W, 60Hz shall be provided. All distribution and isolation measure
Electrical power Supply COMMENTS Noted.
withing shelter is vendor scope.

Only one no. (01) power supply 230V, 1Ph, 2W, 60Hz shall be provided. All distribution and isolation measure
Electrical power Supply COMMENTS Noted.
withing shelter is vendor scope.

Only one no. (01) UPS power supply 120V, 1Ph, 2W, 60Hz shall be provided. All distribution and isolation
Electrical power Supply COMMENTS Noted.
measure withing shelter is vendor scope.

Noted. Will be submitted during the


Vendor to provide area classification (if any) drawing for inside of shelter and make the correct equipment
Area Classification COMMENTS detailed engineering stage after the PO is
selection.
processed

Page 2 of 2
ABDUL KARIM H. AL‐SINAN & PARTNER ‐ TECHNICAL OFFER ‐ Rev 4 QUOTE ‐ QR ‐ 02

Kytos Arabia ; P.O. BOX 374  Al Sinan Ref No# 201800203


AL JUBAIL (Support Industries ‐ 3) ‐ 31961 Date 5/2/2018 16:49
Website: www.sinanakh.com Currency USD
Phone: 013 350 5200 Delivery Time 200 Days
Fax: 013 362‐4886 Delivery Point Yanbu
Prepared by: Mohammed Sarwar Payment Terms As Mentioned Below
Direct Number: 013 350 5241 Quote Validity 30 Days

Submitted To:
To Company ROTARY ENGINEERING SA From AKH AL Sinan & Partner For Trading CO.
Department E&I Dept. Department Sales
Attention Mr.Suresh Kornu Tel 013‐350 5200
Tel No.  Mob: (966) 59 025 8053  Fax 013‐362 4886
Fax Email faisal@sinanakh.com
E‐mail Kornu.Suresh@rotaryeng.com.sg CC Sales@sinanakh.com
CC
Your Ref. CRISTAL Expansion Project
Subject SERVOTOUGH SpectraExact, SERVOTOUGH Oxy O2 , Etc.

Discount
LN Cat No. Item Description QTY UM Unit Price in (%) Unit Net Price Total Amount
I ‐ Analyzers and Sample Conditioning Systems

Analyzer Consists of the following:                                    
1 ANALYZER‐HD
Tag No. 2AE‐2501 for measuring HCL

02500E1 SERVOTOUGH SpectraExact Analyser With the following 
configuration:
Analyser Type: 2510 Series Analyser;
Measurement: Hydrogen Chloride:Gas Filter;
Measurement Units: %;
Measurement Range: 1 0,0 ‐ 100,0;
1.01 02500E1 Stream Component 1: NONE; 1 EA
Stream Comp 1 Normal Range: HCL;
Stream Comp 1 High Range: 100;
Stream Component 2: N2;
Stream Comp 2 High Range: BAL;
Phase of Sample: Gaseous;
Phase of Sample: Gaseous;
Hazardous Atmosphere: Gas;
Approval Type: Haz. Area FM Cl I Div 2 (Z2);
Analyser Compensation: Not Required;
Cell Material: Hastelloy;
Cell Length: 8mm;
CellArea Temperature Class: T4 Temperature Rating;
Cell Heater Type: Electrically Heated <80C;
Cell Temperature (C): 60;
Supply Voltage: 115V 50‐60Hz;
Optional Outputs: 2 x mA + 2 x Relays;
Lens Material: CaF2;
Window Material: Sapphire;
Case Sealing: Standard;
Plate Filter: 3.4UM;
Detector Type: CaF2;
O Ring Material: Special Chemraz 584;
Scrubbers: H2O/CO2 Mix + Purged Bosses;
End Boss Purge Gas: Nitrogen;
Source Type: CAF2 Long Wave Sealed;
Zero Calibration Component: 100%N2;
Span Calibration Component: 100%HCL;
Calibration Temperature: (C) 60;
Calibration Pressure (bara): 1,00;
Calibration Method: MAN‐034 (Special Toxic);
Digital Communications: Modbus TCP (Ethernet);
TDS Specification: Standard TDS;
Application Adder: Application Adder ‐ L;
Tag No 2AE‐2501;
User Manual: English

Abdul Karim H Al Sinan Partner Trading Co. P.O Box 374, Al Jubail Email: Sales@sinanakh.com 1
Note: 
1) Hastelloy measurement cell has been offered.
2) As no further specs have been provided, Balance is assumed to 
be N2.
3) Sample pressure must be reduced to 1bar.
4) Please confirm if Class 1 Div 2 certification is acceptable

ASYSTEM
Sampling system‐ Tag 2AE‐2501 for Analyzer Model#2500 consists 
of the following:
BOM:
1) SS316 enclosure with viewing window;
ASYSTEM
1.02 2) 2‐way Ball Valve # Swagelok; 1 EA
TAG: AE‐2501
3) Needle Valve # Swagelok;
4) 3‐way Ball Valve # Swagelok;
5) Flowmeters # Make # Brooks;
6) Safety Relief Valve # Swagelok/Hoke;
7) Coalescing Filter # Make # Headline;
8) Pressure Regulator # Make‐ Go/ Tescom;

10) 2 Micron Inline Filter # Make # Swagelok;
11) Tube fittings # Make‐ Swagelok;
12) Tubing#s # Make # Sandvik.
Deviation List:
1) PDP & JB#S not considered in our scope
Analyzer Consists of the following:                                    
2 ANALYZER‐HD
Tag No. 2AE‐2503 for measuring Chlroine
02500E1 SERVOTOUGH SpectraExact Analyser With the following 
configuration:
Analyser Type: 2520 Series Analyser;
Measurement: Chlorine;
Measurement Units: %;
Measurement Range1: 100,0;
2.01 02500E1 Stream Component 1: NONE; 1 EA
Stream Comp 1 Normal Range: CL2;
Stream Comp 1 High Range: 100;
Stream Component 2: N2;
Stream Comp 2 High Range: BAL;
Phase of Sample: Gaseous;
Hazardous Atmosphere: Gas;
Approval Type: Haz. Area FM Cl I Div 2 (Z2);
Analyser Compensation: Not Required;
Cell Material: Hastelloy;
Cell Length: 4mm;
CellArea Temperature Class: T3 Temperature Rating;
Cell Heater Type: Electrically Heated <130C;
Cell Temperature (C): 60;
Supply Voltage: 115V 50‐60Hz;
Optional Outputs: 2 x mA + 2 x Relays;
Lens Material: CaF2;
Window Material: Spectrosil / Quartz;
Case Sealing: Standard;
Optical Filter Measurement 1: CL2 (330nm);
Optical Filter Reference 1: CL2 (400nm);
Plate Filter: Not Fitted;
Detector Type: Soft UV;
O Ring Material: Special Chemraz 584;
Scrubbers: H2O/CO2/CO Mix + Purged Bosses;
End Boss Purge Gas: Nitrogen;
Source Type: Soft UV;
Zero Calibration Component: 100%N2;
Span Calibration Component: 100%CL2;
Calibration Temperature (C): 60;
Calibration Pressure (bara): 1,00;
Calibration Method: MAN‐034 (Special Toxic);
Digital Communications: Modbus TCP (Ethernet);
TDS Specification: Standard TDS;
A li ti Add A li ti Add F

Abdul Karim H Al Sinan Partner Trading Co. P.O Box 374, Al Jubail Email: Sales@sinanakh.com 2
Tag No: 2AE‐2503;
User Manual: English
Note: 
1) Hastelloy measurement cell has been offered.
2) As no further specs have been provided, Balance is assumed to 
be N2.

ASYSTEM
Sampling system‐ Tag 2AE‐2503 for Analyzer Model#2500 &  Tag 
2AE‐2504 for Analyzer Model#1910B1 consists of the following:
BOM:
1) SS316 enclosure with viewing window;
ASYSTEM 2) 2‐way Ball Valve # Swagelok;
2.02 1 EA
TAG: AE‐2503 3) Needle Valve # Swagelok;
4) 3‐way Ball Valve # Swagelok;
5) Flowmeters # Make # Brooks;
6) Safety Relief Valve # Swagelok/Hoke;
7) Coalescing Filter # Make # Headline;
8) Pressure Regulator # Make‐ Go/Tescom;
9) Auto Drain # Make # Armstrong;
10) 2 Micron Inline Filter # Make # Swagelok;
11) Tube fittings # Make‐ Swagelok;
12) Tubing#s # Make # Sandvik
Deviation List:
1) PDP & JB#S not considered in our scope.

Analyzer Consists of the following:                                    
3 ANALYZER‐HD
Tag No. 2AE‐2504 for measuring Oxygen

X1910B1 SERVOTOUGH Oxy O2 Analyser (Modified)
With the following configuration:
Analyser Certification: c<CSA>us Class 1 Div 1 Zone 1; Supply 
Voltage: 100‐120Vac 50/60Hz;
Measurement: Solvent Resistant;
3.01 1910B1 Sample Flow: 200 ml/min (nominal); 1 EA
Sample Heater: Fitted;
Internal Pressure Compensation: Not Required;
Internal Flow Sensor: Fitted;
Auto Validation/Calibration: Not Required;
Digital Communications: Modbus RTU (RS 485);
Sample Inlet: Standard 1/4" NPT(F);
Enclosure Options: Breather Fittings;
Conduit Entry: NPT. (2 X 1/2" & 2 X 3/4");
Operators Manual: English;
Oxy Safety Manual: English;
Tag No. 2AE‐2504
Note:
1) The required monel pipework is not available with Oxy. We 
could offer hastelloy pipework with the OxyExact.
2) ‐ Under the condition that the sample is dry, stainless steel 
pipework would be sufficient. However, a chlorine tested cell 
(SIPS) will be mandatory.
3) Sample pressure must be regulated to analyser requirements.
ASYSTEM
ASYSTEM Please refer Line Item 2.02. Common Sample System for Tag # 2AE‐
3.02 0 EA
TAG: AE‐2504 2503 & Tag # 2AE‐2504

II ‐Analyzer Cabinets from Servomex


Analyzer Cabinet for O2 & Cl2 Analyzers: IP65, External Dimensions 
4.01 Cabinet  (LXWXH) : 1500x500 x 2000 mm, with Vortex Ac and JBs, Light  1 Ea
fittings..

Analyzer Cabinet for HCL Analyzer: IP65, External Dimensions 
4.02 Cabinet  (LXWXH) : 800x500 x 2000 mm, with Vortex Ac and JBs, Light  1 Ea
fittings..

III ‐Analyzer Shelters ‐ OPTIONAL For II

Shelter: Safe Area Shelter, FRP (Fiberglass Reinforced Plastic), 
Shelter‐FRP‐
External Dimensions (LXWXH) : 3.0x 3.0 x 2.4 Mtrs, with 2 split Air  1 Each
3x3x2.4
Conditioning Units. ‐ For O2 & CL2 Analyzers

Shelter: Safe Area Shelter, FRP (Fiberglass Reinforced Plastic), 
Shelter‐FRP‐
External Dimensions (LXWXH) : 3.0x 3.0 x 2.4 Mtrs, with 2 split Air  1 Each
3x3x2.4
Conditioning Units. ‐ For HCL Analyzer

Abdul Karim H Al Sinan Partner Trading Co. P.O Box 374, Al Jubail Email: Sales@sinanakh.com 3
IV ‐Common Items and Services
SAMPLE TRANSPORT LINES: 
• HCL: 
Sample tapping point to Analyzer: 20 Meters 
Analyzer / SHS to Sample Return Line: 20Meters
Material: PTFE
5 Sample Tubes 1 LOT
• O2 and Chlorine: 
Sample tapping point to Analyzer:20 Meters 
Analyzer / SHS to Sample Return Line: 20 Meters
Material: Monel

6 CRATING Packing & Crating 1 LOT

SHIPPING & 
7 Shipping and handling charges 1 LOT
HANDLING

8 SPARES ASYSTEM ‐ Sample System Commissioning Spares 1 LOT

 INCIDENTAL‐
9 AKHS Incidental services consists of the following:
SERVICES‐HD

SUPERVISION 
Supervision of Installation & Site Check readiness by AL Sinan 
9.01 OF 2 Days
Engineer ‐ YANBU Region
INSTALLATION

9.02 MOB‐DEMOB Mobilization & De‐mobilization MFG Engineer 1 LOT

Start‐up and commissioning by MFG Service Engineer, maximum 8 
9.03 COMM‐AKHS 3 Days
hours per day

FAT ‐ Analyzers only without SCS. Integrated FAT shall be at AKH‐
9.04 FAT‐ MFG 3 Days
Jubail ‐ Note: OPTIONAL

9.05 SAT‐AKHS Site Acceptance Testing By OEM Certified AL Sinan Service Engineer 2 Days

9.06 Training‐MFG Training by MFG Service Engineer 1 Days

Sit
Site‐
Site Preparations and Installation:                                                             
10 Preparation‐ 0 Lot
Note: Not considered in our scope.
Ins
Calibrations Gases and Standards as below:                                             
HCL Analyzer:                                                                                                  
Zero Calibration: 100%N2
Span Calibration: 100%HCL                                                                          
11 Calib‐STD CL Analyzer:                                                                                                      1 Lot
Zero Calibration: 100%N2
Span Calibration: 100%CL2                                                                           
O2  Analyzer:                                                                                                   
Zero Calibration: 0.3%Oxygen Balance N2

Warranty: Standard warranty is 18 months from shipping or 12 
months from Commissioning which ever comes first.                            
12 Warranty‐STD 1 LOT
Note: Warranty does not cover glassware, consumables and 
defects that are resulted from negligence or misuse/ mishandling.

Integration‐ Integration: System Integration of the three analyzers and the two 
13 1 Lot
ENG Sample Conditioning Systems and Engineering

Remarks
1) Analyzer spares  are not considered in our scope. Shall be provided upon your valuable advise
2) AKH AL SINAN Local Support Shall be avaialble in the Yanbu region for all time. We (AL Sinan & Servomex Middle East) executed TDL, IR analyzers project in Cristal & 
Our work experience, Support shall be with ROTARY All the time

3) PAYMENT TERMS:  20% with your order, 30% on Drawings approval, 40% when materials ready for delivery, 10% on commissioning and Site Acceptance.

4) DCS Configuration, Scaffolding, Civil & Mechanical Works are not considered in our scope
5) No Special Tools are required for the quoted analyzers

Abdul Karim H Al Sinan Partner Trading Co. P.O Box 374, Al Jubail Email: Sales@sinanakh.com 4
6) Warranty:  Standard warranty is 18 months from shipping or 12 months from Commissioning which ever is earlier                       
Note: Warranty does not cover glassware, consumables and defects that are resulted from negligence or misuse/ mishandling.

TERMS AND CONDITIONS

If you have any queries, please contact Mohmmed Sarwar;   013‐350 5241, Email: Sales@sinanakh.com
Thank You For Your Business!

Abdul Karim H Al Sinan Partner Trading Co. P.O Box 374, Al Jubail Email: Sales@sinanakh.com 5
As discussed please find the below information on the sample line distances

HCL:

Sample tapping point to Analyzer: 16 Meters

Analyzer / SHS to Sample Return Line: 16 Meters

Material: PTFE

O2 and Chlorine:

Sample tapping point to Analyzer: 16 Meters

Analyzer / SHS to Sample Return Line: 3 Meters

Material: Monel

As per the below mail, the HCL outlet will be connected back to the process and O2 / Cl2, the sample
return is connected to the Vent header.

Can you check if we can connect the HCL return also to close by Vent header?
SAMPLE DRAWINGS ONLY
DIMENSIONS MIGHT CHANGE DURING DETAILED DESIGN OF ANALYZER SHELTERS.
SAMPLE DRAWINGS ONLY
DIMENSIONS MIGHT CHANGE
DURING DETAILED DESIGN OF
ANALYZER SHELTERS.
SAMPLE DRAWINGS ONLY
DIMENSIONS MIGHT CHANGE
DURING DETAILED DESIGN OF
ANALYZER SHELTERS.
PROCESS DETAILS PROCESS DETAILS
TAG NO 2AE-2503 TAG NO 2AE-2504
FLUID CHLORINE WITH UP TO 10% AIR FLUID CHLORINE WITH UP TO 10% AIR
MAXIMUM PRESSURE 6 Barg MAXIMUM PRESSURE 6 Barg
NORMAL PRESSURE 6 Barg NORMAL PRESSURE 6 Barg
MAXIMUM TEMPERATURE 65°C MAXIMUM TEMPERATURE 65°C
NORMAL TEMPERATURE 60°C NORMAL TEMPERATURE 60°C

BYPASS SAMPLE IN SAMPLE IN END BOSS PURGE


FOR 2AE-2504 TO 2AE-2504 TO 2AE-2503 TO 2AE-2503
(1900 ANALYSER) (1900 ANALYSER) (2500 ANALYSER) (2500 ANALYSER)

GRP CABINET
1000 (H) X 800 (W) X 300

F1 F2

FI1 FI2 FI3 FI4

SET AT SET AT SET AT SET AT


1.5l/min 200ml/min 1.5l/min 100ml/min

PI
END BOSS PURGE IN
INSTRUMENT AIR IN
SRV AFR
BV2-2
RELIEF VENT
1/4" OD BY CUSTOMER
2 METER (max)

SAMPLE IN BV2-3
PI CF
1/4" O.D. BV3-1 BV3-3
SAMPLE TUBE BV3-5
SS316 1/4"
BV2-1 PRV BV3-2 BV3-4 NV1
(BY CUSTOMER)
0.5 Barg

TST

PI

NV2 PRV3 BV2-4


EHT 0.5 Barg
JB

AD

BV2-5

ABBREVIATION : PI PI PI
TO DRAIN

CPR

CPR

CPR
BV2 : 2 WAY BALL VALVE 3/8" O.D.
BV3 : 3 WAY BALL VALVE PI PI PI
F : FILTER
FI : BYPASS FLOW METER
PI : PRESSURE INDICATOR
PRV : PRESSURE REGULATOR VALVE
NOTE:
AFR : AIR FILTER REGULATOR
CPR : CYLINDER PRESSURE REGULATOR
1. PROCESS DATA DETAILS TO BE PROVIDE BY CUSTOMER.
SP : SAMPLE PUMP SPAN GAS ZERO GAS N2 SPAN GAS
2. BASED ON THE PROCESS DATA DETAILS WE CAN CONFIRM THE EHT LINE REQUIREMENT
NV : NEEDLE VALVE O2 Bal N2 4-6 bar.g. INSTRUMENT AIR
3. EHT LINE WITH ACCESSORIES SHALL BE IN CUSTOMER SCOPE. 4-6 bar.g.
CF : COALESCING FILTER 4. ALL FIELD CABLE, TUBING,LAYING AND GLANDING SHALL BE IN CUSTOMER SCOPE
AD : AUTO DRAIN 5. POWER JB AND SIGNAL JB SHALL BE USE IN EXISTING SHELTER.
TST : THERMOSTAT
BY CUSTOMER
BY CUSTOMER

PROCESS DETAILS BYPASS VENT END BOSS PURGE ANALYSER VENT


TAG NO 2AT-2501 1/4" O.D. VENT 1/4" O.D.
NITROGEN AND ARGON WITH
FLUID
TRACE TiCI4 VAPOUR
MAXIMUM PRESSURE 0.25 Barg GRP CABINET
NORMAL PRESSURE 0 Barg 800 (H) X 800 (W) X 300
MAXIMUM TEMPERATURE 65°C
NORMAL TEMPERATURE -18°C 2510

HC

FI FI FI

SET AT SET AT
1.5l/min 200ml/min
PI
END BOSS PURGE IN
INSTRUMENT AIR IN
BV2
AFR
BY CUSTOMER
2 METER (max)

NV

SAMPLE IN BV2
CF
1/4" O.D. BV3
SAMPLE TUBE SP BV3
SS316 1/4" BV3 NV
(BY CUSTOMER)

TST PI

NV PRV3 BV2
PI PI

CPR

CPR
EHT AD
JB
PI PI

ABBREVIATION :

BV2 : 2 WAY BALL VALVE


BV3 : 3 WAY BALL VALVE TO DRAIN
F : FILTER 3/8" O.D. SPAN GAS
ZERO GAS N2
FI : BYPASS FLOW METER INSTRUMENT AIR
4-6 bar.g.
PI : PRESSURE INDICATOR 4-6 bar.g.
PRV : PRESSURE REGULATOR VALVE NOTE:
AFR : AIR FILTER REGULATOR BY CUSTOMER
SP : SAMPLE PUMP 1. PROCESS DATA DETAILS TO BE PROVIDE BY CUSTOMER.
NV : NEEDLE VALVE 2. BASED ON THE PROCESS DATA DETAILS WE CAN CONFIRM THE EHT LINE REQUIREMENT ASSEMBLY NOTES:
CF : COALESCING FILTER 3. EHT LINE WITH ACCESSORIES SHALL BE IN CUSTOMER SCOPE.
AD : AUTO DRAIN 4. ALL FIELD CABLE, TUBING,LAYING AND GLANDING SHALL BE IN CUSTOMER SCOPE 1. PIPING SHOWN AS DENOTES 6mm OD STAINLESS STEEL TUBE.
CPR : CYLINDER PRESSURE REGULATOR 5. POWER JB AND SIGNAL JB SHALL BE USE IN EXISTING SHELTER. 2. PIPING SHOWN AS DENOTES 3mm OD STAINLESS STEEL TUBE.
MATERIAL APPROVAL SUBMISSION FOR OPTION-2
Find the attached files for various models of GRP cabinets we are going to propose for
our project

- HCL

Cabinet Dimensions: 800 (W) x 600 (D) x 2000 (H)


Glass Window
Vortex AC

- CL2 & O2

Cabinet Dimensions: 1500 (W) x 600 (D) x 2000 (H)


Glass Window
Vortex AC
Double Door.
SAMPLE DRAWINGS ONLY
DIMENSIONS MIGHT
CHANGE DURING DETAILED
DESIGN OF ENCLOSED
CABINETS.
BY CUSTOMER

PROCESS DETAILS BYPASS VENT END BOSS PURGE ANALYSER VENT


TAG NO 2AT-2501 1/4" O.D. VENT 1/4" O.D.
NITROGEN AND ARGON WITH
FLUID
TRACE TiCI4 VAPOUR
MAXIMUM PRESSURE 0.25 Barg GRP CABINET
NORMAL PRESSURE 0 Barg 800 (H) X 800 (W) X 300
MAXIMUM TEMPERATURE 65°C
NORMAL TEMPERATURE -18°C 2510

HC

FI FI FI

SET AT SET AT
1.5l/min 200ml/min
PI
END BOSS PURGE IN
INSTRUMENT AIR IN
BV2
AFR
BY CUSTOMER
2 METER (max)

NV

SAMPLE IN BV2
CF
1/4" O.D. BV3
SAMPLE TUBE SP BV3
SS316 1/4" BV3 NV
(BY CUSTOMER)

TST PI

NV PRV3 BV2
PI PI

CPR

CPR
EHT AD
JB
PI PI

ABBREVIATION :

BV2 : 2 WAY BALL VALVE


BV3 : 3 WAY BALL VALVE TO DRAIN
F : FILTER 3/8" O.D. SPAN GAS
ZERO GAS N2
FI : BYPASS FLOW METER INSTRUMENT AIR
4-6 bar.g.
PI : PRESSURE INDICATOR 4-6 bar.g.
PRV : PRESSURE REGULATOR VALVE NOTE:
AFR : AIR FILTER REGULATOR BY CUSTOMER
SP : SAMPLE PUMP 1. PROCESS DATA DETAILS TO BE PROVIDE BY CUSTOMER.
NV : NEEDLE VALVE 2. BASED ON THE PROCESS DATA DETAILS WE CAN CONFIRM THE EHT LINE REQUIREMENT ASSEMBLY NOTES:
CF : COALESCING FILTER 3. EHT LINE WITH ACCESSORIES SHALL BE IN CUSTOMER SCOPE.
AD : AUTO DRAIN 4. ALL FIELD CABLE, TUBING,LAYING AND GLANDING SHALL BE IN CUSTOMER SCOPE 1. PIPING SHOWN AS DENOTES 6mm OD STAINLESS STEEL TUBE.
CPR : CYLINDER PRESSURE REGULATOR 5. POWER JB AND SIGNAL JB SHALL BE USE IN EXISTING SHELTER. 2. PIPING SHOWN AS DENOTES 3mm OD STAINLESS STEEL TUBE.
SAMPLE DRAWINGS ONLY
DIMENSIONS MIGHT CHANGE DURING DETAILED DESIGN OF ENCLOSED CABINETS.
SAMPLE DRAWINGS ONLY
DIMENSIONS MIGHT CHANGE DURING DETAILED DESIGN OF ENCLOSED CABINETS.
PROCESS DETAILS PROCESS DETAILS
TAG NO 2AE-2503 TAG NO 2AE-2504
FLUID CHLORINE WITH UP TO 10% AIR FLUID CHLORINE WITH UP TO 10% AIR
MAXIMUM PRESSURE 6 Barg MAXIMUM PRESSURE 6 Barg
NORMAL PRESSURE 6 Barg NORMAL PRESSURE 6 Barg
MAXIMUM TEMPERATURE 65°C MAXIMUM TEMPERATURE 65°C
NORMAL TEMPERATURE 60°C NORMAL TEMPERATURE 60°C

BYPASS SAMPLE IN SAMPLE IN END BOSS PURGE


FOR 2AE-2504 TO 2AE-2504 TO 2AE-2503 TO 2AE-2503
(1900 ANALYSER) (1900 ANALYSER) (2500 ANALYSER) (2500 ANALYSER)

GRP CABINET
1000 (H) X 800 (W) X 300

F1 F2

FI1 FI2 FI3 FI4

SET AT SET AT SET AT SET AT


1.5l/min 200ml/min 1.5l/min 100ml/min

PI
END BOSS PURGE IN
INSTRUMENT AIR IN
SRV AFR
BV2-2
RELIEF VENT
1/4" OD BY CUSTOMER
2 METER (max)

SAMPLE IN BV2-3
PI CF
1/4" O.D. BV3-1 BV3-3
SAMPLE TUBE BV3-5
SS316 1/4"
BV2-1 PRV BV3-2 BV3-4 NV1
(BY CUSTOMER)
0.5 Barg

TST

PI

NV2 PRV3 BV2-4


EHT 0.5 Barg
JB

AD

BV2-5

ABBREVIATION : PI PI PI
TO DRAIN

CPR

CPR

CPR
BV2 : 2 WAY BALL VALVE 3/8" O.D.
BV3 : 3 WAY BALL VALVE PI PI PI
F : FILTER
FI : BYPASS FLOW METER
PI : PRESSURE INDICATOR
PRV : PRESSURE REGULATOR VALVE
NOTE:
AFR : AIR FILTER REGULATOR
CPR : CYLINDER PRESSURE REGULATOR
1. PROCESS DATA DETAILS TO BE PROVIDE BY CUSTOMER.
SP : SAMPLE PUMP SPAN GAS ZERO GAS N2 SPAN GAS
2. BASED ON THE PROCESS DATA DETAILS WE CAN CONFIRM THE EHT LINE REQUIREMENT
NV : NEEDLE VALVE O2 Bal N2 4-6 bar.g. INSTRUMENT AIR
3. EHT LINE WITH ACCESSORIES SHALL BE IN CUSTOMER SCOPE. 4-6 bar.g.
CF : COALESCING FILTER 4. ALL FIELD CABLE, TUBING,LAYING AND GLANDING SHALL BE IN CUSTOMER SCOPE
AD : AUTO DRAIN 5. POWER JB AND SIGNAL JB SHALL BE USE IN EXISTING SHELTER.
TST : THERMOSTAT
BY CUSTOMER
CRISTAL MGT PROJECT

DOCUMENT TRANSMITTAL
From,
Transmittal No:
Rotary Engineering Saudi Arabia Co. Ltd. Date: 06-May-2018
MGT-RESA-MHDP-T-0287
P.O. Box 10162, Jubail Industrial City,
31961, Kingdom of Saudi Arabia

To,
Gary Korkian
Construction Manager
Mustang-HDP | P.O. Box 3863 Al-Khobar 31952, Saudi Arabia

Documents/Drawings Attached:
Issue
SN. Document No. Title or Description Description Rev

1 6031-MOM-REL-MHDP-0001 Technical Clarification for Analysers (HCL, Cl2 & O2) IFA 00

YOUR’S SINCERELY,

Construction Manager –RESA


Please provide acknowledgment of this transmittal for above Documents/Drawings.

Remarks If Any:

Received By: Date:

Page 1 of 1
ATTACHMENT-3: FOLLOW-UP EMAILS
Suresh Kornu

From: Kannan.Prithiviraj@rotaryeng.com.sa
Sent: Wednesday, 9 May, 2018 9:49 AM
To: Shawki, Thamer (WG Mustang - HDP)
Cc: Ahmed Nisar Basha; Ong Zi Feng; Suresh Kornu
Subject: 6031-Cristal-E7I MA Status for On/Off valves and Control valves

Dear Mr.Thamer,

Please expedite the Material Approval for the below Instrumentation items as they have severe impact on delivery at
Site..

1. On/Off valves -15 no.s


2. Control valves - 7 no.s,
3. Analyzer -3 nos.
4. Temperature Gauge - 2 nos. (we have not received any comments sheet)

Kindly do the needful and revert back with necessary approvals.

Regards,
K.Prithiviraj
Instrument Engineer
Electrical & Instrumentation Department
Rotary Engineering Saudi Arabia
HP (966) 5 1508 3199 | Kannan.Prithiviraj@rotaryeng.com.sa
http://www.rotaryeng.com.sg

This email message (including any attachments) is confidential and may be privileged. If you have received it by mistake, please notify the
sender by return e-mail or telephone and delete this message immediately from your system. Any unauthorized use, disclosure, distribution,
copying or dissemination of this message in whole or part is strictly prohibited. Please note that e-mail is susceptible to change. Rotary
Engineering Limited (including its group of companies) shall not be liable for the improper or incomplete transmission of the information
contained in this communication nor for any delay in its receipt or damage to your system. Rotary Engineering Limited (or its group of
companies) does not guarantee that the integrity of this communication has been maintained nor that this communication is free of viruses,
interceptions or interference.

______________________________________________________________________
This email has been scanned by the Symantec Email Security.cloud service.
For more information please visit http://www.symanteccloud.com
______________________________________________________________________

Anda mungkin juga menyukai