TEKFEN Construction
Job351
Aegean Refinery Project (ARP)
U100 – CDU/VDU
CDU (Crude Distillation Unit): The first processing unit in the oil refineries. Because the
atmosphere works close to the press; also called atmospheric distillation unit. Diesel,
jet fuel, naphtha and similar products can be taken from this unit as output.
VDU (Vacuum Distillation Unit): A unit operated by dropping the air pressure above
the distillation product below the evaporation pressure of the product.
The 100 unit is the first unit to be commissioned in the project. The products to be
released from the unit can be used directly, as well as additional units in other units to
remove other products in terms of quality and usage.
Aegean Refinery Project (ARP)
U100 – CDU/VDU
Substation 10
Vacuum Tower
Crude Tower
Vacuum Heater
Crude Heater
Heater Stack
Aegean Refinery Project (ARP)
U190 – DCU
DCU (Delayed Coker Unit): The long and heavy hydrocarbon molecules coming
out of the distillation are broken up into this unit and gas oil and petroleum coal
are produced.
The coke drums and the steel structure surrounding it (190MES-010) have a
separate prescription as the most generous and tallest structure of the refinery.
Within the scope of this unit, there are the following 2 small units:
116 (Unsaturated gas plant): Unsaturated Gas Unit
415 (Unsaturated LPG Merox): Unsaturated LPG Merox Unit
Aegean Refinery Project (ARP)
U190 – DCU
Unit 116
Unit 415
Coke Fractionator
Coke Heaters
Substation 11
Aegean Refinery Project (ARP)
Shelter
Conveyor System
Operator Building
Parking Area
Aegean Refinery Project (ARP)
1000000 1030895
967364 942650 924947
877595 906364
871510 887525
870957
800000 835701
827877 847815 852291
835701 820831
731249 714113703670
600000
570906
505648
400000 390774
250054
200000
156498
0 34450
Aegean Refinery Project (ARP)
WELFARE AREAS
TEKFEN provide sufficient welfare facilities to the personnel.
The welfare facilities serviced and maintained and subject to
regular inspections.
HSE personnel, Doctor and Camp Boss audit welfare facilities,
staff and also accommodation facilities on a regular basis.
Toilet / washing / shower facilities be in suitable locations and
in sufficient numbers for the personnel on site. They cleaned
regularly and maintained in a hygienic manner by dedicated
personnel.
Aegean Refinery Project (ARP)
WELFARE AREAS
Aegean Refinery Project (ARP)
WATER SAFETY
Drinking and tap water provided to regular analysis/checks to ensure it meets the standards
of the World Health Organization (WHO) and/or applicable legal requirements.
Aegean Refinery Project (ARP)
TEKFEN Management team fully endorses the principles outlined in TEKFEN HSE Plan.
TEKFEN is fully committed to adopting and achieving the goals of:
• ZERO injury,
• ZERO fatalities,
• ZERO property damage,
• ZERO environmental incidents,
• ZERO complaints from the local community.
These goals are to be achieved via the efficient and effective HSE Management System.
Aegean Refinery Project (ARP)
ISO Certificates
Aegean Refinery Project (ARP)
HSE Instructions
• DOs and DONTs are being explained and
instructions signed by the employees.
Aegean Refinery Project (ARP)
DOCUMENTATION TRACKING SYSTEM
http://ev.tekfen.com.tr/
Aegean Refinery Project (ARP)
TEKFEN HSE Org Chart Job351
Aegean Refinery Project (ARP)
HSE Weekly
Walkthrough
35
HSE Weekly Walkthrough
30 5
4.5
4
25
3.5
3
20 2.5
2
15 1.5
1
10 0.5
0
5
0
2016 2017 2018
Aegean Refinery Project (ARP)
Aegean Refinery Project (ARP)
HSE AUDITS & INSPECTIONS
➢ Grating Inspection
➢ Crane Inspection
➢ Scaffolding Inspection
➢ Electrical Inspection Years HSE Walkdown
➢ Hoisting Equipment 2016 2
Inspection 2017 29
➢ Env. WD 2018 0
HSE WALKDOWN
9
4
3 3
2 2 2 2
Aegean Refinery Project (ARP)
HSE AUDITS & INSPECTIONS
HSE WALKDOWN
40
29
30
20
10
2 0
0
2016 2017 2018
Aegean Refinery Project (ARP)
HSE AUDITS & INSPECTIONS MANAGEMENT
WALKTHROUGH
2 2 2 2
1 1 1 1 1 1
Management Walkthrough
9
8
Management
Years Walkthrough
2016 0 0
2017 8 2016 2017 2018
2018 9
Aegean Refinery Project (ARP)
HSE AUDITS & INSPECTIONS
MOM(On site+Meetings)
25
20
15
10
5
0
2016 2017 2018
MOM(On site+Meetings)
4
3.5
3
2.5
2
1.5
1
0.5
0
92 85 89 89
83
74 68 66
53 59 53
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Aegean Refinery Project (ARP)
2017 OBSERVATIONS CLASSIFICATION
Working at Heights
Work Place Conditions (Dust, Noise, Illumination etc.)
Welfare Facilities
Waste Management
Training
Slips, Trips, Falls
Signs and Barriers
Scaffolding / Work Platforms
ROTATING/PRESSURIZED EQUIPMENT
Road Safety / Traffic Management
Resource / Material Use
Radiography
Procedures / Instructions / MS & RA
Pressure Testing / Blowing (Pneumatic, Hydrostatic…etc)
Personal Protective Equipment
Permit to Work
Material / Equipment Transportation
Manual Handling
Lifting Operations
Leakage / Spill Management
Improper Construction Material Storage
Hygiene / Welfare
Housekeeping
Hot Works
Heavy Machinery / Equipment (Maintenance)
Hand Tools
Fire Prevention
FALL PROTECTION
Emergency Preparedness
Electrical Safety
Confined Space
COLOR CODING/PERIODICAL MAINTENANCE (EQUIPMENT/TOOLS)
Chemical Substances (Use/Handling/Transportation/Storage)
Access and Egress
0 20 40 60 80 100 120 140 160
Aegean Refinery Project (ARP)
▪ 2018 2018 OBS. RISK INDEX
600
2018 Source of Observation
500
Environmental Walkthrough 6
400
HSE Walkthrough 197 300
100
STAR Observation 282
0
TSGI Observation 212
HIGH
LOW
TOTAL 732 MEDIUM
Training Topic Date-1 Date-2 Trainer Hrs TC No Attendee Phone Company FOREMEN Responsible Title
Number Supervisor
İNTES HAZIRLIK EĞİTİMİ 18/12/2017 NASIR ÖZDEMİR 4 58810446488 AĞA ERDOĞAN 5531841321 TEKFEN MEMET GÜRÜN BORUCU
İNTES HAZIRLIK EĞİTİMİ 18/12/2017 NASIR ÖZDEMİR 4 44515948112 AHMET ALDIN 5416646446 TEKFEN NUH ARSLANBAY ERKAN KILIÇASLAN ÇELİK MONTAJCI
İNTES HAZIRLIK EĞİTİMİ 18/12/2017 NASIR ÖZDEMİR 4 27722222916 AHMET ERGİN BAŞOL 5533821186 TEKFEN ENVER ALKAÇ HALİT ORAL ISIL İŞLEM YARDIMCISI
İNTES HAZIRLIK EĞİTİMİ 18/12/2017 NASIR ÖZDEMİR 4 18617912050 AHMET KÜÇÜK 5312561650 TEKFEN SAMİ KORKUT-1 CENK ALTAN MEKANİK MONTAJ EKİP BAŞI
İNTES HAZIRLIK EĞİTİMİ 18/12/2017 NASIR ÖZDEMİR 4 30068429574 ALİ AKKUŞ 5449351677 TEKFEN NUH ARSLANBAY ERKAN KILIÇASLAN BROCU YARDIMCISI
İNTES HAZIRLIK EĞİTİMİ 18/12/2017 NASIR ÖZDEMİR 4 48595836840 OĞUZCAN KORKUDAN 5318586700 TEKFEN DÜZGÜN TURAN CENK ALTAN MEKANİK MONTAJCI
Aegean Refinery Project (ARP)
98%
1 2
Aegean Refinery Project (ARP)
Purpose
➢ The purpose of HSE trainings is to increase the awareness of the employees about the
risks associated with the site activities at project work site and work locations.
➢ Accordingly, TEKFEN gives priority to HSE Trainings. TEKFEN believes the importance of
HSE trainings as a key element to achev «0» accident during project lifecycle.
51
Aegean Refinery Project (ARP)
➢ 3M ➢ ETKİ OSGB
➢ BOSCH ➢ MAKİTA
➢ Association for Living with Diabetes ➢ MMO
➢ DÖNÜŞEN ADAM ➢ Stanley-Black Decker
➢ DRAGER ➢ RİDGİD
➢ TSGI ➢ EFE AKADEMİ OSGB
➢ GENIUS ➢ SARIZEYBEK OSGB
➢ HILTI ➢ BİR İZMİR OSGB
➢ MEB
➢ IMOLINE - Over Head Crane Training
➢ INTES
➢ ISITAN MAKİNA
➢ İZELTAŞ
➢ KARBOSAN
Aegean Refinery Project (ARP)
• Totaly, TEKFEN has 3 training rooms located at site man office area & the camp
area.
• TEKFEN erected an outdoor training facility to provide hands-on trainings to the
new hires and unskilled workers in accordance with mentor program.
• Legal HSE trainings conducted at offsite the training facility before entering the
site. The eployees receive the other mandatory trainings and work specific
trainings at both TSGI and TEKFEN training rooms.
53
Aegean Refinery Project (ARP)
TEKFEN Çayağzı Camp Training Room
Legal Training
54
Aegean Refinery Project (ARP)
HSE Policy
Aegean Refinery Project (ARP)
FIRST AID
TEKFEN provide and maintain adequate first-aid facilities at the work site in
accordance with Local Regulations / CONTRACTOR Requirements.
The number of first aid boxes depend on the number of employees on site,
requirements of the local legislation treating the matter and the results of the
health risk assessment.
➢537 TEKFEN Employees have first aid training certificate.
➢743 TEKFEN Employees join with first aid trainings.
Aegean Refinery Project (ARP)
FIRE PREVENTION
Aegean Refinery Project (ARP)
Fire Training way to improve
63
Aegean Refinery Project (ARP)
Fire Training way to improve
Aegean Refinery Project (ARP)
Rescue Trainings way to improve
Aegean Refinery Project (ARP)
Trainings way to improve
Emergency response team members sit for the training by 3th party.
Project Presentation
Aegean Refinery Project (ARP)
RIGGER TRAINING
RIGGER TRAINING
HAZARD SCHOOL
Freshman Training
Aegean Refinery Project (ARP)
Trainings way to improve
3M PPE Training
ERT Training
Aegean Refinery Project (ARP)
Trainings way to improve
ERT Training
Operator
Certificate
Operator List
Name of Operator
Aegean Refinery Project (ARP)
Rigger Certificate
Name of Rigger
EDUCATION TRACKING SYSTEM
Whistle Flagman Fire Watcher
900
800
700
600
500
400
300 Toplam
200
100
0
Sep Oct Nov Dec Jan Feb Apr Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Çey3 Çey4 Çey1 Çey2 Çey3 Çey4 Çey1 Çey2 Çey3
2016 2017 2018
Aegean Refinery Project (ARP)
Road Closure
non certicate 0%
86% Daily Shift
90%
Overtime
0%
Aegean Refinery Project (ARP)
EMERGENCY MANAGEMENT
TEKFEN establish and
implement an Emergency
Response Plan in
compliance with the
CONTRACTOR Emergency
Response Plan, OWNER
Emergency Procedure and
current Turkish regulation.
Rescue from Rescue from Earthquake Heart Attack Rescue from Rescue from Rescue from Fire Drill Fire Drill
Height Dirll Height Drill Drill Height Dirll Height Dirll Height Dirll
10/02/2016 27/04/2017 10/07/2017 10/08/2017 28/09/2017 01/12/2017 16/02/2018 12/04/2018 23/05/2018
Aegean Refinery Project (ARP)
DRILLS
Aegean Refinery Project (ARP)
DRILLS
Aegean Refinery Project (ARP)
DRILLS
Aegean Refinery Project (ARP)
RISK MANAGEMENT
RISK ASSESSMENT
Management of risk is a continuous
process and the cornerstone of all
the HSE elements. We regularly
identify the hazards and assess the
risks associated with our activities.
We take appropriate action to
manage the risks and hence prevent
or reduce the impact of potential
incidents.
The main aim of the HSE
Management System is to decrease
the level of HSE risks to acceptable
levels that not affect human and
environment adversely.
Aegean Refinery Project (ARP)
RISK MANAGEMENT
Job Safety Analysis
Aegean Refinery Project (ARP)
AWARD CEROMANY
12
10
14
0
4
8
2
6
10
15
5
0
0
Sep-16
0
Sep-16
3
Oct-16
0
Oct-16
Incentives
1
Nov-16
8
Nov-16
2
0
Dec-16 Dec-16
4
0
Jan-17 Jan-17
0
Feb-17 Feb-17
13
0
Mar-17
3
Mar-17
Apr-17
3
Apr-17
May-17
3
May-17
Jun-17
4
Jun-17
Jul-17
12 12 11 12
Jul-17
0
Aug-17
4
Aug-17
0
Sep-17
Sep-17 12
Oct-17
Oct-17
Nov-17
11 11
Nov-17
0
Dec-17
TSGI WINNER NUMBER
Dec-17
TEKFEN WINNER NUMBER
Jan-18
Jan-18
Feb-18
Feb-18
0
Mar-18
2
Mar-18
0
Apr-18
3
Apr-18
May-18
10
Aegean Refinery Project (ARP)
May-18
0
Jun-18
Jun-18
0
Jul-18
Jul-18
0
Aug-18
Aug-18
Aegean Refinery Project (ARP)
Violation Type
20
Work at Height
15
Lack of Training
10 Barricading and Marking Red Tag Scaffolds
Smoke Cigarete
5 Lack of Certificate Lifting
16
Piping
Distribution by Groups
14 Scaffolding
12
Enstrument,
10
Welding
8 Electrical Mechanical
Insulation
6 Stell, STEAMTRACING
4
0
Aegean Refinery Project (ARP)
Scaffoldings
Scaffolding Control Forms
Aegean Refinery Project (ARP)
Technical Scaffolding Trainings
Aegean Refinery Project (ARP)
Technical Scaffolding Training
Aegean Refinery Project (ARP)
Good Practices
Aegean Refinery Project (ARP)
Scaffolding Inspection
After the inspections conducted by inspected inspectors;
INCIDENT INVESTIGATION
To prevent injury and damage, it is necessary to recognize potential hazards and take action
to control or eliminate them. This involves systems of control, which include safe methods of
work, adequate supervision, planned maintenance, machinery guarding, personal
protection and personal HSE awareness etc.
10
9
8
7
6
5
4
3
2
1
0
Head
PD (Property 4% Body
Damage) 4%
23%
LWDC (Lost
Hand
Work Day 9% Chest
Case) 4%
6%
NM (Near
Miss)
MTC
27% Foot Chin
(Medical
Treatment 9% 4%
Case)
7% Finger
26%
Aegean Refinery Project (ARP)
Aegean Refinery Project (ARP)
ENVIROMENT
Housekeeping Team
Measurements
Aegean Refinery Project (ARP)
OUR ACHIEVEMENTS
Aegean Refinery Project (ARP)
HSE Posters, Banners and Brochures
Aegean Refinery Project (ARP)
HSE Posters, Banners and Brochures
Aegean Refinery Project (ARP)
Lesson Learnds
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Waste Segregation