Aegean Refinery Project (ARP)

HSE ASSESSMENT REPORT FOR


01.09.2016 to 01.09.2018

TEKFEN Construction
Job351
Aegean Refinery Project (ARP)

İŞ 351 - STAR Aegean Refinery


PB2 Electro-Mechanical and Steel Works
Project General Information
STAR: SOCAR Turkey Aegean Refinery - SOCAR Turkey Aegean Refinery.
Administration: STAR Refinery - SOCAR Turkey Energy Inc.
Employer: T.S.G.I. Technicas Reunidas (Spain), SAIPEM (Italy), GS (South Korea),
ITOCHU (Japan)
Refinery Value: High Complexity High Conversion Crude Oil Refinery
Capacity: 10 million tons / year crude oil
Design Crude oils: Ural, 'Azeri Light and Kirkuk
Installation area: 2.400.000 m2
Storage Capacity: 1 million 640 thousand m3
Refinery Main Fuel: Natural Gas and Refinery Gas
Aegean Refinery Project (ARP)

Refinery Products (approx.)


As Petrochemical Raw Materials:
• Nafta: 1.615.000 tons / year
• Mixed xylene: 422,000 tons / year
As fuel:
• Ultra Low Sulfur Engine: 4.800.000 tons / year
• Jet Fuel: 1.630.000 tons / year
• LPG 320,000 tons / year
Other:
• Reformat: 485,000 tons / year
• Petrokok: 692,000 tons / year
• Sulfur: 153,000 tons / year
Aegean Refinery Project (ARP)
Project General Plan
Some numbers (approximately)
➢ Total Excavation Work: 13.525.100 m3
➢ Cable Length: 3.784 km
➢ Piping Work: 3.556 km
Aegean Refinery Project (ARP)

TEKFEN’s Work Scope


Work Scope: STAR PB2 Electromechanical and Steel Works
Steel installation: 8,000 tons
Installation of mechanical equipment: 10,000 tons
Pipe manufacturing: 4,000 tons
Pipe mounting: 8,500 tons
Cable pull: 1.300 km
Installation of electrical equipment: 11,000 units
Instrument mounting: 7.000 units
Fireproof: 50.000 m2
Insulation: 80,000 m2
Aegean Refinery Project (ARP)

TEKFEN Working Area General Plan

Unit 100: CDU and VDU systems


Unit190 (116/415): Coke
(petroleum coal) processing
Unit 643: Coke stocking and
loading

UNIT 100 UNIT 190 UNIT 643


(116 / 415)
Aegean Refinery Project (ARP)
Photos
Aegean Refinery Project (ARP)
Photos
Photos
Aegean Refinery Project (ARP)

U100 – CDU/VDU
CDU (Crude Distillation Unit): The first processing unit in the oil refineries. Because the
atmosphere works close to the press; also called atmospheric distillation unit. Diesel,
jet fuel, naphtha and similar products can be taken from this unit as output.

VDU (Vacuum Distillation Unit): A unit operated by dropping the air pressure above
the distillation product below the evaporation pressure of the product.

The 100 unit is the first unit to be commissioned in the project. The products to be
released from the unit can be used directly, as well as additional units in other units to
remove other products in terms of quality and usage.
Aegean Refinery Project (ARP)
U100 – CDU/VDU

Substation 10

Vacuum Tower

Crude Tower

Vacuum Heater

Crude Heater

Heater Stack
Aegean Refinery Project (ARP)

U190 – DCU

DCU (Delayed Coker Unit): The long and heavy hydrocarbon molecules coming
out of the distillation are broken up into this unit and gas oil and petroleum coal
are produced.
The coke drums and the steel structure surrounding it (190MES-010) have a
separate prescription as the most generous and tallest structure of the refinery.

Within the scope of this unit, there are the following 2 small units:
116 (Unsaturated gas plant): Unsaturated Gas Unit
415 (Unsaturated LPG Merox): Unsaturated LPG Merox Unit
Aegean Refinery Project (ARP)
U190 – DCU
Unit 116

Unit 415

Coke Fractionator

Coke Drums / Structure

Coke Heaters

Substation 11
Aegean Refinery Project (ARP)

643 Ünitesi – Coke Hand. & Storage

Shelter

Conveyor System

Operator Building

Parking Area
Aegean Refinery Project (ARP)

TOTAL MAN-HOUR RATE

TOTAL MAN -HOUR RATE


1200000

1000000 1030895
967364 942650 924947
877595 906364
871510 887525
870957
800000 835701
827877 847815 852291
835701 820831
731249 714113703670
600000
570906
505648
400000 390774
250054
200000
156498
0 34450
Aegean Refinery Project (ARP)
WELFARE AREAS
TEKFEN provide sufficient welfare facilities to the personnel.
The welfare facilities serviced and maintained and subject to
regular inspections.
HSE personnel, Doctor and Camp Boss audit welfare facilities,
staff and also accommodation facilities on a regular basis.
Toilet / washing / shower facilities be in suitable locations and
in sufficient numbers for the personnel on site. They cleaned
regularly and maintained in a hygienic manner by dedicated
personnel.
Aegean Refinery Project (ARP)
WELFARE AREAS
Aegean Refinery Project (ARP)
WATER SAFETY
Drinking and tap water provided to regular analysis/checks to ensure it meets the standards
of the World Health Organization (WHO) and/or applicable legal requirements.
Aegean Refinery Project (ARP)

HSE PLAN & PROCEDURES


TEKFEN HSE MANAGEMENT SYSTEM
TEKFEN HSE Management System that is based on the OHSAS 18001:2007 Occupational
Health and Safety Management System and ISO 14001:2004 Environmental Management
System.
Efficient and effective HSE Management System is to be achieved via the following
framework:
HSE GOALS

TEKFEN Management team fully endorses the principles outlined in TEKFEN HSE Plan.
TEKFEN is fully committed to adopting and achieving the goals of:
• ZERO injury,
• ZERO fatalities,
• ZERO property damage,
• ZERO environmental incidents,
• ZERO complaints from the local community.
These goals are to be achieved via the efficient and effective HSE Management System.
Aegean Refinery Project (ARP)
ISO Certificates
Aegean Refinery Project (ARP)

HSE PLAN & PROCEDURES


REFERENCE DOCUMENTS
• Law No. 6331 on Occupational Health and Safety & Regulations
• TKF-351-HSE-PLN-001-HSE Plan
• TKF-351-HSE-PLN-002-Environmental Management Plan
• TKF-351-HSE-PLN-003-Emergency Response Plan
• TKF-351-HSE-PLN-004-Training Procedure
• TKF-HSE-PRO-001-Hazard Identification & Control Procedure
• TSGI DISCIPLINARY PROCEDURE
• TSGI GENERAL HSE PLAN
• TSGI HSE AUDIT PLAN
• TSGI HSE ENVIROMENTAL MANAGEMENT PLAN
• TSGI HSE INSPECYION PROGRAMME PLAN
• TSGI HSE MANAGEMENT OF CHANGE PROCEDURE PROCESS HAZARD ANALYSIS
• TSGI HSE MANUEL COMMISSIONING&PRECOMMISSIONING
• TSGI HSE PLAN FOR CONSTRUCTION
• TSGI HSE REQUIREMENTS FOR MAEINE WORKS
• TSGI HSE REQUIREMENTS FOR SUBCONTRACTORS
• TSGI HSE TRAINING PROCEDURE
• TSGI PPE PROCEDURE
• TSGI SMART HSE OBJECTIVES
Aegean Refinery Project (ARP)

ASSESSMENT, ASSURANCE AND IMPROVEMENT


TEKFEN periodically assess the implementation and compliance of the system with these
expectations to assure stakeholders and ourselves that management processes are in place
and working effectively. This involve both internal self-assessments and appropriate
external assessments.

Third Party Certifications


TEKFEN ensure all its construction equipment, equipment accessories and plant has an
approved Third Party ‘Test Certificate’ released by Authorized Entities previously approved
by CONTRACTOR(before using any) of the following;
• Lifting gear as shackles, slings, spreader beam, etc.
• Crane, boom truck, forklift, man lift, etc;
• All equipment used to lift people as man-basket, elevator, etc
• All equipment used to lift material as basket, drums, etc..
• Safety valves on mobile equipment, e.g. air compressor, hydrotest machine, vacuum
truck etc.;
• Cargo tank of tank vehicles, e.g. fuel tanker, vacuum tank or pressurized tank, etc.;
• All pressure vessels, e.g. compressor’s air receiver, etc.
Aegean Refinery Project (ARP)
HSE Inspections
TEKFEN’s site supervisors inspect their areas of responsibility daily. TEKFEN ensure all documentation
needed is made available for inspection at the workplace and pre-task meeting is conducted on every
shift beginning and prior to commencement of a work ( i.e., copy of valid PTW, certification of equipment
and personnel, checklists, Tool Box Talk records and etc.)
HSE Inspection Program comprise the following:
• Lifting appliances inspections (cranes, MEWPs etc.)
• Lifting accessories inspections (slings, chain hoists, etc.)
• Gas cutting apparatus inspections (regulators, gauges, torches, flash-back arrestors, etc.)
• All portable electrical tools, extension cords and other equipment inspections
• Emergency equipment inspections (fire extinguishers, hose cabinets/reels, rescue equipment,
breathing apparatus, etc.)
• Portable pneumatic tools and equipment inspections
• Other equipment inspections as deemed necessary by Project Management
• Machinery / vehicles inspections
• Daily site inspections
• Pre-Job inspections
• Hand tools inspections,
• Body harnesses inspections,
• Ladders and scaffoldings inspections,
• Whip checks inspections
• Post Job Inspections etc.
Aegean Refinery Project (ARP)
HSE CONTROL FORMS
▪ First Aid Cabinet Ins. Checklist
▪ Fire Extinguisher Control Form
▪ Man-lift Checklist
▪ Ladder Inspection Weekly
Checklist
▪ Weekly Oksi-Lpg Cutting
Equipment Checklist
▪ Air Compressor & Generator
Inspection Checklist
▪ Open Hole-Grating Checklist
▪ Check List for Cargo Lashing
▪ Grating Checklist
▪ Assessment Checklist simops
▪ Sling Control Form
▪ Ready For Use Inspection
▪ Boom Truck Checklist
▪ Daily WC Control Form
▪ Container Inspection Checklist etc.
Aegean Refinery Project (ARP)
HSE CONTROL FORMS
Aegean Refinery Project (ARP)

HSE Instructions
• DOs and DONTs are being explained and
instructions signed by the employees.
Aegean Refinery Project (ARP)
DOCUMENTATION TRACKING SYSTEM
http://ev.tekfen.com.tr/
Aegean Refinery Project (ARP)
TEKFEN HSE Org Chart Job351
Aegean Refinery Project (ARP)

TEKFEN Low Tier HSE Org Chart Job351


Aegean Refinery Project (ARP)

Job351 HSE NUMBERS


TEKFEN HSE Number TEKFEN Low Tier HSE Number
Doctor 2 Doctor 8
Environment Inspector ( C ) 1 HSE Expert / A (Full Time on
HSE Expert (B) 1 site) 1
HSE Inspector 8 HSE Expert / B (Full Time on
HSE Inspector (C) 7 site) 2
HSE Lifting and Material Storage HSE Expert / B (Part Time on
Controller 2 site) 4
HSE Manager 1 HSE Expert / C 9
HSE Scaffolding Inspector 1 HSE Inspector 20
HSE Sıte Chief 1 HSE Supervisor 1
HSE Supervisor 2 Other Health Staff 6
HSE Supervisor (C) 2
HSE Training Coordinator (C) 1
HSE Training Officer 1
HSE Site Chief (C) 1
Aegean Refinery Project (ARP)
Aegean Refinery Project (ARP)
Aegean Refinery Project (ARP)
HSE AUDITS & INSPECTIONS
Years HSE Weekly Walkthrough
2016 2
2017 3
2018 32

HSE Weekly
Walkthrough
35
HSE Weekly Walkthrough
30 5
4.5
4
25
3.5
3
20 2.5
2
15 1.5
1
10 0.5
0
5

0
2016 2017 2018
Aegean Refinery Project (ARP)
Aegean Refinery Project (ARP)
HSE AUDITS & INSPECTIONS
➢ Grating Inspection
➢ Crane Inspection
➢ Scaffolding Inspection
➢ Electrical Inspection Years HSE Walkdown
➢ Hoisting Equipment 2016 2
Inspection 2017 29
➢ Env. WD 2018 0

HSE WALKDOWN
9

4
3 3
2 2 2 2
Aegean Refinery Project (ARP)
HSE AUDITS & INSPECTIONS

HSE WALKDOWN
40
29
30
20
10
2 0
0
2016 2017 2018
Aegean Refinery Project (ARP)
HSE AUDITS & INSPECTIONS MANAGEMENT
WALKTHROUGH

2 2 2 2

1 1 1 1 1 1

Management Walkthrough

9
8
Management
Years Walkthrough
2016 0 0
2017 8 2016 2017 2018
2018 9
Aegean Refinery Project (ARP)
HSE AUDITS & INSPECTIONS
MOM(On site+Meetings)
25
20
15
10
5
0
2016 2017 2018

MOM(On site+Meetings)
4
3.5
3
2.5
2
1.5
1
0.5
0

Years MOM(On site+Meetings)


2016 0
2017 22
2018 13
Aegean Refinery Project (ARP)
Safety and Health Assessment for Performance Evaluation
Aegean Refinery Project (ARP)
Camp & Hygine Audits
Aegean Refinery Project (ARP)
SAFETY AWARENESS CAMPAIGN
Aegean Refinery Project (ARP)
Observations 2017 OBS. RISK INDEX

▪ 2017 Card Supervisor Observation


2017 Source of Observation
15
1000
900
800
Environmental Walkthrough 10 700
600
HSE Walkthrough 347 500
400
Management Walkthrough 104 300
200
STAR Observation 355
100
TSGI Observation 110 0

Total 941 HIGH


LOW
MEDIUM

2017 Date of the Observation


130

92 85 89 89
83
74 68 66
53 59 53

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Aegean Refinery Project (ARP)
2017 OBSERVATIONS CLASSIFICATION
Working at Heights
Work Place Conditions (Dust, Noise, Illumination etc.)
Welfare Facilities
Waste Management
Training
Slips, Trips, Falls
Signs and Barriers
Scaffolding / Work Platforms
ROTATING/PRESSURIZED EQUIPMENT
Road Safety / Traffic Management
Resource / Material Use
Radiography
Procedures / Instructions / MS & RA
Pressure Testing / Blowing (Pneumatic, Hydrostatic…etc)
Personal Protective Equipment
Permit to Work
Material / Equipment Transportation
Manual Handling
Lifting Operations
Leakage / Spill Management
Improper Construction Material Storage
Hygiene / Welfare
Housekeeping
Hot Works
Heavy Machinery / Equipment (Maintenance)
Hand Tools
Fire Prevention
FALL PROTECTION
Emergency Preparedness
Electrical Safety
Confined Space
COLOR CODING/PERIODICAL MAINTENANCE (EQUIPMENT/TOOLS)
Chemical Substances (Use/Handling/Transportation/Storage)
Access and Egress
0 20 40 60 80 100 120 140 160
Aegean Refinery Project (ARP)
▪ 2018 2018 OBS. RISK INDEX
600
2018 Source of Observation
500
Environmental Walkthrough 6
400
HSE Walkthrough 197 300

Management Walkthrough 35 200

100
STAR Observation 282
0
TSGI Observation 212
HIGH
LOW
TOTAL 732 MEDIUM

2018 DATE OF THE OBSERVATION


168
144
92 102
66 66 53 41

Jan Feb Mar Apr May Jun Jul Aug


Aegean Refinery Project (ARP)
2018 OBSERVATIONS CLASSIFICATION
Working at Heights
Work Place Conditions (Dust, Noise, Illumination etc.)
Waste Management
Slips, Trips, Falls
Signs and Barriers
Scaffolding / Work Platforms
ROTATING/PRESSURIZED EQUIPMENT
Road Safety / Traffic Management
Resource / Material Use
Procedures / Instructions / MS & RA
Pressure Testing / Blowing (Pneumatic, Hydrostatic…etc)
Personal Protective Equipment
Permit to Work
Non-Categorized
Material / Equipment Transportation
Lifting Operations
Leakage / Spill Management
Improper Construction Material Storage
Hygiene / Welfare
Housekeeping
Hot Works
Heavy Machinery / Equipment (Maintenance)
Fire Prevention
FALL PROTECTION
Emergency Preparedness
Electrical Safety
Confined Space
Chemical Substances (Use/Handling/Transportation/Storage)
BARRICADES
Access and Egress

0 50 100 150 200 250 300 350


Aegean Refinery Project (ARP)
▪ 2017 & 2018 Total OBS. AREA RATE
1591
Source of Observation
Card Supervisor Observation 15
Environmental Walkthrough 16
HSE Walkthrough 544
Management Walkthrough 139
15 14 21 21 11
STAR Observation 637
Area 1A Area 1B Area 3 Area 3 Area 3 Office Area
TSGI Observation 322 Extension Petkim Warehouse
works
Total 1673

2017 &2018 Total Date of the Observation


180
160
140
120
100
80
60
40
20
0
Aegean Refinery Project (ARP)
Aegean Refinery Project (ARP)
TRAINING, AWARENESS AND COMPETENCY
• The productivity of the trainings was monitored.
• Time renewal training was given as needed.
• And records of all the trainings are kept.
• We have organized internal and external training in our project.
Training schedules announced
by TEKFEN HSE Department
periodically.

Training Topic Date-1 Date-2 Trainer Hrs TC No Attendee Phone Company FOREMEN Responsible Title
Number Supervisor
İNTES HAZIRLIK EĞİTİMİ 18/12/2017 NASIR ÖZDEMİR 4 58810446488 AĞA ERDOĞAN 5531841321 TEKFEN MEMET GÜRÜN BORUCU

İNTES HAZIRLIK EĞİTİMİ 18/12/2017 NASIR ÖZDEMİR 4 44515948112 AHMET ALDIN 5416646446 TEKFEN NUH ARSLANBAY ERKAN KILIÇASLAN ÇELİK MONTAJCI

İNTES HAZIRLIK EĞİTİMİ 18/12/2017 NASIR ÖZDEMİR 4 27722222916 AHMET ERGİN BAŞOL 5533821186 TEKFEN ENVER ALKAÇ HALİT ORAL ISIL İŞLEM YARDIMCISI

İNTES HAZIRLIK EĞİTİMİ 18/12/2017 NASIR ÖZDEMİR 4 18617912050 AHMET KÜÇÜK 5312561650 TEKFEN SAMİ KORKUT-1 CENK ALTAN MEKANİK MONTAJ EKİP BAŞI

İNTES HAZIRLIK EĞİTİMİ 18/12/2017 NASIR ÖZDEMİR 4 30068429574 ALİ AKKUŞ 5449351677 TEKFEN NUH ARSLANBAY ERKAN KILIÇASLAN BROCU YARDIMCISI

İNTES HAZIRLIK EĞİTİMİ 18/12/2017 NASIR ÖZDEMİR 4 48595836840 OĞUZCAN KORKUDAN 5318586700 TEKFEN DÜZGÜN TURAN CENK ALTAN MEKANİK MONTAJCI
Aegean Refinery Project (ARP)

HSE TRAINING RATE


16
14 13.92
12
10
8
6 5.55
4 4.3
2 2.57 2.8 2.74 2.16 2.26 2.28 1.99
1.76 1.95 1.33
1.38 1.28 1.03 1.13 0.6 1.45 1.2 0.98 1.54 1.33 0.94
0

HSE Trainings Rate


2%

98%

1 2
Aegean Refinery Project (ARP)

Here below is reported a non-exhaustive list


• Hydrostatic and Pneumatic Test
of training that performed:
• Lock Out and Tag Out
• Site HSE Induction • Portable Power Tool
• Permit to Work System • Safe Welding Grinding and cutting
• Slips Trips and Fall – Housekeeping • Rigging and Lifting
• Working at height and fall protection • Lifting Equipment inspection
(Workers/Users) • Safe crane operation
• Working at height and fall protection • Safe banksman operation
(Supervisors) • Confined space (Entry/Supervisors and rescue)
• Working at height and fall protection • Gas sampling detection and testing
(Rescuers) • Noise hazard at work
• Working at height and fall protection • Vibration
(scaffolders) • UV Radiation Risk
• Mobile Elevated Work Platform • Control of substances hazardous to health
• Safe electrical Works (COSHH)
• Defensive Driving Course • Manual Handling
• Personnel Protective Equipment • Fire Fighting
• Excavation and trenching • First Aid
• Safe forklift operation • Environmental management (Waste, water, spill)
Aegean Refinery Project (ARP)

Purpose

➢ The purpose of HSE trainings is to increase the awareness of the employees about the
risks associated with the site activities at project work site and work locations.
➢ Accordingly, TEKFEN gives priority to HSE Trainings. TEKFEN believes the importance of
HSE trainings as a key element to achev «0» accident during project lifecycle.

51
Aegean Refinery Project (ARP)

Specific HSE Trainings


TEKFEN gave Job Specific Trainings to the employees according to the HSE Training
Matrix.

➢ 3M ➢ ETKİ OSGB
➢ BOSCH ➢ MAKİTA
➢ Association for Living with Diabetes ➢ MMO
➢ DÖNÜŞEN ADAM ➢ Stanley-Black Decker
➢ DRAGER ➢ RİDGİD
➢ TSGI ➢ EFE AKADEMİ OSGB
➢ GENIUS ➢ SARIZEYBEK OSGB
➢ HILTI ➢ BİR İZMİR OSGB
➢ MEB
➢ IMOLINE - Over Head Crane Training
➢ INTES
➢ ISITAN MAKİNA
➢ İZELTAŞ
➢ KARBOSAN
Aegean Refinery Project (ARP)

TEKFEN Training Facilities

• Totaly, TEKFEN has 3 training rooms located at site man office area & the camp
area.
• TEKFEN erected an outdoor training facility to provide hands-on trainings to the
new hires and unskilled workers in accordance with mentor program.
• Legal HSE trainings conducted at offsite the training facility before entering the
site. The eployees receive the other mandatory trainings and work specific
trainings at both TSGI and TEKFEN training rooms.

53
Aegean Refinery Project (ARP)
TEKFEN Çayağzı Camp Training Room

Legal Training

Legal Health Training

54
Aegean Refinery Project (ARP)

TEKFEN Training Rooms 1

TEKFEN Training Room 1


Commitment Board

HSE Policy
Aegean Refinery Project (ARP)

TEKFEN Training Rooms 2

TEKFEN Training Room 2

TEKFEN Training Room 2


Aegean Refinery Project (ARP)
Freshman Training  way to improve
• If employee is defined as a freshman (Less than 6 months ofexperience in relevant field)
construction site experience), is subjected to the specific training before angagement of
any task.
Aegean Refinery Project (ARP)

FIRST AID

TEKFEN provide and maintain adequate first-aid facilities at the work site in
accordance with Local Regulations / CONTRACTOR Requirements.
The number of first aid boxes depend on the number of employees on site,
requirements of the local legislation treating the matter and the results of the
health risk assessment.
➢537 TEKFEN Employees have first aid training certificate.
➢743 TEKFEN Employees join with first aid trainings.
Aegean Refinery Project (ARP)

First Aid Training  way to improve


Aegean Refinery Project (ARP)
First Aid Training  way to improve
Aegean Refinery Project (ARP)
FIRE PREVENTION
All flammable liquids on the job site stored and
dispensed in accordance with the related
regulations. Smoking prohibited in areas
where flammable liquids or materials are
stored or in use. Such areas defined by
warning signs.
Firefighting equipment is visually inspected on
a monthly basis and maintained in good order.
All personnel receive basic information on fire-
fighting techniques during the induction
process and at Toolbox Meetings. Selected
personnel who are to undertake fire-watching
duties receive additional training about basic
fire-fighting. 511 TEKFEN Employees have fire
training.
No open fires lit on the work site without
ensuring proper precautions are taken and
where necessary hot work permit be obtained.
Aegean Refinery Project (ARP)

FIRE PREVENTION
Aegean Refinery Project (ARP)
Fire Training  way to improve

63
Aegean Refinery Project (ARP)
Fire Training  way to improve
Aegean Refinery Project (ARP)
Rescue Trainings  way to improve
Aegean Refinery Project (ARP)
Trainings  way to improve

Emergency response team members sit for the training by 3th party.

Drager Training (Gas


testing machine
usage shown to the
designated HSE
personnel.)
Aegean Refinery Project (ARP)
3th Party & Internal Trainings  way to improve
Safe Usage of hand tools by manufacturers «İZELTAŞ».

INCIDENT- ACCIDENT INVESTIGATION AND ROOT CAUSATION TRAINING

Safe Usage of Threading & Bending Machine by Manufacturer «RIDGID».


Aegean Refinery Project (ARP)
Trainings  way to improve

Safety for Supervisor Training

Root Cause Analysis Training for Chiefs


Root Cause Analysis Training for Chiefs

Project Presentation
Aegean Refinery Project (ARP)

Trainings  way to improve


Hygiene Training

RIGGER TRAINING

RIGGER TRAINING

Grating Installation Training


Aegean Refinery Project (ARP)
Trainings  way to improve

HAZARD SCHOOL

Hoisting Equipment Training

Operator Awareness Training


Spill Prevention Training
Aegean Refinery Project (ARP)
Trainings  way to improve
«How to Pull up Materials to Upper
Levels» Training
Pre-commissioning Training

Importance of HSE Supervision Training


Aegean Refinery Project (ARP)
Trainings  way to improve

HİLTİ Equipment Training

«Who can not work at height»Training by Dr.


Hidayet AÇAR

«Common diseases in summer season» Training by Dr. Mehmet


AYGECE

Grinder Safety Training by manufacturers «BOSCH»


Aegean Refinery Project (ARP)
Trainings  way to improve
Grinder Safety Training Safety for Supervisor Training

Freshman Training
Aegean Refinery Project (ARP)
Trainings  way to improve

3M PPE Training

BOSCH Safe Use of Grinder Training

GENIUS MEWP Training


Aegean Refinery Project (ARP)
Trainings  way to improve

MAKİTA Tork Training


HILTI Training

ERT Training
Aegean Refinery Project (ARP)
Trainings  way to improve

MAKİTA Tork Training

MAKİTA Tork Training

ERT Training

Operator Awareness Training


Aegean Refinery Project (ARP)
Trainings  way to improve

DEWALT Magnetic Drill Training


Aegean Refinery Project (ARP)
Trainings  way to improve

Nutrition Disolders Training


Aegean Refinery Project (ARP)
Trainings  way to improve
Technical Training
MEB MEWP Training

Tork Training Safe Use of Grinder Training


Aegean Refinery Project (ARP)
EDUCATION TRACKING SYSTEM
Aegean Refinery Project (ARP)

EDUCATION TRACKING SYSTEM


Vests  way to improve
Helmet Sticker

Operator
Certificate

Operator List
Name of Operator
Aegean Refinery Project (ARP)

EDUCATION TRACKING SYSTEM


Vests & Stickers  way to improve

Rigger Certificate

Name of Rigger
EDUCATION TRACKING SYSTEM
Whistle Flagman Fire Watcher

Grinder Training Sticker

Safe Use of Grinder Brochure


Vests & Stickers  way to improve
Aegean Refinery Project (ARP)
Tool Box Talk Safety Briefings
• TEKFEN ensure that all its personnel and
all subcontractors on the project receive
regular job specific and general Tool Box
Talk safety briefings on a daily basis.
Relevant foreman or his designee
conduct Toll Box Talk safety briefings
regarding the topics determined by
TEKFEN HSE department. Also, every
Friday, TSGI Weekly Tool Box safety
Briefings conducted to all personnel at
all locations by TEKFEN HSE department
• TEKFEN ensure that the daily Pre-Task
briefing is provided to all engaged
personnel prior to performing the task.
Pre-Task meeting is a process that
utilizes employee participation to
identify and resolve environmental,
safety, and health hazards associated
with a specific task in advance.
Aegean Refinery Project (ARP)

ToolBox Talk way to improve


Aegean Refinery Project (ARP)

All TEKFEN Supervisors and manual workforce attend General Safety


Toolbox Talks every Friday in Unit 100 and Unit 190 before starting
to work.

General Site Toolbox Talk way to improve


Aegean Refinery Project (ARP)
Permit to Work System
PURPOSE TYPES OF PERMIT
The purpose of this document The present procedure considers following permits
is to establish a procedure and certificates:
trough which a safe working ➢ Cold Work Permit
environment is achieved by ➢ Hot Work Permit
providing an effective ➢ Radiography Work Permit
management and punctual ➢ Under Water Work Permit
controls of the various work ➢ Confined Space Certificate
activities, which may be ➢ Excavation Work Certificate
potentially hazardous, within ➢ Grating/Handrail Removal & Open Hole
the areas involved in the Certificate
construction of the ARP. ➢ Isolation/ De-isolation Certificate

Note: Confined Space, Electrical, Grating/handrail


Removal & Open Hole and Excavation Work
Certificate, signed by authorized engineers, must
always be combined with Cold Work Permit or Hot
Work Permit or Radiography permit or Under Water
Work Permit.
Aegean Refinery Project (ARP)
Permit to Work System
Aegean Refinery Project (ARP)

PTW TRACKING SYSTEM

900

800

700

600

500

400

300 Toplam

200

100

0
Sep Oct Nov Dec Jan Feb Apr Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Çey3 Çey4 Çey1 Çey2 Çey3 Çey4 Çey1 Çey2 Çey3
2016 2017 2018
Aegean Refinery Project (ARP)

PTW TRACKING SYSTEM TYPE OF PERMIT


Pre-Com Radiography
8% Work Permit
2%
Cold Work Permit
CERTIFICATION 6%
Grating
Removal Hot Work Permit
Open Hole 2% Commissioning
Certificate , Hazardous 12%
Confined Energy
Space Isolation
0% Certificate Hazardous
1% Energy
Isolation
Grating
Certificate,Co
Removal
nfined Space Construction
Open Hole
1%
Certificate 70%
5%
HIC/CS
Confined 2%
Space
3% HIC/CS/GR Activity Performed
0%
Night Shift
10%
Night Shift Overtime
2%
0%

Road Closure
non certicate 0%
86% Daily Shift
90%
Overtime
0%
Aegean Refinery Project (ARP)
EMERGENCY MANAGEMENT
TEKFEN establish and
implement an Emergency
Response Plan in
compliance with the
CONTRACTOR Emergency
Response Plan, OWNER
Emergency Procedure and
current Turkish regulation.

Rescue from Rescue from Earthquake Heart Attack Rescue from Rescue from Rescue from Fire Drill Fire Drill
Height Dirll Height Drill Drill Height Dirll Height Dirll Height Dirll
10/02/2016 27/04/2017 10/07/2017 10/08/2017 28/09/2017 01/12/2017 16/02/2018 12/04/2018 23/05/2018
Aegean Refinery Project (ARP)

DRILLS
Aegean Refinery Project (ARP)
DRILLS
Aegean Refinery Project (ARP)
DRILLS
Aegean Refinery Project (ARP)

RISK MANAGEMENT
RISK ASSESSMENT
Management of risk is a continuous
process and the cornerstone of all
the HSE elements. We regularly
identify the hazards and assess the
risks associated with our activities.
We take appropriate action to
manage the risks and hence prevent
or reduce the impact of potential
incidents.
The main aim of the HSE
Management System is to decrease
the level of HSE risks to acceptable
levels that not affect human and
environment adversely.
Aegean Refinery Project (ARP)

Risk Assesssment List


TKF-RD-001 - Above ground piping works
TEKFEN review Risk Assessment and revise the
TKF-RD-002 - Cable laying
Risk Control Action Plan in following case: TKF-RD-003- Equipment Installation
• When there are new or modified activities TKF-RD-004 - Scaffold erection and Dismantlement
TKF-RD-004 - Scaffold erection and Dismantlement
as part of Management of Change;
TKF-RD-005 - Pressure Testing of Piping
• When there are other circumstances that TKF-RD-006 - Nitrogen Releasing
may result in changes in risk level TKF-RD-007 - Office Mobilization Works
experienced by CONTRACTOR and other TKF-RD-008 - Office Works
sub-contractors; TKF-RD-009 - Safe use of MEWPS
TKF-RD-010 - Safe Use of Grinder
• When there are new legal requirements; TKF-RD-011 - Lifting operations
• When there will be different equipment or TKF-RD-012 - Removal of Gratings, handrails and
machinery platforms
• When monitoring results indicate an TKF-RD-013 - Sand Blasting and Painting Works
TKF-RD-014 - Steel Structure Installation Works
abnormality; TKF-RD-015 - Power tools and mechinery
• After occurrence of an incident or accident. TKF-RD-016 - Electricity
TKF-RD-017 - Bending Machine
Aegean Refinery Project (ARP)

RISK MANAGEMENT
Job Safety Analysis
Aegean Refinery Project (ARP)

Incentives and Disciplinary Actions


TEKFEN participate in the CONTRACTOR and
Incentive Program.

In addition to CONTRACTOR and program,


TEKFEN establish and implement its own
incentive and disciplinary actions system.

TEKFEN HSE department monitor the site and


periodically determine and submit groups and
supervisors to the Project Manager in order to
select the groups with the highest HSE
performance. Winners receive gifts and also
be announced overall the site.

Likewise, HSE Department apply disciplinary


actions, depending upon the severity, the
repetition and the results or potentials of a
violation. Disciplinary actions may vary from
verbal warning, written warning to permanent
dismissal from site.
Aegean Refinery Project (ARP)

AWARD CEROMANY
12
10
14

0
4
8

2
6
10
15

5
0

0
Sep-16

0
Sep-16

3
Oct-16

0
Oct-16
Incentives

1
Nov-16

8
Nov-16

2
0
Dec-16 Dec-16

4
0
Jan-17 Jan-17

0
Feb-17 Feb-17

13
0
Mar-17

3
Mar-17
Apr-17

3
Apr-17
May-17

3
May-17
Jun-17

4
Jun-17
Jul-17
12 12 11 12

Jul-17
0

Aug-17

4
Aug-17
0

Sep-17
Sep-17 12
Oct-17
Oct-17
Nov-17
11 11

Nov-17
0

Dec-17
TSGI WINNER NUMBER

Dec-17
TEKFEN WINNER NUMBER

Jan-18
Jan-18
Feb-18
Feb-18
0

Mar-18
2

Mar-18
0

Apr-18
3

Apr-18
May-18
10
Aegean Refinery Project (ARP)

May-18
0

Jun-18
Jun-18
0

Jul-18
Jul-18
0

Aug-18
Aug-18
Aegean Refinery Project (ARP)

Violation Type
20
Work at Height

15

Lack of Training
10 Barricading and Marking Red Tag Scaffolds
Smoke Cigarete
5 Lack of Certificate Lifting

16
Piping
Distribution by Groups
14 Scaffolding
12
Enstrument,
10
Welding
8 Electrical Mechanical
Insulation
6 Stell, STEAMTRACING
4

0
Aegean Refinery Project (ARP)

Scaffoldings
Scaffolding Control Forms
Aegean Refinery Project (ARP)
Technical Scaffolding Trainings
Aegean Refinery Project (ARP)
Technical Scaffolding Training
Aegean Refinery Project (ARP)

Technical Scaffolding Training


Aegean Refinery Project (ARP)

Good Practices
Aegean Refinery Project (ARP)

Scaffolding Inspection
After the inspections conducted by inspected inspectors;

Suitable Scaffold: Green Card

Unsuitable Scaffold: Red Card

The scaffolds are checked once a week by component


person. If appropriate, attached to a green card.
Aegean Refinery Project (ARP)

INCIDENT INVESTIGATION
To prevent injury and damage, it is necessary to recognize potential hazards and take action
to control or eliminate them. This involves systems of control, which include safe methods of
work, adequate supervision, planned maintenance, machinery guarding, personal
protection and personal HSE awareness etc.

Types of Incidents & Accidents 2016 2017 2018Total NUMBER OF


Fatalities (F) 1 1 INCIDENTS&ACCIDENTS
Lost Work Day Case (LWDC) 1 2 3
Restricted Work Case (RWC) 2 1 3
Medical Treatment Cases (MTC) 1 3 4
31
Occupational İllness (OCC)
First Aid Cases (FAC) 4 10 4 18
Near Misses (NM) 7 8 15 18
High Potential Incident (HiPo)
Fire Incidents
10
Motor Vehicle Accidents (MVA)
Severe Motor Vehicle Accidents (SMVA)
Property Damage Accidents (PD) 3 7 3
Security Incidents /Work Place Violence
Incidents 2
2016 2017 2018
Aegean Refinery Project (ARP)

10
9
8
7
6
5
4
3
2
1
0

2016 2017 2018


Aegean Refinery Project (ARP)
Types of Incidents &
Accidents 2016 2017 2018 Total
Incidents & Accidents Rate Fatalities (F) 1 1

Project to Date Lost Work Day Case (LWDC) 1 2 3


Restricted Work Case (RWC) 2 1 3
Medical Treatment Cases (MTC) 1 3 4
Occupational İllness (OCC)
Near Misses
Fatalities (F) Lost Work Day First Aid Cases (FAC) 4 10 4 18
(NM)
34% 2% Case (LWDC) Near Misses (NM) 7 8 15
7% Restricted
Work Case High Potential Incident (HiPo)
(RWC)
Fire Incidents
7%
Motor Vehicle Accidents (MVA)

Severe Motor Vehicle Accidents


Medical
(SMVA)
Treatment
Cases (MTC) Property Damage Accidents (PD) 3 7 3
9%
Security Incidents /Work Place
Violence Incidents 2

First Aid Cases


(FAC)
41%
Aegean Refinery Project (ARP)

TYPE OF ACCIDENT BODY PART INJURED

FAC (First Aid


Case) Tooth Ankle
RWC 32% Neck 5% Arm
4%
(Restricted 9% 9%
Work Case) Leg
5%
4% Back
9%

Head
PD (Property 4% Body
Damage) 4%
23%

LWDC (Lost
Hand
Work Day 9% Chest
Case) 4%
6%
NM (Near
Miss)
MTC
27% Foot Chin
(Medical
Treatment 9% 4%
Case)
7% Finger
26%
Aegean Refinery Project (ARP)
Aegean Refinery Project (ARP)

ENVIROMENT

Housekeeping Team

Measurements
Aegean Refinery Project (ARP)

Safety Data Sheet (SDS)


TEKFEN provide a Safety Data Sheet
(SDS) and/or existing COSHH
Assessment if available, shall be
submitted to the CONTRACTOR in soft
copy and filed in folders for auditing
purpose. A hard copy must be kept in the
working areas where these products used.
Aegean Refinery Project (ARP)

OUR ACHIEVEMENTS
Aegean Refinery Project (ARP)
HSE Posters, Banners and Brochures
Aegean Refinery Project (ARP)
HSE Posters, Banners and Brochures
Aegean Refinery Project (ARP)
Lesson Learnds
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project

Waste Segregation

Barrier Management and


Housekeeping
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)

Best Management Project


Aegean Refinery Project (ARP)
Best Management Project
Aegean Refinery Project (ARP)
Last View of the Our Site
Aegean Refinery Project (ARP)
Last View of the Our Site
Aegean Refinery Project (ARP)
Last View of the Our Site
Aegean Refinery Project (ARP)
Last View of the Our Site