Anda di halaman 1dari 2

404310597.

xls MITCHELL ENGINEERING PROGRAMS

COPYRIGHT 1990 MITCHELL ENGINEERING, PO BOX 1492. GOLDEN, CO, 80402, USA (303) 273 3744

Buckling & Wellhead Load After Cementing


CASING PROPERTIES
CASING OD (IN.) 7 EXTERNAL END AREA (SQ.IN.) 38.48

CASING ID (IN.) 6.276 INTERNAL END AREA (SQ.IN.) 30.94

CASING WT./FT 26 STEEL END AREA (SQ.IN.) 7.55

CASING LENGTH (FT) 10,000

Wellhead Loads after Cementing

INITIAL CONDITIONS (While cement sets)


Wellhead Load (=Tension at surface)
T; Mlbs

Mud wt. inside (MWi) 9 ppg +wt. of pipe +wpf*L/1000 260

Mud wt outside (MWo) 12 ppg +wt mud inside +0.052MWi Ai L/1000 145

Pressure inside (Pi) 1,500 psi -wt cement -0.052MWc Ao(L-TOC)/1000 -64

Pressure outside (Po) 1,000 psi -wt. mud outside -0.052MWo Ao TOC/1000 -192

Avg cement dens (MWc) 16 ppg + pressure-area + (PiAi - PoAo)/1000 8

Top of cement (TOC) 8,000 ft + Pickup + Pickup 18

Pickup is + 18 Mlb (Slackoff is -)


Initial Wellhead Load 175
FINAL CONDITIONS
Mud wt inside 13 ppg

Mud wt outside 8 ppg

Pressure inside 2,000 psi


Pressure outside 3,000 psi
Changes (final - initial) Formulae for dT dT; Mlbs

dMWi 4 ppg + µ(0.052dMWi)Ai(TOC)/1000 15


dMWo -4 ppg - µ(0.052dMWo)Ao(TOC)/1000 19
dPi 500 psi +2µ dPi Ai/1000 9
dPo 2,000 psi -2µ dPo Ao/1000 -46

dTemp 34 „F -AE¦(dTemp)/1000 -53


Total dT -55

Final Wellhead Load 119

Page 1 of 2
404310597.xls MITCHELL ENGINEERING PROGRAMS

Buckling of Casing after Cementing


INITIAL CONDITIONS (While cement sets)
Initial Effective tension at TOC Teff;Mlbs
Mud wt. inside (MWi) 9 ppg +pipe below TOC +wpf(L-TOC)/1000 52
Mud wt outside (MWo) 12 ppg +wt mud inside +0.052MWi Ai(L-TOC)/1000 29
Pressure inside (Pi) 1,500 psi -wt cement -0.052MWc Ao(L-TOC)/1000 -64
Pressure outside (Po) 1,000 psi +Pickup +Pickup 18
Avg. cement dens (MWc) 16 ppg

Top of cement (TOC) 8,000 ft Initial Teff at TOC 35


Pickup 18 Mlb (Slackoff is -)

FINAL CONDITIONS
Mud wt inside 13 ppg
Mud wt outside 8 ppg
Pressure inside 2,000 psi
Pressure outside 3,000 psi
Changes (final - initial) Formula for dT dTeff;Mlbs
dMWi 4 ppg -(1-µ)(0.052dMWi)Ai(TOC)/1000 -36
dMWo -4 ppg +(1-µ)(0.052dMWo)Ao(TOC)/1000 -45
dPi 500 psi -(1-2µ)dPi Ai/1000 -6
dPo 2,000 psi +(1-2µ)dPo Ao/1000 31
dTemp 34 „F -AE¦(dTemp)/1000 -53
If Teff < 0, assume casing is buckled. Total dTeff -109
Final Teff at TOC -74
Buckled? Yes
TEMPERATURE CALCULATIONS
(For drilling strings )
Static Temperatures

Surface (Ts) 60 „F y = TOC/TVD 0.57

Bottom hole (Tb) 355 „F k = 0.4+0.306y+0.029y^2-0.125y^3 0.561

TVD next hole section 14,000 ft Init. avg temp: Ts + (Tb-Ts)y/2 144
Final avg temp;„F: Ts+(Tb-Ts)k 225
Must be entered above;„F: dTemp 81

(For completion strings )


Surface Injection (Tsi) 32 „F y = TOC/TVD 0.89

At perforations (Tp) 123 „F For big jobs f = 3 Little jobs f = 2 3

TVD Perforations 9000 ft Final avg temp; „F: Tsi+(Tp-Tsi)y/f 59


Must be entered above; „F: dTemp -85
E = 30,000,000 psi; Poisson's ratio µ = 0.3; Coefficient of thermal expansion ¦ = 6.9E-6 /„F

PROGRAM DOS NAME: CAS_BUCK.XLS

PURPOSE: Computes stresses, loads, and buckling in casing after cementing

COMPUTATIONS:
1. Buckling in intermediate and completion casings
2. Wellhead loads in intermediate and completion casings

Page 2 of 2

Anda mungkin juga menyukai