NO URAIAN PEKERJAAN SAT VOL

b
a e f
UMUM
1 Penyelidikan Tanah (uji sondir) titik 15.00
1 Penyelidikan Tanah (uji boring) titik 19.00
PEKERJAAN PONDASI PIER ELEVATED
1 PDA Test titik 57.00
2 Pengujian Kuat Tekan Beton bh 144.00
PEKERJAAN STRUKTUR PIER ELEVATED
1 Pengujian Kuat Tekan Beton bh 144.00
PEKERJAAN STRUKTUR PIER HEAD ELEVATED
1 Pengujian Kuat Tekan Beton bh 144.00
PEKERJAAN STRUKTUR GEDUNG STASIUN
1 PDA Test titik 12.00
2 Pengujian Kuat Tekan Beton bh 216.00
Jumlah
HARGA SATUAN SUB JUMLAH
NO
(Rp) HARGA (Rp)

g h a

10,000,000.00 150,000,000.00 1
10,000,000.00 190,000,000.00

15,000,000.00 855,000,000.00
75,000.00 10,800,000.00

75,000.00 10,800,000.00

75,000.00 10,800,000.00

15,000,000.00 180,000,000.00
75,000.00 16,200,000.00
1,423,600,000.00
HARGA SATUAN
URAIAN PEKERJAAN SAT VOL
(Rp)

b
e f g
BIAYA PENGAWASAN BERKALA
Laporan Tahap Pengawas Berkala (2 trip x 3 org)
1.1 Tiket Jakarta - Solo ( 2 trip PP) org 6.00 1,880,000.00
1.2 Akomodasi (2 trip x 5 hari) org/hari 30.00 1,200,000.00
1.3 Penginapan (2 trip x 5 hari) org/hari 30.00 600,000.00
1.4 Laporan Pengawas Berkala set 12.00 230,000.00
1.5 Dok . Petunuk Penggunaan, Pemelihara Peralatan / Perlengkapan set 3.00 500,000.00
Jumlah
SUB JUMLAH
NO URAIAN PEKERJAAN
HARGA (Rp)

b
h a
ASURANSI
1 Kerusakan Gedung & Rel Kereta Api
11,280,000.00 Jumlah
36,000,000.00
18,000,000.00
2,760,000.00
1,500,000.00
58,260,000.00
HARGA SATUAN
SAT VOL
(Rp)

e f g h

m 1,262.00 5,000,000.00 6,310,000,000.00


6,310,000,000.00