JADWAL KEGIATAN TEORI , LABORATORIUM DAN BENGKEL KELAS REGULER PAGI DAN SORE JURUSAN T.

SIPIL
SEMESTER GANJIL TAHUN AJARAN 2017/2018
Bulan SEPTEMBER 2017 OKTOBER 2017 NOVEMBER 2017 DESEMBER 2017 JANUARI 2018
Minggu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
SEM. KELAS
Tanggal 5 6 7 8 11 12 13 14 15 18 19 20 21 22 25 26 27 28 29 2 3 4 5 6 9 10 11 12 13 16 17 18 19 20 23 24 25 26 27 30 31 1 2 3 6 7 8 9 10 13 14 15 16 17 20 21 22 23 24 27 28 29 30 1 4 5 6 7 8 11 12 13 14 15 18 19 20 21 22 25 26 27 28 31 1 2 3 4 5 8 9 10 11 12

Hari SL R K J S SL R K J S SL R K J S SL R K J S SL R K J S SL R K J S SL R K J S SL R K J S SL R K J S SL R K J S SL R K J S SL R K J S SL R K J S SL R K J S SL R K J S SL R K J S SL R K J S SL R K J S SL R K J

KERJA KAYU A1 PAGI KERJA BATU A1 PAGI


A1 9 HARI 9 HARI
(ZK/ALI) (MW/ ZULFIKAR)
KERJA KAYU B1 PAGI KERJA BATU B1 PAGI
B1 9 HARI 9 HARI
(KM/ALI) (MW/ZULFIKAR)
KERJA BATU & DRAINASE
BA.1 (BG. AIR) BANG. AIR 1 PAGI 9 HARI
(AY/ M.ALI)
KERJA KAYU C1 SORE KERJA BATU C1 SORE
C1 SORE 9 HARI 9 HARI
(RH/ALI) (FS/ZULFIKAR)
KERJA KAYU D1 SORE KERJA BATU D1 SORE
I D1 SORE 9 HARI 9 HARI
(KM/ALI) (MW/ZULFIKAR)
KERJA KAYU D IV -1 A PAGI KERJA BATU DIV -1 A PAGI
D IV-I A 9 HARI 9 HARI
(ZK/ALI) (FS/M.ALI)
KERJA BATU DIV -1 B PAGI KERJA KAYU D IV -1 B PAGI
D IV-I B 9 HARI 9 HARI
(MW/ZULFIKAR) (RH/ALI)
D IV-I C KERJA BATU DIV-1 CSORE KERJA KAYU D IV -1 C SORE
9 HARI
SORE
9 HARI
(MW/ZULFIKAR) (RH/ALI)
D IV-I D KERJA KAYU D IV -1 DSORE KERJA BATU DIV -1 D SORE
9 HARI 9 HARI
SORE (RH/ALI) (MW/ZULFIKAR )
BT.1 BG WORKSHOP BATU & BETON BT.1 BG. WORKSHOP DRAINASE BT.1
WORKSHOP KAYU BT1.
TRANSPOR- TRANSPORTASI SORE 9 HARI BG.TRANSPORTASI SORE 9 HARI
BG TRANSPORTASI SORE
TASI SORE (MW/ZULFIKAR) (HN/ M.ALI)
PRAKTEK BETON B2 PENGUJIAN BAHAN-I PENGUJIAN TANAH-I B2 PRAKTEK ILMU UKUR KERJA TALANG ATAP B2 PLUMBING
B2 6 HARI B2 6 HARI 6 HARI (FS/INDRA A) TANAH-I B2 6 HARI 6 HARI 6 HARI (Kls. B2)
(HN/ARMAN P) (FR/SYUKUR H) (GF/ZARRULLAH) (AD / M.ALI ) AD/SF
PENGUJIAN BAHAN-I C2 PRAKTEK BETON C2 KERJA TALANG ATAP C2 PRAKTEK ILMU UKUR PENGUJIAN TANAH-I PLUMBING
C2 6 HARI 6 HARI 6 HARI TANAH-I C2 6 HARI 6 HARI 6 HARI (Kls. C2)
(FR/SYUKUR H) (AY/ARMAN P) . ( AD/ M.ALI) (RY /ZAFRULLAH) (MW/INDRA A) HN/SF
PENGUJIAN BAHAN-I PENGJIAN TANAH-I PRAKTEK ILMU UKUR KERJA TALANG ATAP PLUMBING PRAKTEK BETON D2
D2 D2 6 HARI TANAH-I D2 6 HARI D2 6 HARI 6 HARI (Kls. D2)
D2 6 HARI
(AY/ HN/SYUKUR H) (FS/INDRA A) (SW/ ZAFRULLAH ) (AD /M .ALI ) HN/SF
6 HARI
(AY/ARMAN P) UJIAN SEMESTER
PLUMBING PRAKTEK BETON A2 (SORE) PENGUJIAN TANAH-I KERJA TALANG ATAP PENGUJIAN BAHAN-I
A2 SORE 6 HARI (Kls. A2-SORE) 6 HARI A2 (SORE) 7 HARI
PRAKTEK ILMU UKUR TANAH-I
A2 (SORE) 6 HARI A2 (SORE) 6 HARI A2 (SORE) 6 HARI GANJIL
FS/SF (HN/ARMAN P) (MW/INDRA A) (RN/ML/ZAFRULLAH) (AD / M.ALI ) (SB/SYUKUR H
BA.3 (BGN. PRAKTEK IU TANAH-II KERJA PEMIPAAN PRAKTEK BETON KLS. BA.3 BG. TH. 2017/2018
III 6 HARI (Kls. BA.3 BG. AIR AIR SORE
AIR) SORE
BA.3 BG AIR SORE 6 HARI
(IB/MR/ZAFRULLAH) SORE) KM/SF 6 HARI (HN/ARMAN P)
PRAKTEK I.U. TANAH-I DIV-III PENGUJIAN TANAH D IV-IIIA 6 PLUMBING PRAKTEK BETON DIV-IIIA 6 PENGUJIAN BAHAN-I DIV-IIIA
D IV-III A A PAGI 6 HARI HARI 6 HARI (Kls. DIV-IIIA) HARI 6 HARI
(RN/ZAFRULLAH) (GR/ INDRA A) HN/SF (AY/ARMAN P) (CY/FJ/SYUKUR H)
PENGUJIAN TANAH-I PRAKTEK ILMU UKUR PLUMBING PRAKTEK BETON DIV-IIIB PENGUJIAN BAHAN DIV-IIIB
D IV- III B D IV-III B 6 HARI TANAH DIV-III B 6 HARI 6 HARI (Kls. DIV-III B) 6 HARI 6 HARI
(GR /INDRA A) (RN/MR/ZAFRULLAH) HN/SF (AY/ARMAN P) (AY/HN/SYUKUR H)

D IV-III C PRAKTEK ILMU UKUR PLUMBING PRAKTEK BETON PENGUJIAN BAHAN-I PENGUJIAN TANAH-I
TANAH-I DIV-IIIC SORE DIV-IIIC SORE 6 HARI
SORE 6 HARI (IB/ZAFRULLAH)
6 HARI (DIV-IIIC SORE) DIV-IIIC SORE 6 HARI DIV-IIIC SORE 6 HARI
(SP/ INDRA A)
HN/SF (AY/ARMAN P) (CY/FJ/SYUKUR H)
D IV-III D PLUMBING PRAKTEK IU TANAH-I PRAKTEK BETON DIV-III D PENGUJIAN BAHAN-I PENGUJIAN TANAH-I
6 HARI (Kls. DIV-IIID SORE) SORE 6 HARI
SORE KM/SF
DIV-IIID SORE 6 HARI
(SY/ZAFRULLAH) (HN/ARMAN )
DIV-IIID SORE 6 HARI DIV-IIID SORE 6 HARI
(SB/SYUKUR H) (SP/ INDRA A)
A3 PAGI/SORE PRAKTEK KERJA LAPANGAN (PKL)
(TGL. 5 SEPTEMBER S/D 2 OKTOBER 2017)
B3 PAGI/SORE MAHASISWA WAJIB KONSULTASI DGN PEMBIMBING/CO. PEMBIMBING SEBELUM MULAI
C3 PAGI/SORE PKL
PENGUJIAN ASPAL DIV/- V
D IV - V A A 6 HARI
(SW/BUSTAMI)
V PENGUJIAN ASPAL DIV/- V
D IV - V B B 6 HARI
(SM/BUSTAMI
PENGUJIAN ASPAL DIV/- V
DIV V C C SORE 6 HARI
SORE (ZJ/BUSTAMI)

DIV V D +
PENGUJIAN ASPAL DIV/- V
D SORE 6 HARI
SORE (SM/BUSTAMI)
DIV-VII A
PRAKTEK KERJA LAPANGAN (PKL)
DIV-VII B DILAKSANAKAN (TGL. 5 SEPT.S/D 17 OKTOBER. 2017 )
VII
DIV-VII C SORE PERKULIAHAN UNTUK MHS KELAS DIV-VII LIBUR
MAHASISWA WAJIB KONSULTASI DG PEMBIMBING/CO. PEMBIMBING SEBELUM PKL
DIV-VII D SORE

Buketrata, September 2017


Ketua Jurusan Teknik Sipil Ka. Prodi DIV PJJ Ka. Prodi DIII T.Sipil Ka. Prodi Bangunan Air Ka. Prodi D3 TSBT

Dr. Edi Majuar, ST., M.Eng.Sc Muhammad Reza, M. Eng. Khairul Miswar, ST., MT Abdullah Irwansyah, ST., MT Syaifuddin, S.T., M.T.
NIP. 19671224 199802 1 001 NIP. 19880709 201404 1 002 NIP.197802242002121002 NIP.196906201994031002 NIP. 19690420 199702 1 001