HEB
Horas efectivas : 24 Horas
futuro :
Captacion propuesta :
Conduccion :
Regularizacion
Distribucion
Tipo de Servicio
Desinfeccion
INNOMINADO
Habitantes
Años
Horas
Q² 0.0000223729
Pendiente:
mca / m 0.008637
S = KQ² =
Velócidad:
m/s 0.58
V=Q/A
600.00
…..
RD - 32.5 RD - 41 CLASE-5
Espesor Espesor Diam. Interior Espesor Diam. Interior
mm. mm. mm. mm. mm.
1.80 - -
- -
- -
- -
4.70 240.90
6.00 303.30
2.45 2.10 68.80 -
2.20 1.80 56.70 -
2.95 2.50 83.90 -
- -
3.75 3.05 108.20 -
5.50 4.35 159.60 -
7.10 5.60 207.90 -
8.70 7.10 50.00
Tipo Modulo de
Tubería Elasticidad
Acero 2,100,000
Extruc-Pak 5,200
Fo.Go. 500,000
P.V.C. 29,300
Pp : Pa * ( 1 + r ) ^ n
Pp : 679 Habitantes
Actual
Futuro
Actual
Qmd : Qm X CVD
Futuro
Qmd : Qm X CVD
Actual
Futuro
GASTO DE BOMBEO
Actual
Qb : Qmd X 24 / HEB
Futuro
Qb : Qmd X 24 / HEB
Volumen Requerido:»
Pa X Dotacion »
Volumen Bombeado:»
Qb X 3,600 »
Tiempo de bombeo:»
Actual
1.4 Pulgadas
Futuro
2.1 Pulgadas
TRAMO : PRIMERO
Del : 0+000.00
Al : 0+500.00
Longitud del tramo: 500.00 m
Gasto conducido: 0.00306 m³/s
Diámetro efectivo de la tubería: 0.07792 m
Tipo de tubería : FOGO CED-40 (3") DIAM.
Coeficiente de manning: 0.014
Cota piezométrica al inicio del tramo: 500.00 m
Cota del terreno al final del tramo : 450.00 m
Pendiente:
S = KQ²
S = 1645.50394850322 x ( 0.00306 )²
S= 0.01541 mca / m
Velocidad:
V=Q/A= Q / ( ¶ x D² / 4 )
V = 0.00306 / ( ¶ x ( 0.07792 )² / 4) =
V= 0.64 m/s
Constante de
Diametro Nom. Area en Gasto en velocidad en Long. Linea Coef. Fricc. Manning
m² m³/seg. m/seg en m. (Q²) Manning
(A) (Q) (V) (L) (n)
(K)
mm. Pulg.
PVC RD-26 38 1 1½" 0.00152 0.00111 0.73 438.8 1.2321E-06 0.009 14329.84
PVC RD-26 50 2" 0.00239 0.00111 0.46 438.8 1.2321E-06 0.009 4275.44
GOLPE DE ARIETE
Presión de Espesor E a d 1 + E a d
Diametro E d E e
trabajo de la Num. (d) cm. tubo (e)de
pared V en m/seg. 145 V a f
Tubería Kg/cm² cm. E f e E f e
H. tanque = 3
Desnivel = 67.58 11.20 4.40 0.22 0.73 105.89 90948.00 6041.50 15.05 16.05
Prof. carc= 4 11.20 5.52 0.26 0.46 67.34 114098.40 7165.50 15.92 16.92
Altura de tanque 3
Desnivel topográfico 67.58
Profundidad del cárcamo 4
Módulo de elasticidad del agua 20670
Módulo de elasticidad del PVC 28100
OPCION 1 OPCION 2
Qbombeo (l.p.s.) 1.11 1.11
Carga normal de operación = H
H = Desnivel topográfico + Altura de tanque + hft = 18.15 + 19.91+ 3.0 = 78.71 73.01
HT=H+ PROFUNDIDAD DEL CARCAMO 82.71 77.01
Qbombeo (l.p.s.) x HT 91.81 85.48
O EN LINEA DE CONDUCCION
145 V
Sobrepresión Sobrepresión Carga normal Presión total
1 + E a d Absorbida por Absorbida por de operación 20% h +
E f e 1 + E a d
Válvula tubería (en m) carga normal
R.P. 80 % h 20% h H= hf + DT de operación
E f e
Diametro
Tabla Clase Interior Constante
Tabla Clase Interior
4.01 26.43 21.14 5.29 78.71 84.00 #N/A 0 4.09
4.11 16.37 13.10 3.27 73.01 76.28 #REF! 2 5.251
1 2 6.271
0
0
0
0
Revisión de Línea de Conducción por Bombeo
REVISIÓN CON TUBERÍAS DE PROYECTO
TRAMO : UNICO CONSTANTES UTILIZADAS
Del : 0+000.00
Al : 0+500.00 Modulo de Elasticidad de
Longitud del tramo: 500.00 m las tuberías de Fierro Galvanizado 500,000 ( Et ) fogo
Para determinar la sobrepresión que podria presentarse por fenomenos transitorios como el golpe de ariete se usará la
siguiente ecuación:
Sustituyendo tendremos :
Cota
Longitud Longitud Longitud Diametro Area Coeficiente Cotas en el punto a
Diametro y Clase de las tuberias TRAMO Gastos Gastos² K S= K.Q² Hf velocidad Punto
del Tramo tributaria Acumulada efectivo Efectiva Maninng FINAL del tramo
inicial
Fo.Go. 2" CED - 40 TANQUE 1 102.00 480.79 0.00 102.00 0.1762 0.0002 3.10E-8 52.51 0.002166 0.014 13,504.21 0.000419 0.0428 0.0813 523.29 523.25
Fo.Go. 2" CED - 40 1 2 17.00 479.50 119.00 136.00 0.2349 0.0002 5.52E-8 52.51 0.002166 0.014 13,504.21 0.000745 0.0127 0.1085 523.25 523.23
Fo.Go. 2" CED - 40 2 3 58.00 477.59 177.00 235.00 0.4059 0.0004 1.65E-7 52.51 0.002166 0.014 13,504.21 0.002225 0.1291 0.1874 523.23 523.11
Fo.Go. 2" CED - 40 3 4 81.00 476.20 258.00 339.00 0.5856 0.0006 3.43E-7 52.51 0.002166 0.014 13,504.21 0.004631 0.3751 0.2703 523.11 522.73
Fo.Go. 2" CED - 40 4 5 73.00 475.00 331.00 404.00 0.6978 0.0007 4.87E-7 52.51 0.002166 0.014 13,504.21 0.006576 0.4801 0.3222 522.73 522.25
Fo.Go. 2" CED - 40 5 6 65.00 474.56 396.00 461.00 0.7963 0.0008 6.34E-7 52.51 0.002166 0.014 13,504.21 0.008563 0.5566 0.3676 522.25 521.69
Fo.Go. 2" CED - 40 6 7 42.00 475.32 438.00 480.00 0.8291 0.0008 6.87E-7 52.51 0.002166 0.014 13,504.21 0.009284 0.3899 0.3828 521.69 521.30
Fo.Go. 2" CED - 40 7 8 40.00 472.23 478.00 518.00 0.8948 0.0009 8.01E-7 52.51 0.002166 0.014 13,504.21 0.010812 0.4325 0.4131 521.30 520.87
Fo.Go. 2" CED - 40 8 9 47.00 472.32 525.00 572.00 0.9880 0.0010 9.76E-7 52.51 0.002166 0.014 13,504.21 0.013183 0.6196 0.4562 520.87 520.25
Fo.Go. 2" CED - 40 9 10 7.00 471.50 532.00 539.00 0.9310 0.0009 8.67E-7 52.51 0.002166 0.014 13,504.21 0.011706 0.0819 0.4298 520.25 520.17
Fo.Go. 2" CED - 40 10 11 27.00 472.30 559.00 586.00 1.0122 0.0010 1.02E-6 52.51 0.002166 0.014 13,504.21 0.013836 0.3736 0.4673 520.17 519.80
Fo.Go. 2" CED - 40 11 12 26.00 473.29 585.00 611.00 1.0554 0.0011 1.11E-6 52.51 0.002166 0.014 13,504.21 0.015042 0.3911 0.4873 519.80 519.41
50 PVC 2 1/2" RD - 32.5 TANQUE 1 27.50 523.29 Err:522 Err:522 Err:522 Err:522 Err:522 68.10 0.003642 0.009 1,394.88 Err:522 Err:522 Err:522 523.29 Err:522
49 PVC 2 1/2" RD - 32.5 1 2 27.50 668.51 Err:522 Err:522 Err:522 Err:522 Err:522 68.10 0.003642 0.009 1,394.88 Err:522 Err:522 Err:522 523.25 Err:522
PVC 2 1/2" RD - 32.5 2 3 27.50 668.51 Err:522 Err:522 Err:522 Err:522 Err:522 68.10 0.003642 0.009 1,394.88 Err:522 Err:522 Err:522 523.23 Err:522
PVC 2 1/2" RD - 32.5 3 3 27.50 668.51 Err:522 Err:522 Err:522 Err:522 Err:522 68.10 0.003642 0.009 1,394.88 Err:522 Err:522 Err:522 523.11 Err:522
PVC 2 1/2" RD - 32.5 4 3 27.50 668.51 Err:522 Err:522 Err:522 Err:522 Err:522 68.10 0.003642 0.009 1,394.88 Err:522 Err:522 Err:522 522.73 Err:522
PVC 2 1/2" RD - 32.5 5 3 27.50 668.51 Err:522 Err:522 Err:522 Err:522 Err:522 68.10 0.003642 0.009 1,394.88 Err:522 Err:522 Err:522 522.25 Err:522
PVC 2 1/2" RD - 32.5 6 3 27.50 668.51 Err:522 Err:522 Err:522 Err:522 Err:522 68.10 0.003642 0.009 1,394.88 Err:522 Err:522 Err:522 521.69 Err:522
PVC 2 1/2" RD - 32.5 7 3 27.50 668.51 Err:522 Err:522 Err:522 Err:522 Err:522 68.10 0.003642 0.009 1,394.88 Err:522 Err:522 Err:522 521.30 Err:522
PVC 2 1/2" RD - 32.5 8 3 27.50 668.51 Err:522 Err:522 Err:522 Err:522 Err:522 68.10 0.003642 0.009 1,394.88 Err:522 Err:522 Err:522 520.87 Err:522
PVC 2 1/2" RD - 32.5 9 3 27.50 668.51 Err:522 Err:522 Err:522 Err:522 Err:522 68.10 0.003642 0.009 1,394.88 Err:522 Err:522 Err:522 520.25 Err:522
PVC 2 1/2" RD - 32.5 10 3 27.50 668.51 Err:522 Err:522 Err:522 Err:522 Err:522 68.10 0.003642 0.009 1,394.88 Err:522 Err:522 Err:522 520.17 Err:522
PVC 2 1/2" RD - 32.5 11 3 27.50 668.51 Err:522 Err:522 Err:522 Err:522 Err:522 68.10 0.003642 0.009 1,394.88 Err:522 Err:522 Err:522 519.80 Err:522
PVC 2 1/2" RD - 32.5 12 3 27.50 668.51 Err:522 Err:522 Err:522 Err:522 Err:522 68.10 0.003642 0.009 1,394.88 Err:522 Err:522 Err:522 519.41 Err:522
Cota
Longitud Longitud Longitud Diametro Area Coeficiente Cotas en el punto a
Diametro y Clase de las tuberias TRAMO Gastos Gastos² K S= K.Q² Hf velocidad Punto
del Tramo tributaria Acumulada efectivo Efectiva Maninng FINAL del tramo
inicial
PVC 2 1/2" RD - 32.5 13 3 27.50 668.51 Err:522 Err:522 Err:522 Err:522 Err:522 68.10 0.003642 0.009 1,394.88 Err:522 Err:522 Err:522 #N/A #N/A
PVC 2 1/2" RD - 32.5 14 3 27.50 668.51 Err:522 Err:522 Err:522 Err:522 Err:522 68.10 0.003642 0.009 1,394.88 Err:522 Err:522 Err:522 Err:522 Err:522
PVC 2 1/2" RD - 32.5 15 3 27.50 668.51 Err:522 Err:522 Err:522 Err:522 Err:522 68.10 0.003642 0.009 1,394.88 Err:522 Err:522 Err:522 #N/A #N/A
PVC 2 1/2" RD - 32.5 16 3 27.50 668.51 Err:522 Err:522 Err:522 Err:522 Err:522 68.10 0.003642 0.009 1,394.88 Err:522 Err:522 Err:522 Err:522 Err:522
PVC 2 1/2" RD - 32.5 TANQUE 3 27.50 668.51 Err:522 Err:522 Err:522 Err:522 Err:522 68.10 0.003642 0.009 1,394.88 Err:522 Err:522 Err:522 523.29 Err:522
35 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
34 PVC 1 1/2" RD - 26 12 14 90.50 658.97 Err:522 Err:522 Err:522 Err:522 Err:522 44.00 0.001521 0.009 14,329.84 Err:522 Err:522 Err:522 519.41 Err:522
33 PVC 1 1/2" RD - 26 14 16 85.50 657.25 Err:522 Err:522 Err:522 Err:522 Err:522 44.00 0.001521 0.009 14,329.84 Err:522 Err:522 Err:522 Err:522 Err:522
32 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
31 PVC 1 1/2" RD - 26 14 18 45.00 656.94 0.00 45.00 0.0777 0.0001 6.04E-9 44.00 0.001521 0.009 14,329.84 0.000087 0.0039 0.0511 Err:522 Err:522
30 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
29 PVC 1 1/2" RD - 26 14 17 91.00 652.60 379.50 470.50 0.8127 0.0008 6.61E-7 44.00 0.001521 0.009 14,329.84 0.009465 0.8613 0.5343 Err:522 Err:522
28 PVC 1 1/2" RD - 26 17 19 84.00 652.13 0.00 84.00 0.1451 0.0001 2.11E-8 44.00 0.001521 0.009 14,329.84 0.000302 0.0253 0.0954 Err:522 Err:522
27 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
26 PVC 1 1/2" RD - 26 17 21 45.00 655.69 0.00 45.00 0.0777 0.0001 6.04E-9 44.00 0.001521 0.009 14,329.84 0.000087 0.0039 0.0511 Err:522 Err:522
25 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
24 PVC 1 1/2" RD - 26 17 20 87.50 654.64 163.00 250.50 0.4327 0.0004 1.87E-7 44.00 0.001521 0.009 14,329.84 0.002683 0.2348 0.2845 Err:522 Err:522
23 PVC 1 1/2" RD - 26 20 22 88.00 645.95 0.00 88.00 0.1520 0.0002 2.31E-8 44.00 0.001521 0.009 14,329.84 0.000331 0.0291 0.0999 Err:522 Err:522
22 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
21 PVC 1 1/2" RD - 26 20 23 30.00 654.69 0.00 30.00 0.0518 0.0001 2.69E-9 44.00 0.001521 0.009 14,329.84 0.000038 0.0012 0.0341 Err:522 Err:522
20 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
19 PVC 1 1/2" RD - 26 20 24 45.00 656.74 0.00 45.00 0.0777 0.0001 6.04E-9 44.00 0.001521 0.009 14,329.84 0.000087 0.0039 0.0511 Err:522 Err:522
18 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
17 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
16 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
15 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
Cota
Longitud Longitud Longitud Diametro Area Coeficiente Cotas en el punto a
Diametro y Clase de las tuberias TRAMO Gastos Gastos² K S= K.Q² Hf velocidad Punto
del Tramo tributaria Acumulada efectivo Efectiva Maninng FINAL del tramo
inicial
14 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
13 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
12 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
11 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
10 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
9 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
8 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
7 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
6 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
5 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
4 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
3 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
2 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
1 0.00 0.00 0.0000 0.0000 0.00E+0 0.000000 0.00 0.000000 0.0000 0.0000 0.00 0.00
CONCLUIR DATOS ANTES DE ESTA LINEA
Long. Tota 1,771.50 Longitud total de las tuberias utilizadas
Long. SS 0.001 Longitud de tramos sin servicio en ruta suma de perdiadas Err:522
Long. Rea 1771.50 Longitud efectiva para diseño de la red de Distribucion
Cota
Longitud Longitud Longitud Diametro Area Coeficiente Cotas en el punto a
Diametro y Clase de las tuberias TRAMO Gastos Gastos² K S= K.Q² Hf velocidad Punto
del Tramo tributaria Acumulada efectivo Efectiva Maninng FINAL del tramo
inicial
0
1 PVC 1/ 1/2" 13 RD - 13.5 21.30 1.90 17.50 22.40 0.009 21.30
2 PVC 3/ 3/4" 19 RD - 13.5 26.70 2.30 22.10 22.40 0.009 26.70
3 PVC 1" 1" 25 RD - 13.5 33.40 2.80 27.80 22.40 0.009 33.40
4 PVC 1" 1" 25 RD - 26 33.40 1.80 29.80 11.20 0.009 33.40
5 PVC 1 1 1/4" 32 RD - 13.5 42.20 3.40 35.40 22.40 0.009 42.20
6 PVC 1 1 1/4" 32 RD - 26 42.20 1.90 38.40 11.20 0.009 42.20
7 PVC 1 1 1/2" 38 RD - 13.5 48.30 3.90 40.50 22.40 0.009 48.30
8 PVC 1 1 1/2" 38 RD - 26 48.30 2.15 44.00 11.20 0.009 48.30
9 PVC 1 1 1/2" 38 RD - 32.5 48.30 1.8 44.7 8.7 0.009 48.30
10 PVC 2" 2" 50 RD - 13.5 60.30 4.8 50.7 22.4 0.009 60.30
11 PVC 2" 2" 50 RD - 26 60.30 2.55 55.2 11.2 0.009 60.30
12 PVC 2" 2" 50 RD - 32.5 60.30 2.2 55.9 8.7 0.009 60.30
13 PVC 2" 2" 50 RD - 41 60.30 2.2 55.9 7.1 0.009 60.30
14 PVC 2 2 1/2" 60 RD - 26 73.00 3.05 66.9 11.2 0.009 73.00
15 PVC 2 2 1/2" 60 RD - 32.5 73.00 2.45 68.1 8.7 0.009 73.00
16 PVC 2 2 1/2" 60 RD - 41 73.00 2.1 68.8 7.1 0.009 73.00
17 PVC 3" 3" 75 RD - 26 88.90 3.65 81.6 11.2 0.009 88.90
18 PVC 3" 3" 75 RD - 32.5 88.90 2.95 83 8.7 0.009 88.90
19 PVC 3" 3" 75 RD - 41 88.90 2.5 83.9 7.1 0.009 88.90
20 PVC 4" 4" 100 RD - 26 114.30 4.65 105 11.2 0.009 114.30
21 PVC 4" 4" 100 RD - 32.5 114.30 3.75 106.8 8.7 0.009 114.30
22 PVC 4" 4" 100 RD - 41 114.30 3.05 108.2 7.1 0.009 114.30
23 PVC 6" 6" 150 RD - 26 168.30 6.9 154.5 11.2 0.009 168.30
24 PVC 6" 6" 150 RD - 32.5 168.30 5.5 157.3 8.7 0.009 168.30
25 PVC 6" 6" 150 RD - 41 168.30 4.35 159.6 7.1 0.009 168.30
26 PVC 8" 8" 200 RD - 26 219.10 8.9 201.3 11.2 0.009 219.10
27 PVC 8" 8" 200 RD - 32.5 219.10 7.1 204.9 8.7 0.009 219.10
28 PVC 8" 8" 200 RD - 41 219.10 5.6 207.9 7.1 0.009 219.10
29 PVC 10 10" 250 C-5 250.30 4.7 240.9 50 0.009 250.30
30 PVC 12 12" 300 C-5 315.30 6 303.3 50 0.009 315.30
39 Fo.Go. 3/8" 10 CED - 40 17.15 2.31 12.53 100 0.014 17.15
34 Fo.Go. 1/2" 13 CED - 40 21.34 2.77 15.8 100 0.014 21.34
38 Fo.Go. 3/4" 19 CED - 40 26.67 2.87 20.93 100 0.014 26.67
33 Fo.Go. 1" 25 CED - 40 33.40 3.38 26.64 100 0.014 33.40
32 Fo.Go. 1 1/4" 32 CED - 40 42.16 3.56 35.04 100 0.014 42.16
31 Fo.Go. 1 1/2" 38 CED - 40 48.26 3.68 40.9 100 0.014 48.26
Cota
Longitud Longitud Longitud Diametro Area Coeficiente Cotas en el punto a
Diametro y Clase de las tuberias TRAMO Gastos Gastos² K S= K.Q² Hf velocidad Punto
del Tramo tributaria Acumulada efectivo Efectiva Maninng FINAL del tramo
inicial
as en el punto al Carga
NAL del tramo DIsponible
Terreno m
523.29 0.00
480.79 42.46
479.50 43.73
477.59 45.52
476.20 46.53
475.00 47.25
474.56 47.13
475.32 45.98
472.23 48.64
472.32 47.93
471.50 48.67
472.30 47.50
473.29 46.12
523.29 Err:522
668.51 Err:522
668.51 Err:522
668.51 Err:522
668.51 Err:522
668.51 Err:522
668.51 Err:522
668.51 Err:522
668.51 Err:522
668.51 Err:522
668.51 Err:522
668.51 Err:522
668.51 Err:522
as en el punto al Carga
NAL del tramo DIsponible
Terreno m
668.51 #N/A
668.51 Err:522
668.51 #N/A
668.51 Err:522
668.51 Err:522
0.00 0.00
658.97 Err:522
657.25 Err:522
0.00 0.00
656.94 Err:522
0.00 0.00
652.60 Err:522
652.13 Err:522
0.00 0.00
655.69 Err:522
0.00 0.00
654.64 Err:522
645.95 Err:522
0.00 0.00
654.69 Err:522
0.00 0.00
656.74 Err:522
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
as en el punto al Carga
NAL del tramo DIsponible
Terreno m
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Página 25 c:\deproy\octavio\404421049.xls\Tablas
4" 102 114.30 6.02 102.26
100.00
Página 26 c:\deproy\octavio\404421049.xls\Tablas