PTT 458 Quality Assurance And Control in Chemical Engineering

Semester 1, Academic Session 2018/2019


Assignment 2
Name:_______________________________________________________
Matric number:________________________________________________

1. Examine a double sampling plan with AQL is 4%, inspection level II, and lot size is 2000
garments. [10 marks]

2. Examine a single sampling plan with AQL is 0.4%, inspection level I, and lot size is 9000. [10
marks]

3. Examine a double sampling plan with AQL is 1%, inspection level II, and lot size is 2000 [10
marks]

4. A single-sampling plan with n = 80 and c = 2 is being used for receiving inspection. Rejected
lot is screened, and all nonconforming items are reworked and returned to the lot. Develop the
operating characteristic (OC) curve for this inspection system.
(10 marks)

5. Suppose that a product is shipped in lots of size N = 5000. The receiving inspection procedure
used is single sampling with n = 50 and c =1. Draw the OC curve for the plan.
(10 Marks)

6. Consider the single sampling plan found in Q5. The receiving inspection procedure was
rescheduled with n = 150 and c =3. Redraw the OC curve for both plan. Discuss the difference
between plan in Q5 and Q6. Estimate the consumer risk (β) for both sampling plan Q5 and Q6.
(20 Marks)

7. Predict the system reliability shown below.

[20 marks]

8. A 75W light bulb has a mean life of 800 hr with a standard deviation of 40 hr. Calculate the
reliability at 840 hr.
[10 marks]