Anda di halaman 1dari 1

BILL OF QUANTITY ( BQ )

KEGIATAN : APBD KABUPATEN BANGKA BARAT TAHUN ANGGARAN 2017


PEKERJAAN : SID JARINGAN IRIGASI D.I TEBING BULIN (180 HA)
LOKASI : KEC. KELAPA KABUPATEN BANGKA BARAT
WAKTU PELAKSANAAN : 1,5 ( SATU KOMA LIMA ) BULAN

I. BIAYA LANGSUNG PERSONIL

KETERANGAN BIAYA
JUMLAH
NO KEGIATAN/SUB KEGIATAN/JENIS JUMLAH JUMLAH SATUAN
SATUAN
PERSONIL WAKTU (Rp.) (Rp.)
A. BIAYA TENAGA AHLI

1 AHLI PERENCANAAN SUMBER DAYA AIR / TEAM LEADER ORANG/BULAN 1 1,5 -


2 AHLI PERENCANAAN SUMBER DAYA AIR ORANG/BULAN 1 1,5
3 AHLI IRIGASI ORANG/BULAN 2 1,5 -
4 AHLI GEODESI ORANG/BULAN 1 1,5 -
5 AHLI HIDROLOGI ORANG/BULAN 1 1,5
6 AHLI GEOTEKNIK ORANG/BULAN 1 1
7 AHLI COST ESTIMATE ORANG/BULAN 1 1
Sub Total A -
B. BIAYA TENAGA PENDUKUNG

1 OPERATOR KOMPUTER/DRAFTER ORANG/BULAN 1 1 -


2 TENAGA ADMINISTRASI ORANG/BULAN 1 1 -
3 SURVEYOR ORANG/BULAN 4 1 -
Sub Total B -
JUMLAH I -

II. BIAYA LANGSUNG NON PERSONIL

KETERANGAN HARGA
JUMLAH JUMLAH
NO KEGIATAN/SUB KEGIATAN/JENIS JUMLAH SATUAN
SATUAN NON
WAKTU
PERSONIL (Rp.) (Rp.)
A. BIAYA SEWA PERALATAN, ATK, KOMUNIKASI DAN MOBILISASI

1 SEWA PRINTER
- PRINTER A3 UNIT/BULAN 1 1 -
- PRINTER A4 UNIT/BULAN 1 1,5 -
2 BIAYA ALAT TULIS KANTOR / ATK PAKET/BULAN 1 1 -
3 BIAYA KOMUNIKASI PAKET/BULAN 1
4 SEWA KENDARAAN RODA 2 UNIT/BULAN 1
5 SEWA KENDARAAN RODA 4 UNIT/BULAN 1
Sub Total A -
B. BIAYA PELAPORAN

1 BIAYA BUKU GAMBAR PERENCANAAN ( A3 ) BUKU 3 1 -


2 BIAYA BUKU GAMBAR PERENCANAAN ( A1 ) BUKU 3 1 -
3 BIAYA CETAK BIRU (A1) BUKU 3
4 LAPORAN PENDAHULUAN BUKU 3 1 -
5 LAPORAN AKHIR BUKU 5 1 -
6 LAPORAN COST ESTIMATE DAN SPESIFIKASI TEKNIS BUKU 5 1 -
7 BIAYA SEMINAR / PRESENTASI PERTEMUAN 2 1 -
8 PENGGANDAAN : SHOFT COPY CD BUAH 5 1 -
9 PENGGANDAAN DI HARD DISK BUAH 1
Sub Total B -
C. BIAYA SURVEY DAN KOORDINASI
1 BIAYA KOORDINASI DENGAN PENGAWAS TEKNIS LS 1
2 BIAYA SURVEY PENGUKURAN LAPANGAN LS 1 1 -
3 ALAT TULIS LAPANGAN LS 1 1 -

Sub Total C -
JUMLAH II -