SQEMS
documentation key operations - Cargo operation 1 3
Document: Release:
LOADING OPERATION
3 Sea chests and over-board discharge valves are fully closed and locked
4 Communication link between deck/control room and control room/shore is set up and
working properly
5 Loading procedures and emergency shut down are discussed and agreed with terminal
6 Check if any oil slicks already present in the water near the ship, same recorded and reported
14 Pump room bulk head and other valves are closed (Not applicable for chemical tankers)
17 Enforcement of no smoking regulations and use of no naked lights are effectively announced
Document: Release:
2 Lines, valves, level of all tanks are frequently checked for leakage and correct set up
6 Pump room and bilges frequently checked (Not applicable for chemical tankers)
15 Enough space left after completion to allow for draining or blowing hoses or loading arms