BUILDING AND EXTERNAL WORKS (INCLUSIVE OF ALL PRIME COST AND PROVISIONAL
SUM) FOR CADANGAN PEMBANGUNAN HOSPITAL SWASTA (500 KATIL) BAGI FASA 1 (250
KATIL) YANG TERDIRI DARIPADA BLOK HOSPITAL 8 TINGKAT (SAYAP A) DENGAN PODIUM
TEMPAT LETAK KERETA, BLOK PERKHIDMATAN SOKONGAN M&E 2 TINGKAT, BLOK
KEDIAMAN KAKITANGAN HOSPITAL 5 TINGKAT, BLOK PERUBATAN SAMPINGAN 5
TINGKAT DAN 3 BUAH PONDOK PENGAWAL DI ATAS SEBAHAGIAN LOT PT 1493, MUKIM
KAMPAR, DAERAH KAMPAR, PERAK DARUL RIDZUAN UNTUK TETUAN UTAR EDUCATION
FOUNDATION.
- Technical Query No. 7.
Above captioned is referred.
We herewith enclosed the Technical Query No. 7, for your perusal and response.
Your earliest reply to the above is highly appreciated.
Thank you.
Yours faithfully,
for and on behalf of
IREKA ENGINEERING & CONSTRUCTION SDN BHD
‘ )
DAY
‘FONG KIAN MON
Manager, Quantity Surveying
enc!
= 2
Ineka Engineering & Construction Sdn Bhd 1 18, Wisma Mont” Kiara, No.1, jaan Kiara, Mon
0 Malaysia T +603.64116388 F +603.5611.6383 |W www.iraka commyTender Query No.: 07
Tenderer Ireka Engineering & Construction Sdn Bhd
TTEM | DESCRIPTION
‘QUERY
as
1 | Tower Crane
2 | Batching Plant
3 Sitttrap
‘We envisage that the tower crane shall be supported by ples, Has the Piling Contract
Package allowed for this? If allowed, please give locations, sizes and capacity of piles.
Kindly advise whether the batching plant set up is allowed within the UTAR campus,
|compound and itis free of land charge,
Kindly provide detail drawing: P561/C&S/ESCP/STDIO( as described in BO.
wnJURU KOS,
BILL 9.1 TEMPORARY WORKS
LT
Employer in nt
Practical Cor worl im
D> |Generally
tem
Item
Item] -
Item
Item Description unit | ty Rate Amount
Lt 9.3 TE WORKS (Cont'd:
TEMPORARY WORKS (Cont'd)
TOTAL CARRIED TO COLLECTION|
UTAR EDUCATION FOUNDATION
BILL 9 INFRASTRUCTURE WORKS (INSIDE
BOUNDARY) one