Jumlah A 840,000
B. PEKERJAAN INSTALASI PIPA
B.1 Instalasi pipa power 3", AW 20 m' 130,940 2,618,794
B.2 Tutup paralon 3" 1 bh 8,510 8,510
B.3 Instalasi Pipa PVC 3/4" 28 m' 30,452 852,653
B.4 Tusen klep 1 bh 51,510 51,510
B.5 Shock drat 1 bh 6,510 6,510
B.6 Water mor 3/4" 2 bh 11,010 22,020
B.7 Knee 3/4" 6 bh 6,510 39,060
B.8 Shock 3/4" 5 bh 6,510 32,550
B.9 Lem paralon 2 bh 17,500 35,000
B.10 Seal tape 2 bh 5,000 10,000
B.11 Mesin pompa air semi jet pump shimizu jet 108 bit 1 bh 719,250 719,250
Jumlah B 4,395,857
Jumlah A+B 5,235,857
Dibulatkan Rp5,235,800
TABEL XII.1
Harga Sat.
No. Uraian Jenis pekerjaan Sat. Koeff. Bahan / Upah / Alat
Rp.
1 2 3 4 5
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 1 M' PIPA PVC MASPION ABU DIAMETER 1"
Pipa PVC maspion abu diameter 1" (AW) bt 0.167 Rp30,000.00
Perlengkapan (35% x harga pipa) lot 1.000 Rp10,500.00
Tukang batu Oh 0.060 Rp48,000.00
Kepala tukang batu Oh 0.006 Rp52,000.00
Pekerja Oh 0.036 Rp38,000.00
Mandor Oh 0.002 Rp60,000.00
Jumlah
XII.2 1 M' PIPA PVC MASPION ABU DIAMETER 3"
Pipa PVC maspion abu diameter 3" (AW) bt 0.167 Rp231,120.00
Perlengkapan (35% x harga pipa) lot 1.000 Rp80,892.00
Tukang batu Oh 0.060 Rp120,000.00
Kepala tukang batu Oh 0.006 Rp135,000.00
Pekerja Oh 0.036 Rp90,000.00
Mandor Oh 0.002 Rp150,000.00
Jumlah
XII.3 1 M' PIPA PVC MASPION ABU DIAMETER 4"
Pipa PVC maspion abu diameter 4" (AW) bt 0.167 Rp235,000.00
Perlengkapan (35% x harga pipa) lot 1.000 Rp82,250.00
Tukang batu Oh 0.060 Rp48,000.00
Kepala tukang batu Oh 0.006 Rp52,000.00
Pekerja Oh 0.036 Rp38,000.00
Mandor Oh 0.002 Rp60,000.00
Jumlah
XII.4 1 BUAH BAK MANDI FIBERGLASS 60 x 60
Bak fiberglass bh 1.000 Rp95,000.00
Perlengkapan (35% x harga pipa) lot 1.000 Rp33,250.00
Tukang batu Oh 2.700 Rp48,000.00
Kepala tukang batu Oh 0.540 Rp52,000.00
Pekerja Oh 1.800 Rp38,000.00
Mandor Oh 0.110 Rp60,000.00
Jumlah
XII.5 1 BUAH BATHTUBE
Bathtube standard bh 1.000 Rp2,745,000.00
Perlengkapan (35% x harga pipa) lot 1.000 Rp960,750.00
Tukang batu Oh 2.700 Rp48,000.00
Kepala tukang batu Oh 0.540 Rp52,000.00
Pekerja Oh 1.800 Rp38,000.00
Mandor Oh 0.110 Rp60,000.00
Jumlah
XII.6 1 BUAH KERAN
Kran stainless lokal kait bh 1.000 Rp22,000.00
Perlengkapan (6% x harga pipa) lot 1.000 Rp1,320.00
Pekerja Oh 0.040 Rp38,000.00
Mandor Oh 0.040 Rp60,000.00
Jumlah
XII.7 1 KLOSET DUDUK
Kloset duduk warna standard TOTO C 240 lengkap bh 1.000 Rp2,050,000.00
Perlengkapan (6% x harga pipa) lot 1.000 Rp123,000.00
Tukang batu Oh 1.100 Rp48,000.00
Kepala tukang batu Oh 0.010 Rp52,000.00
Pekerja Oh 3.300 Rp38,000.00
Mandor Oh 0.160 Rp60,000.00
Jumlah
XII.8 1 KITCHEN ZINK STAINLESS 2 LUBANG
Kitchen zink stainless 2 lubang bh 1.000 Rp425,000.00
Perlengkapan (612% x harga pipa) lot 1.000 Rp51,000.00
Tukang batu Oh 1.100 Rp48,000.00
Kepala tukang batu Oh 0.010 Rp52,000.00
Pekerja Oh 3.300 Rp38,000.00
Mandor Oh 0.160 Rp60,000.00
Jumlah
XII.9 1 UNIT SEPTICTANK 2 X 1,5 X 1,5 M + REMBESANNYA (KANTOR TYPE KECIL)
Galian tanah M3 4.500 Rp36,900.00
Pasir urug M3 0.214 Rp50,000.00
Lantai kerja t = 10 cm M2 2.250 Rp57,084.53
Pas. Bata 1 PC : 2 PS + plesteran M2 15.000 Rp71,656.00
Plat beton penutup dan balok M3 0.300 Rp8,591,412.59
Pipa PVC 4" jenis AW + sambungan M1 5.400 Rp40,000.00
Pipa GIP 1 1/2" btg 1.200 Rp294,000.00
Galian tanah untuk rembesan M3 3.375 Rp36,900.00
Pas.ijuk Kg 5.400 Rp7,000.00
Urugan kerikil 3,5 cm M3 1.050 Rp36,500.00
Pipa PVC 4" berlobang jenis AW M1 9.000 Rp58,750.00
Urugan kembali perataan tanah M3 1.125 Rp9,998.00
Pekerja Oh 7.078 Rp38,000.00
Tukang batu Oh 3.000 Rp48,000.00
Kepala tukang batu Oh 0.800 Rp52,000.00
Mandor Oh 0.500 Rp60,000.00
Jumlah
XII.10 1 BUAH MESIN POMPA
Mesin pompa air semi jet pump shimizu jet 108 bit bh 1.000 Rp678,000.00
Pekerja Oh 0.250 Rp90,000.00
Mandor Oh 0.125 Rp150,000.00
Jumlah
TABEL XII.1
Rp5,001.00 - -
- - Rp10,500.00
- Rp2,880.00 -
- Rp312.00 -
- Rp1,368.00 -
- Rp108.00 -
Rp5,001.00 Rp4,668.00 Rp10,500.00 Rp20,169.00
Rp38,527.70 - -
- - Rp80,892.00
- Rp7,200.00 -
- Rp810.00 -
- Rp3,240.00 -
- Rp270.00 -
Rp38,527.70 Rp11,520.00 Rp80,892.00 Rp130,939.70
Rp39,174.50 - -
- - Rp82,250.00
- Rp2,880.00 -
- Rp312.00 -
- Rp1,368.00 -
- Rp108.00 -
Rp39,174.50 Rp4,668.00 Rp82,250.00 Rp126,092.50
Rp95,000.00 - -
- - Rp33,250.00
- Rp129,600.00 -
- Rp28,080.00 -
- Rp68,400.00 -
- Rp6,600.00 -
Rp95,000.00 Rp232,680.00 Rp33,250.00 Rp360,930.00
Rp2,745,000.00 - -
- - Rp960,750.00
- Rp129,600.00 -
- Rp28,080.00 -
- Rp68,400.00 -
- Rp6,600.00 -
Rp2,745,000.00 Rp232,680.00 Rp960,750.00 Rp3,938,430.00
Rp22,000.00 - -
- - Rp1,320.00
- Rp1,520.00 -
- Rp2,400.00 -
Rp22,000.00 Rp3,920.00 Rp1,320.00 Rp27,240.00
Rp2,050,000.00 - -
- - Rp123,000.00
- Rp52,800.00 -
- Rp520.00 -
- Rp125,400.00 -
- Rp9,600.00 -
Rp2,050,000.00 Rp188,320.00 Rp123,000.00 Rp2,361,320.00
Rp425,000.00 - -
- - Rp51,000.00
- Rp52,800.00 -
- Rp520.00 -
- Rp125,400.00 -
- Rp9,600.00 -
Rp425,000.00 Rp188,320.00 Rp51,000.00 Rp664,320.00
(KANTOR TYPE KECIL)
Rp166,050.00 - -
Rp10,710.00 - -
Rp128,440.19 - -
Rp1,074,840.00 - -
Rp2,577,423.78 - -
Rp216,000.00 - -
Rp352,800.00 - -
Rp124,537.50 - -
Rp37,800.00 - -
Rp38,325.00 - -
Rp528,750.00 - -
Rp11,247.75 - -
- Rp268,957.03
- Rp144,000.00
- Rp41,600.00
- Rp30,000.00 -
Rp5,266,924.22 Rp484,557.03 Rp0.00 Rp5,751,481.25
Rp678,000.00 - -
- Rp22,500.00 -
- Rp18,750.00 -
Rp678,000.00 Rp41,250.00 Rp0.00 Rp719,250.00
TABEL XII.3
Koeff. Koeff.
No. Uraian Jenis pekerjaan Sat. Volume Sat
(Awal) (Akhir)
1 2 3 4 5 6 7
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Tukang batu Oh 0.0600 0.0540 20.000 m'
Kepala tukang batu Oh 0.0060 0.0054 20.000 m'
Pekerja Oh 0.0360 0.0324 20.000 m'
Mandor Oh 0.0018 0.0016 20.000 m'
Jumlah
XII.2 Pipa PVC 3''
Tukang batu Oh 0.0600 0.0540 1.000 m'
Kepala tukang batu Oh 0.0060 0.0054 1.000 m'
Pekerja Oh 0.0360 0.0324 1.000 m'
Mandor Oh 0.0018 0.0016 1.000 m'
Jumlah
XII.3 Pipa PVC 4"
Tukang batu Oh 0.0600 0.0540 28.000 m'
Kepala tukang batu Oh 0.0060 0.0054 28.000 m'
Pekerja Oh 0.0360 0.0324 28.000 m'
Mandor Oh 0.0018 0.0016 28.000 m'
Jumlah
XII.4 Bak
Tukang batu Oh 2.7000 2.4300 1.000 bh
Kepala tukang batu Oh 0.5400 0.4860 1.000 bh
Pekerja Oh 1.8000 1.6200 1.000 bh
Mandor Oh 0.1100 0.0990 1.000 bh
Jumlah
XII.5 Bathtub
Tukang batu Oh 2.7000 2.4300 1.000 bh
Kepala tukang batu Oh 0.5400 0.4860 1.000 bh
Pekerja Oh 1.8000 1.6200 1.000 bh
Mandor Oh 0.1100 0.0990 1.000 bh
Jumlah
XII.6 Keran
Pekerja Oh 0.0400 0.0360 2.000 bh
Mandor Oh 0.0400 0.0360 2.000 bh
Jumlah
XII.7 Kloset Duduk
Tukang batu Oh 1.1000 0.9900 6.000 bh
Kepala tukang batu Oh 0.0100 0.0090 6.000 bh
Pekerja Oh 3.3000 2.9700 6.000 bh
Mandor Oh 0.1600 0.1440 6.000 bh
Jumlah
XII.8 Kitchen zink stainless 2 lobang
Tukang batu Oh 1.1000 0.9900 5.000 bh
Kepala tukang batu Oh 0.0100 0.0090 5.000 bh
Pekerja Oh 3.3000 2.9700 5.000 bh
Mandor Oh 0.1600 0.1440 5.000 bh
Jumlah
XII.9 Septictank
Pekerja Oh 7.078 6.3700 2.000 unit
Tukang batu Oh 3.000 2.7000 2.000 unit
Kepala tukang batu Oh 0.800 0.7200 2.000 unit
Mandor Oh 0.500 0.4500 2.000 unit
Jumlah
XII.10 Pompa Zet Pump
Pekerja Oh 0.2500 0.2250 2.000 unit
Mandor Oh 0.1250 0.1125 2.000 unit
Jumlah
TABEL XII.3
8=5x6
SI
1.080
0.108
0.648
0.032
1.868
0.054
0.005
0.032
0.002
0.093
1.512
0.151
0.907
0.045
2.616
2.430
0.486
1.620
0.099
4.635
2.430
0.486
1.620
0.099
4.635
0.072
0.072
0.144
5.940
0.054
17.820
0.864
24.678
4.950
0.045
14.850
0.720
20.565
12.740
5.400
1.440
0.900
20.480
0.450
0.225
0.675
TABEL XII.4
0.540
0.054
0.324 10.000 m'
0.016
0.027
0.003
0.016 0.500 bh
0.001
0.756
0.076
14.000 m'
0.454
0.023
1.215
0.243
0.810 0.500 bh
0.050
0.810
0.162
0.540 0.333 bh
0.033
0.072
0.072 2.000 bh
2.970
0.027
8.910 3.000 bh
0.432
4.950
0.045
14.850 5.000 bh
0.720
6.370
2.700
Err:509 unit
0.720
0.450
0.450
0.225 Err:509 Err:509
TABEL XII.5
No. Uraian Jenis pekerjaan Sat. Koeff. Volume Sat Kebutuhan Bahan
1 2 3 4 5 6 7=5x4
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Pipa PVC maspion abu diameter 1" (AW) bt 0.1667 Err:509 m' Err:509
XII.4 Bak
Bak fiberglass bh 1.0000 Err:509 Err:509 Err:509
XII.5 Bathtub
Bathtube standard bh 1.0000 Err:509 Err:509 Err:509
XII.6 Keran
Kran stainless lokal kait bh 1.0000 Err:509 Err:509 Err:509
XII.9 Septictank
Galian tanah M3 4.5000 Err:509 Err:509 Err:509
Pasir urug M3 0.2142 Err:509 Err:509 Err:509
Lantai kerja t = 10 cm M2 2.2500 Err:509 Err:509 Err:509
Pas. Bata 1 PC : 2 PS + plesteran M2 15.0000 Err:509 Err:509 Err:509
Plat beton penutup dan balok M3 0.3000 Err:509 Err:509 Err:509
Pipa PVC 4" jenis AW + sambungan M1 5.4000 Err:509 Err:509 Err:509
Pipa GIP 1 1/2" btg 1.2000 Err:509 Err:509 Err:509
Galian tanah untuk rembesan M3 3.3750 Err:509 Err:509 Err:509
Pas.ijuk Kg 5.4000 Err:509 Err:509 Err:509
Urugan kerikil 3,5 cm M3 1.0500 Err:509 Err:509 Err:509
Pipa PVC 4" berlobang jenis AW M1 9.0000 Err:509 Err:509 Err:509
Urugan kembali perataan tanah M3 1.1250 Err:509 Err:509 Err:509
7 8 9 10 11 12 13 14
REKAPITULASI UPAH TENAGA KERJA PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR
No. Jenis Pekerja Sat Jumlah Pekerja Sat Harga Satuan RAB Upah Jumlah
Upah Pekerja/Hari
1 Pekerja Oh 50.760 Oh Rp38,000 Rp1,928,867 5.640
2 Tukang batu Oh 23.796 Oh Rp48,000 Rp1,142,208 2.644
3 Kepala tukang batu Oh 2.776 Oh Rp52,000 Rp144,331 0.308
4 Mandor Oh 3.058 Oh Rp60,000 Rp183,503 0.340
Jumlah Rp3,398,909 Jumlah
No. Jenis Bahan Sat Jumlah Bahan Sat Harga Satuan RAB Bahan Jumlah
Bahan Bahan/Hari
1 Pipa PVC maspion abu diameter 1" (AW) bt Err:509 bt Rp30,000 Err:509 Err:509
2 Pipa PVC maspion abu diameter 3" (AW) bt Err:509 bt Rp231,120 Err:509 Err:509
3 Pipa PVC maspion abu diameter 4" (AW) bt Err:509 bt Rp235,000 Err:509 Err:509
4 Bak fiberglass bh Err:509 bh Rp95,000 Err:509 Err:509
5 Bathtube standard bh Err:509 bh Rp2,745,000 Err:509 Err:509
6 Kran stainless lokal kait bh Err:509 bh Rp22,000 Err:509 Err:509
7 Kloset duduk warna standard TOTO C 240 lengkap bh Err:509 bh Rp2,050,000 Err:509 Err:509
8 Kitchen zink stainless 2 lubang bh Err:509 bh Rp425,000 Err:509 Err:509
9 Galian tanah M3 Err:509 M3 Rp36,900 Err:509 Err:509
10 Pasir urug M3 Err:509 M3 Rp50,000 Err:509 Err:509
11 Lantai kerja t = 10 cm M2 Err:509 M2 Rp57,085 Err:509 Err:509
12 Pas. Bata 1 PC : 2 PS + plesteran M2 Err:509 M2 Rp71,656 Err:509 Err:509
13 Plat beton penutup dan balok M3 Err:509 M3 Rp8,591,413 Err:509 Err:509
14 Pipa PVC 4" jenis AW + sambungan M1 Err:509 M1 Rp40,000 Err:509 Err:509
15 Pipa GIP 1 1/2" btg Err:509 btg Rp294,000 Err:509 Err:509
16 Galian tanah untuk rembesan M3 Err:509 M3 Rp36,900 Err:509 Err:509
17 Pas.ijuk Kg Err:509 Kg Rp7,000 Err:509 Err:509
18 Urugan kerikil 3,5 cm M3 Err:509 M3 Rp36,500 Err:509 Err:509
19 Pipa PVC 4" berlobang jenis AW M1 Err:509 M1 Rp58,750 Err:509 Err:509
20 Urugan kembali perataan tanah M3 Err:509 M3 Rp9,998 Err:509 Err:509
21 Mesin pompa air semi jet pump shimizu jet 108 bit bh Err:509 bh Rp678,000 Err:509 Err:509
Jumlah Err:509 Jumlah
Biaya
Upah/Hari
Rp214,319
Rp126,912
Rp16,037
Rp20,389
Rp377,657
Biaya
Bahan/Hari
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
RAB BAHAN PEKERJAAN INSTALASI AIR DAN SANITASI
Biaya
Bahan/Hari
Rp33,578
Rp171,249
Rp335,781
Rp40,714
Rp784,286
Rp18,857
Rp1,171,429
Rp60,714
Rp23,721
Rp1,530
Rp18,349
Rp153,549
Rp368,203
Rp30,857
Rp50,400
Rp17,791
Rp5,400
Rp5,475
Rp75,536
Rp1,607
Rp692,857
Rp4,061,883
KEBUTUHAN TENAGA KERJA
Koeff. Koeff.
No. Uraian Jenis pekerjaan Sat. Volume Sat
(Awal) (Akhir)
1 2 3 4 5 6 7
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Tukang batu Oh 0.0600 0.0540 47.000 m'
Kepala tukang batu Oh 0.0060 0.0054 47.000 m'
Pekerja Oh 0.0360 0.0324 47.000 m'
Mandor Oh 0.0018 0.0016 47.000 m'
Jumlah
XII.2 Pipa PVC 3''
Tukang batu Oh 0.0600 0.0540 47.000 m'
Kepala tukang batu Oh 0.0060 0.0054 47.000 m'
Pekerja Oh 0.0360 0.0324 47.000 m'
Mandor Oh 0.0018 0.0016 47.000 m'
Jumlah
XII.3 Pipa PVC 4"
Tukang batu Oh 0.0600 0.0540 60.000 m'
Kepala tukang batu Oh 0.0060 0.0054 60.000 m'
Pekerja Oh 0.0360 0.0324 60.000 m'
Mandor Oh 0.0018 0.0016 60.000 m'
Jumlah
XII.4 Bak
Tukang batu Oh 2.7000 2.4300 3.000 bh
Kepala tukang batu Oh 0.5400 0.4860 3.000 bh
Pekerja Oh 1.8000 1.6200 3.000 bh
Mandor Oh 0.1100 0.0990 3.000 bh
Jumlah
XII.5 Bathtub
Tukang batu Oh 2.7000 2.4300 2.000 bh
Kepala tukang batu Oh 0.5400 0.4860 2.000 bh
Pekerja Oh 1.8000 1.6200 2.000 bh
Mandor Oh 0.1100 0.0990 2.000 bh
Jumlah
XII.6 Keran
Pekerja Oh 0.0400 0.0360 6.000 bh
Mandor Oh 0.0400 0.0360 6.000 bh
Jumlah
XII.7 Kloset Duduk
Tukang batu Oh 1.1000 0.9900 4.000 bh
Kepala tukang batu Oh 0.0100 0.0090 4.000 bh
Pekerja Oh 3.3000 2.9700 4.000 bh
Mandor Oh 0.1600 0.1440 4.000 bh
Jumlah
XII.8 Kitchen zink stainless 2 lobang
Tukang batu Oh 1.1000 0.9900 1.000 bh
Kepala tukang batu Oh 0.0100 0.0090 1.000 bh
Pekerja Oh 3.3000 2.9700 1.000 bh
Mandor Oh 0.1600 0.1440 1.000 bh
Jumlah
XII.9 Septictank
Pekerja Oh 7.078 6.3700 1.000 unit
Tukang batu Oh 3.000 2.7000 1.000 unit
Kepala tukang batu Oh 0.800 0.7200 1.000 unit
Mandor Oh 0.500 0.4500 1.000 unit
Jumlah
XII.10 Pompa Zet Pump
Pekerja Oh 0.2500 0.2250 1.000 unit
Mandor Oh 0.1250 0.1125 1.000 unit
Jumlah
1 2 3 4 5 6 7=5x4
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Pipa PVC maspion abu diameter 1" (AW) bt 0.1667 47.00 m' 7.835
XII.4 Bak
Bak fiberglass bh 1.0000 3.00 bh 3.000
XII.5 Bathtub
Bathtube standard bh 1.0000 2.00 bh 2.000
XII.6 Keran
Kran stainless lokal kait bh 1.0000 6.00 bh 6.000
XII.9 Septictank
Galian tanah M3 4.5000 1.00 unit 4.500
Pasir urug M3 0.2142 1.00 unit 0.214
Lantai kerja t = 10 cm M2 2.2500 1.00 unit 2.250
Pas. Bata 1 PC : 2 PS + plesteran M2 15.0000 1.00 unit 15.000
Plat beton penutup dan balok M3 0.3000 1.00 unit 0.300
Pipa PVC 4" jenis AW + sambungan M1 5.4000 1.00 unit 5.400
Pipa GIP 1 1/2" btg 1.2000 1.00 unit 1.200
Galian tanah untuk rembesan M3 3.3750 1.00 unit 3.375
Pas.ijuk Kg 5.4000 1.00 unit 5.400
Urugan kerikil 3,5 cm M3 1.0500 1.00 unit 1.050
Pipa PVC 4" berlobang jenis AW M1 9.0000 1.00 unit 9.000
Urugan kembali perataan tanah M3 1.1250 1.00 unit 1.125
7 8 9 10 11 12 13 14
1.269
0.127
47 m' 0.761 23.500 m'
0.038
1.269
0.127
47 m' 0.761 23.500 m'
0.038
1.620
0.162
60 m' 30.000 m'
0.972
0.049
3.645
0.729
3 bh 2.430 1.500 bh
0.149
1.620
0.324
2 bh 1.080 0.667 bh
0.066
0.216
6 bh 0.216 6.000 bh
1.980
0.018
4.000 bh 5.940 2.000 bh
0.288
4.000 bh 2.000 bh
0.990
0.009
1 bh 2.970 1.000 bh
0.144
3.185
1.350
1.000 unit 0.500 unit
0.360
0.225
0.225
1.000 unit 0.113 1.000 unit